CN107975237A - A kind of housing construction line runner wagon - Google Patents
A kind of housing construction line runner wagon Download PDFInfo
- Publication number
- CN107975237A CN107975237A CN201711292675.8A CN201711292675A CN107975237A CN 107975237 A CN107975237 A CN 107975237A CN 201711292675 A CN201711292675 A CN 201711292675A CN 107975237 A CN107975237 A CN 107975237A
- Authority
- CN
- China
- Prior art keywords
- barrel
- belt pulley
- stent
- agitating shaft
- sweep
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/16—Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
- E01C23/20—Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for forming markings in situ
- E01C23/22—Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for forming markings in situ by spraying
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Toys (AREA)
Abstract
The invention belongs to construction engineering technical field, more particularly to a kind of housing construction line runner wagon.When shedding pulverized limestone the technical problem to be solved in the present invention is to provide one kind, work efficiency is high, it is uniform to shed, shielding wire beauty, and can reduce the building engineering construction danger zone line alarm set of construction cost.In order to solve the above-mentioned technical problem, the present invention provides such a housing construction line runner wagon, include sweep, wheel, stent, barrel, first bearing seat, agitating shaft, big belt pulley, lower hopper, discharge nozzle, discharge valve, first motor etc.;The bottom of sweep is equipped with wheel, and the top of sweep is provided with stent, barrel is provided with the inside of stent by bolted connection.During invention achieves shedding pulverized limestone, work efficiency is high, it is uniform to shed, shielding wire beauty, and can reduce the effect of construction cost.
Description
Technical field
The invention belongs to construction engineering technical field, more particularly to a kind of housing construction line runner wagon.
Background technology
Architectural engineering, refer to by the construction to all kinds of building constructions and its affiliated facility and the circuit supporting with it, pipeline,
The engineering entity that the installation activity of equipment is formed.Wherein " building construction ", which refers to, head cover, beam column, wall, basis and can
Inner space is formed, meets people's production, lives, learns, the engineering of public activity needs.
In building engineering construction, part danger zone needs to mark shielding wire, and needs special messenger to guard, and avoids other people
Danger zone is swarmed into, triggers accident.Shielding wire is typically that worker spreads pulverized limestone on the ground at present, and there are inefficiency, stone
Ashes sheds uneven, the inaesthetic shortcoming of shielding wire, and the guard that arrests can improve construction cost, therefore a kind of there is an urgent need for research and development
When shedding pulverized limestone, work efficiency is high, it is uniform to shed, shielding wire beauty, and the architectural engineering that can reduce construction cost is applied
Work danger zone line alarm set.
The content of the invention
(1) technical problems to be solved
The present invention is typically that worker spreads pulverized limestone on the ground to overcome current shielding wire, and there are inefficiency, stone
Ashes sheds uneven, the inaesthetic shortcoming of shielding wire, and the technical problem to be solved in the present invention is to provide one kind to shed pulverized limestone
When, work efficiency is high, it is uniform to shed, shielding wire is beautiful, and can reduce the building engineering construction hazardous area of construction cost
Domain line alarm set.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a housing construction line runner wagon, including
There are sweep, wheel, stent, barrel, first bearing seat, agitating shaft, big belt pulley, lower hopper, discharge nozzle, discharge valve, first
Motor, small belt pulley and flat belt, the bottom of sweep are equipped with wheel, and the top of sweep is provided with branch by bolted connection
Frame, is provided with barrel on the inside of stent, discharge nozzle is connected among the bottom of barrel, discharge valve is provided with discharge nozzle, expects
Cylinder top left side is equipped with lower hopper, and lower hopper is connected with barrel, is mounted on first bearing seat at left and right sides of barrel, and two first
Agitating shaft is installed, the right end of agitating shaft is stretched out on the right side of barrel, and big belt pulley is provided with agitating shaft, sweep between bearing block
Top right side is provided with the first motor, and small belt pulley is connected with the output shaft of the first motor, and small belt pulley is located at big belt pulley
Underface, flat belt is connected between small belt pulley and big belt pulley.
The present invention could also say that a kind of building construction shielding wire alert device, further include sector gear, guide rod, hammer
Head, rack, spring, second bearing seat, shaft, top plate and bronze gong, the right end of agitating shaft are provided with sector gear, and sector gear leads to
The mode for crossing key connection is connected with agitating shaft, and pilot hole is provided with the right side of cradle top, is equipped with pilot hole and is led with what it coordinated
To bar, tup is connected with the top of guide rod, the bottom of guide rod is connected with rack, and spring, tooth are equipped between rack and stent
Bar is engaged with sector gear, is provided with second bearing seat on the right side of cradle top, shaft, the top of shaft are provided with second bearing seat
End horizontal connection has top plate, and top base is provided with bronze gong by bolted connection, and bronze gong is located above tup.
The present invention could also say that a kind of efficient building construction line xegregating unit, further include board, top of support
Board is installed by bolted connection among portion.
The present invention could also say that a kind of efficiently beautiful housing construction isolation alert device, further, write
The material of plate is PVC plastic.
The present invention could also say that a kind of efficient building construction reminds isolation chalker, and the shape of board can be
Cuboid, square or circle.
The present invention could also say that one kind sheds uniform building construction line-marking vehicle, and the material of tup is stainless steel.
The present invention could also say that a kind of housing construction isolating device that can reduce cost, the discharging degree of lip-rounding of discharge nozzle
Shape is linear type, and length is at least 10cm.
The present invention could also say that a kind of building construction of high efficiency, low cost reminds xegregating unit, and the top surface of tup is arc
Shape.
The present invention could also say that a kind of low cost and beautiful building construction scoring equipment, and board is blank.
The present invention could also say that one kind sheds uniform and efficient building construction shielding wire alert device, and lower hopper is in leakage
It is bucket-shaped.
Further, wheel is universal wheel.
Operation principle:Pulverized limestone is filled in lower hopper and is poured into barrel, promotes sweep, wheel is opened out in ground surface
Expect valve, the pulverized limestone in barrel is flowed on ground from discharge nozzle, and the scope that operating personnel can rule as needed promotes this hair
It is bright.Complete shielding wire so can be just marked on the ground, and when long-time is not used, the pulverized limestone in barrel is easily tied
Block, at this time, can start the rotation of the first motor, and the first motor drives small belt pulley to rotate, and small belt pulley, which rotates, passes through flat belt band
Dynamic big belt pulley rotates, and agitating shaft rotates therewith, and agitating shaft rotates and can be deblocked, crushed to the pulverized limestone in barrel, when
After pulverized limestone deblocking completely in barrel, the first motor is closed, agitating shaft stops operating.So avoid the need for caking manually
Pulverized limestone lumps, and improves work efficiency.
Because sector gear, guide rod, tup, rack, spring, second bearing seat, shaft, top plate and copper are further included
Gong, the right end of agitating shaft are provided with sector gear, and sector gear is connected by way of key connection with agitating shaft, cradle top
Right side is provided with pilot hole, and the guide rod coordinated with it is equipped with pilot hole, tup, the bottom of guide rod are connected with the top of guide rod
End is connected with rack, and spring is equipped between rack and stent, and rack is engaged with sector gear, and second is provided with the right side of cradle top
Bearing block, is provided with shaft in second bearing seat, the top horizontal connection of shaft has top plate, what top base was bolted
Mode is provided with bronze gong, and bronze gong is located above tup.After shielding wire is rule, start the first motor and rotate drive agitating shaft
Rotate, sector gear rotates therewith, and the intermittent engaged transmission of sector wheel and rack, under the cooperation of spring, tup taps copper
Gong, reaches the effect of warning.When the pulverized limestone in barrel needs to deblock, but when being not required the bronze gong to do reminding effect, rotatable top
Plate, bronze gong is removed.
Because having further included board, board is installed by bolted connection among cradle top.It can write
Caveat is write on letter stencil, improves warning effect.
(3) beneficial effect
During invention achieves shedding pulverized limestone, work efficiency is high, it is uniform to shed, shielding wire beauty, and can reduce
The effect of construction cost.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Mark in attached drawing for:1- sweeps, 2- wheels, 3- stents, 4- barrels, 5- first bearing seats, 6- agitating shafts, 7- are big
Belt pulley, 8- lower hoppers, 9- discharge nozzles, 10- discharge valves, the first motors of 11-, 12- small belt pulleys, 13- flat belts, 14- fans
Shape gear, 15- pilot holes, 16- guide rods, 17- tups, 18- racks, 19- springs, 20- second bearing seats, 21- shafts, 22-
Top plate, 23- bronze gongs, 24- boards.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of housing construction is rule runner wagon, as shown in Figs. 1-3, include sweep 1, wheel 2, stent 3, barrel 4,
First bearing seat 5, agitating shaft 6, big belt pulley 7, lower hopper 8, discharge nozzle 9, discharge valve 10, the first motor 11, small belt pulley
12 and flat belt 13, the bottom of sweep 1 be equipped with wheel 2, the top of sweep 1 is provided with stent 3 by bolted connection, branch
The inner side of frame 3 is provided with barrel 4, and discharge nozzle 9 is connected among the bottom of barrel 4, discharge valve 10 is provided with discharge nozzle 9,
4 top left side of barrel is equipped with lower hopper 8, and lower hopper 8 is connected with barrel 4, and the left and right sides of barrel 4 is mounted on first bearing seat
5, agitating shaft 6 is installed, the right end of agitating shaft 6 stretches out the right side of barrel 4, is provided with agitating shaft 6 big between two first bearing seats 5
Belt pulley 7, the top right side of sweep 1 are provided with the first motor 11, small belt pulley 12 are connected with the output shaft of the first motor 11,
Small belt pulley 12 is located at the underface of big belt pulley 7, and flat belt 13 is connected between small belt pulley 12 and big belt pulley 7.
Embodiment 2
A kind of housing construction is rule runner wagon, as shown in Figs. 1-3, include sweep 1, wheel 2, stent 3, barrel 4,
First bearing seat 5, agitating shaft 6, big belt pulley 7, lower hopper 8, discharge nozzle 9, discharge valve 10, the first motor 11, small belt pulley
12 and flat belt 13, the bottom of sweep 1 be equipped with wheel 2, the top of sweep 1 is provided with stent 3 by bolted connection, branch
The inner side of frame 3 is provided with barrel 4, and discharge nozzle 9 is connected among the bottom of barrel 4, discharge valve 10 is provided with discharge nozzle 9,
4 top left side of barrel is equipped with lower hopper 8, and lower hopper 8 is connected with barrel 4, and the left and right sides of barrel 4 is mounted on first bearing seat
5, agitating shaft 6 is installed, the right end of agitating shaft 6 stretches out the right side of barrel 4, is provided with agitating shaft 6 big between two first bearing seats 5
Belt pulley 7, the top right side of sweep 1 are provided with the first motor 11, small belt pulley 12 are connected with the output shaft of the first motor 11,
Small belt pulley 12 is located at the underface of big belt pulley 7, and flat belt 13 is connected between small belt pulley 12 and big belt pulley 7.
Further included sector gear 14, guide rod 16, tup 17, rack 18, spring 19, second bearing seat 20, shaft 21,
Top plate 22 and bronze gong 23, the right end of agitating shaft 6 are provided with sector gear 14, and sector gear 14 is by way of key connection and stirring
Axis 6 is connected, and 3 top right side of stent is provided with pilot hole 15, and the guide rod 16 coordinated with it, guide rod 16 are equipped with pilot hole 15
Top be connected with tup 17, the bottom of guide rod 16 is connected with rack 18, and spring 19, tooth are equipped between rack 18 and stent 3
Bar 18 is engaged with sector gear 14, and 3 top right side of stent is provided with second bearing seat 20, and shaft is provided with second bearing seat 20
21, the top horizontal connection of shaft 21 has top plate 22, and top base is provided with bronze gong 23, bronze gong 23 by bolted connection
Above tup 17.
Embodiment 3
A kind of housing construction is rule runner wagon, as shown in Figs. 1-3, include sweep 1, wheel 2, stent 3, barrel 4,
First bearing seat 5, agitating shaft 6, big belt pulley 7, lower hopper 8, discharge nozzle 9, discharge valve 10, the first motor 11, small belt pulley
12 and flat belt 13, the bottom of sweep 1 be equipped with wheel 2, the top of sweep 1 is provided with stent 3 by bolted connection, branch
The inner side of frame 3 is provided with barrel 4, and discharge nozzle 9 is connected among the bottom of barrel 4, discharge valve 10 is provided with discharge nozzle 9,
4 top left side of barrel is equipped with lower hopper 8, and lower hopper 8 is connected with barrel 4, and the left and right sides of barrel 4 is mounted on first bearing seat
5, agitating shaft 6 is installed, the right end of agitating shaft 6 stretches out the right side of barrel 4, is provided with agitating shaft 6 big between two first bearing seats 5
Belt pulley 7, the top right side of sweep 1 are provided with the first motor 11, small belt pulley 12 are connected with the output shaft of the first motor 11,
Small belt pulley 12 is located at the underface of big belt pulley 7, and flat belt 13 is connected between small belt pulley 12 and big belt pulley 7.
Further included sector gear 14, guide rod 16, tup 17, rack 18, spring 19, second bearing seat 20, shaft 21,
Top plate 22 and bronze gong 23, the right end of agitating shaft 6 are provided with sector gear 14, and sector gear 14 is by way of key connection and stirring
Axis 6 is connected, and 3 top right side of stent is provided with pilot hole 15, and the guide rod 16 coordinated with it, guide rod 16 are equipped with pilot hole 15
Top be connected with tup 17, the bottom of guide rod 16 is connected with rack 18, and spring 19, tooth are equipped between rack 18 and stent 3
Bar 18 is engaged with sector gear 14, and 3 top right side of stent is provided with second bearing seat 20, and shaft is provided with second bearing seat 20
21, the top horizontal connection of shaft 21 has top plate 22, and top base is provided with bronze gong 23, bronze gong 23 by bolted connection
Above tup 17.
Board 24 is further included, 3 crown center of stent is provided with board 24 by bolted connection.
Embodiment 4
A kind of housing construction is rule runner wagon, as shown in Figs. 1-3, include sweep 1, wheel 2, stent 3, barrel 4,
First bearing seat 5, agitating shaft 6, big belt pulley 7, lower hopper 8, discharge nozzle 9, discharge valve 10, the first motor 11, small belt pulley
12 and flat belt 13, the bottom of sweep 1 be equipped with wheel 2, the top of sweep 1 is provided with stent 3 by bolted connection, branch
The inner side of frame 3 is provided with barrel 4, and discharge nozzle 9 is connected among the bottom of barrel 4, discharge valve 10 is provided with discharge nozzle 9,
4 top left side of barrel is equipped with lower hopper 8, and lower hopper 8 is connected with barrel 4, and the left and right sides of barrel 4 is mounted on first bearing seat
5, agitating shaft 6 is installed, the right end of agitating shaft 6 stretches out the right side of barrel 4, is provided with agitating shaft 6 big between two first bearing seats 5
Belt pulley 7, the top right side of sweep 1 are provided with the first motor 11, small belt pulley 12 are connected with the output shaft of the first motor 11,
Small belt pulley 12 is located at the underface of big belt pulley 7, and flat belt 13 is connected between small belt pulley 12 and big belt pulley 7.
Further included sector gear 14, guide rod 16, tup 17, rack 18, spring 19, second bearing seat 20, shaft 21,
Top plate 22 and bronze gong 23, the right end of agitating shaft 6 are provided with sector gear 14, and sector gear 14 is by way of key connection and stirring
Axis 6 is connected, and 3 top right side of stent is provided with pilot hole 15, and the guide rod 16 coordinated with it, guide rod 16 are equipped with pilot hole 15
Top be connected with tup 17, the bottom of guide rod 16 is connected with rack 18, and spring 19, tooth are equipped between rack 18 and stent 3
Bar 18 is engaged with sector gear 14, and 3 top right side of stent is provided with second bearing seat 20, and shaft is provided with second bearing seat 20
21, the top horizontal connection of shaft 21 has top plate 22, and top base is provided with bronze gong 23, bronze gong 23 by bolted connection
Above tup 17.
Board 24 is further included, 3 crown center of stent is provided with board 24 by bolted connection.
The material of board 24 is PVC plastic.
The shape of board 24 can be cuboid, square or circle.
The material of tup 17 is stainless steel.
Embodiment 5
A kind of housing construction is rule runner wagon, as shown in Figs. 1-3, include sweep 1, wheel 2, stent 3, barrel 4,
First bearing seat 5, agitating shaft 6, big belt pulley 7, lower hopper 8, discharge nozzle 9, discharge valve 10, the first motor 11, small belt pulley
12 and flat belt 13, the bottom of sweep 1 be equipped with wheel 2, the top of sweep 1 is provided with stent 3 by bolted connection, branch
The inner side of frame 3 is provided with barrel 4, and discharge nozzle 9 is connected among the bottom of barrel 4, discharge valve 10 is provided with discharge nozzle 9,
4 top left side of barrel is equipped with lower hopper 8, and lower hopper 8 is connected with barrel 4, and the left and right sides of barrel 4 is mounted on first bearing seat
5, agitating shaft 6 is installed, the right end of agitating shaft 6 stretches out the right side of barrel 4, is provided with agitating shaft 6 big between two first bearing seats 5
Belt pulley 7, the top right side of sweep 1 are provided with the first motor 11, small belt pulley 12 are connected with the output shaft of the first motor 11,
Small belt pulley 12 is located at the underface of big belt pulley 7, and flat belt 13 is connected between small belt pulley 12 and big belt pulley 7.
Further included sector gear 14, guide rod 16, tup 17, rack 18, spring 19, second bearing seat 20, shaft 21,
Top plate 22 and bronze gong 23, the right end of agitating shaft 6 are provided with sector gear 14, and sector gear 14 is by way of key connection and stirring
Axis 6 is connected, and 3 top right side of stent is provided with pilot hole 15, and the guide rod 16 coordinated with it, guide rod 16 are equipped with pilot hole 15
Top be connected with tup 17, the bottom of guide rod 16 is connected with rack 18, and spring 19, tooth are equipped between rack 18 and stent 3
Bar 18 is engaged with sector gear 14, and 3 top right side of stent is provided with second bearing seat 20, and shaft is provided with second bearing seat 20
21, the top horizontal connection of shaft 21 has top plate 22, and top base is provided with bronze gong 23, bronze gong 23 by bolted connection
Above tup 17.
Board 24 is further included, 3 crown center of stent is provided with board 24 by bolted connection.
The material of board 24 is PVC plastic.
The shape of board 24 can be cuboid, square or circle.
The material of tup 17 is stainless steel.
The discharging mouth-shaped of discharge nozzle 9 is linear type, and length is at least 10cm.
The top surface of tup is arc.
Board is blank.
Embodiment 6
A kind of housing construction is rule runner wagon, as shown in Figs. 1-3, include sweep 1, wheel 2, stent 3, barrel 4,
First bearing seat 5, agitating shaft 6, big belt pulley 7, lower hopper 8, discharge nozzle 9, discharge valve 10, the first motor 11, small belt pulley
12 and flat belt 13, the bottom of sweep 1 be equipped with wheel 2, the top of sweep 1 is provided with stent 3 by bolted connection, branch
The inner side of frame 3 is provided with barrel 4, and discharge nozzle 9 is connected among the bottom of barrel 4, discharge valve 10 is provided with discharge nozzle 9,
4 top left side of barrel is equipped with lower hopper 8, and lower hopper 8 is connected with barrel 4, and the left and right sides of barrel 4 is mounted on first bearing seat
5, agitating shaft 6 is installed, the right end of agitating shaft 6 stretches out the right side of barrel 4, is provided with agitating shaft 6 big between two first bearing seats 5
Belt pulley 7, the top right side of sweep 1 are provided with the first motor 11, small belt pulley 12 are connected with the output shaft of the first motor 11,
Small belt pulley 12 is located at the underface of big belt pulley 7, and flat belt 13 is connected between small belt pulley 12 and big belt pulley 7.
Further included sector gear 14, guide rod 16, tup 17, rack 18, spring 19, second bearing seat 20, shaft 21,
Top plate 22 and bronze gong 23, the right end of agitating shaft 6 are provided with sector gear 14, and sector gear 14 is by way of key connection and stirring
Axis 6 is connected, and 3 top right side of stent is provided with pilot hole 15, and the guide rod 16 coordinated with it, guide rod 16 are equipped with pilot hole 15
Top be connected with tup 17, the bottom of guide rod 16 is connected with rack 18, and spring 19, tooth are equipped between rack 18 and stent 3
Bar 18 is engaged with sector gear 14, and 3 top right side of stent is provided with second bearing seat 20, and shaft is provided with second bearing seat 20
21, the top horizontal connection of shaft 21 has top plate 22, and top base is provided with bronze gong 23, bronze gong 23 by bolted connection
Above tup 17.
Board 24 is further included, 3 crown center of stent is provided with board 24 by bolted connection.
The material of board 24 is PVC plastic.
The shape of board 24 can be cuboid, square or circle.
The material of tup 17 is stainless steel.
The discharging mouth-shaped of discharge nozzle 9 is linear type, and length is at least 10cm.
The top surface of tup is arc.
Board is blank.
Lower hopper is in funnel-form.
Wheel is universal wheel.
Operation principle:Pulverized limestone is filled in lower hopper 8 and is poured into barrel 4, promotes sweep 1, wheel 2 is beaten in ground surface
Open discharge valve 10, the pulverized limestone in barrel 4 is flowed on ground from discharge nozzle 9, the scope that operating personnel can rule as needed
Promote the present invention.So complete shielding wire can be just marked on the ground, when long-time is not used, the lime in barrel 4
Powder easily lumps, and at this time, can start the first motor 11 and rotate, and the first motor 11 drives small belt pulley 12 to rotate, small belt pulley 12
Rotate and drive big belt pulley 7 to rotate by flat belt 13, agitating shaft 6 rotates therewith, and agitating shaft 6 rotates can be in barrel 4
Pulverized limestone is deblocked, crushed, and after the pulverized limestone in barrel 4 deblocks completely, closes the first motor 11, agitating shaft 6 stops turning
It is dynamic.So avoid the need for that manually the pulverized limestone of caking luming, improve work efficiency.
Because further included sector gear 14, guide rod 16, tup 17, rack 18, spring 19, second bearing seat 20, turn
Axis 21, top plate 22 and bronze gong 23, the right end of agitating shaft 6 are provided with sector gear 14, and sector gear 14 is by way of key connection
It is connected with agitating shaft 6,3 top right side of stent is provided with pilot hole 15, is equipped with the guide rod 16 coordinated with it in pilot hole 15, leads
Tup 17 is connected with to the top of bar 16, the bottom of guide rod 16 is connected with rack 18, spring is equipped between rack 18 and stent 3
19, rack 18 is engaged with sector gear 14, and 3 top right side of stent is provided with second bearing seat 20, is installed in second bearing seat 20
There is shaft 21, the top horizontal connection of shaft 21 has top plate 22, and top base is provided with bronze gong 23 by bolted connection,
Bronze gong 23 is located at the top of tup 17.After shielding wire is rule, start the rotation of the first motor 11 and drive agitating shaft 6 to rotate, fan
Shape gear 14 rotates therewith, and sector gear 14 and the intermittent engaged transmission of rack 18, under the cooperation of spring 19, tup 17 taps
Bronze gong 23, reaches the effect of warning., can when the pulverized limestone in barrel 4 needs to deblock, but when being not required the bronze gong 23 to do reminding effect
Rotating top plate 22, bronze gong 23 is removed.
Because having further included board 24,3 crown center of stent is provided with board 24 by bolted connection.Can
Caveat is write on board 24, improves warning effect.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (1)
- The runner wagon 1. a kind of housing construction is rule, include sweep, wheel, stent, barrel, first bearing seat, agitating shaft, Big belt pulley, lower hopper, discharge nozzle, discharge valve, the first motor, small belt pulley, flat belt, sector gear, guide rod, hammer Head, rack, spring, second bearing seat, shaft, top plate and bronze gong, the bottom of sweep of the present invention are equipped with wheel, and the top of sweep leads to Cross bolted mode and stent is installed, barrel is installed on the inside of stent, discharge nozzle is connected among the bottom of barrel, goes out Discharge valve is installed, barrel top left side is equipped with lower hopper, and barrel top left side is equipped with lower hopper, lower hopper and material in expects pipe Cylinder connects, and is mounted on first bearing seat at left and right sides of barrel, agitating shaft is provided between two first bearing seats, agitating shaft Right end is stretched out on the right side of barrel, and the right end of agitating shaft is stretched out on the right side of barrel, and big belt pulley, the top right of sweep are provided with agitating shaft Side is provided with the first motor, is connected with small belt pulley on the output shaft of the first motor, small belt pulley be located at big belt pulley just under Side, is connected with flat belt, the right end of agitating shaft is provided with sector gear, and sector gear passes through between small belt pulley and big belt pulley The mode of key connection is connected with agitating shaft, and pilot hole is provided with the right side of cradle top, the guiding coordinated with it is equipped with pilot hole Bar, is connected with tup at the top of guide rod, the bottom of guide rod is connected with rack, and spring, rack are equipped between rack and stent Engaged with sector gear, second bearing seat is installed on the right side of cradle top, shaft, the top of shaft are installed in second bearing seat Horizontal connection has top plate, and top base is provided with bronze gong by bolted connection, and bronze gong is located above tup.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711292675.8A CN107975237A (en) | 2017-12-08 | 2017-12-08 | A kind of housing construction line runner wagon |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711292675.8A CN107975237A (en) | 2017-12-08 | 2017-12-08 | A kind of housing construction line runner wagon |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107975237A true CN107975237A (en) | 2018-05-01 |
Family
ID=62009487
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711292675.8A Withdrawn CN107975237A (en) | 2017-12-08 | 2017-12-08 | A kind of housing construction line runner wagon |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107975237A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108748063A (en) * | 2018-06-20 | 2018-11-06 | 邹福灶 | A kind of pincers worker Multifunctional template ruler cleaning device |
CN108797301A (en) * | 2018-05-04 | 2018-11-13 | 南昌华学科技有限公司 | A kind of road construction lime pay-off equipment |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205713121U (en) * | 2016-04-23 | 2016-11-23 | 洪勇军 | A kind of building site foundation stone ashes chalker |
CN107146346A (en) * | 2017-07-18 | 2017-09-08 | 喻杨凯 | A kind of power equipment safety reminder alarm device |
CN206475167U (en) * | 2017-01-22 | 2017-09-08 | 浙江工业职业技术学院 | A kind of building site foundation stone ashes chalker |
-
2017
- 2017-12-08 CN CN201711292675.8A patent/CN107975237A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205713121U (en) * | 2016-04-23 | 2016-11-23 | 洪勇军 | A kind of building site foundation stone ashes chalker |
CN206475167U (en) * | 2017-01-22 | 2017-09-08 | 浙江工业职业技术学院 | A kind of building site foundation stone ashes chalker |
CN107146346A (en) * | 2017-07-18 | 2017-09-08 | 喻杨凯 | A kind of power equipment safety reminder alarm device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797301A (en) * | 2018-05-04 | 2018-11-13 | 南昌华学科技有限公司 | A kind of road construction lime pay-off equipment |
CN108748063A (en) * | 2018-06-20 | 2018-11-06 | 邹福灶 | A kind of pincers worker Multifunctional template ruler cleaning device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209549352U (en) | A kind of architectural decoration coating proportioner | |
CN106269024A (en) | A kind of mosaic tiles environment-friendly type processing means | |
CN205074043U (en) | Agitating unit is smashed to gangue | |
CN107975237A (en) | A kind of housing construction line runner wagon | |
CN107974915A (en) | A kind of efficiently beautiful housing construction isolation alert device | |
CN204432670U (en) | A kind of vacuum pulverizes closet | |
CN204338454U (en) | A kind of cement grinding mill abrasive body screening plant | |
CN205182891U (en) | Ore crusher | |
CN107974916A (en) | A kind of building construction shielding wire alert device | |
CN210880305U (en) | Concrete mixing plant discharging device | |
CN211463341U (en) | Hydraulic engineering is with system sand breaker | |
CN210386469U (en) | Chemical raw material refined production device | |
CN108295946A (en) | A kind of architectural engineering solid refuse processing unit | |
CN214765751U (en) | Rubbing crusher for recycled concrete | |
CN109127021A (en) | A kind of rosin preparation rosin pulverizer | |
CN208340796U (en) | A kind of spoil grinding device for restoration of the ecosystem | |
CN107303518A (en) | Limestone crushing machine | |
CN208116127U (en) | A kind of discharging proportional control apparatus and rotary screen for rotary screen | |
CN110813503A (en) | Shell pulverizer | |
CN205095850U (en) | Breaker is retrieved to refractory brick | |
CN105771747A (en) | Mixing device for experiment in inorganic chemistry | |
CN205216914U (en) | A sealed reducing mechanism for gypsum is smashed | |
CN205517472U (en) | A special coating dispersion machine for afforestation | |
CN207998262U (en) | Mechanical self-shield discharging screw machine | |
CN213467952U (en) | Civil engineering construction waste treatment device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180501 |
|
WW01 | Invention patent application withdrawn after publication |