CN107967599A - A kind of Wind Power Project development system and development approach based on exploitation map - Google Patents

A kind of Wind Power Project development system and development approach based on exploitation map Download PDF

Info

Publication number
CN107967599A
CN107967599A CN201711273693.1A CN201711273693A CN107967599A CN 107967599 A CN107967599 A CN 107967599A CN 201711273693 A CN201711273693 A CN 201711273693A CN 107967599 A CN107967599 A CN 107967599A
Authority
CN
China
Prior art keywords
wind power
data
wind
module
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711273693.1A
Other languages
Chinese (zh)
Inventor
邓跃锋
汪景烨
姜宇君
杨占勇
程漪凡
李鸿秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tianrun New Energy Investment Co
Original Assignee
Beijing Tianrun New Energy Investment Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tianrun New Energy Investment Co filed Critical Beijing Tianrun New Energy Investment Co
Priority to CN201711273693.1A priority Critical patent/CN107967599A/en
Publication of CN107967599A publication Critical patent/CN107967599A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention provides a kind of Wind Power Project development system based on exploitation map, including data acquisition module;Visualize electronic map platform, the information related with wind-power market development is integrated and shown according to the dimension of time, region, development trend respectively on visualization electronic map platform, the data integrated at the same time according to the data acquisition module, expand space wind-power market and are predicted with the time;Application layer module, realizes the intelligence, big data and policy analysis of information system, and provides analysis result;Wind Power Project development module, including wind farm siting system module, Risk-warning module, wind power plant installation scale and electricity volume estimation block, wind power plant wind power generating set monitoring modular and wind power plant investment estimate module.A kind of corresponding development approach is additionally provided, realizes the visualization of information integration and business;Shorten the early development time, save human cost, quickly specification operation flow and identification and item controlled risk.

Description

A kind of Wind Power Project development system and development approach based on exploitation map
Technical field
The present invention relates to a kind of Wind Power Generation technical field, particularly a kind of project development system based on exploitation Orientation on map System and development approach, belong to wind-power market lean development technique field.
Background technology
In recent years, Wind Power Generation Industry progressively shows development in pluralism situation:1) industrial policy system gradual perfection;2) wind is abandoned Rationing the power supply can not effectively solve in a short time;3) market strategy south is moved progressively deeply;4) industrial concentration is further lifted;5) wind fire is same It is inevitable that tide is made a price reduction under valency pressure;6) distributing can the phase with offshore wind farm potentiality.Above situation cause wind-power market compete into One step is aggravated, and market access threshold progressively declines, and item difficulty is increased with investment risk, and cooperation trend highlights.Characteristics of the times with Market trend proposes " vertical equity lifting " and the demand of " laterally innovation makes the transition " to wind-power market exploitation business.
At present, existing correlation technique and Patent are as follows:Based on Internet of Things, cloud computing, intelligent control technology the energy Internet platform, such as Greenwich, Apollo cloud, Sylvanas Windrunner, FreeMeso, energy magic square.These energy internets, Internet ofEnergy, comprising thing it is more, presentation is all that one kind attempts various energy forms to be combined into one Supernet opens greatly big conjunction, contains the numerous intelligence of intelligence communication, intelligent grid, intelligent transportation etc. and green concept, so And new energy is fused in energy internet, and by new energy electric field exploitation and the combination of energy internet also not existing Have in technology and find.Before new energy electric field exploitation, new energy technology is simultaneously immature, and investment risk is uncontrollable, it is therefore desirable to Effective energy internet information is integrated, can just can be reasonable in wind field design and initial stage of development so as to develop The system of forming arrangements.
The content of the invention
In order to overcome the missing and deficiency of this part in the prior art, enhancing Wind Power Project develops the layout of business, Realize the visualization of wind-power market exploitation and be precisely laid out, reduce the risk in Wind Power Project development process, lift project development Success rate, realizes the fine-grained management of project development, and lifts the work efficiency of Wind Power Project developer, and the present invention provides A kind of Wind Power Project development system based on exploitation map, the system include:
Data acquisition module, for gathering the Wind Power Project data that use of exploitation and carrying out classification storage and integrated;
Electronic map platform is visualized, the information related with wind-power market development is divided on visualization electronic map platform Do not integrated and shown according to the dimension of time, region, development trend, while the number integrated according to the data acquisition module According to expanding space to wind-power market and be predicted with the time;
Application layer module, realizes intellectual analysis, big data analysis and the policy analysis of information system, and is visualization electricity Sub- map platform provides analysis result;
Wind Power Project development module, including wind farm siting system module, Risk-warning module, wind power plant installation scale and Electricity volume estimation block, wind power plant wind power generating set monitoring modular and wind power plant investment estimate module, user can roots Institute is obtained according to the selection of exploitation demand and the one or more modules of combination, and by data analysis, data comparison and data management Need information.
Preferably, the Wind Power Project development system based on exploitation map further includes:Service module, for providing map Service, function services and logical algorithm service or component.
Preferably, the Wind Power Project development system based on exploitation map further includes:Function module, there is provided map is clear Look at, map inquiry, Orientation on map, regional analysis, screening collect, regional correlation, information management, data statistics, data analysis, number According to contrast and data management function.
Preferably, the Wind Power Project development system based on exploitation map further includes:Enterprise project management module and shelves Case material management module, realizes the precision management to exploration project overall process key element.
Preferably, the content that the enterprise project management module is managed includes but not limited to project process, cost, matter Amount, risk.
Preferably, the document content of the file information management module management includes but not limited to policy document, industry is moved State, project data.
Preferably, the data collecting module collected one or more data as follows:Geography information, remote sensing image, landform Data, wind-resources data, policy data and project data.
Preferably, the Risk-warning module, for by the policy being collected into, account for storage, red line information integration to data is put down Platform, by data processing technique, is realized to the Risk-warning in Wind Power Project development process.
Preferably, the Wind Power Project development system based on exploitation map further includes:Basis of software mechanical floor and hardware Infrastructure device layer, the basis of software mechanical floor include operating system and security system, and the hardware foundation mechanical floor includes clothes Business device, storage device, the network equipment, mobile equipment and safety means.
The present invention also aims to provide a kind of Wind Power Project development approach based on exploitation map, the method uses A kind of above-mentioned Wind Power Project development system based on exploitation map, includes the following steps:
(1) data that Wind Power Project exploitation uses are gathered and carries out classification storage and integrates;
(2) visualization electronic map platform is built, by the information related with wind-power market development in visualization electronic map Integrated and shown according to the dimension of time, region, development trend respectively on platform, while according to the data acquisition module Integrated data, expand space wind-power market and are predicted with the time;
(3) intellectual analysis, big data analysis and the policy analysis of information system are carried out, and is put down for visualization electronic map Platform provides analysis result;
(4) user is according to the selection of exploitation demand and the one or more following modules of combination:Wind farm siting system module, wind Dangerous warning module, wind power plant installation scale and electricity volume estimation block, wind power plant wind power generating set monitoring modular and wind Electric field investment estimate module, and information needed is obtained by data analysis, data comparison and data management;
(5) fine tube of enterprise project management module and file information management module to exploration project overall process key element is used Reason;
(6) establish data operation model, calculated based on selection area and generate with feasibility programmatic recommendation report and Application for developing.
Using above-mentioned Wind Power Project development system and its development approach based on exploitation map, it can realize that wind-power market is opened The visualization of information integration and business during hair;Effectively shorten the Wind Power Project early development time;Wind-resources can be saved The human cost of exploitation;It is capable of the operation flow of specification Wind Power Project exploration project;It can quickly identify and control Wind Power Project Project risk in development process.
According to the accompanying drawings will be brighter to the detailed description of the specific embodiment of the invention, those skilled in the art Above-mentioned and other purposes, the advantages and features of the present invention.
Brief description of the drawings
Some specific embodiments of detailed description of the present invention by way of example, and not by way of limitation with reference to the accompanying drawings hereinafter. Identical reference numeral denotes same or similar component or part in attached drawing.It should be appreciated by those skilled in the art that these What attached drawing was not necessarily drawn to scale.The target and feature of the present invention is considered to will be apparent from below in conjunction with the description of attached drawing, In attached drawing:
Attached drawing 1 is the system architecture diagram according to the embodiment of the present invention;
Attached drawing 2 is the system architecture schematic diagram according to the multi-layer of the embodiment of the present invention;
Attached drawing 3 is the method flow diagram according to the embodiment of the present invention.
Embodiment
Referring to attached drawing 1, the structure according to embodiments of the present invention based on the Wind Power Project development system for developing map is represented Block diagram, the system include:Data acquisition module, for gathering the Wind Power Project data that use of exploitation and carrying out classification storage sum aggregate Into, data collecting module collected one or more data as follows:Geography information, remote sensing image, terrain data, wind-resources data, Policy data and project data;Electronic map platform is visualized, by the information related with wind-power market development in visualization electricity Integrated and shown according to the dimension of time, region, development trend respectively on sub- map platform, while adopted according to the data The data that collection module integrates, expand space wind-power market and are predicted with the time;Application layer module, realizes the intelligence of information system Energy analysis, big data analysis and policy analysis, and provide analysis result for visualization electronic map platform;And Wind Power Project Development module, including wind farm siting system module, Risk-warning module, wind power plant installation scale and electricity volume estimation mould Block, wind power plant wind power generating set monitoring modular and wind power plant investment estimate module, user can be according to exploitation demand selections With the one or more modules of combination, and information needed is obtained by data analysis, data comparison and data management, wherein, wind Dangerous warning module is very crucial for the development cost of project, and it is the policy that will be collected into that it, which is acted on, accounts for storage, red line information integration To data platform, by data processing technique, realize to the Risk-warning in Wind Power Project development process, be based in the embodiment The Wind Power Project development system of exploitation map further includes:Service module, is calculated for providing Map Services, function services and logic Method service or component;Function module, there is provided map view, map inquiry, Orientation on map, regional analysis, screening collect, region pair Than, information management, data statistics, data analysis, data comparison and data management function;Enterprise project management module and archives Material management module, realizes the precision management to exploration project overall process key element, and wherein enterprise project management module is managed Content includes the key element that project process, cost, quality, risk etc. have critical significance for the cycle of project development and cost, And the document content of file information management module management includes but policy document, trade trend, project data etc. are opened for project The detail success or failure of hair have the key element of beam-shaping effect.The Wind Power Project development system based on exploitation map is based on software Infrastructure device layer and hardware foundation mechanical floor realize, operating system that basis of software mechanical floor relates generally to and security system Design, the development system of the present embodiment can compatible several operation systems common on the market and security system, certainly according to opening Hair scale and enterprises characteristics can carry out secondary development to security system;And hardware foundation mechanical floor is related to server, deposits Store up the type selecting of equipment, the network equipment, mobile equipment and safety means, buying and secondary development.
Attached drawing 2 represents multi-layer system architecture schematic diagram, including application layer, represent layer, functional layer, service layer, data Layer And seven level of software and hardware infrastructure device layer;And display form is divided into two different latitude platforms of Intranet door and outer net door.
Wherein application layer is accomplished that three information system intellectual analysis, big data analysis and policy analysis functions.Exhibition Existing layer is specially the core of the present embodiment, that is, develops map.Functional layer realizes multiple functions, includes but not limited to:Map Browse, map inquiry, Orientation on map, regional analysis, screening collect, regional correlation, information management, data statistics, data analysis, Data comparison and data management.Service layer includes but not limited to Map Services, function services and logical algorithm service or component. The type service that data were once provided is made choice according to the demand that wind power plant is developed and permutation and combination, including geography information number According to remote sensing image data, terrain data, wind-resources data, policy data and project data.Infrastructure device layer be divided into software and Two levels of hardware, wherein software device layer include operating system and security system, and hardware device level includes server, storage is set The standby, network equipment, mobile equipment and safety means.
Referring to attached drawing 3, on a kind of flow chart of the Wind Power Project development approach based on exploitation map, including following step Suddenly:
(1) data that Wind Power Project exploitation uses are gathered and carries out classification storage and integrates;
(2) visualization electronic map platform is built, by the information related with wind-power market development in visualization electronic map Integrated and shown according to the dimension of time, region, development trend respectively on platform, while according to the data acquisition module Integrated data, expand space wind-power market and are predicted with the time;
(3) intellectual analysis, big data analysis and the policy analysis of information system are carried out, and is put down for visualization electronic map Platform provides analysis result;
(4) user is according to the selection of exploitation demand and the one or more following modules of combination:Wind farm siting system module, wind Dangerous warning module, wind power plant installation scale and electricity volume estimation block, wind power plant wind power generating set monitoring modular and wind Electric field investment estimate module, and information needed is obtained by data analysis, data comparison and data management;
(5) fine tube of enterprise project management module and file information management module to exploration project overall process key element is used Reason;
(6) establish data operation model, calculated based on selection area and generate with feasibility programmatic recommendation report and Application for developing.
The guide provided according to above-mentioned development system and development approach, has carried out certain company's somewhere wind power plant exploration project Implement.By building the visualization electronic map platform in the whole country, count and show the relevant policies in selection area, OK The contents such as industry information, wind-resources situation and Wind Power Project details, finally calculate and generate the programmatic recommendation with feasibility Report.Specific embodiment and the function of realizing are as follows:
1st, figure layer demonstration tool:Establish Wind Power Project Relational database and information bank, by visualization virtual map technology, Realize the user demand displaying to selection area.Displaying function is longitudinally divided into Pyatyi (country, province, city or area, county, selected area Domain), laterally each level can show geography information, wind-resources situation (containing anemometer tower), relevant policies, trade information, wind Dangerous five dimensions of factor.
2nd, zone location instrument:According to user's actual need, selection area relevant information is realized using data processing technique Screening, statistics, analysis, to when report output function, including:
(1) positioning function:For in selection area or administrative areas at the county level domain, based on regional feature situation, project development feelings Condition, and the condition such as resource distribution situation, positioning project can developing zone;
(2) screening and statistical function:, can be from owner, project (property, progress), resource situation etc. no based on different levels Data screening and statistics are realized with dimension;
(3) analytic function:Developing zone is drafted for user, is opened based on policy, geography, wind-resources etc. information Send out the analysis of the relevant informations such as feasibility, development scheme, development difficulty;
(4) comparing function:Selected different zones, carry out resource, development risk, development difficulty etc. Information Number in region Contrast according to statistics;
(5) output function:Analysis table is carried out based on user demand or suggests the output and push of report.
3rd, project management tool
By the collection and analysis to enterprises and exterior Wind Power Project information, realize and enterprises Wind Power Project is opened Progress, cost, quality and the risk management in sending service each stage.
4th, document management instrument
Realize the document management to the Wind Power Project development phase, management and control content includes but not limited to policy document, industry is moved State, project data etc..
Before project development, following information have collected:The nearly three Nian Feng areas project planning report in the ground and country are to wind The long term planning policy of power construction, the proposed natural environmental condition for setting Project Area, wind energy resources condition, conditions of transportation with And lifting condition, above- mentioned information is inputted in exploitation map, and according to the wind energy resources situation on the ground, the proposed wind of preresearch estimates Electric field year it is equivalent utilize hourage and year electricity volume, can be worked out on map it is multiple near reference zones (reference zone Selected standard is based in planning region, and the cold air channel between anemometer tower and river valley area is on the way), surveyed for different zones Calculate the investment of electric field, finally select it is proposed set wind power plant location, installed capacity, Fan Selection and access system plan, and Early warning is carried out to the risk of whole project construction.Transported according to wind-resources in combination with other weather conditions, landform and traffic Defeated, engineering geology, access system, the weight of other society and politics and economic and technological factor, proposed wind field be located at certain county of city with Eastern air line distance is about at 4km, and wind-powered electricity generation planning installed capacity is completed according to 49.5MW, and addressing region area is open, builds wind power plant The wind-resources of locality are not only effectively utilized, can also play the role of power supply supplement to power grid end.According to available data this Mineral exploration region has been avoided in planning, proposed place without baleful geological processes such as landslide, avalanche, goaf, underground Natural Caves, Overall merit place, ground have good stability, and planning wind power plant is intended according to the principle construction for intervening electric substation nearby.In wind-powered electricity generation In the construction of field, the selection of wind power generating set is subject to wind power plant natural environmental condition, conditions of transportation, lifting condition etc. to make About, at the same advanced technology, it is reliable on the premise of, select economically practical wind power generating set, and according to wind The wind energy resources situation and selected wind power generating set of field, calculate the annual electricity generating capacity of wind field, select the optimal wind of overall target Power generator group.The project plan total installation of generating capacity is 49.5MW, in view of the wind field (is shown) close to national highway on exploitation map, is handed over Logical convenient transportation, using relatively large wind power generating set, can save occupation of land, make full use of wind resource.River it is domestic at present into Ripe commercialization Wind turbines technical specification is fully entered in exploitation map, and the optimization algorithm used by development system is selected Select, select the wind power generating set that wind power plant single-machine capacity uses 1.5MW or 2MW, type characteristic parameter is as follows:
The number of blade:3
Rated power:1.5MW and 2.0MW
Rotor diameter:82~93m
Cut wind speed:3~4m/s
Cut-out wind speed:20、25m/s
Rated wind speed:11~13m/s
Survival wind speed:52.5m/s (Risk-warning module, which calculates, to be obtained)
Hub height:70~80m
By other wind power plant operating condition data input exploitation map, preresearch estimates 1500KW wind around this wind power plant Motor group is about 2300h in the project wind power plant annual utilization hours.Virtual anemometer tower is set in exploitation map, and input is local Measured data further adjust wind field generated energy.
Although the present invention is described by reference to specific illustrative embodiment, these embodiments will not be subject to Restriction and only limited be subject to accessory claim.It should be understood by those skilled in the art that can be without departing from the present invention's The embodiment of the present invention can be modified and be changed in the case of protection domain and spirit.

Claims (10)

1. a kind of Wind Power Project development system based on exploitation map, it is characterised in that the system includes:
Data acquisition module, for gathering the Wind Power Project data that use of exploitation and carrying out classification storage and integrated;
Electronic map platform is visualized, the information related with wind-power market development is pressed respectively on visualization electronic map platform Integrated and shown according to the dimension of time, region, development trend, while the data integrated according to the data acquisition module, Expand space to wind-power market and be predicted with the time;
Application layer module, realizes intellectual analysis, big data analysis and the policy analysis of information system, and for visualization electronically Figure platform provides analysis result;
Wind Power Project development module, including wind farm siting system module, Risk-warning module, wind power plant installation scale and online Electricity estimation block, wind power plant wind power generating set monitoring modular and wind power plant investment estimate module, user can be according to opening Hair demand selects and the one or more modules of combination, and obtains required letter by data analysis, data comparison and data management Breath.
A kind of 2. Wind Power Project development system based on exploitation map according to claim 1, it is characterised in that:Further include Service module, for providing Map Services, function services and logical algorithm service or component.
A kind of 3. Wind Power Project development system based on exploitation map according to claim 1, it is characterised in that:Further include Function module, for providing map view, map inquiry, Orientation on map, regional analysis, screening collect, regional correlation, message tube Reason, data statistics, data analysis, data comparison and data management function.
A kind of 4. Wind Power Project development system based on exploitation map according to claim 1, it is characterised in that:Further include Enterprise project management module and file information management module, realize the precision management to exploration project overall process key element.
A kind of 5. Wind Power Project development system based on exploitation map according to claim 4, it is characterised in that:The enterprise The content that industry project management module is managed includes but not limited to project process, cost, quality, risk.
A kind of 6. Wind Power Project development system based on exploitation map according to claim 1, it is characterised in that:The shelves The document content of case material management module management includes but not limited to policy document, trade trend, project data.
A kind of 7. Wind Power Project development system based on exploitation map according to claim 1, it is characterised in that the number Following one or more data are gathered according to acquisition module:Geography information, remote sensing image, terrain data, wind-resources data, policy number According to this and project data.
A kind of 8. Wind Power Project development system based on exploitation map according to claim 1, it is characterised in that:The wind Dangerous warning module is used for the policy being collected into, accounts for storage, red line information integration to data platform, real by data processing technique Now to the Risk-warning in Wind Power Project development process.
A kind of 9. Wind Power Project development system based on exploitation map according to claim 1, it is characterised in that:The base Basis of software mechanical floor and hardware foundation mechanical floor, the basis of software are further included in the Wind Power Project development system of exploitation map Mechanical floor includes operating system and security system, the hardware foundation mechanical floor include server, storage device, the network equipment, Mobile equipment and safety means.
10. a kind of Wind Power Project development system using based on exploitation map according to claim 1-9 any one carries out The method of Wind Power Project exploitation, it is characterised in that include the following steps:
(1) data that Wind Power Project exploitation uses are gathered and carries out classification storage and integrates;
(2) visualization electronic map platform is built, by the information related with wind-power market development in visualization electronic map platform It is upper to be integrated and shown according to the dimension of time, region, development trend respectively, while integrated according to the data acquisition module Data, expand space to wind-power market and be predicted with the time;
(3) intellectual analysis, big data analysis and the policy analysis of information system are carried out, and is carried for visualization electronic map platform For analysis result;
(4) user is according to the selection of exploitation demand and the one or more following modules of combination:Wind farm siting system module, risk are pre- Alert module, wind power plant installation scale and electricity volume estimation block, wind power plant wind power generating set monitoring modular and wind power plant Investment estimate module, and information needed is obtained by data analysis, data comparison and data management;
(5) precision management of enterprise project management module and file information management module to exploration project overall process key element is used;
(6) data operation model is established, is calculated based on selection area and generates programmatic recommendation report and feasibility study with feasibility Report.
CN201711273693.1A 2017-12-06 2017-12-06 A kind of Wind Power Project development system and development approach based on exploitation map Pending CN107967599A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711273693.1A CN107967599A (en) 2017-12-06 2017-12-06 A kind of Wind Power Project development system and development approach based on exploitation map

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711273693.1A CN107967599A (en) 2017-12-06 2017-12-06 A kind of Wind Power Project development system and development approach based on exploitation map

Publications (1)

Publication Number Publication Date
CN107967599A true CN107967599A (en) 2018-04-27

Family

ID=61998385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711273693.1A Pending CN107967599A (en) 2017-12-06 2017-12-06 A kind of Wind Power Project development system and development approach based on exploitation map

Country Status (1)

Country Link
CN (1) CN107967599A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110007901A (en) * 2019-02-28 2019-07-12 华电电力科学研究院有限公司 A kind of development system collecting regimental wind-powered electricity generation monitor supervision platform and its operation method and development approach
CN110580263A (en) * 2018-05-21 2019-12-17 北京金风科创风电设备有限公司 Method and system for generating wind resource data report
CN111950843A (en) * 2020-06-19 2020-11-17 湖南拓比科技有限公司 Ecological environment development method and system based on block chain
CN112832952A (en) * 2020-12-25 2021-05-25 北方大贤风电科技(北京)有限公司 Historical meteorological data-based wind energy resource development method
CN112884269A (en) * 2020-12-14 2021-06-01 中国船舶重工集团海装风电股份有限公司 Wind power plant technology exploitable amount calculation method and system based on GIS
CN117078460A (en) * 2023-08-18 2023-11-17 国家电投集团科学技术研究院有限公司 Wind resource data management system and wind resource data management method
CN117152372A (en) * 2023-10-30 2023-12-01 四川电力设计咨询有限责任公司 Three-dimensional digital geographic information service platform for wind power engineering

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104506566A (en) * 2014-11-17 2015-04-08 中国电建集团昆明勘测设计研究院有限公司 IPad mobile online/offline site selection system based on cloud GIS (Geographic Information System) platform for wind power plant
KR20150118699A (en) * 2014-04-15 2015-10-23 (주)진우소프트이노베이션 Method of visualizing estimating generation amount of wind power using gis base realtime weather information

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150118699A (en) * 2014-04-15 2015-10-23 (주)진우소프트이노베이션 Method of visualizing estimating generation amount of wind power using gis base realtime weather information
CN104506566A (en) * 2014-11-17 2015-04-08 中国电建集团昆明勘测设计研究院有限公司 IPad mobile online/offline site selection system based on cloud GIS (Geographic Information System) platform for wind power plant

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨林波 等: "基于云GIS的风电场电子地图研究及应用", 《云南省测绘地理信息学会2015年学术年会论文集》 *
艾斯卡尔·阿不力米提 等: "风电场设计私有云GIS平台架构研究", 《测绘与空间地理信息》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110580263A (en) * 2018-05-21 2019-12-17 北京金风科创风电设备有限公司 Method and system for generating wind resource data report
CN110007901A (en) * 2019-02-28 2019-07-12 华电电力科学研究院有限公司 A kind of development system collecting regimental wind-powered electricity generation monitor supervision platform and its operation method and development approach
CN111950843A (en) * 2020-06-19 2020-11-17 湖南拓比科技有限公司 Ecological environment development method and system based on block chain
CN112884269A (en) * 2020-12-14 2021-06-01 中国船舶重工集团海装风电股份有限公司 Wind power plant technology exploitable amount calculation method and system based on GIS
CN112884269B (en) * 2020-12-14 2022-04-01 中国船舶重工集团海装风电股份有限公司 Wind power plant technology exploitable amount calculation method and system based on GIS
CN112832952A (en) * 2020-12-25 2021-05-25 北方大贤风电科技(北京)有限公司 Historical meteorological data-based wind energy resource development method
CN112832952B (en) * 2020-12-25 2021-10-29 北方大贤风电科技(北京)有限公司 Historical meteorological data-based wind energy resource development method
CN117078460A (en) * 2023-08-18 2023-11-17 国家电投集团科学技术研究院有限公司 Wind resource data management system and wind resource data management method
CN117152372A (en) * 2023-10-30 2023-12-01 四川电力设计咨询有限责任公司 Three-dimensional digital geographic information service platform for wind power engineering
CN117152372B (en) * 2023-10-30 2024-01-30 四川电力设计咨询有限责任公司 Three-dimensional digital geographic information service platform for wind power engineering

Similar Documents

Publication Publication Date Title
CN107967599A (en) A kind of Wind Power Project development system and development approach based on exploitation map
Jahangiri et al. Finding the best locations for establishment of solar-wind power stations in Middle-East using GIS: A review
Yeo et al. A proposal for a site location planning model of environmentally friendly urban energy supply plants using an environment and energy geographical information system (E-GIS) database (DB) and an artificial neural network (ANN)
CN107944632A (en) A kind of wind farm siting system and site selecting method based on exploitation map
Canales et al. Cost-reliability analysis of hybrid pumped-battery storage for solar and wind energy integration in an island community
Hunter et al. Wind-diesel systems: a guide to the technology and its implementation
Satkin et al. Multi criteria site selection model for wind-compressed air energy storage power plants in Iran
Talinli et al. A holistic approach for wind farm site selection by FAHP
National Research Council et al. Electricity from renewable resources: Status, prospects, and impediments
Sunak et al. A GIS-based decision support system for the optimal siting of wind farm projects
Zhao et al. Risk evaluation on UHV power transmission construction project based on AHP and FCE method
Phuangpornpitak et al. Feasibility study of wind farms under the Thai very small scale renewable energy power producer (VSPP) program
Zhao et al. Design of low-energy buildings in densely populated urban areas based on IoT
Wang et al. Method multi-criteria decision-making method for site selection analysis and evaluation of urban integrated energy stations based on geographic information system
Seyed Alavi et al. Optimal site selection for wind power plant using multi-criteria decision-making methods: A case study in eastern Iran
Baniya et al. Nepal Himalaya offers considerable potential for pumped storage hydropower
Energiewende et al. Making the most of offshore wind: Re-evaluating the potential of offshore wind in the German North Sea
CN107958335A (en) A kind of wind power plant installation scale and electricity volume estimating system and evaluation method based on exploitation map
Wu et al. An innovative method for offshore wind farm site selection based on the interval number with probability distribution
Prasad et al. Technologies and methods used in wind resource assessment
Cradden Impact of climate change on wind energy generation in the UK
Akpoti et al. Technological advances in prospecting sites for pumped hydro energy storage
Buontempo European climate services
Fedorchuk et al. Using the Concept of Prosumers as a Staff for Balancing at the Power Grid
Krystalidis Wind Energy in Greece: Economic Analysis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180427