CN108000730A - A kind of solar water heater attic installs punch device - Google Patents

A kind of solar water heater attic installs punch device Download PDF

Info

Publication number
CN108000730A
CN108000730A CN201711261014.9A CN201711261014A CN108000730A CN 108000730 A CN108000730 A CN 108000730A CN 201711261014 A CN201711261014 A CN 201711261014A CN 108000730 A CN108000730 A CN 108000730A
Authority
CN
China
Prior art keywords
welding
guide sleeve
gear
nut
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711261014.9A
Other languages
Chinese (zh)
Other versions
CN108000730B (en
Inventor
陈达健
陈立峰
王会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qidong Shengde Machinery Manufacturing Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711261014.9A priority Critical patent/CN108000730B/en
Publication of CN108000730A publication Critical patent/CN108000730A/en
Application granted granted Critical
Publication of CN108000730B publication Critical patent/CN108000730B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Drilling And Boring (AREA)

Abstract

The present invention relates to a kind of solar water heater to install equipment, more particularly to a kind of solar water heater attic installation punch device.A kind of solar water heater attic the technical problem to be solved in the present invention is to provide the real-time deep that drill process is time saving and energy saving, the distance and position of punching is accurate, can understand punching installs punch device.In order to solve the above technical problem, the present invention provides such a solar water heater attic to install punch device, includes installing plate, stent, supporting rod, first bearing seat, screw etc.;The left and right sides is provided with stent by welding on the downside of installing plate, and the left and right sides is provided with supporting rod by welding on the upside of installing plate.Invention achieves drill process is time saving and energy saving, the distance and position of punching is accurate, can understand punching real-time deep effect, the first crank is rotated by using user and by way of the cooperation on the second pointer and the second scale plate, can be accurately controlled the horizontal level of drill bit.

Description

A kind of solar water heater attic installs punch device
Technical field
The present invention relates to a kind of solar water heater to install equipment, more particularly to a kind of installation of solar water heater attic is beaten Hole equipment.
Background technology
Solar energy, generally refers to the emittance of sunlight, is typically used as generating electricity in the modern times.It is just main that biology is formed from the earth The light and heat to be provided with the sun are survived, and are also understood from ancient human with sun-dried object, and as the method for preservation food, Such as salt manufacturing and solarization cured fish.But under fossil fuel reduction, just solar energy is further developed intentionally.The utilization of solar energy have by Dynamic formula utilizes (photothermal conversion) and opto-electronic conversion two ways.A kind of emerging regenerative resource of solar power generation.It is sensu lato Solar energy is the source of many energy on the earth, such as wind energy, chemical energy, the potential energy of water.In tens years, solar energy is Too late, the nexhaustible preferable energy taken.
At present when being installed to attic solar energy, especially when mounting hole is beaten, most of is all to use work Human hand held electric hand drill punches floor, but so has the drawback that the distance and position of opening is not accurate enough, Er Qie During punching, it is difficult to understand the depth of drilling, and it is time-consuming and laborious in boring procedure.
Therefore there is an urgent need for researching and developing, a kind of drill process is time saving and energy saving, the distance and position of punching is accurate, can understand the reality of punching When depth solar water heater attic installation punch device beaten at present when being installed to solar water heater to overcome There are drill process is time-consuming and laborious, the distance and position of punching is not accurate enough, is difficult the real-time deep of understanding punching when hole Shortcoming.
The content of the invention
(1) technical problems to be solved
There are drill process when the present invention is in order to overcome punching when being installed to solar water heater at present Time-consuming and laborious, punching distance and position is not accurate enough, is difficult the shortcomings that understanding the real-time deep of punching, the invention solves skill Art problem be to provide drill process is time saving and energy saving, the distance and position of punching is accurate, can understand punching real-time deep one kind Solar water heater attic installs punch device.
(2) technical solution
In order to solve the above technical problem, the present invention provides the installation punching of such a solar water heater attic to set It is standby, include installing plate, stent, supporting rod, first bearing seat, screw, the first crank, the first guide rail, the first guide sleeve, the first spiral shell Mother, baffle, slide, sliding block, connecting rod, decelerating motor, drill bit, rack, the first L-shaped bar, shaft, first gear and second are shaken The left and right sides is provided with stent by welding on the downside of installing plate, and the installing plate upside left and right sides passes through the side of welding Formula is provided with supporting rod, and supporting rod inner underside is provided with first bearing seat, connects in first bearing seat by bolted connection Screw is connected to, screw right end is connected with the first crank, and supporting rod is provided with the first guide rail by welding between middle part, the Slidingtype is connected with the first guide sleeve on one guide rail, and left is provided with the first nut by welding on the downside of the first guide sleeve, the One nut passes through screw, and the first nut coordinates with screw, and front is provided with baffle by welding on the downside of the first guide sleeve, keeps off Plate is located on front side of screw, and left is provided with slide, the connection of slide inner sliding type by bolted connection on front side of the first guide sleeve There is sliding block, sliding block right end is provided with connecting rod by welding, and connecting rod lower end, which is bolted mode and is provided with, to be subtracted Speed motor, decelerating motor downside are connected with drill bit, rack are connected with the right side of connecting rod, guide sleeve right side top is by welding First L-shaped bar is installed, upper side rotary is connected with shaft in the first L-shaped bar, and shaft left end is connected with first gear, the first tooth Wheel is on rear side of rack, and first gear is engaged with rack, and shaft right end is connected with the second crank.
Preferably, drilling depth measuring device has been further included, drilling depth measuring device includes contiguous block, second leads Set, the second guide rail, fixed block, block, the first scale plate, extension rod and the first pointer, drill bit right are measured equipped with drilling depth Device, right is connected with contiguous block on the downside of decelerating motor, and contiguous block right end is provided with the second guide sleeve by welding, and second Guide sleeve inner sliding type is connected with the second guide rail, and the second guide rail lower end is connected with fixed block, and fixed block is with drill bit lower end positioned at same Horizontal line, the second guide rail upper end are connected with block, and block right end is connected with the first scale plate, passes through welding on the right side of the second guide sleeve Mode is provided with extension rod, and right is connected with the first pointer on the upside of extension rod, and the first pointer refers on the first scale plate.
Preferably, the second L-shaped bar, the second pointer and the second scale plate have been further included, left is connected with the 2nd L on the downside of baffle Shape bar, the second L-shaped bar lower right-hand side are connected with the second pointer, and installing plate front side top is connected with the second scale plate, the second pointer Refer on the second scale plate.
Preferably, quick regulating device has been further included, quick regulating device includes second bearing seat, bull stick, the 3rd shakes , keypad, 3rd bearing seat, rotating ring and second gear, on the upside of supporting rod between be equipped with quick regulating device supporting rod Side is provided with second bearing seat by bolted connection, and bull stick is connected with second bearing seat, and bull stick right end is connected with Three cranks, bull stick upside are connected with keypad, and the first L-shaped bar upper end is provided with 3rd bearing seat by bolted connection, the It is connected with rotating ring in three bearing blocks, upside is provided with keyway in rotating ring, and keyway coordinates with keypad, and the is connected with the left of rotating ring Two gears, second gear are engaged with first gear.
Preferably, the second nut and screw rod have been further included, top is provided with by welding on the right side of Right side support bar Second nut, screw rod is rotary with the second nut, and screw rod and the second nut coordinate.
Operation principle:When user needs to install solar water heater, user can place the equipment Need to install on the position of solar water heater in roof, then user can rotate the first crank, and the first crank drives screw Rotation, screw drive the first nut to move left and right by the cooperation with the first nut, and the first nut drives first guide sleeve or so to move Dynamic, the first guide sleeve drives baffle to move left and right, and the first guide sleeve drives slide to move left and right, and slide drives connecting rod to move left and right, Connecting rod drives decelerating motor and drill bit to move left and right, so as to change the position of drill bit, when the horizontal level for needing to drill is adjusted After good, user can rotate the second crank counterclockwise, and the second crank drives shaft rotation, and shaft drives first gear to revolve counterclockwise Turn, first gear band carry-over bar moves down, and rack drives connecting rod moves down, so as to drive decelerating motor and drill bit downward Mobile, then user can open decelerating motor, and decelerating motor drives bit, and then user continues rotation first counterclockwise Gear, needs on the position that drills so that drill bit is moved down into, so as to drill to floor, when being bored into certain depth Afterwards, user can rotate clockwise the second crank, so as to drive decelerating motor and drill bit to move up, so that drill bit departs from building Layer, then user can continue to rotate the first crank, so that the place for needing to drill carries out moving drill bit, when drilling finishes Afterwards, user can close decelerating motor.
Because having further included drilling depth measuring device, drilling depth measuring device includes contiguous block, the second guide sleeve, Two guide rails, fixed block, block, the first scale plate, extension rod and the first pointer, drill bit right are equipped with drilling depth measuring device, Right is connected with contiguous block on the downside of decelerating motor, and contiguous block right end is provided with the second guide sleeve, the second guide sleeve by welding Inner sliding type is connected with the second guide rail, and the second guide rail lower end is connected with fixed block, and fixed block is located at same level with drill bit lower end Line, the second guide rail upper end are connected with block, and block right end is connected with the first scale plate, and the second guide sleeve right side is by welding Extension rod is installed, right is connected with the first pointer on the upside of extension rod, and the first pointer refers on the first scale plate, when user needs During the depth bored under accurate understanding drill bit, when decelerating motor, which drives drill bit to move down, to be drilled, when drill bit connects When contacting floor surface, fixed block also touches floor surface, and when creeping into row drilling under drill bit, decelerating motor drives fixed block Moved down with the second guide sleeve, and the second guide rail will not move, the second guide sleeve, which moves down, will drive extension rod and first to refer to Pin moves down so that the first pointer refers to the diverse location on the first scale plate, user can according to the position of instruction come The accurate depth for understanding drilling.
Because having further included the second L-shaped bar, the second pointer and the second scale plate, left is connected with the second L-shaped on the downside of baffle Bar, the second L-shaped bar lower right-hand side are connected with the second pointer, and installing plate front side top is connected with the second scale plate, and the second pointer refers to On the second scale plate, between user needs the accurate horizontal level understood at drill bit or accurate judgement needs to punch Horizontal distance when, when user moves left and right drill bit, the second L-shaped bar by drive the second pointer move left and right, Yong Hucong And the judgement to the location of pointer into row distance.
Because having further included quick regulating device, quick regulating device include second bearing seat, bull stick, the 3rd crank, Keypad, 3rd bearing seat, rotating ring and second gear, on the upside of supporting rod between to be equipped with upside in quick regulating device supporting rod logical Cross bolted mode and second bearing seat is installed, bull stick is connected with second bearing seat, bull stick right end is connected with the 3rd and shakes Bull stick upside is connected with keypad, and the first L-shaped bar upper end is provided with 3rd bearing seat, the 3rd axis by bolted connection Rotating ring is connected with bearing, upside is provided with keyway in rotating ring, and keyway coordinates with keypad, and the second tooth is connected with the left of rotating ring Wheel, second gear are engaged with first gear, and when user is needed efficiently to adjust the depth of drilling, user can rotate the 3rd Crank, the 3rd crank drive bull stick rotation, and bull stick drives rotating ring in 3rd bearing seat inward turning by the cooperation of keypad and keyway Turn, rotating ring drives second gear rotation, and second gear drives first gear rotation, when user adjusts the horizontal position of the first guide sleeve When putting, the first guide sleeve drives the first L-shaped bar to move left and right, so that drive rotating ring and second gear to move left and right, so that the Two gears can drive first gear also to be moved left and right when rotation, in this way, the position of the first crank and the 3rd crank It is close, so as to fulfill the quick purpose for adjusting bit depth.
Because having further included the second nut and screw rod, top is provided with second by welding on the right side of Right side support bar Nut, screw rod is rotary with the second nut, and screw rod and the second nut coordinate, when user rotates the height that the 3rd crank regulates drill bit When being transported so as to the equipment, avoiding drill bit, user can be led to rotary screw, screw rod because gravity moves down and causes to contact to earth Cross with the downward precession of the cooperation of the second nut so that screw rod fixes bull stick and it is no longer moved.
(3) beneficial effect
Invention achieves drill process is time saving and energy saving, the distance and position of punching is accurate, can understand the real-time depth of punching The effect of degree, rotates the first crank and by way of the cooperation on the second pointer and the second scale plate, energy by using user The horizontal level of drill bit is enough accurately controlled, drives drill bit to move down and by the first pointer by using the 3rd crank of rotation With the mode of the cooperation of the first scale plate, the real-time deep of drilling can be accurately understood, and can save the strength of user.
Brief description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the main structure diagram of drilling depth measuring device of the present invention.
Fig. 3 is the main structure diagram of the second scale plate of the invention.
Fig. 4 is the main structure diagram of the quick regulating device of the present invention.
Fig. 5 is the main structure diagram of the second nut of the invention.
Mark in attached drawing for:1- installing plates, 2- stents, 3- supporting rods, 4- first bearing seats, 5- screws, 6- first shake , the first guide rails of 7-, the first guide sleeves of 8-, the first nuts of 9-, 10- baffles, 11- slides, 12- sliding blocks, 13- connecting rods, 14- decelerations Motor, 15- drill bits, 16- racks, 17- the first L-shaped bars, 18- shafts, 19- first gears, the second cranks of 20-, 30- drilling depths Measuring device, 301- contiguous blocks, the second guide sleeves of 302-, the second guide rails of 303-, 304- fixed blocks, 305- blocks, the first quarters of 306- Spend plate, 307- extension rods, the first pointers of 308-, 3021- the second L-shaped bars, the second pointers of 3022-, the second scale plates of 3023-, 31- Quick regulating device, 311- second bearing seats, 312- bull sticks, the 3rd cranks of 313-, 314- keypads, 315- 3rd bearing seats, 316- rotating rings, 317- keyways, 318- second gears, the second nuts of 3121-, 3122- screw rods.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of solar water heater attic installs punch device, as shown in Figs. 1-5, includes installing plate 1, stent 2, support Bar 3, first bearing seat 4, screw 5, the first crank 6, the first guide rail 7, the first guide sleeve 8, the first nut 9, baffle 10, slide 11, Sliding block 12, connecting rod 13, decelerating motor 14, drill bit 15, rack 16, the first L-shaped bar 17, shaft 18, first gear 19 and second Crank 20, the downside of installing plate 1 left and right sides are provided with stent 2 by welding, and the upside of installing plate 1 left and right sides passes through weldering The mode connect is provided with supporting rod 3, and 3 inner underside of supporting rod is provided with first bearing seat 4, first axle by bolted connection Screw 5 is connected with bearing 4,5 right end of screw is connected with the first crank 6, and supporting rod 3 is installed by welding between middle part There is the first guide rail 7, slidingtype is connected with the first guide sleeve 8 on the first guide rail 7, and 8 downside left of the first guide sleeve is by welding First nut 9 is installed, the first nut 9 passes through screw 5, and the first nut 9 coordinates with screw 5, and the downside of the first guide sleeve 8 front passes through The mode of welding is provided with baffle 10, and baffle 10 is located at the front side of screw 5, the side that 8 front side left of the first guide sleeve is bolted Formula is provided with slide 11, and 11 inner sliding type of slide is connected with sliding block 12, and 12 right end of sliding block is provided with connection by welding Bar 13,13 lower end of connecting rod are bolted mode and are provided with decelerating motor 14, and the downside of decelerating motor 14 is connected with drill bit 15, The right side of connecting rod 13 is connected with rack 16, and top is provided with the first L-shaped bar 17, the first L-shaped by welding on the right side of guide sleeve Upper side rotary is connected with shaft 18 in bar 17, and 18 left end of shaft is connected with first gear 19, and first gear 19 is located at rack 16 Rear side, first gear 19 are engaged with rack 16, and 18 right end of shaft is connected with the second crank 20.
Embodiment 2
A kind of solar water heater attic installs punch device, as shown in Figs. 1-5, includes installing plate 1, stent 2, support Bar 3, first bearing seat 4, screw 5, the first crank 6, the first guide rail 7, the first guide sleeve 8, the first nut 9, baffle 10, slide 11, Sliding block 12, connecting rod 13, decelerating motor 14, drill bit 15, rack 16, the first L-shaped bar 17, shaft 18, first gear 19 and second Crank 20, the downside of installing plate 1 left and right sides are provided with stent 2 by welding, and the upside of installing plate 1 left and right sides passes through weldering The mode connect is provided with supporting rod 3, and 3 inner underside of supporting rod is provided with first bearing seat 4, first axle by bolted connection Screw 5 is connected with bearing 4,5 right end of screw is connected with the first crank 6, and supporting rod 3 is installed by welding between middle part There is the first guide rail 7, slidingtype is connected with the first guide sleeve 8 on the first guide rail 7, and 8 downside left of the first guide sleeve is by welding First nut 9 is installed, the first nut 9 passes through screw 5, and the first nut 9 coordinates with screw 5, and the downside of the first guide sleeve 8 front passes through The mode of welding is provided with baffle 10, and baffle 10 is located at the front side of screw 5, the side that 8 front side left of the first guide sleeve is bolted Formula is provided with slide 11, and 11 inner sliding type of slide is connected with sliding block 12, and 12 right end of sliding block is provided with connection by welding Bar 13,13 lower end of connecting rod are bolted mode and are provided with decelerating motor 14, and the downside of decelerating motor 14 is connected with drill bit 15, The right side of connecting rod 13 is connected with rack 16, and top is provided with the first L-shaped bar 17, the first L-shaped by welding on the right side of guide sleeve Upper side rotary is connected with shaft 18 in bar 17, and 18 left end of shaft is connected with first gear 19, and first gear 19 is located at rack 16 Rear side, first gear 19 are engaged with rack 16, and 18 right end of shaft is connected with the second crank 20.
Drilling depth measuring device 30 is further included, drilling depth measuring device 30 includes contiguous block 301, the second guide sleeve 302nd, the second guide rail 303, fixed block 304, block 305, the first scale plate 306,307 and first pointer 308 of extension rod, drill bit 15 Right is equipped with drilling depth measuring device 30, and 14 downside right of decelerating motor is connected with contiguous block 301, and 301 right end of contiguous block leads to The mode for crossing welding is provided with the second guide sleeve 302, and 302 inner sliding type of the second guide sleeve is connected with the second guide rail 303, the second guide rail 303 lower ends are connected with fixed block 304, and fixed block 304 is located at same horizontal line with 15 lower end of drill bit, and 303 upper end of the second guide rail connects Block 305 is connected to, 305 right end of block is connected with the first scale plate 306, and the right side of the second guide sleeve 302 is installed by welding There is extension rod 307,307 upside right of extension rod is connected with the first pointer 308, and the first pointer 308 refers in the first scale plate 306 On.
Embodiment 3
A kind of solar water heater attic installs punch device, as shown in Figs. 1-5, includes installing plate 1, stent 2, support Bar 3, first bearing seat 4, screw 5, the first crank 6, the first guide rail 7, the first guide sleeve 8, the first nut 9, baffle 10, slide 11, Sliding block 12, connecting rod 13, decelerating motor 14, drill bit 15, rack 16, the first L-shaped bar 17, shaft 18, first gear 19 and second Crank 20, the downside of installing plate 1 left and right sides are provided with stent 2 by welding, and the upside of installing plate 1 left and right sides passes through weldering The mode connect is provided with supporting rod 3, and 3 inner underside of supporting rod is provided with first bearing seat 4, first axle by bolted connection Screw 5 is connected with bearing 4,5 right end of screw is connected with the first crank 6, and supporting rod 3 is installed by welding between middle part There is the first guide rail 7, slidingtype is connected with the first guide sleeve 8 on the first guide rail 7, and 8 downside left of the first guide sleeve is by welding First nut 9 is installed, the first nut 9 passes through screw 5, and the first nut 9 coordinates with screw 5, and the downside of the first guide sleeve 8 front passes through The mode of welding is provided with baffle 10, and baffle 10 is located at the front side of screw 5, the side that 8 front side left of the first guide sleeve is bolted Formula is provided with slide 11, and 11 inner sliding type of slide is connected with sliding block 12, and 12 right end of sliding block is provided with connection by welding Bar 13,13 lower end of connecting rod are bolted mode and are provided with decelerating motor 14, and the downside of decelerating motor 14 is connected with drill bit 15, The right side of connecting rod 13 is connected with rack 16, and top is provided with the first L-shaped bar 17, the first L-shaped by welding on the right side of guide sleeve Upper side rotary is connected with shaft 18 in bar 17, and 18 left end of shaft is connected with first gear 19, and first gear 19 is located at rack 16 Rear side, first gear 19 are engaged with rack 16, and 18 right end of shaft is connected with the second crank 20.
Drilling depth measuring device 30 is further included, drilling depth measuring device 30 includes contiguous block 301, the second guide sleeve 302nd, the second guide rail 303, fixed block 304, block 305, the first scale plate 306,307 and first pointer 308 of extension rod, drill bit 15 Right is equipped with drilling depth measuring device 30, and 14 downside right of decelerating motor is connected with contiguous block 301, and 301 right end of contiguous block leads to The mode for crossing welding is provided with the second guide sleeve 302, and 302 inner sliding type of the second guide sleeve is connected with the second guide rail 303, the second guide rail 303 lower ends are connected with fixed block 304, and fixed block 304 is located at same horizontal line with 15 lower end of drill bit, and 303 upper end of the second guide rail connects Block 305 is connected to, 305 right end of block is connected with the first scale plate 306, and the right side of the second guide sleeve 302 is installed by welding There is extension rod 307,307 upside right of extension rod is connected with the first pointer 308, and the first pointer 308 refers in the first scale plate 306 On.
The second L-shaped bar 3021, the second pointer 3022 and the second scale plate 3023, the connection of 10 downside left of baffle are further included There is the second L-shaped bar 3021,3021 lower right-hand side of the second L-shaped bar is connected with the second pointer 3022, and 1 front side top of installing plate is connected with Second scale plate 3023, the second pointer 3022 refer on the second scale plate 3023.
Embodiment 4
A kind of solar water heater attic installs punch device, as shown in Figs. 1-5, includes installing plate 1, stent 2, support Bar 3, first bearing seat 4, screw 5, the first crank 6, the first guide rail 7, the first guide sleeve 8, the first nut 9, baffle 10, slide 11, Sliding block 12, connecting rod 13, decelerating motor 14, drill bit 15, rack 16, the first L-shaped bar 17, shaft 18, first gear 19 and second Crank 20, the downside of installing plate 1 left and right sides are provided with stent 2 by welding, and the upside of installing plate 1 left and right sides passes through weldering The mode connect is provided with supporting rod 3, and 3 inner underside of supporting rod is provided with first bearing seat 4, first axle by bolted connection Screw 5 is connected with bearing 4,5 right end of screw is connected with the first crank 6, and supporting rod 3 is installed by welding between middle part There is the first guide rail 7, slidingtype is connected with the first guide sleeve 8 on the first guide rail 7, and 8 downside left of the first guide sleeve is by welding First nut 9 is installed, the first nut 9 passes through screw 5, and the first nut 9 coordinates with screw 5, and the downside of the first guide sleeve 8 front passes through The mode of welding is provided with baffle 10, and baffle 10 is located at the front side of screw 5, the side that 8 front side left of the first guide sleeve is bolted Formula is provided with slide 11, and 11 inner sliding type of slide is connected with sliding block 12, and 12 right end of sliding block is provided with connection by welding Bar 13,13 lower end of connecting rod are bolted mode and are provided with decelerating motor 14, and the downside of decelerating motor 14 is connected with drill bit 15, The right side of connecting rod 13 is connected with rack 16, and top is provided with the first L-shaped bar 17, the first L-shaped by welding on the right side of guide sleeve Upper side rotary is connected with shaft 18 in bar 17, and 18 left end of shaft is connected with first gear 19, and first gear 19 is located at rack 16 Rear side, first gear 19 are engaged with rack 16, and 18 right end of shaft is connected with the second crank 20.
Drilling depth measuring device 30 is further included, drilling depth measuring device 30 includes contiguous block 301, the second guide sleeve 302nd, the second guide rail 303, fixed block 304, block 305, the first scale plate 306,307 and first pointer 308 of extension rod, drill bit 15 Right is equipped with drilling depth measuring device 30, and 14 downside right of decelerating motor is connected with contiguous block 301, and 301 right end of contiguous block leads to The mode for crossing welding is provided with the second guide sleeve 302, and 302 inner sliding type of the second guide sleeve is connected with the second guide rail 303, the second guide rail 303 lower ends are connected with fixed block 304, and fixed block 304 is located at same horizontal line with 15 lower end of drill bit, and 303 upper end of the second guide rail connects Block 305 is connected to, 305 right end of block is connected with the first scale plate 306, and the right side of the second guide sleeve 302 is installed by welding There is extension rod 307,307 upside right of extension rod is connected with the first pointer 308, and the first pointer 308 refers in the first scale plate 306 On.
The second L-shaped bar 3021, the second pointer 3022 and the second scale plate 3023, the connection of 10 downside left of baffle are further included There is the second L-shaped bar 3021,3021 lower right-hand side of the second L-shaped bar is connected with the second pointer 3022, and 1 front side top of installing plate is connected with Second scale plate 3023, the second pointer 3022 refer on the second scale plate 3023.
Quick regulating device 31 is further included, quick regulating device 31 includes second bearing seat 311, bull stick the 312, the 3rd Crank 313, keypad 314,3rd bearing seat 315, rotating ring 316 and second gear 318, supporting rod 3 are equipped with fast between upside Upside is provided with second bearing seat 311 by bolted connection in 31 supporting rod 3 of regulating device, in second bearing seat 311 Bull stick 312 is connected with, 312 right end of bull stick is connected with the 3rd crank 313, and the upside of bull stick 312 is connected with keypad 314, the first L-shaped bar 17 upper ends are provided with 3rd bearing seat 315 by bolted connection, and rotating ring 316 is connected with 3rd bearing seat 315, rotation Upside is provided with keyway 317 in change 316, and keyway 317 coordinates with keypad 314, and the left side of rotating ring 316 is connected with second gear 318, Second gear 318 is engaged with first gear 19.
The second nut 3121 and screw rod 3122 are further included, the right side of Right side support bar 3 top is installed by welding There is the second nut 3121, screw rod 3122 is rotary with the second nut 3121, screw rod 3122 coordinates with the second nut 3121.
Operation principle:When user needs to install solar water heater, user can place the equipment Need to install on the position of solar water heater in roof, then user can rotate the first crank 6, and the first crank 6 drives silk Bar 5 rotates, and screw 5 drives the first nut 9 to move left and right by the cooperation with the first nut 9, and the first nut 9 drives the first guide sleeve 8 move left and right, and the first guide sleeve 8 drives baffle 10 to move left and right, and the first guide sleeve 8 drives slide 11 to move left and right, and slide 11 drives Connecting rod 13 moves left and right, and connecting rod 13 drives decelerating motor 14 and drill bit 15 to move left and right, so that change the position of drill bit 15, After the horizontal level for needing to drill regulates, user can rotate the second crank 20 counterclockwise, and the second crank 20 drives shaft 18 rotations, shaft 18 drive first gear 19 to rotate counterclockwise, and first gear 19 is moved down with carry-over bar 16, and rack 16 drives Connecting rod 13 moves down, so as to drive decelerating motor 14 and drill bit 15 to move down, then user can open decelerating motor 14, decelerating motor 14 drives drill bit 15 to rotate, and then user continues revolving first gear 19 counterclockwise, so that drill bit 15 is downward It is moved on the position for needing to drill, so as to drill to floor, after certain depth is bored into, user can revolve clockwise Turn the second crank 20, so as to drive decelerating motor 14 and drill bit 15 to move up, so that drill bit 15 departs from floor, then user It can continue to rotate the first crank 6, so that the place for needing to drill carries out moving drill bit 15, after drilling, Yong Huke To close decelerating motor 14.
Because having further included drilling depth measuring device 30, drilling depth measuring device 30 includes contiguous block 301, second Guide sleeve 302, the second guide rail 303, fixed block 304, block 305, the first scale plate 306,307 and first pointer 308 of extension rod, are bored First 15 right is equipped with drilling depth measuring device 30, and 14 downside right of decelerating motor is connected with contiguous block 301, and contiguous block 301 is right End is provided with the second guide sleeve 302 by welding, and 302 inner sliding type of the second guide sleeve is connected with the second guide rail 303, and second leads 303 lower end of rail is connected with fixed block 304, and fixed block 304 is located at same horizontal line, 303 upper end of the second guide rail with 15 lower end of drill bit Block 305 is connected with, 305 right end of block is connected with the first scale plate 306, and the right side of the second guide sleeve 302 is pacified by welding Equipped with extension rod 307,307 upside right of extension rod is connected with the first pointer 308, and the first pointer 308 refers in the first scale plate 306 On, when user needs the depth of accurate 15 times brills of understanding drill bit, when decelerating motor 14 drives drill bit 15 to move down progress When drilling, when drill bit 15 touches floor surface, fixed block 304 also touches floor surface, when 15 times drillings of drill bit During row drilling, decelerating motor 14 drives 304 and second guide sleeve 302 of fixed block to move down, and the second guide rail 303 will not move Dynamic, the second guide sleeve 302, which moves down, will drive 307 and first pointer 308 of extension rod to move down, so that the first pointer 308 Refer to the diverse location on the first scale plate 306, user can be according to the position of instruction come the accurate depth for understanding drilling.
Because having further included the second L-shaped bar 3021, the second pointer 3022 and the second scale plate 3023,10 downside left of baffle The second L-shaped bar 3021 is connected with, 3021 lower right-hand side of the second L-shaped bar is connected with the second pointer 3022, and 1 front side top of installing plate connects The second scale plate 3023 is connected to, the second pointer 3022 refers on the second scale plate 3023, when user needs accurate understanding drill bit 15 When present horizontal level or accurate judgement need the horizontal distance between punching, when user moves left and right drill bit 15 Wait, the second L-shaped bar 3021 will drive the second pointer 3022 to move left and right, user so as to the location of pointer into row distance Judge.
Because having further included quick regulating device 31, quick regulating device 31 include second bearing seat 311, bull stick 312, 3rd crank 313, keypad 314,3rd bearing seat 315, rotating ring 316 and second gear 318, supporting rod 3 are equipped between upside Upside is provided with second bearing seat 311, second bearing seat by bolted connection in quick 31 supporting rod 3 of regulating device It is connected with bull stick 312 in 311,312 right end of bull stick is connected with the 3rd crank 313, and the upside of bull stick 312 is connected with keypad 314, and first 17 upper end of L-shaped bar is provided with 3rd bearing seat 315 by bolted connection, and rotating ring is connected with 3rd bearing seat 315 316, the interior upside of rotating ring 316 is provided with keyway 317, and keyway 317 coordinates with keypad 314, and the left side of rotating ring 316 is connected with the second tooth Wheel 318, second gear 318 is engaged with first gear 19, and when user is needed efficiently to adjust the depth of drilling, user can be with The 3rd crank 313 is rotated, the 3rd crank 313 drives bull stick 312 to rotate, the cooperation that bull stick 312 passes through keypad 314 and keyway 317 The rotation in 3rd bearing seat 315 of rotating ring 316 is driven, rotating ring 316 drives second gear 318 to rotate, 318 band of second gear Dynamic first gear 19 rotates, and when user adjusts the horizontal level of the first guide sleeve 8, the first guide sleeve 8 drives the first L-shaped bar 17 or so It is mobile, so as to drive rotating ring 316 and second gear 318 to move left and right, so that second gear 318 can drive first gear It can also be moved left and right when 19 rotation, in this way, the position of the first crank 6 and the 3rd crank 313 is close, so as to fulfill quick Adjust the purpose of 15 depth of drill bit.
Because having further included the second nut 3121 and screw rod 3122, the right side of Right side support bar 3 top is by welding Second nut 3121 is installed, screw rod 3122 is rotary with the second nut 3121, screw rod 3122 coordinates with the second nut 3121, when with Family rotate the 3rd crank 313 regulate the height of drill bit 15 so as to the equipment transported when, avoid drill bit 15 because gravity to Lower movement causes to contact to earth, user can with rotary screw 3122, screw rod 3122 by the downward precession of cooperation with the second nut 3121, So that screw rod 3122 fixes bull stick 312 and it is no longer moved.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (5)

1. a kind of solar water heater attic installs punch device, it is characterised in that includes installing plate (1), stent (2), branch Strut (3), first bearing seat (4), screw (5), the first crank (6), the first guide rail (7), the first guide sleeve (8), the first nut (9), baffle (10), slide (11), sliding block (12), connecting rod (13), decelerating motor (14), drill bit (15), rack (16), first L-shaped bar (17), shaft (18), first gear (19) and the second crank (20), installing plate (1) the downside left and right sides pass through welding Mode is provided with stent (2), and the left and right sides is provided with supporting rod (3), supporting rod by welding on the upside of installing plate (1) (3) inner underside is provided with first bearing seat (4) by bolted connection, and screw (5) is connected with first bearing seat (4), Screw (5) right end is connected with the first crank (6), and supporting rod (3) is provided with the first guide rail by welding between middle part (7), slidingtype is connected with the first guide sleeve (8) on the first guide rail (7), and left is pacified by welding on the downside of the first guide sleeve (8) Equipped with the first nut (9), the first nut (9) passes through screw (5), and the first nut (9) coordinates with screw (5), under the first guide sleeve (8) Baffle (10) is installed by welding, baffle (10) is located on front side of screw (5), left on front side of the first guide sleeve (8) in front of side Side is provided with slide (11) by bolted connection, and slide (11) inner sliding type is connected with sliding block (12), and sliding block (12) is right End is provided with connecting rod (13) by welding, and connecting rod (13) lower end is bolted mode and is provided with decelerating motor (14), drill bit (15) is connected with the downside of decelerating motor (14), rack (16), guide sleeve right side top are connected with the right side of connecting rod (13) First L-shaped bar (17) is installed by welding, upper side rotary is connected with shaft (18) in the first L-shaped bar (17), turns Axis (18) left end is connected with first gear (19), and first gear (19) is located on rear side of rack (16), first gear (19) and rack (16) engage, shaft (18) right end is connected with the second crank (20).
A kind of 2. solar water heater attic installation punch device according to claim 1, it is characterised in that
Drilling depth measuring device (30) is further included, drilling depth measuring device (30) includes contiguous block (301), second leads Cover (302), the second guide rail (303), fixed block (304), block (305), the first scale plate (306), extension rod (307) and first Pointer (308), drill bit (15) right are equipped with drilling depth measuring device (30), and right is connected with connection on the downside of decelerating motor (14) Block (301), contiguous block (301) right end are provided with the second guide sleeve (302), are slided in the second guide sleeve (302) by welding Formula is connected with the second guide rail (303), and the second guide rail (303) lower end is connected with fixed block (304), fixed block (304) and drill bit (15) lower end is located at same horizontal line, and the second guide rail (303) upper end is connected with block (305), and block (305) right end is connected with One scale plate (306), is provided with extension rod (307) on the right side of the second guide sleeve (302) by welding, on extension rod (307) Side right is connected with the first pointer (308), and the first pointer (308) refers on the first scale plate (306).
3. a kind of solar water heater attic installation punch device according to claim 2, it is characterised in that further included Second L-shaped bar (3021), the second pointer (3022) and the second scale plate (3023), baffle (10) downside left are connected with the 2nd L Shape bar (3021), second L-shaped bar (3021) lower right-hand side are connected with the second pointer (3022), the connection of installing plate (1) front side top There is the second scale plate (3023), the second pointer (3022) refers on the second scale plate (3023).
4. a kind of solar water heater attic installation punch device according to claim 3, it is characterised in that further included Quick regulating device (31), quick regulating device (31) include second bearing seat (311), bull stick (312), the 3rd crank (313), keypad (314), 3rd bearing seat (315), rotating ring (316) and second gear (318), on the upside of supporting rod (3) between Second bearing seat (311) is installed by bolted connection equipped with upside in quick regulating device (31) supporting rod (3), the Bull stick (312) is connected with two bearing bracket (311), bull stick (312) right end is connected with the 3rd crank (313), bull stick (312) upside It is connected with keypad (314), first L-shaped bar (17) upper end is provided with 3rd bearing seat (315) by bolted connection, and the 3rd Rotating ring (316) is connected with bearing block (315), upside is provided with keyway (317), keyway (317) and keypad in rotating ring (316) (314) coordinate, be connected with second gear (318) on the left of rotating ring (316), second gear (318) is engaged with first gear (19).
5. a kind of solar water heater attic installation punch device according to claim 4, it is characterised in that further included Second nut (3121) and screw rod (3122), Right side support bar (3) right side top are provided with the second nut by welding (3121), screw rod (3122) is rotary with the second nut (3121), screw rod (3122) coordinates with the second nut (3121).
CN201711261014.9A 2017-12-04 2017-12-04 Solar water heater top building installation drilling equipment Active CN108000730B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711261014.9A CN108000730B (en) 2017-12-04 2017-12-04 Solar water heater top building installation drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711261014.9A CN108000730B (en) 2017-12-04 2017-12-04 Solar water heater top building installation drilling equipment

Publications (2)

Publication Number Publication Date
CN108000730A true CN108000730A (en) 2018-05-08
CN108000730B CN108000730B (en) 2019-12-06

Family

ID=62056639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711261014.9A Active CN108000730B (en) 2017-12-04 2017-12-04 Solar water heater top building installation drilling equipment

Country Status (1)

Country Link
CN (1) CN108000730B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2638921Y (en) * 2003-09-05 2004-09-08 周宇航 Automatic diamond grinding machine
CN104368678A (en) * 2014-10-28 2015-02-25 浙江德盛铁路器材股份有限公司 Movable rail punching device
CN104475811A (en) * 2014-12-17 2015-04-01 戴先科 Multifunctional lockset puncher
CN106180825A (en) * 2016-09-08 2016-12-07 济南大学 Drilling guide device
CN106907563A (en) * 2017-03-31 2017-06-30 浙江工业职业技术学院 A kind of electromechanical equipment gear-box lubricating oil efficiently adds equipment
CN107042331A (en) * 2017-02-22 2017-08-15 赣州科源甬致科技有限公司 A kind of industrial larger caliber steel pipe cutting equipment
CN107214414A (en) * 2017-06-19 2017-09-29 上海三束实业有限公司 A kind of laser welding apparatus for the overlapping welding of rosette

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2638921Y (en) * 2003-09-05 2004-09-08 周宇航 Automatic diamond grinding machine
CN104368678A (en) * 2014-10-28 2015-02-25 浙江德盛铁路器材股份有限公司 Movable rail punching device
CN104475811A (en) * 2014-12-17 2015-04-01 戴先科 Multifunctional lockset puncher
CN106180825A (en) * 2016-09-08 2016-12-07 济南大学 Drilling guide device
CN107042331A (en) * 2017-02-22 2017-08-15 赣州科源甬致科技有限公司 A kind of industrial larger caliber steel pipe cutting equipment
CN106907563A (en) * 2017-03-31 2017-06-30 浙江工业职业技术学院 A kind of electromechanical equipment gear-box lubricating oil efficiently adds equipment
CN107214414A (en) * 2017-06-19 2017-09-29 上海三束实业有限公司 A kind of laser welding apparatus for the overlapping welding of rosette

Also Published As

Publication number Publication date
CN108000730B (en) 2019-12-06

Similar Documents

Publication Publication Date Title
CN205309385U (en) Drilling equipment
CN107238512B (en) Geology beach environment detects sampler
CN107914030A (en) A kind of wall-hanging solar installation drilling device
CN207147813U (en) A kind of Municipal Engineering Construction soil sample collector
CN213689012U (en) Ocean engineering marine environment monitoring devices
CN112798328A (en) Geological soil layer exploration sampling device
CN209021270U (en) A kind of production automobile water tank radiation fan drilling machine
CN108000730A (en) A kind of solar water heater attic installs punch device
CN103042252B (en) Drilling equipment
CN209198132U (en) Underground water sampling device for hydrogeology and engineering geology
CN205213376U (en) Self -propelled full -automatic rice transplanter
CN115462361B (en) Bird repellent device for transmission line
CN206865404U (en) A kind of device of solar generating with sunflower characteristic
CN103042250B (en) Perforating device
CN215725960U (en) Fixed point marking device in engineering survey
CN210977305U (en) Research block soil layer drilling device for deposition simulation experiment
CN202985802U (en) Drilling device
CN203519265U (en) Large-size raining testing box with wind source
CN203824792U (en) Universal concrete core drilling machine
CN208262472U (en) A kind of annular is redrilled with gear-hobbing machine burr remover
CN110607816A (en) Mechanical arm of earth boring machine
CN202984734U (en) Perforating device
CN203076641U (en) Drilling device
CN204085930U (en) A kind of metal bores milling sampling device
CN204330279U (en) The integrated gathering-device of wind erosion depositing dust

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191112

Address after: Paitou town 311800 Zhejiang city of Shaoxing province Zhuji City, Wang Jia Zhai Cun Tang Nan No. 23

Applicant after: Zhuji Yihe Project Investment Co.,Ltd.

Address before: 200433 No. 220, Handan Road, Shanghai, Yangpu District

Applicant before: Chen Dajian

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200901

Address after: 226200 No.1 Xinglong Road, Chengbei Industrial Park, Qidong City, Nantong City, Jiangsu Province

Patentee after: Qidong Hezi New Material Co.,Ltd.

Address before: Paitou town 311800 Zhejiang city of Shaoxing province Zhuji City, Wang Jia Zhai Cun Tang Nan No. 23

Patentee before: Zhuji Yihe Project Investment Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220919

Address after: No. 16, Qingnian East Road, Qidong science and technology entrepreneurship Park, Nantong City, Jiangsu Province, 226000

Patentee after: Qidong Shengde Machinery Manufacturing Co.,Ltd.

Address before: 226200 No.1 Xinglong Road, Chengbei Industrial Park, Qidong City, Nantong City, Jiangsu Province

Patentee before: Qidong Hezi New Material Co.,Ltd.