CN108011358B - A kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness - Google Patents

A kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness Download PDF

Info

Publication number
CN108011358B
CN108011358B CN201711160736.5A CN201711160736A CN108011358B CN 108011358 B CN108011358 B CN 108011358B CN 201711160736 A CN201711160736 A CN 201711160736A CN 108011358 B CN108011358 B CN 108011358B
Authority
CN
China
Prior art keywords
fault
equipment
switch
information
situation awareness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711160736.5A
Other languages
Chinese (zh)
Other versions
CN108011358A (en
Inventor
郭文鑫
都海坤
卢建刚
李波
徐展强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd filed Critical Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority to CN201711160736.5A priority Critical patent/CN108011358B/en
Publication of CN108011358A publication Critical patent/CN108011358A/en
Application granted granted Critical
Publication of CN108011358B publication Critical patent/CN108011358B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/261Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
    • H02H7/262Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations involving transmissions of switching or blocking orders
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/06Details with automatic reconnection
    • H02H3/066Reconnection being a consequence of eliminating the fault which caused disconnection
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/06Details with automatic reconnection
    • H02H3/07Details with automatic reconnection and with permanent disconnection after a predetermined number of reconnection cycles
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/261Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
    • H02H7/263Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations involving transmissions of measured values
    • H02J13/0017
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The power distribution network multinode intelligent fault diagnosis method based on Situation Awareness that the invention discloses a kind of, the following steps are included: being primarily based on the static failure diagnosis that Situation Awareness carries out each node device of power distribution network, by obtaining electrical network basic data from electric system, the verifying of comprehensive descision fault message determines result;It is then based on Situation Awareness and carries out fault moment equipment state variation diagnostic, multinode faulty equipment is recruited immediately and surveys fault moment electric current calculating jump information, state change is analyzed, correctness verification is carried out to single equipment fault diagnosis;Finally based on relationship between Situation Awareness comprehensive analysis Distribution Network Equipment failure, event correlation diagnosis is carried out to each node failure according to power network topology, merges relevant fault, accuracy is mutually verified by upstream and downstream equipment fault.

Description

A kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness
Technical field
The present invention relates to the fault diagnosis fields of electric system, more particularly, to a kind of distribution based on Situation Awareness Net multinode intelligent fault diagnosis method.
Background technique
With the raising of Distribution Network Equipment equipment and the development and application of monitoring automation technology, power distribution network access is big The automation equipments such as FTU, DTU, fault detector are measured, in addition major network bus, substation's outlet switch and metering automation system The information content of the equipment such as transformer terminals under unified central planning, access electrical power distribution automatization system main website increases severely therewith.The main website of mainstream generally deposits at present The problem of be that collected equipment operating data is all shown in chronological order, not plus effectively layering or judgement processing, and Alarm window is pushed in a discrete fashion, once accident occurs, will generate a large amount of related warning information.This traditional matches Power grid alarm, contains much information, information type is complicated, without analysis ratiocination process, and dispatcher is difficult to analyze current power distribution network operation The critical event of middle generation, to affect accident treatment efficiency.
The advanced application of part main website can protection act based on single automation equipment and switch changed position information realization open The tripping of pass diagnoses, but its major defect is: 1) since current electrical secondary system signal is delayed or reports by mistake, especially metering is automatic The alarm signal problem of the distribution transformer terminals of change system, causes fault diagnosis mistaken diagnosis higher;2) it cannot handle caused by single failure The cascade alarm of substation's outlet switch, branched breaker, branch line on-load switch, fault of branch line indicator, distribution transformer terminals.
Summary of the invention
Present invention aim to address above-mentioned one or more deficiencies, propose a kind of power distribution network more piece based on Situation Awareness Point failure intelligent diagnosing method.
To realize the above goal of the invention, the technical solution adopted is that:
A kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness, comprising the following steps:
S1: the static failure diagnosis of each node device of power distribution network is carried out based on Situation Awareness, by obtaining from electric system Electrical network basic data, the verifying of comprehensive descision fault message determine result;
S2: fault moment equipment state variation diagnostic is carried out based on Situation Awareness, survey is recruited immediately to multinode faulty equipment Fault moment electric current calculates jump information, analyzes state change, carries out correctness verification to single equipment fault diagnosis;
S3: based on relationship between Situation Awareness comprehensive analysis Distribution Network Equipment failure, according to power network topology to each node failure Event correlation diagnosis is carried out, merges relevant fault, accuracy is mutually verified by upstream and downstream equipment fault.
Electric system described in step S1 includes EMS system, DMS system, metering automation system, generalized information system.
Electrical network basic data described in step S1 includes that electric network model information, equipment digital & analog signal information, power grid mode are converted Business information;
Wherein electric network model packet enclosed tool control area, outlet switch, fault detector, distribution power transformation device, plant area, feeder line, On-load switch, measurement, interval, branch line, breaker, topology;
Equipment digital & analog signal information includes switch state, protection signal, device current;
Power grid mode transformation service information temporarily turns including information listed in station, distribution scheduled outage information, distribution for letter Breath.
Each node device static failure of power distribution network described in step S1, which diagnoses, includes:
1) no-voltage of entire station, bus loss of pressure directly acquire EMS main website judgement decompression telegram in reply result;
2) substation's outlet switch, feeder line do/branched breaker acquisition EMS, DMS main website protection act, switch changed position letter Number carry out instantaneous/permanent fault diagnosis.Protection act mainly has zero sequence movement, quick-break movement, overcurrent movement, landing operation, guarantor Shield acts, accident is total etc., and switch changed position information is reclosing, separating brake, switching signal.Protection act is diagnosed as fault type, Switch changed position information is used as fail result analysis, and output protection acts class permanent fault if only sub-gate signal, if there is coincidence Lock, a separating brake, the primary then output protection that closes a floodgate act successful reclosing class transient fault, if having reclosing, twice separating brake, primary The then output protection that closes a floodgate acts unsuccessful reclosing class permanent fault.Transient fault recruits survey switch state to should be combined floodgate, permanent event Barrier recruits survey switch state to should be separating brake;
3) feeder line it is dry/branch line on-load switch obtain DMS main website separating brake, combined floodgate and block signal carry out point, close, failure every From diagnosis;
4) fault detector obtains DMS main station failure type and carries out fault actions diagnosis;
5) distribution transforming acquisition metering automation system stops extensive electric phase shortage alarm progress decompression, phase shortage telegram in reply diagnoses.
Step S2 the following steps are included:
S2.1: continuously taking 5 minutes real-time three-phase current curves before and after fault moment, calculates every 10 seconds each phase currents in front and back Hop rate;Wherein
Maximum value in 30 hop rates is taken, is diagnosed as device current jump, electricity respectively if more than 20% or equal to 100% Stream zero, is otherwise diagnosed as no jump;
S2.2: it examines and cannot pass through by verification, or without jump if faulty equipment is diagnosed as electric current zero.
Step S3 the following steps are included:
S3.1: switch fault state is automated according to upstream first, verification distribution transforming stops information of sending a telegram in reply, under permanent fault equipment Allergic effect whole decompression is matched in trip, and transient fault device downstream stops to send a telegram in reply in short-term with allergic effect, upstream distribution automation equipment fault-free but When distribution transforming has decompression phase shortage, substation's outlet switch or circuit breaker failure tripping operation information are released by distribution transforming is counter according to power network topology, And it is supplemented in tree-shaped grouping;
S3.2: finding automatic Switching from root node with breadth traversal algorithm, disconnected comprising power transformation outlet switch or Heavenly Stems and Earthly Branches line Road device;
S3.3: first permanent fault is found with extreme saturation algorithm using Switching automatic in step S3.2 as starting point Automatic Switching or on-load switch or distribution transforming, fault point are the fault detector of the equipment or the device downstream closest to load measuring Rear side;
S3.4: if permanent fault equipment can not be found in step S3.3, fault point be step S3.2 in equipment or this set For downstream closest to the fault detector rear side of load measuring, and it is in the front side of the fault detector of no alarm movement.
Compared with prior art, the beneficial effects of the present invention are:
1) this method is based on situational awareness techniques, based on the acquisition of comprehensive electric network state and power grid Dynamic Variation Analysis, improves Power distribution network single node fault diagnosis accuracy rate, while being diagnosis core with accuracy and higher EMS, DMS data of reliability, with Distribution transforming diagnostic data is auxiliary, is analyzed by upstream and downstream equipment fault linkage situation, each node device failure of comprehensive verification Diagnostic accuracy improves the availability of intelligent diagnostics.
2) this method can relationship between comprehensive analysis Distribution Network Equipment failure, in the failure period automatically to belonging to the same thing Therefore, all related datas of multiple terminals carry out intelligent classification.
Detailed description of the invention
Fig. 1 is flow chart of the invention;
Fig. 2 is system architecture diagram of the invention;
Fig. 3 is the method for the present invention Switch equipment diagnosis logic figure;
Fig. 4 is the chain instance graph of failure caused by short circuit;
Fig. 5 is fault trip successful reclosing current-jump figure;
Fig. 6 is fault trip, permanent fault current-jump figure.
Specific embodiment
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;
Below in conjunction with drawings and examples, the present invention is further elaborated.
Embodiment 1
Please refer to Fig. 1, Fig. 2, a kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness, including it is following Step:
S1: the static failure diagnosis of each node device of power distribution network is carried out based on Situation Awareness, by obtaining from electric system Electrical network basic data, the verifying of comprehensive descision fault message determine result;
S2: fault moment equipment state variation diagnostic is carried out based on Situation Awareness, survey is recruited immediately to multinode faulty equipment Fault moment electric current calculates jump information, analyzes state change, carries out correctness verification to single equipment fault diagnosis;
S3: based on relationship between Situation Awareness comprehensive analysis Distribution Network Equipment failure, according to power network topology to each node failure Event correlation diagnosis is carried out, merges relevant fault, accuracy is mutually verified by upstream and downstream equipment fault.
Electric system described in step S1 includes EMS system, DMS system, metering automation system, generalized information system.
Electrical network basic data described in step S1 includes that electric network model information, equipment digital & analog signal information, power grid mode are converted Business information;
Wherein electric network model packet enclosed tool control area, outlet switch, fault detector, distribution power transformation device, plant area, feeder line, On-load switch, measurement, interval, branch line, breaker, topology;
Equipment digital & analog signal information includes switch state, protection signal, device current;
Power grid mode transformation service information temporarily turns including information listed in station, distribution scheduled outage information, distribution for letter Breath.
Each node device static failure of power distribution network described in step S1, which diagnoses, includes:
1) no-voltage of entire station, bus loss of pressure directly acquire EMS main website judgement decompression telegram in reply result;
2) substation's outlet switch, feeder line do/branched breaker acquisition EMS, DMS main website protection act, switch changed position letter Number carry out instantaneous/permanent fault diagnosis.Protection act mainly has zero sequence movement, quick-break movement, overcurrent movement, landing operation, guarantor Shield acts, accident is total etc., and switch changed position information is reclosing, separating brake, switching signal.Protection act is diagnosed as fault type, Switch changed position information is used as fail result analysis, and output protection acts class permanent fault if only sub-gate signal, if there is coincidence Lock, a separating brake, the primary then output protection that closes a floodgate act successful reclosing class transient fault, if having reclosing, twice separating brake, primary The then output protection that closes a floodgate acts unsuccessful reclosing class permanent fault.Transient fault recruits survey switch state to should be combined floodgate, permanent event Barrier recruits survey switch state to should be separating brake;
3) feeder line it is dry/branch line on-load switch obtain DMS main website separating brake, combined floodgate and block signal carry out point, close, failure every From diagnosis;
4) fault detector obtains DMS main station failure type and carries out fault actions diagnosis;
5) distribution transforming acquisition metering automation system stops extensive electric phase shortage alarm progress decompression, phase shortage telegram in reply diagnoses.
Step S2 the following steps are included:
S2.1: continuously taking 5 minutes real-time three-phase current curves before and after fault moment, calculates every 10 seconds each phase currents in front and back Hop rate;Wherein
Maximum value in 30 hop rates is taken, is diagnosed as device current jump, electricity respectively if more than 20% or equal to 100% Stream zero, is otherwise diagnosed as no jump;
S2.2: it examines and cannot pass through by verification, or without jump if faulty equipment is diagnosed as electric current zero.
Step S3 the following steps are included:
S3.1: switch fault state is automated according to upstream first, verification distribution transforming stops information of sending a telegram in reply, under permanent fault equipment Allergic effect whole decompression is matched in trip, and transient fault device downstream stops to send a telegram in reply in short-term with allergic effect, upstream distribution automation equipment fault-free but When distribution transforming has decompression phase shortage, substation's outlet switch or circuit breaker failure tripping operation information are released by distribution transforming is counter according to power network topology, And it is supplemented in tree-shaped grouping;
S3.2: finding automatic Switching from root node with breadth traversal algorithm, disconnected comprising power transformation outlet switch or Heavenly Stems and Earthly Branches line Road device;
S3.3: first permanent fault is found with extreme saturation algorithm using Switching automatic in step S3.2 as starting point Automatic Switching or on-load switch or distribution transforming, fault point are the fault detector of the equipment or the device downstream closest to load measuring Rear side;
S3.4: if permanent fault equipment can not be found in step S3.3, fault point be step S3.2 in equipment or this set For downstream closest to the fault detector rear side of load measuring, and it is in the front side of the fault detector of no alarm movement.
Referring to FIG. 3, the fault diagnosis for Switch equipment mainly using protection act and opens displacement signal as base Plinth, signal combine by way of judged,
A) fault type is quick-break if occurring 1 segment signal of quick-break or overcurrent in message;
B) referring concurrently to switch changed position signal:
If i. only once separating brake, no combined floodgate are determined as that quick-break acts;
If ii. once separating brake once closes a floodgate and reclosing acts, it is determined as that quick-break acts, successful reclosing;
If iii. having, separating brake once closes a floodgate twice and reclosing acts, and is determined as that quick-break acts, unsuccessful reclosing.
Other fault types are similarly.
Referring to FIG. 4, if failure is permanent fault caused by short circuit, the specific steps are as follows:
1) based on each node device static failure diagnosis of Situation Awareness power distribution network
A) whole station mistake station and bus loss of pressure alarm, no alarm signal in EMS system are obtained in real time continues Distribution Network Failure Analysis
B) obtain in real time substation's outlet switch in EMS system, feeder line is dry in DMS system/branched breaker/load opens Pass/fault detector/network distribution transformer coherent signal carries out the diagnosis of fault trip situation:
I. substation, which goes out to switch, does not find alarm signal, i.e. substation's outlet switch does not break down tripping, does not cause entirely Line has a power failure;
No. ii.1 high village's A-wire/main line/N1 shaft tower _ fault detector signal in first base station/713 is as follows:
Alarm signal
713 high village's A-wire main line N1 tower trumpet side fault detectors _ 2015/09/07 09:36:16 of short action diagnosis As a result it is " single short action "
No. iii.2 high village's A-wire/main line/1T1 breaker signal in first base station/713 is as follows:
Alarm signal
713 high village's A-wire main line #1 bar 1T1 breaker protection acts act 2015/09/07 09:35:27
713 high village's A-wire main line #1 bar 1T1 breaker overcurrent alarms act 2015/09/07 09:35:27
713 high village's A-wire main line #1 bar 1T1 breakers disconnect 2015/09/07 09:35:27
713 high village's A-wire main line #1 bar 1T1 breaker reclosing movements act 2015/09/07 09:35:35
713 high 2015/09/07 09:35:35 of village's A-wire main line #1 bar 1T1 breaker closing
Illustrate that diagnostic result is " overcurrent movement, successful reclosing " by Fig. 3, recruiting survey switch state in real time is "on" position, school It tests and passes through.
No. iv.3 high village's A-wire/main line/N22 shaft tower _ fault detector signal in first base station/713 is as follows:
Alarm signal
713 high village's A-wire main line N22 tower trumpet side fault detectors _ 2015/09/07 09:36:14 of short action diagnosis As a result it is " single short action "
V.4 number high village's A-wire/main line/32T1 on-load switch signal in first base station/713 is as follows:
Alarm signal
713 high village's A-wire main line #32 tower 32T1 on-load switches disconnect 2015/9/07 09:35:56
713 high village's A-wire main line #32 tower 32T1 on-load switches are closed 2015/9/07 09:36:03
713 high village's A-wire main line #32 tower 32T1 on-load switches are latched 2015/9/07 09:36:05 of feed motion
713 high village's A-wire main line #32 tower 32T1 on-load switches disconnect 2015/9/07 09:36:08
Diagnostic result is " segment fault has been isolated after on-load switch ", and recruiting survey switch state in real time is gate-dividing state, and verification is logical It crosses.No. vi.5 713 high village's A-wires/Xin Da electrical apparatus factory/Z3031-0350 Xin Da electrical apparatus factory/01 Shunde District, Foshan City Beijiao Town newly reaches Electrical Appliances Co., Ltd is as follows with varying signal:
Alarm signal
Power off time: 2015/09/07 09:35:00
Diagnostic result is " permanent fault "
Vii.6 fault detector fault-free action
No. viii.7 high village's A-wire/main line/38T2 on-load switch signal in first base station/713 is as follows:
Alarm signal
713 high 38 tower 38T2 on-load switches of village's A-wire main line disconnect 2015/9/07 09:35:56
It is " load that 713 high 38 tower 38T2 on-load switches of village's A-wire main line, which are closed 2015/9/07 09:35:58 diagnostic result, Switch is without instantaneous divide-shut brake information-preserving "
No. ix.8 713 high village's A-wires/dedicated power distribution station of Xing Ao packing Co., Ltd., Foshan City #2/02 star Australia, Foshan City packaging Co., Ltd is as follows with varying signal:
Alarm signal
Power off time: 2015/09/07 09:36:00
It sends a telegram in reply the time: 2015/09/07 09:36:00
Diagnostic result is " transient fault "
X. marketing system power failure pond is inquired, does not find this route scheduled outage work order.
2) it is based on Situation Awareness fault moment equipment state variation diagnostic, equipment fault moment state change mainly monitors electricity Stream jump:
I. as shown in figure 5, No. 2 breaker maximum hop rates are 100%, state change meets fault trip successful reclosing electricity Flow curve.
Ii. as shown in fig. 6, No. 4 on-load switch maximum hop rates are 100%, it is bent that state change meets permanent fault electric current Line.
3) Distribution Network Equipment failure linkage analysis is carried out based on Situation Awareness
I. when a short circuit occurs, fault current causes upstream and downstream device action, and the fault detector of upstream 1,3 detects event Hinder electric current, carries out short-circuit alarm;No. 2 breaker overcurrent protection movement movements, separating brakes, reclosing, closing success;No. 4 loads are opened First separating brake is closed, after upstream circuit breaker reclosing success power transmission, attempts to close a floodgate, since short trouble does not exclude, load is opened Sealed lock, separating brake are closed by Fault Isolation;No. 5 distribution transforming decompressions have a power failure;Other branch line load switch, distribution transforming are first on rear side of breaker Have a power failure, sends a telegram in reply after breaker successful reclosing;Breaker upstream equipment no alarm.
Ii. failure in the first step is grouped with tree
Corresponding No. 7 corresponding No. 4 on-load switch permanent faults of No. 1.5 distribution transforming permanent faults, No. 8 distribution transforming transient faults instantaneous events Barrier, verification pass through
2. finding No. 2 breakers since No. 1 fault detector, with this as the starting point;
No. 4 on-load switches of first permanent fault are found, No. 4 switch rear end fault-free pointers further reduce failure model It encloses, so fault section is i.e. 4 to 5 segments on rear side of No. 4 on-load switches.
If failure is transient fault caused by short circuit, method and step are as follows:
1) based on each node device static failure diagnosis of Situation Awareness power distribution network
A) whole station mistake station and bus loss of pressure alarm, no alarm signal in EMS system are obtained in real time continues Distribution Network Failure Analysis
B) obtain in real time substation's outlet switch in EMS system, feeder line is dry in DMS system/branched breaker/load opens Pass/fault detector/network distribution transformer coherent signal carries out the diagnosis of fault trip situation:
I. substation, which goes out to switch, does not find alarm signal, i.e. substation's outlet switch does not break down tripping, does not cause entirely Line has a power failure;
No. ii.1 high village's A-wire/main line/N1 shaft tower _ fault detector in first base station/713, diagnostic result are that " single short circuit is dynamic Make "
No. iii.2 first high village's A-wire/main line/1T1 breaker in base station/713, diagnostic result be " overcurrent movement, be overlapped at Function ", recruiting survey switch state in real time is "on" position, and verification passes through.
No. iv.3 first high village's A-wire/main line/N22 shaft tower _ fault detector diagnostic result in base station/713 is that " single short circuit is dynamic Make "
No. 4 first high village's A-wire/main line/32T1 on-load switch diagnostic results in base station/713 are that " on-load switch is without information-preserving instantaneous Divide-shut brake "
V.5 number 713 high village's A-wires/Xin Da electrical apparatus factory/Z3031-0350 Xin Da electrical apparatus factory/01 Shunde District, Foshan City Beijiao Town Xin Da Electrical Appliances Co., Ltd distribution transforming diagnostic result is " transient fault "
Vi.6 fault detector fault-free action
No. vii.7 first high village's A-wire/main line/38T2 on-load switch diagnostic result in base station/713 is that " on-load switch is without information-preserving Instantaneous divide-shut brake "
No. viii.8 713 high village's A-wires/dedicated power distribution station of Xing Ao packing Co., Ltd., Foshan City #2/02 star Australia, Foshan City packet Filling Co., Ltd's distribution transforming diagnostic result is " transient fault "
Ix. marketing system power failure pond is inquired, does not find this route scheduled outage work order.
2) it is based on Situation Awareness fault moment equipment state variation diagnostic, equipment fault moment state change mainly monitors electricity Stream jump:
I.2 number breaker maximum hop rate is 100%, and state change meets fault trip successful reclosing current curve.
Ii.4 on-load switch maximum hop rate is 100%, and electric current jump should gradually restore after being 0.
3) Distribution Network Equipment failure linkage analysis is carried out based on Situation Awareness
I. when a short circuit occurs, fault current causes upstream and downstream device action, and the fault detector of upstream 1,3 detects event Hinder electric current, carries out short-circuit alarm;No. 2 breaker overcurrent protection movement movements, separating brakes, reclosing, closing success;No. 4 loads are opened First separating brake is closed, after upstream circuit breaker reclosing success power transmission, attempts to close a floodgate, since short trouble has disappeared, on-load switch It closes a floodgate;No. 5 distribution transforming decompressions have a power failure and send a telegram in reply;Other branch line load switch, distribution transforming first have a power failure on rear side of breaker, think highly of in open circuit It sends a telegram in reply after synthesis function;Breaker upstream equipment no alarm.
Ii. failure in the first step is grouped with tree
1. the corresponding No. 4 on-load switch transient faults of No. 5 distribution transforming permanent faults, corresponding No. 7 of No. 8 distribution transforming transient faults are instantaneously Failure, verification pass through
2. finding No. 2 breakers since No. 1 fault detector, with this as the starting point;
3. not finding permanent fault equipment;
It can only determine on rear side of No. 3 fault detectors of the fault section for short circuit alarm occurs, No. 6 failures not alerted On front side of indicator, i.e. 3 to 5 segments.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention Protection scope within.

Claims (4)

1. a kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness, which comprises the following steps:
S1: the static failure diagnosis of each node device of power distribution network is carried out based on Situation Awareness, by obtaining power grid from electric system Basic data, the verifying of comprehensive descision fault message determine result;
S2: fault moment equipment state variation diagnostic is carried out based on Situation Awareness, multinode faulty equipment is recruited immediately and surveys failure Moment electric current calculates jump information, analyzes state change, carries out correctness verification to single equipment fault diagnosis;
S3: based on relationship between Situation Awareness comprehensive analysis Distribution Network Equipment failure, each node failure is carried out according to power network topology Event correlation diagnosis, merges relevant fault, mutually verifies accuracy by upstream and downstream equipment fault;
Wherein, electric system described in step S1 includes EMS system, DMS system, metering automation system, generalized information system;
Electrical network basic data described in step S1 includes electric network model information, equipment digital & analog signal information, power grid mode transformation service Information;
Wherein electric network model packet enclosed tool control area, outlet switch, fault detector, distribution power transformation device, plant area, feeder line, load Switch, measurement, interval, branch line, breaker, topology;
Equipment digital & analog signal information includes switch state, protection signal, device current;
Power grid mode transformation service information temporarily turns including information listed in station, distribution scheduled outage information, distribution for information.
2. a kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness according to claim 1, special Sign is that each node device static failure diagnosis of power distribution network described in step S1 includes:
1) no-voltage of entire station, bus loss of pressure directly acquire EMS main website judgement decompression telegram in reply result;
2) substation's outlet switch, feeder line it is dry/branched breaker obtain EMS, DMS main website protection act, switch changed position signal into Instantaneous/permanent fault of going diagnoses;Protection act mainly has zero sequence movement, quick-break movement, overcurrent movement, landing operation, protection dynamic Make, accident summation, switch changed position information is reclosing, separating brake, switching signal;Protection act is diagnosed as fault type, switch Displacement information is used as fail result analysis, and output protection acts class permanent fault if only sub-gate signal, if having reclosing, one Secondary separating brake, the primary then output protection that closes a floodgate act successful reclosing class transient fault, if having reclosing, twice separating brake, primary combined floodgate Then output protection acts unsuccessful reclosing class permanent fault;Transient fault recruits survey switch state to should be combined floodgate, and permanent fault, which is recruited, to be surveyed Switch state should be separating brake;
3) feeder line it is dry/branch line on-load switch obtains that DMS main website separating brake, combined floodgate and block signal are carried out point, closed, Fault Isolation is examined It is disconnected;
4) fault detector obtains DMS main station failure type and carries out fault actions diagnosis;
5) distribution transforming acquisition metering automation system stops telegram in reply phase shortage alarm progress decompression, phase shortage telegram in reply diagnoses.
3. a kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness according to claim 1, special Sign is, step S2 the following steps are included:
S2.1: continuously taking 5 minutes real-time three-phase current curves before and after fault moment, calculates the jump every 10 seconds each phase currents in front and back Variability;Wherein
Maximum value in 30 hop rates is taken, is diagnosed as device current jump respectively if more than 20% or equal to 100%, electric current is returned Zero, otherwise it is diagnosed as no jump;
S2.2: it examines and cannot pass through by verification, or without jump if faulty equipment is diagnosed as electric current zero.
4. a kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness according to claim 1, special Sign is, step S3 the following steps are included:
S3.1: automating switch fault state according to upstream first, and verification distribution transforming stops information of sending a telegram in reply, and permanent fault device downstream is matched Allergic effect whole decompression, transient fault device downstream stop to send a telegram in reply in short-term with allergic effect, upstream distribution automation equipment fault-free but distribution transforming When having decompression phase shortage, substation's outlet switch or circuit breaker failure tripping operation information are released by distribution transforming is counter according to power network topology, and mend It is charged in tree-shaped grouping;
S3.2: automatic Switching is found from root node with breadth traversal algorithm, includes power transformation outlet switch or dry branched breaker;
S3.3: the automatic of first permanent fault is found with extreme saturation algorithm using Switching automatic in step S3.2 as starting point Switching or on-load switch or distribution transforming, fault point be first permanent fault automatic Switching or on-load switch or distribution transforming or The downstream of the automatic Switching or on-load switch of first permanent fault or distribution transforming is closest on rear side of the fault detector of load side;
S3.4: if can not find permanent fault equipment in step S3.3, fault point is for Switching automatic in step S3.2 or certainly Dynamic Switching downstream is closest on rear side of the fault detector of load side, and before the fault detector in no alarm movement Side.
CN201711160736.5A 2017-11-20 2017-11-20 A kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness Active CN108011358B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711160736.5A CN108011358B (en) 2017-11-20 2017-11-20 A kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711160736.5A CN108011358B (en) 2017-11-20 2017-11-20 A kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness

Publications (2)

Publication Number Publication Date
CN108011358A CN108011358A (en) 2018-05-08
CN108011358B true CN108011358B (en) 2019-11-05

Family

ID=62052885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711160736.5A Active CN108011358B (en) 2017-11-20 2017-11-20 A kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness

Country Status (1)

Country Link
CN (1) CN108011358B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110544176B (en) * 2019-08-12 2021-09-21 广东电网有限责任公司 Method for switching failure of distribution transformer voltage loss information backward-pushing switch of OCS (online charging system) master station system
CN110568275B (en) * 2019-09-17 2022-02-01 国网福建省电力有限公司安溪县供电公司 Open-phase fault studying and judging method and system based on public and private power distribution network variable data
CN111415077A (en) * 2020-03-17 2020-07-14 内蒙古电力(集团)有限责任公司乌兰察布电业局 Intelligent distribution network fault diagnosis positioning method
CN112162209B (en) * 2020-09-14 2022-12-30 江苏中烟工业有限责任公司 Driving power supply tripping diagnosis method of C800-BV packaging machine
CN113452142B (en) * 2021-07-01 2024-01-23 国网河南省电力公司电力科学研究院 Remote monitoring and restarting device and method for automatic equipment at station end
CN114221436B (en) * 2021-11-20 2023-09-12 云南电网有限责任公司昆明供电局 Intelligent alarm method and system based on distribution network operation management system
CN115184738B (en) * 2022-09-08 2023-01-24 北京智芯微电子科技有限公司 Power distribution network fault positioning system, positioning method and computer readable medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102565572A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Platform and method for judging fault of match power grid
CN103592567A (en) * 2013-10-23 2014-02-19 广东电网公司佛山供电局 Grid fault locating system and method based on multisystem information integration
CN103941158A (en) * 2014-04-17 2014-07-23 国家电网公司 Power distribution network fault diagnosis system and method based on multi-source information
KR101501118B1 (en) * 2014-04-08 2015-03-19 아주대학교산학협력단 Diagnosis apparatus and method of open switch fault of back to back converter of npc type topology

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105048517A (en) * 2015-08-19 2015-11-11 国家电网公司 Multistage energy coordination control system
CN106846174A (en) * 2017-01-10 2017-06-13 中国南方电网有限责任公司电网技术研究中心 Method and device for power distribution network situation perception based on data fusion

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102565572A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Platform and method for judging fault of match power grid
CN103592567A (en) * 2013-10-23 2014-02-19 广东电网公司佛山供电局 Grid fault locating system and method based on multisystem information integration
KR101501118B1 (en) * 2014-04-08 2015-03-19 아주대학교산학협력단 Diagnosis apparatus and method of open switch fault of back to back converter of npc type topology
CN103941158A (en) * 2014-04-17 2014-07-23 国家电网公司 Power distribution network fault diagnosis system and method based on multi-source information

Also Published As

Publication number Publication date
CN108011358A (en) 2018-05-08

Similar Documents

Publication Publication Date Title
CN108011358B (en) A kind of power distribution network multinode intelligent fault diagnosis method based on Situation Awareness
US20200293033A1 (en) Knowledge-based systematic health monitoring system
Kezunovic Smart fault location for smart grids
CN106124935A (en) Middle and low voltage network Fault Locating Method
CN106771883A (en) A kind of multi-source information distribution fault localization method and system based on cloud
CN108132425A (en) Power grid distribution line failure on-line monitoring method and system
Sarathkumar et al. A technical review on self-healing control strategy for smart grid power systems
WO2023060705A1 (en) Bus/line grounding line selection alternate removal method based on scada data
Guo et al. An analytic model-based approach for power system alarm processing employing temporal constraint network
Jamborsalamati et al. Implementation of an agent based distributed FLISR algorithm using IEC 61850 in active distribution grids
Wong et al. Modeling and co-simulation of IEC61850-based microgrid protection
La Scala et al. Development of applications in WAMS and WACS: an international cooperation experience
CN110763937A (en) Intelligent substation test platform and method based on electromagnetic transient real-time simulation
Kezunovic et al. Merging PMU, operational, and non-operational data for interpreting alarms, locating faults and preventing cascades
Kezunovic Substation fault analysis requirements
Jiang Outage management of active distribution systems with data fusion from multiple sensors given sensor failures
Tutvedt et al. Smart fault handling in medium voltage distribution grids
Daboul et al. Testing protection relays based on IEC 61850 in substation automation systems
Kamps et al. Reliability of decentralized network automation systems and impacts on distribution network reliability
Russell et al. Reliability improvement of distribution feeders through real-time, intelligent monitoring
Martínez et al. Faulted phase selection multicriteria algorithm implemented in generic hardware for centralized P&C in Smart Grids
Liu et al. Risk assessment of a generator rejection scheme implemented in a wind farm
Banerjee et al. Testing and validation of synchrophasor devices and applications
Dolezilek Case study examples of interoperable ethernet communications within distribution, transmission, and wide-area control systems
Wan et al. Visualizing IED Interaction in Smart Substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant