CN107993028A - A kind of acquisition methods and system in storage server product standard man-hour - Google Patents
A kind of acquisition methods and system in storage server product standard man-hour Download PDFInfo
- Publication number
- CN107993028A CN107993028A CN201711443379.3A CN201711443379A CN107993028A CN 107993028 A CN107993028 A CN 107993028A CN 201711443379 A CN201711443379 A CN 201711443379A CN 107993028 A CN107993028 A CN 107993028A
- Authority
- CN
- China
- Prior art keywords
- man
- hour
- difference
- benchmark
- standard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003860 storage Methods 0.000 title claims abstract description 56
- 238000000034 method Methods 0.000 title claims abstract description 38
- 239000000463 material Substances 0.000 claims abstract description 159
- 238000005259 measurement Methods 0.000 claims abstract description 25
- 230000008569 process Effects 0.000 claims abstract description 13
- 238000003672 processing method Methods 0.000 claims description 11
- 230000008859 change Effects 0.000 claims description 8
- 230000035479 physiological effects, processes and functions Effects 0.000 claims description 7
- 238000003754 machining Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 8
- 238000005516 engineering process Methods 0.000 description 4
- 230000033001 locomotion Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Manufacturing & Machinery (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of acquisition methods and system in storage server product standard man-hour, its acquisition process is:Measurement obtains all man-hours when every kind of material for storing product is processed first, for same material, wherein any one will measure man-hour as material benchmark man-hour, other to measure man-hours with the difference in benchmark man-hour as material difference man-hour;The difference man-hour pair principle of every kind of material, obtains all differences man-hour under the type in the definition storage every kind of type of product;Calculate and obtain storage product standard man-hour, i.e. standard work force=(during ∑ material benchmark man-hour * k+ material difference chief engineers) (1+ α).The acquisition methods and system in a kind of storage server product standard man-hour of the present invention are compared with prior art, solve the problems, such as identical name of material but the time variance caused by mode of operation is varied in all kinds of types, accurate foundation is provided to production capacity and cost accounting, it is highly practical, it is applied widely, it is easy to spread.
Description
Technical field
The present invention relates to storage server product standard man-hour calculation technology, specifically a kind of highly practical storage
The acquisition methods and system of server product standard work force.
Background technology
Standard work force is under standard working environment, carries out the manual time needed for one of manufacturing procedure.Standard work force
Formulating method has a variety of, and commonly used approach has:Standard work force=standard work time+non-cutting time.Standard work time by
Technical process determines, predominantly directly increases artificial/machine time consumption of value of the product.Reduction to standard work force can only lead to
Crossing process improving and non-cutting time reduces.
Most common standard work force obtains and is realized by stopwatch mensuration in the prior art, i.e., using stopwatch(Also it is code table)
Method measured directly is carried out, generally selects the operation in normal circumstances of general skilled staff, carries out time measurement;Stopwatch measures
Also there are a variety of methods, can select, using repeatedly measurement, can also select continuously to measure;Given time standard setting
(Predetermined Time Standards, PTS)Method, it is that the movement decomposition that will form working cell is basic into several
Action, observes these elemental motions, then makes the standard time table of elemental motion in detail.
But traditional standard work force accounting method is in the case of in face of same model various configurations, even if identical
The material of configuration, there is also a variety of assembling modes, causes man-hour to adjust distortion in different types, causes follow-up man-hour to safeguard
The puzzlement such as difficult, production capacity and cost accounting distortion.
Therefore, there is an urgent need for a kind of technology for precisely obtaining standard work force.
The content of the invention
The technical assignment of the present invention is to be directed to above shortcoming, there is provided a kind of highly practical storage server product mark
The acquisition methods and system in quasi- man-hour.
A kind of acquisition methods in storage server product standard man-hour, for storing in product same thing under a certain model
The standard machining period statistics of material, its acquisition process are:
First, first measurement obtain it is every kind of be used to store all man-hours when the material of product is processed, for same material,
Wherein any one man-hour will be measured as material benchmark man-hour, the differences in other measurement man-hours and benchmark man-hour are as material difference
Man-hour;
2nd, definition stores the difference man-hour pair principle of every kind of material in the every kind of type of product, obtains all differences under the type
Man-hour;
3rd, calculate and obtain storage product standard man-hour, i.e. standard work force=(during ∑ material benchmark man-hour * k+ material difference chief engineers)
(1+ α), wherein k represent the quantity of same material in the storage product, and when material difference chief engineer is same material in the type
All differences man-hour, α puts coefficient, value 8-20% for self-defined width.
In the step 1, the acquisition process in benchmark man-hour is:By the way of when stopwatch is surveyed, to same name of material,
Material under same processing method carries out at least 10 times measurements, and it is base to take from all data man-hour of its Median levels
Plinth, the benchmark man-hour as the title material.
In the step 1, the acquisition process in difference man-hour is:By the way of when stopwatch is surveyed, to same name of material,
Material under the processing method different from benchmark man-hour carries out at least 10 times measurements, and its Median levels is taken from all data
Man-hour based on, numerical value which is obtained takes difference with benchmark man-hour, which is difference man-hour.
Difference man-hour pair principle in the step 2 refers to existing all differences work under this kind storage product type
When, i.e., all materials difference man-hour existing for used material in this kind of type can determine that by the pair principle.
Wide factor alpha=α 1+ α 2+ α 3, wherein α 1 of putting in the step 3 is to change Dan Kuanfang, value 1-4%;α 2 is order
Batch width is put, value 2-8%;α 3 is fatigue and physiology is wide puts, value 2-8%;The α 1, α 2, α 3 are self-defined coefficient.
A kind of acquisition system in storage server product standard man-hour, including,
Benchmark man-hour storehouse, for storing material benchmark man-hour;
Difference man-hour storehouse, for storing material difference man-hour, which refers to same material in different processing sides
Machining period under formula and the difference between material benchmark man-hour;
Man-hour storehouse is matched, for storing product type pair principle, can be obtained under the type according to the man-hour pair principle
All differences man-hour;
Computing module, calculates for completing standard work force, and when user inputs storage product type, computing module obtains benchmark work
Material benchmark time data in Shi Ku, and data in difference man-hour storehouse are obtained by matching the pair principle in man-hour storehouse, then
Standard work force is obtained by the following formula:
Standard work force=(during ∑ material benchmark man-hour * k+ material difference chief engineers) (1+ α), wherein k represents same in the storage product
The quantity of material;It it is all differences man-hour of same material in the type during material difference chief engineer, α is put for self-defined width is
Number, value 8-20%.
Material benchmark man-hour in benchmark man-hour storehouse obtains in the following manner:It is right by the way of when stopwatch is surveyed
Material under same name of material, same processing method carries out at least 10 times measurements, and its median water is taken from all data
Based on flat man-hour, the material benchmark man-hour as the title material.
Material difference man-hour in the pairing man-hour storehouse obtains in the following manner:It is right by the way of when stopwatch is surveyed
Material under same name of material, the processing method different from benchmark man-hour carries out at least 10 times measurements, and from all data
The numerical value for obtaining the measurement based on taking the man-hour of its Median levels and the material benchmark man-hour stored in benchmark man-hour storehouse
Difference is taken, which is difference man-hour.
The pair principle of the pairing man-hour library storage refers to existing all differences man-hour under this kind storage product type,
All materials difference man-hour existing for used material in this kind of type can determine that by the pair principle.
It is wide to put factor alpha=α 1+ α 2+ α 3, wherein α 1 to change in the formula that the computing module calculates standard work force
Dan Kuanfang, value 1-4%;α 2 is put for order batch width, value 2-8%;α 3 is fatigue and physiology is wide puts, value 2-8%;
The α 1, α 2, α 3 are self-defined coefficient.
Compared to the prior art the acquisition methods and system in a kind of storage server product standard man-hour of the present invention, have
Following beneficial effect:
The acquisition methods and system in a kind of storage server product standard man-hour of the present invention, for storage product standard man-hour
Adjust, product man-hour is divided into different levels, and form the man-hour storehouse of each level, according to customer order and type, core
The man-hour of each level is calculated, according to above-mentioned logic, the standard work force for forming product carrys out Instructing manufacture, solves identical material name
Title but the time variance problem caused by mode of operation is varied in all kinds of types, standard is provided to production capacity and cost accounting
True foundation, it is highly practical, it is applied widely, it is easy to spread.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
The embodiment of invention, for those of ordinary skill in the art, without creative efforts, can also basis
The attached drawing of offer obtains other attached drawings.
Attached drawing 1 realizes schematic diagram for the present invention's.
Embodiment
In order to make those skilled in the art more fully understand the solution of the present invention, with reference to embodiment to this
Invention is described in further detail.Obviously, described embodiment is only part of the embodiment of the present invention, rather than all
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art institute without making creative work
The every other embodiment obtained, belongs to the scope of protection of the invention.
As shown in Figure 1, a kind of acquisition methods in storage server product standard man-hour, for storing a certain type in product
The standard machining period statistics of same material, this method are suitable for other similar products work under CELL multistation dot patterns under number
The accounting of standard work force when making.
It is varied to store the type configuration of product, for material of the same race when different types assembles, operation technique may
There is difference, the present invention is by building hierarchical model, on the basis of a kind of material assembles man-hour, different types, different things
Material gives appropriate compensation in different levels, has achieveed the purpose that to balance man-hour;According to material variety and operating method, scene
Measure material the number of working processes, as the basis in hierarchical man-hour, then according to material different type of machines difference, with benchmark material
Based on man-hour, hierarchical man-hour is auxiliary, hierarchical standard work force storehouse is made, and then form the standard work force of storage product.
Its acquisition process is:
First, first measurement obtain it is every kind of be used to store all man-hours when the material of product is processed, for same material,
Wherein any one man-hour will be measured as material benchmark man-hour, the differences in other measurement man-hours and benchmark man-hour are as material difference
Man-hour;
2nd, definition stores the difference man-hour pair principle of every kind of material in the every kind of type of product, obtains all differences under the type
Man-hour;
3rd, calculate and obtain storage product standard man-hour, i.e. standard work force=(during ∑ material benchmark man-hour * k+ material difference chief engineers)
(1+ α), wherein k represent the quantity of same material in the storage product, and when material difference chief engineer is same material in the type
All differences man-hour, α puts coefficient, value 8-20% for self-defined width.
In the step 1, the acquisition process in benchmark man-hour is:By the way of when stopwatch is surveyed, to same name of material,
Material under same processing method carries out at least 10 times measurements, and it is base to take from all data man-hour of its Median levels
Plinth, the benchmark man-hour as the title material.
In the step 1, the acquisition process in difference man-hour is:By the way of when stopwatch is surveyed, to same name of material,
Material under the processing method different from benchmark man-hour carries out at least 10 times measurements, and its Median levels is taken from all data
Man-hour based on, numerical value which is obtained takes difference with benchmark man-hour, which is difference man-hour.
Difference man-hour pair principle in the step 2 refers to existing all differences work under this kind storage product type
When, i.e., all materials difference man-hour existing for used material in this kind of type can determine that by the pair principle.
Wide factor alpha=α 1+ α 2+ α 3, wherein α 1 of putting in the step 3 is to change Dan Kuanfang, value 1-4%;α 2 is order
Batch width is put, value 2-8%;α 3 is fatigue and physiology is wide puts, value 2-8%;The α 1, α 2, α 3 are self-defined coefficient.
Instantiation is as follows:
First, according to Company material Naming conventions, on the basis of name of material, material is divided into classification, utilizes stopwatch mensuration
Man-hour of the in-site measurement per a kind of material, as the basis in hierarchical man-hour, for belonging to same name of material, different assembling sides
The material of formula, measures its difference man-hour, forms the difference man-hour storehouse of the title material, and then calculates the standard work of the type
When, as production capacity and the foundation of cost accounting.
When generally, on the basis of name of material, classifying to product material and its assembling mode, and being surveyed with stopwatch
Method, carries out the material of same name of material 10 measurements, and based on taking the man-hour of its Median levels from 10 groups of data,
Man-hour benchmark as the title material.
It is identical to name of material, but the material that operation technique is different, based on the man-hour benchmark of the 1st step formation, use
Stopwatch mensuration measures the difference with benchmark man-hour, and then establishes the difference man-hour storehouse under name of material.
According to the large quantities of a small amount of of CELL units, change the characteristics of single-frequency is numerous, and material time is long, determine to change it is single it is wide put α 1,
Order batch is wide to put α 2, fatigue and physiology is wide puts α 3, and then calculates the wide of CELL units and put value α=α 1+ α 2+ α 3.
According to storage product type configuration, same title material different man-hours are established in type pair principle when assembled, and
Different man-hour is matched and is encoded according to name of material, for example, HD001, HD002 ... so that formed storage type with it is poor
The pairing man-hour storehouse in different man-hour.
The standard work force of storage product is finally adjusted according to material benchmark man-hour, difference man-hour and pairing man-hour storehouse.
As shown in Figure 1, a kind of acquisition system in storage server product standard man-hour, including,
Benchmark man-hour storehouse, for storing material benchmark man-hour;
Difference man-hour storehouse, for storing material difference man-hour, which refers to same material in different processing sides
Machining period under formula and the difference between material benchmark man-hour;
Man-hour storehouse is matched, for storing product type pair principle, can be obtained under the type according to the man-hour pair principle
All differences man-hour;
Computing module, calculates for completing standard work force, and when user inputs storage product type, computing module obtains benchmark work
Material benchmark time data in Shi Ku, and data in difference man-hour storehouse are obtained by matching the pair principle in man-hour storehouse, then
Standard work force is obtained by the following formula:
Standard work force=(during ∑ material benchmark man-hour * k+ material difference chief engineers) (1+ α), wherein k represents same in the storage product
The quantity of material;It it is all differences man-hour of same material in the type during material difference chief engineer, α is put for self-defined width is
Number, value 8-20%.
Material benchmark man-hour in benchmark man-hour storehouse obtains in the following manner:It is right by the way of when stopwatch is surveyed
Material under same name of material, same processing method carries out at least 10 times measurements, and its median water is taken from all data
Based on flat man-hour, the material benchmark man-hour as the title material.
Material difference man-hour in the pairing man-hour storehouse obtains in the following manner:It is right by the way of when stopwatch is surveyed
Material under same name of material, the processing method different from benchmark man-hour carries out at least 10 times measurements, and from all data
The numerical value for obtaining the measurement based on taking the man-hour of its Median levels and the material benchmark man-hour stored in benchmark man-hour storehouse
Difference is taken, which is difference man-hour.
The pair principle of the pairing man-hour library storage refers to existing all differences man-hour under this kind storage product type,
All materials difference man-hour existing for used material in this kind of type can determine that by the pair principle.
It is wide to put factor alpha=α 1+ α 2+ α 3, wherein α 1 to change in the formula that the computing module calculates standard work force
Dan Kuanfang, value 1-4%;α 2 is put for order batch width, value 2-8%;α 3 is fatigue and physiology is wide puts, value 2-8%;
The α 1, α 2, α 3 are self-defined coefficient.
The hierarchical structure for adjusting storage product standard man-hour of the present invention, by carrying out hierarchical stroke to product
Point, by measuring man-hour and the difference of the various materials of each level, form the man-hour storehouse of each level, and to material and type into
Row pairing, can obtain desired result, accurate foundation is provided to production capacity and cost accounting.
The present invention ensures man-hour, the accuracy of production capacity and cost accounting and in time based on storage product structure feature design
Property, the hierarchical model of storage product man-hour module is built, it is right by the way that all kinds of storage products are built with unified hierarchical model
The man-hour of each level keeps separate accounts, and forms the man-hour basis of storage server product.
The foregoing is merely presently preferred embodiments of the present invention, scope of patent protection of the invention includes but not limited to above-mentioned tool
Body embodiment, within the spirit and principles of the invention, any modification, equivalent substitution, improvement and etc. done, should all include
Within the scope of patent protection of the present invention.
By embodiment above, the those skilled in the art can readily realize the present invention.Herein
Apply specific case to be set forth the principle of the present invention and embodiment, the explanation of above example is only intended to help
Understand the method and its core concept of the present invention.It should be pointed out that for those skilled in the art, do not taking off
On the premise of from the principle of the invention, some improvement and modification can also be carried out to the present invention, these are improved and modification also falls into this
In invention scope of the claims.
Claims (10)
1. a kind of acquisition methods in storage server product standard man-hour, it is characterised in that for storing a certain model in product
Under same material standard machining period statistics, its acquisition process is:
First, first measurement obtain it is every kind of be used to store all man-hours when the material of product is processed, for same material,
Wherein any one man-hour will be measured as material benchmark man-hour, the differences in other measurement man-hours and benchmark man-hour are as material difference
Man-hour;
2nd, definition stores the difference man-hour pair principle of every kind of material in the every kind of type of product, obtains all differences under the type
Man-hour;
3rd, calculate and obtain storage product standard man-hour, i.e. standard work force=(during ∑ material benchmark man-hour * k+ material difference chief engineers)
(1+ α), wherein k represent the quantity of same material in the storage product, and when material difference chief engineer is same material in the type
All differences man-hour, α puts coefficient, value 8-20% for self-defined width.
2. the acquisition methods in a kind of storage server product standard man-hour according to claim 1, it is characterised in that described
In step 1, the acquisition process in material benchmark man-hour is:By the way of when stopwatch is surveyed, to same name of material, same processing
Material under mode carries out at least 10 times measurements, and based on taking the man-hour of its Median levels from all data, is used as this
The benchmark man-hour of title material.
A kind of 3. acquisition methods in storage server product standard man-hour according to claim 1 or 2, it is characterised in that
In the step 1, the acquisition process in material difference man-hour is:By the way of when stopwatch is surveyed, to same name of material and base
Material under different processing method of quasi- man-hour carries out at least 10 times measurements, and the work of its Median levels is taken from all data
When based on, numerical value which is obtained takes difference with benchmark man-hour, which is material difference man-hour.
4. the acquisition methods in a kind of storage server product standard man-hour according to claim 3, it is characterised in that described
Difference man-hour pair principle in step 2 refers to existing all materials difference man-hour under this kind storage product type, that is, passes through
The pair principle can determine that all materials difference man-hour existing for used material in this kind of type.
5. the acquisition methods in a kind of storage server product standard man-hour according to claim 3, it is characterised in that described
Wide factor alpha=α 1+ α 2+ α 3, wherein α 1 of putting in step 3 is to change Dan Kuanfang, value 1-4%;α 2 is put for order batch width, takes
It is worth for 2-8%;α 3 is fatigue and physiology is wide puts, value 2-8%;The α 1, α 2, α 3 are self-defined coefficient.
A kind of 6. acquisition system in storage server product standard man-hour, it is characterised in that including,
Benchmark man-hour storehouse, for storing material benchmark man-hour;
Difference man-hour storehouse, for storing material difference man-hour, which refers to same material in different processing sides
Machining period under formula and the difference between material benchmark man-hour;
Man-hour storehouse is matched, for storing product type pair principle, can be obtained under the type according to the man-hour pair principle
All differences man-hour;
Computing module, calculates for completing standard work force, and when user inputs storage product type, computing module obtains benchmark work
Material benchmark time data in Shi Ku, and data in difference man-hour storehouse are obtained by matching the pair principle in man-hour storehouse, then
Standard work force is obtained by the following formula:
Standard work force=(during ∑ material benchmark man-hour * k+ material difference chief engineers) (1+ α), wherein k represents same in the storage product
The quantity of material;It it is all differences man-hour of same material in the type during material difference chief engineer, α is put for self-defined width is
Number, value 8-20%.
7. the acquisition system in a kind of storage server product standard man-hour according to claim 6, it is characterised in that described
Material benchmark man-hour in benchmark man-hour storehouse obtains in the following manner:By the way of when stopwatch is surveyed, to same name of material,
Material under same processing method carries out at least 10 times measurements, and it is base to take from all data man-hour of its Median levels
Plinth, the material benchmark man-hour as the title material.
A kind of 8. acquisition system in storage server product standard man-hour according to claim 6 or 7, it is characterised in that
Material difference man-hour in the pairing man-hour storehouse obtains in the following manner:By the way of when stopwatch is surveyed, to same material
Material under title, the processing method different from benchmark man-hour carries out at least 10 times measurements, and its middle position is taken from all data
Based on number horizontal man-hour, the numerical value which is obtained takes difference with the material benchmark man-hour stored in benchmark man-hour storehouse,
The difference is difference man-hour.
9. the acquisition system in a kind of storage server product standard man-hour according to claim 8, it is characterised in that described
The pair principle of pairing man-hour library storage refers to existing all differences man-hour under this kind storage product type, former by the pairing
It then can determine that all materials difference man-hour existing for used material in this kind of type.
A kind of 10. acquisition system in storage server product standard man-hour according to claim 8, it is characterised in that institute
State in the formula that computing module calculates standard work force, it is wide to put factor alpha=α 1+ α 2+ α 3, wherein α 1 to change Dan Kuanfang, value
For 1-4%;α 2 is put for order batch width, value 2-8%;α 3 is fatigue and physiology is wide puts, value 2-8%;The α 1, α 2, α 3
It is self-defined coefficient.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711443379.3A CN107993028A (en) | 2017-12-27 | 2017-12-27 | A kind of acquisition methods and system in storage server product standard man-hour |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711443379.3A CN107993028A (en) | 2017-12-27 | 2017-12-27 | A kind of acquisition methods and system in storage server product standard man-hour |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107993028A true CN107993028A (en) | 2018-05-04 |
Family
ID=62041947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711443379.3A Pending CN107993028A (en) | 2017-12-27 | 2017-12-27 | A kind of acquisition methods and system in storage server product standard man-hour |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107993028A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112001605A (en) * | 2020-08-10 | 2020-11-27 | 苏州浪潮智能科技有限公司 | Method and device for calculating comprehensive efficiency of assembly personnel based on MES system server |
CN112184287A (en) * | 2020-09-08 | 2021-01-05 | 杭州杭丝时装集团有限公司 | Batch coefficient actuarial method for production orders of clothing front-line staff |
CN112508414A (en) * | 2020-12-08 | 2021-03-16 | 北京无线电测量研究所 | Working hour accounting method, system and computer equipment |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107194668A (en) * | 2017-05-25 | 2017-09-22 | 郑州云海信息技术有限公司 | A kind of assembling standard work force computational methods of homotype differentiation configuration server |
CN107316138A (en) * | 2017-06-20 | 2017-11-03 | 王建 | Custom item compliance detection method and its system |
-
2017
- 2017-12-27 CN CN201711443379.3A patent/CN107993028A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107194668A (en) * | 2017-05-25 | 2017-09-22 | 郑州云海信息技术有限公司 | A kind of assembling standard work force computational methods of homotype differentiation configuration server |
CN107316138A (en) * | 2017-06-20 | 2017-11-03 | 王建 | Custom item compliance detection method and its system |
Non-Patent Citations (3)
Title |
---|
傅武雄: "《标准工时制定与工作改善》", 31 July 2003, 厦门大学出版社 * |
刘培义: "家具生产企业标准工时系统的构建", 《家具》 * |
赵国瑞,项振东: "《现代企业劳动定额教程》", 31 May 1991, 杭州大学出版社 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112001605A (en) * | 2020-08-10 | 2020-11-27 | 苏州浪潮智能科技有限公司 | Method and device for calculating comprehensive efficiency of assembly personnel based on MES system server |
CN112001605B (en) * | 2020-08-10 | 2022-06-21 | 苏州浪潮智能科技有限公司 | Method and device for calculating comprehensive efficiency of assembly personnel based on MES system server |
CN112184287A (en) * | 2020-09-08 | 2021-01-05 | 杭州杭丝时装集团有限公司 | Batch coefficient actuarial method for production orders of clothing front-line staff |
CN112184287B (en) * | 2020-09-08 | 2024-01-19 | 杭州杭丝时装集团有限公司 | Batch coefficient accurate calculation method for production orders of first-line clothing staff |
CN112508414A (en) * | 2020-12-08 | 2021-03-16 | 北京无线电测量研究所 | Working hour accounting method, system and computer equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107993028A (en) | A kind of acquisition methods and system in storage server product standard man-hour | |
CN103514259B (en) | Abnormal data detection and modification method based on numerical value relevance model | |
CN100574663C (en) | The personalized shoe last model generating method that comprehensive three-dimension foot type global parameter and partial cross-section are adjusted | |
CN107146035B (en) | Method for calculating batch coefficients in large-goods production of knitted clothes | |
CN105205221B (en) | A kind of heavy digital control machine tool precision reliability analysis method | |
CN110232249A (en) | A kind of rolling bearing method for predicting residual useful life | |
CN110501978B (en) | Scheduling method for scheduling robot product production workshop | |
CN110533389A (en) | The determination method and device of Project Cost | |
CN104070513B (en) | The accurate scribble method of thin-wall special-shaped casting cabin body | |
CN107194668A (en) | A kind of assembling standard work force computational methods of homotype differentiation configuration server | |
CN109840377A (en) | A kind of grinding machine mixing filling rate online soft sensor method | |
CN110247396A (en) | State Estimation for Distribution Network and system based on adaptive robust Unscented kalman filtering | |
CN108937867A (en) | A kind of dormant monitoring method and device | |
CN108733003A (en) | Slewing parts process working hour prediction technique based on kmeans clustering algorithms and system | |
CN105530581A (en) | Smart wearable device based on voice recognition and control method thereof | |
CN116029682A (en) | Construction progress management method and system based on BIM technology | |
CN101949680B (en) | Method for designing blade standard component for profile measurement | |
Wu et al. | How Does the Productivity and Economic Growth Performance of China and India Compare in the Post-Reform Era, 1981-2011? | |
CN107369206A (en) | A kind of maize population 3 D model construction method and system | |
CN109948929B (en) | Method and system for constructing power distribution network collaborative management model | |
CN112231782A (en) | Shoe product design method based on reverse engineering | |
CN116602286A (en) | Plant protection unmanned aerial vehicle spraying operation control system and method | |
CN106094721A (en) | The processing method of three-dimensional live topography sand table | |
CN109165740A (en) | The fault time calculation method of product subsystem based on section step analysis | |
CN114545791A (en) | Digital twin simulation system based on intelligent manufacturing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180504 |