CN107982882A - A kind of physical culture child basketball frame - Google Patents
A kind of physical culture child basketball frame Download PDFInfo
- Publication number
- CN107982882A CN107982882A CN201711417062.2A CN201711417062A CN107982882A CN 107982882 A CN107982882 A CN 107982882A CN 201711417062 A CN201711417062 A CN 201711417062A CN 107982882 A CN107982882 A CN 107982882A
- Authority
- CN
- China
- Prior art keywords
- screw
- slide
- shaft
- sliding block
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B63/00—Targets or goals for ball games
- A63B63/08—Targets or goals for ball games with substantially horizontal opening for ball, e.g. for basketball
- A63B63/083—Targets or goals for ball games with substantially horizontal opening for ball, e.g. for basketball for basketball
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B2225/00—Miscellaneous features of sport apparatus, devices or equipment
- A63B2225/09—Adjustable dimensions
- A63B2225/093—Height
Landscapes
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Physical Education & Sports Medicine (AREA)
- Transmission Devices (AREA)
Abstract
The present invention relates to a kind of basketball frame, more particularly to a kind of physical culture child basketball frame.The technical problem to be solved in the present invention is to provide one kind to be exclusively used in physical culture child basketball frame.In order to solve the above technical problem, the present invention provides such a physical culture child basketball frame, include hoop, backboard, connecting rod, first support bar, sliding sleeve, slide bar, baffle, screw, screw, clutch shaft bearing etc.;First sliding block upper left quarter is provided with clutch shaft bearing, and screw is connected with by interference in clutch shaft bearing, and screw is provided with by screw thread on screw, screw upper end is provided with baffle, first sliding block upper right quarter is provided with slide bar, and slidingtype is equipped with sliding sleeve on slide bar, and sliding sleeve right end is provided with first support bar.Invention achieves can freely adjust height, position, by device universality, suitable for the children of all age group, while children can be increased the interest of movement and basketball movement are imparted rudimentary knowledge to beginners.
Description
Technical field
The present invention relates to a kind of basketball frame, more particularly to a kind of physical culture child basketball frame.
Background technology
Physical culture, is a kind of complicated Social Culture phenomenon, it gives birth to using body and intellection as basic means according to human body
The rules such as long development, technical ability are formed and function improves, reach promote full development, improve fitness and overall education level,
Build up health a kind of conscious, purposeful, organized with improving the quality of living with raising locomitivity, mode of making the life better
Social activities.With the expansion of international association, the scale and level of sports business development have been to weigh country, a social development
A progressive important symbol, also becomes the important means of diplomacy and cultural exchanges between country.Physical culture can be divided into sport for all, specially
The species such as industry physical culture, school physical education.Including sports culture, physical education, sports, athletic competition, sports equipment, sports group
Knit, the lot of essential factors such as sports science technology.
When children carry out sports, often because the height of children is more short and small, most of sports equipment does not apply to, and leads
Cause children can not be taken exercise using regular equipment, therefore physical culture child basketball frame is exclusively used in there is an urgent need for researching and developing one kind.
The content of the invention
(1) technical problems to be solved
When the present invention is in order to overcome children's progress sports, often because the height of children is more short and small, most of body
The shortcomings that educating equipment not applying to, causing children regular equipment can not be used to take exercise, the technical problem to be solved in the present invention is to provide
One kind is exclusively used in physical culture child basketball frame.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a physical culture child basketball frame, include basket
Frame, backboard, connecting rod, first support bar, sliding sleeve, slide bar, baffle, screw, screw, clutch shaft bearing, the first sliding block, the first sliding block
Upper left quarter is provided with clutch shaft bearing, and screw is connected with by interference in clutch shaft bearing, and screw is provided with by screw thread on screw,
Screw upper end is provided with baffle, and the first sliding block upper right quarter is provided with slide bar, and slidingtype is equipped with sliding sleeve, the installation of sliding sleeve right end on slide bar
There is first support bar, first support bar upper left quarter is equipped with connecting rod, and connecting rod left end is equipped with backboard, and backboard left end is provided with basket
Frame.
Preferably, first bevel gear, second bevel gear, the second shaft, the first rocking bar, the first turntable, second have been further included
Bearing, second support bar, are connected and installed with first bevel gear on screw, the first sliding block left end is provided with the second support by interference
Bar, second support bar top are provided with second bearing, and second bearing is connected with the second shaft, the second shaft right end by interference
Second bevel gear is connected and installed with by interference, the second shaft left end is provided with the first turntable, and the first turntable is equipped with the first rocking bar,
First bevel gear and second bevel gear engagement.
Preferably, the first slide, the second sliding block, the second slide, bottom plate have been further included, the first cunning is installed under the first sliding block
Rail, is provided with the second sliding block under the first slide, the second slide is provided with the second sliding block, the second slide has bottom plate.
Preferably, 3rd bearing, the 3rd shaft, rack, gear wheel, the second turntable, the second rocking bar have been further included, first slides
Rail right part is equipped with rack, and bottom plate upper right quarter is provided with the 3rd shaft, and the 3rd shaft lower part is connected and installed with the 3rd axis by interference
Hold, gear wheel is connected and installed with by interference in the middle part of the 3rd shaft, the 3rd shaft top is provided with the second turntable, on the second turntable
Portion is provided with the second rocking bar, gear wheel and rack engagement.
Preferably, bolt, cushion block, clump weight have been further included, the second slide upper right side is provided with clump weight, clump weight or so
It is bolted, cushion block is equipped between bolt and clump weight.
Operation principle:In use, the present apparatus is placed on vacant lot, by rotary screw, screw is moved up and down, pass through cunning
Set moves up and down first support bar, moves up and down backboard and hoop by connecting rod.
Because first bevel gear, second bevel gear, the second shaft, the first rocking bar, the first turntable, the second axis are further included
Hold, second support bar, first bevel gear is connected and installed with by interference on screw, the first sliding block left end is provided with the second support
Bar, second support bar top are provided with second bearing, and second bearing is connected with the second shaft, the second shaft right end by interference
Second bevel gear is connected and installed with by interference, the second shaft left end is provided with the first turntable, and the first turntable is equipped with the first rocking bar,
First bevel gear and second bevel gear engagement, the first rocking bar of manual rotation, rotates the first turntable, makes second by the second shaft
Bevel gear rotates, and second bevel gear rotates first bevel gear by engagement, and first bevel gear drives screw to rotate, convenient to adjust
Section.
Because having further included the first slide, the second sliding block, the second slide, bottom plate, the first slide is installed under the first sliding block,
Second sliding block is installed under the first slide, the second slide is installed under the second sliding block, the second slide has bottom plate, the second sliding block
The position of adjustment hoop and backboard can be moved left and right, the first sliding block can move back and forth the position of adjustment hoop and backboard.
Because 3rd bearing, the 3rd shaft, rack, gear wheel, the second turntable, the second rocking bar, the first slide are further included
Right part is equipped with rack, and bottom plate upper right quarter is provided with the 3rd shaft, and the 3rd shaft lower part is connected and installed with 3rd bearing by interference,
Gear wheel is connected and installed with by interference in the middle part of 3rd shaft, the 3rd shaft top is provided with the second turntable, the second turntable top
Second rocking bar, gear wheel and rack engagement are installed, the second rocking bar of manual rotation, rotates the second turntable, pass through the 3rd shaft
Bull gear drive is driven, gear wheel is moved left and right by engaging band carry-over bar, and the first slide of rack drives moves left and right.
Because having further included bolt, cushion block, clump weight, it is logical that the second slide upper right side is provided with clump weight, clump weight or so
Cross and be bolted, cushion block is equipped between bolt and clump weight, clump weight causes whole device more to stablize.
(3) beneficial effect
Invention achieves can freely adjust height, position, by device universality, suitable for the youngster of all age group
Child, while children can be increased the interest of movement and basketball movement are imparted rudimentary knowledge to beginners, the profit of basketball system can be improved using this equipment
With rate, children are to the interest of sports for enhancing, make moral education closer to first floor.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Mark in attached drawing for:1- hoops, 2- backboards, 3- connecting rods, 4- first support bars, 5- sliding sleeves, 6- slide bars, 7- gears
Plate, 8- screws, 9- screws, 10- clutch shaft bearings, 11- first bevel gears, 12- second bevel gears, the second shafts of 13-, 14- first
Rocking bar, the first turntables of 15-, 16- second bearings, 17- second support bars, the first sliding blocks of 18-, the first slides of 19-, 20- second are slided
Block, the second slides of 21-, 22- racks, 23- bottom plates, 24- 3rd bearings, the 3rd shafts of 25-, 26- gear wheels, the second turntables of 27-,
The second rocking bars of 28-, 29- bolts, 30- cushion blocks, 31- clump weights.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of physical culture child basketball frame, as shown in Figs. 1-5, includes hoop 1, backboard 2, connecting rod 3, first and supports
Bar 4, sliding sleeve 5, slide bar 6, baffle 7, screw 8, screw 9, clutch shaft bearing 10, the first sliding block 18, the installation of 18 upper left quarter of the first sliding block
There is a clutch shaft bearing 10, screw 9 is connected with by interference in clutch shaft bearing 10, screw 8, silk are provided with by screw thread on screw 9
9 upper end of bar is provided with baffle 7, and 18 upper right quarter of the first sliding block is provided with slide bar 6, and slidingtype is equipped with sliding sleeve 5 on slide bar 6, and sliding sleeve 5 is right
End is provided with first support bar 4, and 4 upper left quarter of first support bar is equipped with connecting rod 3, and 3 left end of connecting rod is equipped with backboard 2, and backboard 2 is left
End is provided with hoop 1.
Embodiment 2
A kind of physical culture child basketball frame, as shown in Figs. 1-5, includes hoop 1, backboard 2, connecting rod 3, first and supports
Bar 4, sliding sleeve 5, slide bar 6, baffle 7, screw 8, screw 9, clutch shaft bearing 10, the first sliding block 18, the installation of 18 upper left quarter of the first sliding block
There is a clutch shaft bearing 10, screw 9 is connected with by interference in clutch shaft bearing 10, screw 8, silk are provided with by screw thread on screw 9
9 upper end of bar is provided with baffle 7, and 18 upper right quarter of the first sliding block is provided with slide bar 6, and slidingtype is equipped with sliding sleeve 5 on slide bar 6, and sliding sleeve 5 is right
End is provided with first support bar 4, and 4 upper left quarter of first support bar is equipped with connecting rod 3, and 3 left end of connecting rod is equipped with backboard 2, and backboard 2 is left
End is provided with hoop 1.
First bevel gear 11, second bevel gear 12, the second shaft 13, the first rocking bar 14, the first turntable 15, are further included
Two bearings 16, second support bar 17, are connected and installed with first bevel gear 11,18 left end of the first sliding block peace on screw 9 by interference
Equipped with second support bar 17,17 top of second support bar is provided with second bearing 16, and second bearing 16 is connected with by interference
Second shaft 13,13 right end of the second shaft are connected and installed with second bevel gear 12 by interference, and 13 left end of the second shaft is provided with
First turntable 15, the first turntable 15 are equipped with the first rocking bar 14, and first bevel gear 11 and second bevel gear 12 engage.
Embodiment 3
A kind of physical culture child basketball frame, as shown in Figs. 1-5, includes hoop 1, backboard 2, connecting rod 3, first and supports
Bar 4, sliding sleeve 5, slide bar 6, baffle 7, screw 8, screw 9, clutch shaft bearing 10, the first sliding block 18, the installation of 18 upper left quarter of the first sliding block
There is a clutch shaft bearing 10, screw 9 is connected with by interference in clutch shaft bearing 10, screw 8, silk are provided with by screw thread on screw 9
9 upper end of bar is provided with baffle 7, and 18 upper right quarter of the first sliding block is provided with slide bar 6, and slidingtype is equipped with sliding sleeve 5 on slide bar 6, and sliding sleeve 5 is right
End is provided with first support bar 4, and 4 upper left quarter of first support bar is equipped with connecting rod 3, and 3 left end of connecting rod is equipped with backboard 2, and backboard 2 is left
End is provided with hoop 1.
First bevel gear 11, second bevel gear 12, the second shaft 13, the first rocking bar 14, the first turntable 15, are further included
Two bearings 16, second support bar 17, are connected and installed with first bevel gear 11,18 left end of the first sliding block peace on screw 9 by interference
Equipped with second support bar 17,17 top of second support bar is provided with second bearing 16, and second bearing 16 is connected with by interference
Second shaft 13,13 right end of the second shaft are connected and installed with second bevel gear 12 by interference, and 13 left end of the second shaft is provided with
First turntable 15, the first turntable 15 are equipped with the first rocking bar 14, and first bevel gear 11 and second bevel gear 12 engage.
The first slide 19, the second sliding block 20, the second slide 21, bottom plate 23 have been further included, is provided with the first sliding block 18
One slide 19, is provided with the second sliding block 20 under the first slide 19, the second slide 21, the second slide 21 is provided with the second sliding block 20
Have bottom plate 23.
Embodiment 4
A kind of physical culture child basketball frame, as shown in Figs. 1-5, includes hoop 1, backboard 2, connecting rod 3, first and supports
Bar 4, sliding sleeve 5, slide bar 6, baffle 7, screw 8, screw 9, clutch shaft bearing 10, the first sliding block 18, the installation of 18 upper left quarter of the first sliding block
There is a clutch shaft bearing 10, screw 9 is connected with by interference in clutch shaft bearing 10, screw 8, silk are provided with by screw thread on screw 9
9 upper end of bar is provided with baffle 7, and 18 upper right quarter of the first sliding block is provided with slide bar 6, and slidingtype is equipped with sliding sleeve 5 on slide bar 6, and sliding sleeve 5 is right
End is provided with first support bar 4, and 4 upper left quarter of first support bar is equipped with connecting rod 3, and 3 left end of connecting rod is equipped with backboard 2, and backboard 2 is left
End is provided with hoop 1.
First bevel gear 11, second bevel gear 12, the second shaft 13, the first rocking bar 14, the first turntable 15, are further included
Two bearings 16, second support bar 17, are connected and installed with first bevel gear 11,18 left end of the first sliding block peace on screw 9 by interference
Equipped with second support bar 17,17 top of second support bar is provided with second bearing 16, and second bearing 16 is connected with by interference
Second shaft 13,13 right end of the second shaft are connected and installed with second bevel gear 12 by interference, and 13 left end of the second shaft is provided with
First turntable 15, the first turntable 15 are equipped with the first rocking bar 14, and first bevel gear 11 and second bevel gear 12 engage.
The first slide 19, the second sliding block 20, the second slide 21, bottom plate 23 have been further included, is provided with the first sliding block 18
One slide 19, is provided with the second sliding block 20 under the first slide 19, the second slide 21, the second slide 21 is provided with the second sliding block 20
Have bottom plate 23.
3rd bearing 24, the 3rd shaft 25, rack 22, gear wheel 26, the second turntable 27, the second rocking bar 28 have been further included,
First slide, 19 right part is equipped with rack 22, and 23 upper right quarter of bottom plate is provided with the 3rd shaft 25, and 25 lower part of the 3rd shaft passes through interference
3rd bearing 24 is connected and installed with, the middle part of the 3rd shaft 25 is connected and installed with gear wheel 26,25 top of the 3rd shaft by interference
Second turntable 27 is installed, 27 top of the second turntable is provided with the second rocking bar 28, and gear wheel 26 and rack 22 engage.
Bolt 29, cushion block 30, clump weight 31 are further included, 21 upper right side of the second slide is provided with clump weight 31, clump weight
31 or so are connected by bolt 29, and cushion block 30 is equipped between bolt 29 and clump weight 31.
Operation principle:In use, the present apparatus is placed on vacant lot, by rotary screw 9, screw 8 is moved up and down, is passed through
Sliding sleeve 5 moves up and down first support bar 4, moves up and down backboard 2 and hoop 1 by connecting rod 3.
Because first bevel gear 11, second bevel gear 12, the second shaft 13, the first rocking bar 14, the first turntable are further included
15th, second bearing 16, second support bar 17, are connected and installed with first bevel gear 11 on screw 9 by interference, and the first sliding block 18 is left
End is provided with second support bar 17, and 17 top of second support bar is provided with second bearing 16, and second bearing 16 is connected by interference
Equipped with the second shaft 13,13 right end of the second shaft is connected and installed with second bevel gear 12,13 left end of the second shaft peace by interference
Equipped with the first turntable 15, the first turntable 15 is equipped with the first rocking bar 14, and first bevel gear 11 and second bevel gear 12 engage, and manually turns
Dynamic first rocking bar 14, rotates the first turntable 15, rotates second bevel gear 12 by the second shaft 13, and second bevel gear 12 is logical
Crossing engagement rotates first bevel gear 11, and first bevel gear 11 drives screw 9 to rotate, convenient to adjust.
Because having further included the first slide 19, the second sliding block 20, the second slide 21, bottom plate 23, the installation of the first sliding block 18 times
There is the first slide 19, the second sliding block 20 is installed under first slide 19, the second slide 21 is installed under second sliding block 20, second slides
Rail 21 has a bottom plate 23, and the second sliding block 20 can move left and right the position of adjustment hoop 1 and backboard 2, and the first sliding block 18 can be with
Move back and forth the position of adjustment hoop 1 and backboard 2.
Because 3rd bearing 24, the 3rd shaft 25, rack 22, gear wheel 26, the second turntable 27, the second rocking bar are further included
28,19 right part of the first slide is equipped with rack 22, and 23 upper right quarter of bottom plate is provided with the 3rd shaft 25, and 25 lower part of the 3rd shaft passed through
It is full of and is connected and installed with 3rd bearing 24, the middle part of the 3rd shaft 25 is connected and installed with gear wheel 26 by interference, in the 3rd shaft 25
Portion is provided with the second turntable 27, and 27 top of the second turntable is provided with the second rocking bar 28, and gear wheel 26 and rack 22 engage, and manually turns
Dynamic second rocking bar 28, rotates the second turntable 27, drives gear wheel 26 to rotate by the 3rd shaft 25, gear wheel 26 passes through engagement
Band carry-over bar 22 moves left and right, and rack 22 drives the first slide 19 to move left and right.
Because having further included bolt 29, cushion block 30, clump weight 31,21 upper right side of the second slide is provided with clump weight 31, matches somebody with somebody
Pouring weight 31 or so is connected by bolt 29, and cushion block 30 is equipped between bolt 29 and clump weight 31, and clump weight 31 is so that whole device
More stablize.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (5)
1. a kind of physical culture child basketball frame, it is characterised in that include hoop (1), backboard (2), connecting rod (3), first
Supporting rod (4), sliding sleeve (5), slide bar (6), baffle (7), screw (8), screw (9), clutch shaft bearing (10), the first sliding block (18),
First sliding block (18) upper left quarter is provided with clutch shaft bearing (10), and clutch shaft bearing (10) is interior to be connected with screw (9), silk by interference
Screw (8) is provided with by screw thread on bar (9), screw (9) upper end is provided with baffle (7), the installation of the first sliding block (18) upper right quarter
There is a slide bar (6), slidingtype is equipped with sliding sleeve (5) on slide bar (6), and sliding sleeve (5) right end is provided with first support bar (4), the first support
Bar (4) upper left quarter is equipped with connecting rod (3), and connecting rod (3) left end is equipped with backboard (2), and backboard (2) left end is provided with hoop (1).
2. a kind of physical culture child basketball frame according to claim 1, it is characterised in that further included first bevel gear
(11), second bevel gear (12), the second shaft (13), the first rocking bar (14), the first turntable (15), second bearing (16), second
Supporting rod (17), is connected and installed with first bevel gear (11) on screw (9), the first sliding block (18) left end is provided with by interference
Two supporting rods (17), second support bar (17) top are provided with second bearing (16), and second bearing (16) is set by interference connection
There is the second shaft (13), the second shaft (13) right end is connected and installed with second bevel gear (12), the second shaft (13) by interference
Left end is provided with the first turntable (15), and the first turntable (15) is equipped with the first rocking bar (14), first bevel gear (11) and the second cone tooth
Take turns (12) engagement.
3. a kind of physical culture child basketball frame according to claim 2, it is characterised in that further included the first slide
(19), the second sliding block (20), the second slide (21), bottom plate (23), are provided with the first slide (19) under the first sliding block (18), and first
Second sliding block (20) is installed under slide (19), the second slide (21) is installed under the second sliding block (20), under the second slide (21)
Equipped with bottom plate (23).
4. a kind of physical culture child basketball frame according to claim 3, it is characterised in that further included 3rd bearing
(24), the 3rd shaft (25), rack (22), gear wheel (26), the second turntable (27), the second rocking bar (28), the first slide (19)
Right part is equipped with rack (22), and bottom plate (23) upper right quarter is provided with the 3rd shaft (25), and the 3rd shaft (25) lower part is connected by interference
Connect and 3rd bearing (24) is installed, gear wheel (26), the 3rd shaft are connected and installed with by interference in the middle part of the 3rd shaft (25)
(25) top is provided with the second turntable (27), and the second turntable (27) top is provided with the second rocking bar (28), gear wheel (26) and tooth
Bar (22) engages.
A kind of 5. physical culture child basketball frame according to claim 4, it is characterised in that further included bolt (29),
Cushion block (30), clump weight (31), the second slide (21) upper right side are provided with clump weight (31), and clump weight (31) left and right passes through bolt
(29) connect, cushion block (30) is equipped between bolt (29) and clump weight (31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711417062.2A CN107982882B (en) | 2017-12-25 | 2017-12-25 | A kind of sport child basketball frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711417062.2A CN107982882B (en) | 2017-12-25 | 2017-12-25 | A kind of sport child basketball frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107982882A true CN107982882A (en) | 2018-05-04 |
CN107982882B CN107982882B (en) | 2019-07-23 |
Family
ID=62042343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711417062.2A Active CN107982882B (en) | 2017-12-25 | 2017-12-25 | A kind of sport child basketball frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107982882B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108421227A (en) * | 2018-05-18 | 2018-08-21 | 佛山拾念科技有限公司 | A kind of Multifunctional sports teaching body-building equipment |
CN108853998A (en) * | 2018-06-08 | 2018-11-23 | 雷钦英 | A kind of mechanical shuttlecock take-off is bounced the ball trained equipment |
CN108905123A (en) * | 2018-06-29 | 2018-11-30 | 曾祥文 | A kind of sport movable backboard |
CN111068273A (en) * | 2019-12-30 | 2020-04-28 | 烟台工程职业技术学院(烟台市技师学院) | Basketball stands are used in sports teaching |
CN114504783A (en) * | 2022-02-19 | 2022-05-17 | 利瑞宝运动器材(吴江)有限公司 | Adjustable basketball stand |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2624982Y (en) * | 2003-03-14 | 2004-07-14 | 杜宏明 | Liftable basketball stand |
CN201295515Y (en) * | 2008-11-12 | 2009-08-26 | 姜新民 | Basketball stand with adjustable height |
KR100940735B1 (en) * | 2009-07-02 | 2010-02-04 | 이종석 | Elevation adjustment basketball post |
CN201906436U (en) * | 2010-12-14 | 2011-07-27 | 林沧泽 | Hand-shaking adjustment device for lifting backboard |
CN103418123A (en) * | 2012-05-24 | 2013-12-04 | 沈绍骁 | Screw rod driven type lifting basketball stands |
-
2017
- 2017-12-25 CN CN201711417062.2A patent/CN107982882B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2624982Y (en) * | 2003-03-14 | 2004-07-14 | 杜宏明 | Liftable basketball stand |
CN201295515Y (en) * | 2008-11-12 | 2009-08-26 | 姜新民 | Basketball stand with adjustable height |
KR100940735B1 (en) * | 2009-07-02 | 2010-02-04 | 이종석 | Elevation adjustment basketball post |
CN201906436U (en) * | 2010-12-14 | 2011-07-27 | 林沧泽 | Hand-shaking adjustment device for lifting backboard |
CN103418123A (en) * | 2012-05-24 | 2013-12-04 | 沈绍骁 | Screw rod driven type lifting basketball stands |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108421227A (en) * | 2018-05-18 | 2018-08-21 | 佛山拾念科技有限公司 | A kind of Multifunctional sports teaching body-building equipment |
CN108853998A (en) * | 2018-06-08 | 2018-11-23 | 雷钦英 | A kind of mechanical shuttlecock take-off is bounced the ball trained equipment |
CN108905123A (en) * | 2018-06-29 | 2018-11-30 | 曾祥文 | A kind of sport movable backboard |
CN111068273A (en) * | 2019-12-30 | 2020-04-28 | 烟台工程职业技术学院(烟台市技师学院) | Basketball stands are used in sports teaching |
CN114504783A (en) * | 2022-02-19 | 2022-05-17 | 利瑞宝运动器材(吴江)有限公司 | Adjustable basketball stand |
CN114504783B (en) * | 2022-02-19 | 2022-12-16 | 利瑞宝运动器材(吴江)有限公司 | Adjustable basketball stand |
Also Published As
Publication number | Publication date |
---|---|
CN107982882B (en) | 2019-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107982882A (en) | A kind of physical culture child basketball frame | |
CN206183604U (en) | Medical shank rehabilitation training device | |
CN206907417U (en) | One kind is had a rest formula sports culture propagandizing device | |
CN210521695U (en) | Basketball stands with adjustable sports education is used | |
CN206587326U (en) | A kind of interest type physical fitness device | |
CN211357607U (en) | Aerobics exercises trainer | |
CN208018084U (en) | A kind of sport Liftable basketball stands | |
CN207384747U (en) | A kind of chin-up fitness equipment with miscellaneous function | |
CN108295445A (en) | A kind of adjustable multi-panel basketball stands of physical education | |
CN206642056U (en) | Rocking chair is used before a kind of sports person's motion | |
CN207993289U (en) | A kind of electronic information teaching Display Rack | |
CN207624215U (en) | A kind of Teaching of Economics display platform | |
CN206198627U (en) | A kind of child's early education physical education experience apparatus | |
CN108654122A (en) | A kind of hurdle bracket for sports training | |
CN108172074A (en) | A kind of digital addition and subtraction method interaction teaching device | |
CN209092654U (en) | A kind of children educational basketball shooting toy | |
CN106422254A (en) | Physical education experience device for infant early education | |
CN108905123A (en) | A kind of sport movable backboard | |
CN207249970U (en) | A kind of Teachig-aid for infant studying of step-less adjustment orbit angle | |
CN107993526A (en) | Mathematical education interaction device is used in one kind teaching | |
CN205287398U (en) | Arm muscle training device | |
CN109090905A (en) | A kind of high shaking table for baby of usage comfort | |
CN209500708U (en) | A kind of ligament training device for Dancing Teaching | |
CN205434897U (en) | Horse -ride step trainer | |
CN208938491U (en) | Teaching of Psychology device for displaying information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190619 Address after: 510000 Zhongcun Street, Panyu District, Guangzhou, Guangdong Province, No. 10, 2nd floor, No. 27 Zhongpingcha Road, Zhongyi Village, Zhongcun Street Applicant after: Guangzhou Saidiwang Sports Goods Co., Ltd. Address before: 110004 No. 11 Lane 3, Cultural District, Heping District, Shenyang, Liaoning Applicant before: Huang Yue |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |