CN108011176A - New front battle array frame structure - Google Patents
New front battle array frame structure Download PDFInfo
- Publication number
- CN108011176A CN108011176A CN201711219559.3A CN201711219559A CN108011176A CN 108011176 A CN108011176 A CN 108011176A CN 201711219559 A CN201711219559 A CN 201711219559A CN 108011176 A CN108011176 A CN 108011176A
- Authority
- CN
- China
- Prior art keywords
- battle array
- frame
- array frame
- front battle
- hog
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q1/00—Details of, or arrangements associated with, antennas
- H01Q1/12—Supports; Mounting means
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q21/00—Antenna arrays or systems
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Panels For Use In Building Construction (AREA)
Abstract
The present invention provides a kind of new front battle array frame structure, it includes wall, darkroom, hog frame, front battle array frame, turntable, darkroom, hog frame, front battle array frame, turntable are all located inside wall, hog frame, front battle array frame, turntable are all located inside darkroom, front battle array frame is fixed on hog frame, turntable is located at hog frame side, and front battle array frame space availability ratio of the present invention is high, radius of curvature and largest surface area;Front battle array frame is aluminum skeleton stressed-skin construction, is conducive to mitigate quality;The dead weight of front battle array frame is small, is conducive to Reducing distortion and improves rigidity.
Description
Technical field
The present invention relates to a kind of structure design form, and in particular, to a kind of new front battle array frame structure.
Background technology
Front battle array frame is the structural framing specially designed, and function is installation, support radiation aerial array, forms radiation field,
And maintenance for radiating antenna array and the placement of radio-frequency feed system equipment provide Platform Site, while provided for staff
System installation, integrated, debugging, the workbench safeguarded and space.Front battle array frame is due to radius of curvature and the demand of surface area, ruler
Very little and quality is often larger, and then causes the weakening of rigidity.In order to improve the specification of rigidity, front battle array frame section and plate into one
Step increase, the quality for ultimately resulting in front battle array frame reach hundreds of tonnes, can only be placed in bottom, place space and are restricted.
The content of the invention
For in the prior art the defects of, the object of the present invention is to provide a kind of new front battle array frame structure, its lightweight, height
Rigidity, space-efficient front battle array frame structure design form, can either make full use of existing space so that front curvature half
Footpath and largest surface area, front battle array frame total quality is light and rigidity is high.
According to an aspect of the present invention, there is provided a kind of new front battle array frame structure, it include wall, darkroom, hog frame,
Front battle array frame, turntable, darkroom, hog frame, front battle array frame, turntable are all located inside wall, and hog frame, front battle array frame, turntable are all
Inside darkroom, front battle array frame is fixed on hog frame, and turntable is located at hog frame side.
Preferably, the front battle array frame is rotary spherical covering of the fan.
Preferably, the front battle array frame is placed along darkroom diagonal.
Preferably, the front battle array frame is upper aluminum skeleton stressed-skin construction.
Preferably, the covering is connected by rivet with front battle array frame.
Preferably, the hog frame and front battle array frame are by being welded to connect.
Preferably, the hog frame is grid frame structure.
Compared with prior art, the present invention has following beneficial effect:
1. radius of curvature maximizes.Front battle array frame of the present invention is placed along darkroom diagonal, realizes front battle array frame curvature half
The maximization in footpath, solves existing back-off or edge-on bowl formula front battle array frame radius of curvature is relatively small, and low space utilization is asked
Topic;
2. light weight.For the present invention by using aluminum design and the optimization design of hog frame, quality is only same specification steel
/ 10th of front battle array frame processed;
3. cost is low.By reducing quality, front battle array is put up this and is significantly reduced compared with existing design;
4. rigidity is high.By using aluminium and hog frame, front battle array frame of the present invention has higher rigidity;
5. adaptability is good.To floor bearing capacity without particular/special requirement, solving existing front battle array frame can only place the present invention
In bottom, if not bottom need to then be planned in advance at the beginning of lab design, otherwise the later stage can not carry out front battle array frame and add that builds to ask
Topic.
Of the invention its lightweight, high rigidity, space-efficient front battle array frame structure design form, can make full use of existing
Space so that front radius of curvature and largest surface area, front battle array frame total quality is light and rigidity is high.Solves existing battle array
Frame quality is larger for face battle array, of high cost, radius of curvature is limited and can not maximize and need to be placed in bottom and can not add the problem of building in the later stage.
Brief description of the drawings
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, further feature of the invention,
Objects and advantages will become more apparent upon:
Fig. 1 is a kind of new front battle array frame structure top view in the present invention.
Fig. 2 is a kind of new front battle array frame structure section figure in the present invention.
Fig. 3 is a kind of new front battle array frame structure front view in the present invention.
Embodiment
With reference to specific embodiment, the present invention is described in detail.Following embodiments will be helpful to the technology of this area
Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill to this area
For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made.These belong to the present invention
Protection domain.
As shown in Figure 1, the new front battle array frame structure of the present invention includes wall 1, darkroom 2, hog frame 3, front battle array frame 4, turns
Platform 5, darkroom 2, hog frame 3, front battle array frame 4, turntable 5 are all located inside wall 1, hog frame 3, front battle array frame 4, all positions of turntable 5
Inside darkroom 2, front battle array frame 4 is fixed on hog frame 3, and turntable 5 is located at 3 side of hog frame.
Front battle array frame 4 is rotary spherical covering of the fan, and is placed along darkroom diagonal, so reaches maximum to space availability ratio
Change.
Front battle array frame 4 is upper aluminum skeleton stressed-skin construction, is so conducive to mitigate quality.
Covering is connected by rivet with front battle array frame 4, so facilitates covering to connect.
Hog frame 3 is by being welded to connect with front battle array frame 4, this spline structure is more firm.
Hog frame 3 is grid frame structure, can so increase the intensity of hog frame 3.
In conclusion front battle array frame space availability ratio of the present invention is high, radius of curvature and largest surface area;Front battle array frame is
Aluminum skeleton stressed-skin construction, is conducive to mitigate quality;The dead weight of front battle array frame is small, is conducive to Reducing distortion and improves rigidity.
The specific embodiment of the present invention is described above.It is to be appreciated that the invention is not limited in above-mentioned
Particular implementation, those skilled in the art can make various deformations or amendments within the scope of the claims, this not shadow
Ring the substantive content of the present invention.
Claims (7)
1. a kind of new front battle array frame structure, it is characterised in that including wall, darkroom, hog frame, front battle array frame, turntable, secretly
Room, hog frame, front battle array frame, turntable are all located inside wall, and hog frame, front battle array frame, turntable are all located inside darkroom, front
Battle array frame is fixed on hog frame, and turntable is located at hog frame side.
2. new front battle array frame structure according to claim 1, it is characterised in that the front battle array frame is fanned for rotary spherical
Face.
3. new front battle array frame structure according to claim 1, it is characterised in that the front battle array frame is along darkroom diagonal
Place.
4. new front battle array frame structure according to claim 1, it is characterised in that the front battle array frame is upper aluminum skeleton
Stressed-skin construction.
5. new front battle array frame structure according to claim 4, it is characterised in that the covering passes through rivet and front battle array
Frame connects.
6. new front battle array frame structure according to claim 1, it is characterised in that the hog frame is logical with front battle array frame
Cross and be welded to connect.
7. new front battle array frame structure according to claim 1, it is characterised in that the hog frame is grid framework knot
Structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711219559.3A CN108011176B (en) | 2017-11-28 | 2017-11-28 | Array frame structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711219559.3A CN108011176B (en) | 2017-11-28 | 2017-11-28 | Array frame structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108011176A true CN108011176A (en) | 2018-05-08 |
CN108011176B CN108011176B (en) | 2020-07-14 |
Family
ID=62054439
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711219559.3A Active CN108011176B (en) | 2017-11-28 | 2017-11-28 | Array frame structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108011176B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203406411U (en) * | 2013-08-22 | 2014-01-22 | 中国电子科技集团公司第三十八研究所 | Composite material antenna backboard used for radar array plane electric connection |
CN104535858A (en) * | 2014-12-18 | 2015-04-22 | 北京无线电计量测试研究所 | Compact field antenna measurement synchronization reflection point region determination method |
CN104596357A (en) * | 2013-11-01 | 2015-05-06 | 上海机电工程研究所 | Radio frequency/optical semi-physical simulation composite target simulation system |
CN204536364U (en) * | 2014-12-31 | 2015-08-05 | 苏州市大富通信技术有限公司 | For the testing apparatus of antenna intermodulation testing |
TW201619619A (en) * | 2014-11-26 | 2016-06-01 | 泓淋科技有限公司 | Microwave dark room with absorbing body changing reflection path |
-
2017
- 2017-11-28 CN CN201711219559.3A patent/CN108011176B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203406411U (en) * | 2013-08-22 | 2014-01-22 | 中国电子科技集团公司第三十八研究所 | Composite material antenna backboard used for radar array plane electric connection |
CN104596357A (en) * | 2013-11-01 | 2015-05-06 | 上海机电工程研究所 | Radio frequency/optical semi-physical simulation composite target simulation system |
TW201619619A (en) * | 2014-11-26 | 2016-06-01 | 泓淋科技有限公司 | Microwave dark room with absorbing body changing reflection path |
CN104535858A (en) * | 2014-12-18 | 2015-04-22 | 北京无线电计量测试研究所 | Compact field antenna measurement synchronization reflection point region determination method |
CN204536364U (en) * | 2014-12-31 | 2015-08-05 | 苏州市大富通信技术有限公司 | For the testing apparatus of antenna intermodulation testing |
Non-Patent Citations (1)
Title |
---|
周艳阳,王李宁: ""微波暗室面阵结构设计新方案"", 《电子机械工程》 * |
Also Published As
Publication number | Publication date |
---|---|
CN108011176B (en) | 2020-07-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105822072A (en) | Hoisting construction structure and method for air corridor ceiling | |
CN106759883A (en) | The tower crane construction method of large-scale steel structure air cooling tower | |
CN106544959B (en) | The construction method of king-tower lifting segment and bridge main tower saddle containing saddle | |
CN208473230U (en) | A kind of raised flooring adjustable supporter | |
CN108011176A (en) | New front battle array frame structure | |
CN205257721U (en) | Many sedan -chairs elevator | |
CN107100283A (en) | A kind of assembled wallboard connector and its installation method | |
CN212837114U (en) | Visual shielding plate support frame | |
CN204899130U (en) | Overhead network floor | |
CN208918333U (en) | Support construction is used in a kind of construction of steel structural roof top-bunt Slippage | |
CN206397167U (en) | Heavy in section girder steel connecting plate installation servicing unit | |
CN204662927U (en) | A kind of adjustable hoistway operation platform | |
CN204357138U (en) | Simple steel structure lifting upending frame | |
CN205189438U (en) | Three -layer assemblyization steel constructs green antidetonation local -style dwelling houses | |
CN203145187U (en) | Expansion square cabin with high expansion ratio | |
CN204590657U (en) | Formwork bracing system | |
CN210196918U (en) | Support frame of close-range photogrammetry hoist lifting type shooting device | |
CN207603516U (en) | The full aluminium photovoltaic bracket of back-to-back ballast formula | |
CN206202898U (en) | Novel reactor extranal packing box | |
CN205716244U (en) | A kind of ship launching is with rolling dolly | |
CN106150922A (en) | A kind of wind power plant and pylon | |
CN105236290B (en) | Crane with hoistable platform quickly moves erecting device | |
CN103993729A (en) | High rise elevator shaft formwork erecting platform | |
CN204711557U (en) | The servicing unit of large-scale vertical mill spiral system assembling | |
CN203233109U (en) | Foldable cable head fixing support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |