CN108008639A - The system digitalized emulation platform of electric locomotive microcomputer network control based on Life cycle - Google Patents

The system digitalized emulation platform of electric locomotive microcomputer network control based on Life cycle Download PDF

Info

Publication number
CN108008639A
CN108008639A CN201710668532.6A CN201710668532A CN108008639A CN 108008639 A CN108008639 A CN 108008639A CN 201710668532 A CN201710668532 A CN 201710668532A CN 108008639 A CN108008639 A CN 108008639A
Authority
CN
China
Prior art keywords
locomotive
equipment
microcomputer network
life cycle
network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710668532.6A
Other languages
Chinese (zh)
Inventor
郭振东
丁越
王大为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Datong Co Ltd
Original Assignee
CRRC Datong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Datong Co Ltd filed Critical CRRC Datong Co Ltd
Publication of CN108008639A publication Critical patent/CN108008639A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric

Abstract

The invention discloses a kind of system digitalized emulation platform of electric locomotive microcomputer network control based on Life cycle, arranged using distributed network, based on TCN frameworks, train real-time ethernet and CANOpen networks are taken into account, equipment mainly includes the locomotive microcomputer network equipment, locomotive equipment simulation electrical cabinet, console, emulator, Fault Insertion Equipment.Microcomputer network equipment, simulation electrical cabinet, console can realize the locomotive control functions such as pantograph, main disconnected control, emulator can simulate the systems such as locomotive TCU, BCU and whole multi-locomotive function, Fault Insertion Equipment can realize fault detection capability, so as to fulfill locomotive network system Life cycle digitalized artificial.The present invention can carry out the analysis of locomotive network system contrast of multiple-schemes before sample produces with regard to quick, so as to efficiently screen and verify extensively designing scheme, meet the needs of railway transportation equipment marketization.

Description

The system digitalized emulation of electric locomotive microcomputer network control based on Life cycle Platform
Technical field
This patent is related to electric locomotive microcomputer network control technical field of system simulation, more particularly to one kind is based on full life The system digitalized emulation platform of electric locomotive microcomputer network control in cycle.
Background technology
Microcomputer network control system has been the nervous centralis of AC transmission electric power locomotive at present, it is coordinated and manages machine The multisystems such as car traction electric drive system, supplementary controlled system, braking system;And microcomputer network control system architecture is cleverer Work is various, relatively complicated;Though there are some analogue systems to emulate microcomputer network control system at present, do not build Vertical Multi net voting and the test platform that Life cycle digitalized artificial is carried out to microcomputer network control system.
The content of the invention
It is system digitalized that the purpose of this patent is to provide a kind of electric locomotive microcomputer network control based on Life cycle Emulation platform, platform can carry out Life cycle digitalized artificial to electric locomotive microcomputer network control system, be produced in sample It is preceding to carry out the analysis of locomotive network system contrast of multiple-schemes with regard to quick, so as to efficiently screen and verify extensively designing scheme, meet The demand of the railway transportation equipment marketization.Specifically include:
It is the locomotive control unit VCU1 and VCU2 of microcomputer network equipment including redundancy, drivers' cab display unit DDU, long-range defeated Enter output unit RIOM1 and RIOM2, Ethernet switch, WTB turns MVB gateways, WTB turns CANopen gateways and Ethernet joins again Gateway.
Remote input output unit RIOM1 is interacted with console by I/O, and machine is established jointly with driver display unit DDU Car control command, the mock-up of presentation of information.
Remote input output unit RIOM2 and locomotive equipment simulation electrical cabinet are interacted by I/O, establish motor relay, The mock-up of the ancillary equipment such as contactor.
The locomotive control unit VCU1 and VCU2 of hot backup redundancy can realize pantograph, lead the locomotive control function such as disconnected, and lead to The information exchange with DDU, RIOM1, RIOM2 is crossed, establishes whole locomotive microcomputer network control system mock-up jointly.
Emulator includes RCP analogue systems and HIL analogue systems.
RCP analogue systems can be used as the rapid prototyping of microcomputer network control system, mutually redundant with mock-up and mend Fill, the models switching of replicating machine and true part in kind can be realized by way of power management.
HIL analogue systems are used for operation power locomotive behavior model, are that RCP analogue systems or microcomputer network control system are real Thing model provides emulation testing excitation, tests closed-loop system for building, can specifically simulate locomotive traction control unit TCU, auxiliary The functions such as control unit ACU, brak control unit BCU are helped, and emulate the operating mode of more locomotive double heading.
Fault Insertion Equipment can realize fault detection capability, and the reliability, stability, correctness set for this platform are carried out Evaluation, and simulate all kinds of failures that may occur in locomotive actual motion.
Brief description of the drawings
Fig. 1 positions emulation platform system architecture topology schematic diagram provided by the invention.
Embodiment
The present invention will be further described below in conjunction with the accompanying drawings.
It is as shown in Figure 1 the system architecture topological structure block diagram of the present invention, present invention comprises the locomotive control list of redundancy First VCU1 and VCU2, drivers' cab display unit DDU, remote input output unit RIOM1 and RIOM2, Ethernet switch, WTB Turn MVB gateways, WTB turns CANopen gateways, Ethernet and networks again pass, RCP analogue systems, HIL analogue systems, WTB direct fault locations Equipment, MVB Fault Insertion Equipments and Ethernet Fault Insertion Equipment, console and locomotive equipment simulation electrical cabinet.
This test platform equipment is attached separately in console, locomotive equipment simulation electrical cabinet and Fault Insertion Equipment cabinet, behaviour Vertical platform often uses console structure using electric locomotive, is mounted with the equipment such as controller, key-lifting switch, button, indicator light and DDU; Locomotive equipment simulation electrical cabinet be mounted with locomotive control unit VCU1 and VCU2, WTB turn MVB gateways, WTB turns CANopen gateways, Ethernet network again pass, RCP replicating machines, HIL replicating machines and for analogue relay, contactor etc. machinery between equipment industry control Machine;Fault Insertion Equipment cabinet is mounted with remote input output unit RIOM1 and RIOM2, WTB Fault Insertion Equipment, MVB failures note Enter equipment and Ethernet Fault Insertion Equipment etc..
To meet the comparison of multiple network framework control system, emulation platform is provided (to be met including WTB and Ethernet IEC 61375-2-5 (ETB)) train bus-line, vehicle bus (meets IEC 61375-3-4 including MVB, Ethernet (ECN)) and CANopen, wherein VCU1, VCU2, RIOM1, RIOM2, MVB Fault Insertion Equipment, RCP analogue systems and HIL are imitated True system passes through MVB network connections;VCU1, VCU2, RIOM1, RIOM2, DDU, Ethernet Fault Insertion Equipment, Ethernet exchanging Machine passes through ECN network connections;VCU1, VCU2 also access CANopen networks at the same time.

Claims (5)

  1. A kind of 1. system digitalized emulation platform of electric locomotive microcomputer network control based on Life cycle, it is characterised in that Arranged using distributed network, equipment mainly includes:Microcomputer network equipment, console, locomotive equipment simulation electrical cabinet, emulation are set Standby, Fault Insertion Equipment etc..Locomotive equipment simulation electrical cabinet, console, emulator, Fault Insertion Equipment.Microcomputer network is set Standby, simulation electrical cabinet, console can realize that locomotive control function, the emulators such as pantograph, main disconnected control can simulate locomotive The systems such as TCU, BCU and whole multi-locomotive function, Fault Insertion Equipment can realize fault detection capability, so as to fulfill locomotive network Network system Life cycle digitalized artificial.
  2. 2. a kind of electric locomotive microcomputer network control based on Life cycle according to claim 1 is system digitalized imitative True platform, it is characterised in that locomotive control unit VCU1 and VCU2, the drivers' cab that the microcomputer network equipment includes redundancy are shown Show cells D DU, remote input output unit RIOM1 and RIOM2, Ethernet switch, WTB turns MVB gateways, WTB turns CANopen Gateway and Ethernet are networked pass again;The wherein described remote input output unit RIOM1 is interacted with console by I/O, with department Machine display unit DDU establishes locomotive control instruction, the mock-up of presentation of information jointly;The remote input output unit RIOM2 is interacted with locomotive equipment simulation electrical cabinet by I/O, establishes the natural pattern of the ancillary equipment such as motor relay, contactor Type;The locomotive control unit VCU1 and VCU2 of the hot backup redundancy can realize pantograph, lead the locomotive control function such as disconnected, and lead to The information exchange with DDU, RIOM1, RIOM2 is crossed, establishes whole locomotive microcomputer network control system mock-up jointly.
  3. 3. a kind of electric locomotive microcomputer network control based on Life cycle according to claim 2 is system digitalized imitative True platform, it is characterised in that using in kind plus emulation Model Establishment, wherein the emulator includes RCP analogue systems With HIL analogue systems, the RCP analogue systems can be used as the rapid prototyping of microcomputer network control system, with mock-up It is mutually redundant and supplement, the models switching of replicating machine and true part in kind can be realized by way of power management;HIL analogue systems For operation power locomotive behavior model, emulation testing is provided for RCP analogue systems or microcomputer network control system mock-up Excitation, closed-loop system is tested for building, and can specifically simulate locomotive traction control unit TCU, Auxiliary Control Element ACU, braking The functions such as control unit BCU, and emulate the operating mode of more locomotive double heading.
  4. 4. a kind of electric locomotive microcomputer network control based on Life cycle according to claim 1 is system digitalized imitative True platform, it is characterised in that the Fault Insertion Equipment includes WTB Fault Insertion Equipments, MVB Fault Insertion Equipments and ether Net Fault Insertion Equipment evaluates the reliability, stability, correctness set for this platform, it can be achieved that fault detection capability, And simulate all kinds of failures that may occur in locomotive actual motion.
  5. 5. a kind of electric locomotive microcomputer network control based on Life cycle according to claim 1 is system digitalized imitative True platform, it is characterised in that VCU structure of the microcomputer network control system based on two groups of hot backup redundancies, can meet polytype Vehicle bus and train join bus again;Wherein train joins bus and (meets IEC 61375-2-5 including WTB and Ethernet again (ETB));Vehicle bus includes MVB, CANopen and Ethernet (meeting IEC 61375-3-4 (ECN));Wherein VCU1, VCU2, RIOM1, RIOM2, MVB Fault Insertion Equipment, RCP analogue systems and HIL analogue systems pass through MVB network connections;Wherein VCU1, VCU2, RIOM1, RIOM2, DDU, Ethernet Fault Insertion Equipment, Ethernet switch pass through ECN network connections; VCU1, VCU2 also access CANopen networks at the same time.
CN201710668532.6A 2016-10-31 2017-08-07 The system digitalized emulation platform of electric locomotive microcomputer network control based on Life cycle Pending CN108008639A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2016109339424 2016-10-31
CN201610933942 2016-10-31

Publications (1)

Publication Number Publication Date
CN108008639A true CN108008639A (en) 2018-05-08

Family

ID=62051407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710668532.6A Pending CN108008639A (en) 2016-10-31 2017-08-07 The system digitalized emulation platform of electric locomotive microcomputer network control based on Life cycle

Country Status (1)

Country Link
CN (1) CN108008639A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110562275A (en) * 2019-09-09 2019-12-13 中车南京浦镇车辆有限公司 Multichannel dual-redundancy rail transit vehicle reconnection system and method
CN111308905A (en) * 2018-12-12 2020-06-19 中国电力科学研究院有限公司 Asymmetric real-time simulation system
CN111931284A (en) * 2019-05-13 2020-11-13 中车株洲电力机车研究所有限公司 Rail transit simulation system and method based on distributed architecture
CN112068532A (en) * 2020-09-10 2020-12-11 中车大连电力牵引研发中心有限公司 Test bed and test method for network control system of multi-locomotive
CN112776853A (en) * 2019-11-08 2021-05-11 株洲中车时代电气股份有限公司 Train microcomputer network control system and method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102023575A (en) * 2010-10-25 2011-04-20 中国北车股份有限公司大连电力牵引研发中心 Simulation alternating current electric locomotive
CN102323761A (en) * 2011-07-18 2012-01-18 铁道部运输局 Semi-physical simulation testing platform of train control network
US20140343767A1 (en) * 2013-05-17 2014-11-20 Wabtec Holding Corp. Braking Systems and Methods for Determining Dynamic Braking Data for a Braking Model for a Train
CN105759631A (en) * 2016-03-28 2016-07-13 株洲中车时代电气股份有限公司 Train network control system semi-physical simulation testing system and method
CN105867172A (en) * 2016-06-14 2016-08-17 成都运达牵引技术有限公司 Train vehicle-mounted control network semi-entity test platform
CN105890917A (en) * 2016-06-07 2016-08-24 中车青岛四方车辆研究所有限公司 Traction brake test system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102023575A (en) * 2010-10-25 2011-04-20 中国北车股份有限公司大连电力牵引研发中心 Simulation alternating current electric locomotive
CN102323761A (en) * 2011-07-18 2012-01-18 铁道部运输局 Semi-physical simulation testing platform of train control network
US20140343767A1 (en) * 2013-05-17 2014-11-20 Wabtec Holding Corp. Braking Systems and Methods for Determining Dynamic Braking Data for a Braking Model for a Train
CN105759631A (en) * 2016-03-28 2016-07-13 株洲中车时代电气股份有限公司 Train network control system semi-physical simulation testing system and method
CN105890917A (en) * 2016-06-07 2016-08-24 中车青岛四方车辆研究所有限公司 Traction brake test system
CN105867172A (en) * 2016-06-14 2016-08-17 成都运达牵引技术有限公司 Train vehicle-mounted control network semi-entity test platform

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
丁荣军,等: "电力机车交流传动系统的半实物实时仿真", 《中国铁道科学》 *
中国铁路总公司: "《CTCS-3级列车运行控制系统》", 30 November 2013, 中国铁道出版社 *
吴芳美,等: "《铁路安全软件测试评估》", 31 October 2001, 中国铁道出版社 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111308905A (en) * 2018-12-12 2020-06-19 中国电力科学研究院有限公司 Asymmetric real-time simulation system
CN111308905B (en) * 2018-12-12 2023-11-14 中国电力科学研究院有限公司 Asymmetric real-time simulation system
CN111931284A (en) * 2019-05-13 2020-11-13 中车株洲电力机车研究所有限公司 Rail transit simulation system and method based on distributed architecture
CN110562275A (en) * 2019-09-09 2019-12-13 中车南京浦镇车辆有限公司 Multichannel dual-redundancy rail transit vehicle reconnection system and method
CN112776853A (en) * 2019-11-08 2021-05-11 株洲中车时代电气股份有限公司 Train microcomputer network control system and method thereof
CN112776853B (en) * 2019-11-08 2022-03-22 株洲中车时代电气股份有限公司 Train microcomputer network control system and method thereof
CN112068532A (en) * 2020-09-10 2020-12-11 中车大连电力牵引研发中心有限公司 Test bed and test method for network control system of multi-locomotive
CN112068532B (en) * 2020-09-10 2022-04-15 中车大连电力牵引研发中心有限公司 Test bed and test method for network control system of multi-locomotive

Similar Documents

Publication Publication Date Title
CN108008639A (en) The system digitalized emulation platform of electric locomotive microcomputer network control based on Life cycle
CN102567205B (en) Simulation test system and simulation test device of train network control software
CN101963805B (en) Redundant locomotive WorldFIP network physical simulation platform
CN102023575A (en) Simulation alternating current electric locomotive
CN104364663A (en) Train test platform
CN102616253B (en) Railway signal control simulation system
CN109031977A (en) A kind of design method and HIL test macro of HIL test macro
CN103092755A (en) Automatic generation method of train control system test sequence
CN113219950B (en) Multifunctional virtual test platform for train
CN106406278B (en) The combined test system of rail traffic vehicles control equipment based on MVB bus
CN114488847B (en) Semi-physical simulation system of vehicle-mounted network control system
CN103631147A (en) Train network control system semi-physical comprehensive simulation test platform and test method
CN111319657A (en) Urban rail transit simulation system
CN111123739A (en) Network control system semi-physical simulation experiment platform used in full-automatic unmanned driving mode
CN104503771A (en) Integrated development platform of train network control system
CN108121217A (en) Train Operation Control System Onboard function model machine emulation driving analog system based on inter-vehicle communication
CN112445149A (en) Semi-physical simulation test system of rail train braking system
CN110456761A (en) Test macro, method and the vehicle of energy management apparatus
CN108172060A (en) A kind of full-automatic train driving analog system
CN106354120A (en) Combined test system of rail transit vehicle control device
CN104572108A (en) Train network control system software development method
CN102023637A (en) Test platform of controller area network (CAN)-based light rail vehicle network control system
CN202013572U (en) Low voltage electric simulating system of a train
CN202261347U (en) TCN-based train network simulation experimental system
CN201897792U (en) Simulation AC electric locomotive

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Cui Lan

Inventor after: Ding Yue

Inventor after: Wang Dawei

Inventor before: Guo Zhendong

Inventor before: Ding Yue

Inventor before: Wang Dawei

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180508