CN107967392A - 一种变电站内变压器中性点过电压评估方法 - Google Patents

一种变电站内变压器中性点过电压评估方法 Download PDF

Info

Publication number
CN107967392A
CN107967392A CN201711253529.4A CN201711253529A CN107967392A CN 107967392 A CN107967392 A CN 107967392A CN 201711253529 A CN201711253529 A CN 201711253529A CN 107967392 A CN107967392 A CN 107967392A
Authority
CN
China
Prior art keywords
transformer
neutral point
overvoltage
power frequency
substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711253529.4A
Other languages
English (en)
Inventor
郑鸣
郑一鸣
何文林
姚晖
李晨
刘浩军
杨智
詹江杨
陈珉
于淼
孙翔
李思南
邵先军
王绍安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711253529.4A priority Critical patent/CN107967392A/zh
Publication of CN107967392A publication Critical patent/CN107967392A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Abstract

本发明公开了一种变电站内变压器中性点过电压评估方法。对于中性点不接地的变压器,其中性点通过保护间隙并联避雷器进行保护;在线路发生单向接地故障、非全相运行以及雷击过电压的时候,中性点不接地变电站的中性点会产生很大的过电压,引起保护间隙或者避雷器动作。本发明根据变电站电气主接线图和各出线的杆塔布置图,在仿真软件中搭建系统模型,对输电线路、站内GIS设备、变压器分别进行建模,提出了评估变电站内变压器中性点过电压的方法;并给出了基于过电压评估结果的保护间隙选择方法和中性点绝缘水平评估方法。本发明解决了变电站内变压器中性点过电压的计算,以及相应保护间隙和绝缘水平的选择问题,提高了变压器的安全、可靠运行水平。

Description

一种变电站内变压器中性点过电压评估方法
技术领域
本发明涉及过电压评估和相关设备参数选择领域,具体地说是一种基于PSCAD暂态仿真软件的变电站内变压器中性点过电压评估方法,包括过电压计算、保护间隙选择和绝缘水平选择。
背景技术
在我国,3~66kV电力系统采用非有效接地方式,110~750kV电力系统中性点采用有效接地方式。有效接地系统中性点电压不会很高,一般采用分级绝缘变压器,这样可以降低造价,节省成本。而对于某些供电可靠性和连续性要求较高的用户,其110kV变电站也有采用全绝缘主变的情况。分级绝缘变压器中性点过电压保护一般设置避雷器和放电间隙进行过电压保护的方式,避雷器参数选择和绝缘配合相关规范和设计手册都有较明确的要求,而对于全绝缘变压器,其中性点绝缘水平较高,过电压保护也较为简单。我国目前电网110kV、220kV系统中变压器中性点可以直接接地,根据运行的实际需要,部分变压器中性点也可以采用不接地方式,对于中性点可能接地也可能不接地运行的变压器,需要采取过电压保护的措施。在线路发生单向接地故障、非全相运行以及雷击过电压的时候,中性点不接地变电站的中性点会产生很大的过电压,引起保护间隙或者避雷器动作。
但是,变压器中性点过电压的计算,以往只采用一般性的理论公式来计算,而以往的间隙距离整定和氧化锌避雷器型号选择也均是基于理论公式得出,对于一个实际电力系统中变压器中性点过电压的具体仿真计算和分析,涉及较少。因此,电力变压器中性点保护间隙或避雷器配置不合理,有可能导致其过电压,影响安全稳定运行。
发明内容
本发明所要解决的技术问题是克服上述现有技术存在的缺陷,提供一种评估变电站内变压器中性点过电压以及选择保护间隙和绝缘水平的方法,以解决目前变压器中性点间隙和避雷器选择与实际需求之间的偏差问题。
为此,本发明采用如下的技术方案:一种变电站内变压器中性点过电压评估方法,其包括如下步骤:
1)根据变电站电气主接线图和各出线的杆塔布置图,在仿真软件中搭建系统模型,对输电线路、站内GIS设备、变压器分别进行建模;过电压仿真时系统运行电压按最大值进行计算;
2)仿真进线段某相在距离变电站不同距离处发生单相接地故障,计算变压器中性点过电压,记录最大稳态过电压U1;
3)仿真单相断线和两相断线时变压器中性点过电压,记录最大稳态过电压U2;
4)仿真雷电作用下绕击和反击造成的变压器中性点过电压,记录在最近10个杆塔处发生反击时变压器中性点最大暂态过电压绝对值u3,记录不同故障距离下绕击发生时变压器中性点最大暂态过电压绝对值u4;
5)选择保护间隙;
6)选择变压器中性点绝缘水平
a)考虑工频过电压下中性点绝缘水平的要求,考虑安全系数后的中性点绝缘水平应大于max(U1,U2)/0.85;
b)考虑雷电过电压下中性点绝缘水平的要求,考虑安全系数后的中性点绝缘水平要求达到max(u3,u4)/0.6069。
作为上述技术方案的补充,步骤1)中,所述的仿真软件为PSCAD暂态仿真软件。
作为上述技术方案的补充,步骤2)中,对距离变电站0/20/40/60/80/100/120km处发生单相接地故障进行仿真。
作为上述技术方案的补充,步骤4)中,在雷击线路时,站内断路器、隔离开关、电流互感器、电压互感器、变压器及套管用接地电容进行等效。
作为上述技术方案的补充,步骤5)中,保护间隙的选择需要考虑“系统以有效接地方式运行发生接地和断线故障时,中性点棒间隙不应动作”、“间隙的工频击穿电压应低于变压器中性点的1min工频耐受电压”及“棒间隙的工频击穿电压应保证金属氧化物避雷器在工频过电压下不动作”三方面要求。
作为上述技术方案的补充,步骤5)中,系统以有效接地方式运行发生接地和断线故障时,中性点棒间隙不应动作,中性点棒间隙的工频击穿电压有效值应满足:
式中,Ubg为棒间隙的工频击穿电压有效值,kV;σ为空气间隙工频击穿电压的标准偏差;K1为安全系数;K2为气象修正系数;U0取max(U1,U2);计算得到的Ubg根据棒间隙工频击穿电压有效值与空气间隙长度之间的关系图得到h1,棒间隙应满足H>h1。
作为上述技术方案的补充,步骤5)中,间隙的工频击穿电压应低于变压器中性点的1min工频耐受电压,应满足:
式中,Uog为变压器中性点1min工频耐受电压有效值,kV;对于110kV变压器,其中性点短时工频耐受电压有效值为95kV;对于220kV变压器,其中性点短时工频耐受电压有效值为200kV;
计算得到的Ubg根据棒间隙工频击穿电压有效值与空气间隙长度之间的关系图得到h2,棒间隙应满足H<h2。
作为上述技术方案的补充,步骤5)中,棒间隙的工频击穿电压应保证金属氧化物避雷器在工频过电压下不动作,应满足:
式中,Ue为金属氧化物避雷器的持续运行电压有效值,kV;计算得到的Ubg根据棒间隙工频击穿电压有效值与空气间隙长度之间的关系图得到h3,棒间隙应满足H<h3;
综上,保护棒间间隙H应满足h1<H<min(h2,h3)。
作为上述技术方案的补充,步骤6)的a)中,工频安全系数取1.0,变压器中性点绝缘老化累计安全系数为0.85,因此中性点综合耐受工频裕度系数取0.85。
作为上述技术方案的补充,步骤6)的b)中,雷电安全系数取0.714,变压器中性点绝缘老化累计安全系数为0.85,因此中性点综合耐受雷电冲击裕度系数取0.714×0.8=0.6069。
本发明基于PSCAD暂态仿真软件,提出了评估变电站内变压器中性点过电压的方法,并给出了基于过电压评估结果的110kV和220kV保护间隙选择方法和中性点绝缘水平评估方法。
本发明解决了变电站内变压器中性点过电压的计算,以及相应保护间隙和绝缘水平的选择问题,提高了变压器的安全、可靠运行水平。
附图说明
图1为本发明过电压评估方法的流程图;
图2为现有棒间隙的工频击穿电压有效值与空气间隙长度之间的关系图。
具体实施方式
下面结合说明书附图和具体实施方式对本发明作进一步说明。
如图1所示的一种变电站内变压器中性点过电压评估方法,其包括如下步骤:
1)根据实际变电站电气主接线图和各出线的杆塔布置图,在PSCAD软件中搭建系统模型,对输电线路、站内GIS设备、变压器等分别进行建模;过电压仿真时系统运行电压按最大值(额定电压1.15倍)进行计算。
2)仿真进线段某相(可任选)在距离变电站0/20/40/60/80/100/120km处发生单相接地故障进行仿真,计算变压器中性点过电压,记录最大稳态过电压U1
3)仿真单相断线和两相断线时变压器中性点过电压,记录最大稳态过电压U2
4)仿真雷电作用下,绕击和反击造成的变压器中性点过电压。雷电流波形采用负极性2.6/50us双指数波形。反击雷的雷电流幅取230-260kA,雷道波阻抗取300欧姆,绕击雷的雷电流幅值取30kA左右,雷道波阻抗取800欧姆。在雷击线路时,站内断路器、隔离开关、电流电压互感器等用接地电容来进行等效,具体等效参数如下表所示。
电压等级 变压器 电容式电压互感器 隔离开关(GIS内) 断路器 电流互感器 套管
110kV 3000 3000 80/40(合/分) 300/150(合/分) 100 150
220kV 5000 5000 80/40(合/分) 300/150(合/分) 100 150
记录在最近10个杆塔处发生反击时变压器中性点最大暂态过电压(绝对值)u3;记录不同故障距离下绕击发生时变压器中性点最大暂态过电压(绝对值)u4
5)选择保护间隙
a)系统以有效接地方式运行发生接地和断线故障时,中性点棒间隙不应动作,中性点棒间隙的工频击穿电压有效值应满足
式中,Ubg为棒间隙的工频击穿电压有效值,kV;
σ为空气间隙工频击穿电压的标准偏差,一般取σ=0.03;
K1为安全系数,一般取K1=1.05;
K2为气象修正系数,一般取K2=1.05;
U0在计算中取max(U1,U2)。
由计算所得的Ubg通过图2关系图查找得到h1,棒间隙应满足H>h1。
b)间隙的工频击穿电压应低于变压器中性点的1min工频耐受电压,应满足:
式中,Uog为变压器中性点1min工频耐受电压有效值,kV。
对于110kV变压器,其中性点短时工频耐受电压有效值为95kV。对于220kV变压器,其中性点短时工频耐受电压有效值为200kV。由计算所得的Ubg通过图2关系图查找得到h2,可得棒间隙H<h2。
c)棒间隙的工频击穿电压应保证金属氧化物避雷器(MOA)在工频过电压下不动作,应满足:
式中,Ue为MOA的持续运行电压有效值,kV。
根据避雷器型号可知Ue,由计算所得的Ubg通过图2关系图查找得到h3,可得棒间隙H<h3。
综上,保护棒间间隙H应满足h1<H<min(h2,h3)。
6)变压器中性点绝缘水平选择
a)考虑工频过电压下中性点绝缘水平的要求,工频安全系数取1.0,变压器中性点绝缘老化累计安全系数为0.85,因此中性点综合耐受工频裕度系数取0.85,考虑安全系数后的中性点绝缘水平应大于max(U1,U2)/0.85;
b)考虑雷电过电压下中性点绝缘水平的要求,雷电安全系数取0.714,变压器中性点绝缘老化累计安全系数为0.85,因此中性点综合耐受雷电冲击裕度系数取0.714×0.8=0.6069,考虑安全系数后的中性点绝缘水平要求达到max(u3,u4)/0.6069。
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (10)

1.一种变电站内变压器中性点过电压评估方法,其特征在于,包括如下步骤:
1)根据变电站电气主接线图和各出线的杆塔布置图,在仿真软件中搭建系统模型,对输电线路、站内GIS设备、变压器分别进行建模;过电压仿真时系统运行电压按最大值进行计算;
2)仿真进线段某相在距离变电站不同距离处发生单相接地故障,计算变压器中性点过电压,记录最大稳态过电压U1;
3)仿真单相断线和两相断线时变压器中性点过电压,记录最大稳态过电压U2;
4)仿真雷电作用下绕击和反击造成的变压器中性点过电压,记录在最近10个杆塔处发生反击时变压器中性点最大暂态过电压绝对值u3,记录不同故障距离下绕击发生时变压器中性点最大暂态过电压绝对值u4;
5)选择保护间隙;
6)选择变压器中性点绝缘水平
a)考虑工频过电压下中性点绝缘水平的要求,考虑安全系数后的中性点绝缘水平应大于max(U1,U2)/0.85;
b)考虑雷电过电压下中性点绝缘水平的要求,考虑安全系数后的中性点绝缘水平要求达到max(u3,u4)/0.6069。
2.根据权利要求1所述的变电站内变压器中性点过电压评估方法,其特征在于,步骤1)中,所述的仿真软件为PSCAD暂态仿真软件。
3.根据权利要求1所述的变电站内变压器中性点过电压评估方法,其特征在于,步骤2)中,对距离变电站0/20/40/60/80/100/120km处发生单相接地故障进行仿真。
4.根据权利要求1所述的变电站内变压器中性点过电压评估方法,其特征在于,步骤4)中,在雷击线路时,站内断路器、隔离开关、电流互感器、电压互感器、变压器及套管用接地电容进行等效。
5.根据权利要求1所述的变电站内变压器中性点过电压评估方法,其特征在于,步骤5)中,保护间隙的选择需要考虑“系统以有效接地方式运行发生接地和断线故障时,中性点棒间隙不应动作”、“间隙的工频击穿电压应低于变压器中性点的1min工频耐受电压”及“棒间隙的工频击穿电压应保证金属氧化物避雷器在工频过电压下不动作”三方面要求。
6.根据权利要求5所述的变电站内变压器中性点过电压评估方法,其特征在于,步骤5)中,
系统以有效接地方式运行发生接地和断线故障时,中性点棒间隙不应动作,中性点棒间隙的工频击穿电压有效值应满足:
<mrow> <msub> <mi>U</mi> <mrow> <mi>b</mi> <mi>g</mi> </mrow> </msub> <mo>&gt;</mo> <mfrac> <mrow> <msub> <mi>K</mi> <mn>1</mn> </msub> <msub> <mi>K</mi> <mn>2</mn> </msub> <msub> <mi>U</mi> <mn>0</mn> </msub> </mrow> <mrow> <mn>1</mn> <mo>-</mo> <mn>3</mn> <mi>&amp;sigma;</mi> </mrow> </mfrac> <mo>,</mo> </mrow>
式中,Ubg为棒间隙的工频击穿电压有效值,kV;σ为空气间隙工频击穿电压的标准偏差;K1为安全系数;K2为气象修正系数;U0取max(U1,U2);
计算得到的Ubg根据棒间隙工频击穿电压有效值与空气间隙长度之间的关系图得到h1,棒间隙应满足H>h1。
7.根据权利要求6所述的变电站内变压器中性点过电压评估方法,其特征在于,步骤5)中,
间隙的工频击穿电压应低于变压器中性点的1min工频耐受电压,应满足:
<mrow> <msub> <mi>U</mi> <mrow> <mi>b</mi> <mi>g</mi> </mrow> </msub> <mo>&lt;</mo> <mfrac> <msub> <mi>U</mi> <mrow> <mi>o</mi> <mi>g</mi> </mrow> </msub> <mrow> <mo>(</mo> <mn>1</mn> <mo>+</mo> <mn>3</mn> <mi>&amp;sigma;</mi> <mo>)</mo> <msub> <mi>K</mi> <mn>1</mn> </msub> <msub> <mi>K</mi> <mn>2</mn> </msub> </mrow> </mfrac> <mo>,</mo> </mrow>
式中,Uog为变压器中性点1min工频耐受电压有效值,kV;对于110kV变压器,其中性点短时工频耐受电压有效值为95kV;对于220kV变压器,其中性点短时工频耐受电压有效值为200kV;
计算得到的Ubg根据棒间隙工频击穿电压有效值与空气间隙长度之间的关系图得到h2,棒间隙应满足H<h2。
8.根据权利要求7所述的变电站内变压器中性点过电压评估方法,其特征在于,步骤5)中,棒间隙的工频击穿电压应保证金属氧化物避雷器在工频过电压下不动作,应满足:
<mrow> <msub> <mi>U</mi> <mrow> <mi>b</mi> <mi>g</mi> </mrow> </msub> <mo>&lt;</mo> <mfrac> <msub> <mi>U</mi> <mi>e</mi> </msub> <mrow> <mo>(</mo> <mn>1</mn> <mo>+</mo> <mn>3</mn> <mi>&amp;sigma;</mi> <mo>)</mo> <msub> <mi>K</mi> <mn>1</mn> </msub> <msub> <mi>K</mi> <mn>2</mn> </msub> </mrow> </mfrac> </mrow>
式中,Ue为金属氧化物避雷器的持续运行电压有效值,kV;
计算得到的Ubg根据棒间隙工频击穿电压有效值与空气间隙长度之间的关系图得到h3,棒间隙应满足H<h3;
综上,保护棒间间隙H应满足h1<H<min(h2,h3)。
9.根据权利要求1所述的变电站内变压器中性点过电压评估方法,其特征在于,步骤6)的a)中,工频安全系数取1.0,变压器中性点绝缘老化累计安全系数为0.85,因此中性点综合耐受工频裕度系数取0.85。
10.根据权利要求1所述的变电站内变压器中性点过电压评估方法,其特征在于,步骤6)的b)中,雷电安全系数取0.714,变压器中性点绝缘老化累计安全系数为0.85,因此中性点综合耐受雷电冲击裕度系数取0.714×0.8=0.6069。
CN201711253529.4A 2017-12-02 2017-12-02 一种变电站内变压器中性点过电压评估方法 Pending CN107967392A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711253529.4A CN107967392A (zh) 2017-12-02 2017-12-02 一种变电站内变压器中性点过电压评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711253529.4A CN107967392A (zh) 2017-12-02 2017-12-02 一种变电站内变压器中性点过电压评估方法

Publications (1)

Publication Number Publication Date
CN107967392A true CN107967392A (zh) 2018-04-27

Family

ID=61998597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711253529.4A Pending CN107967392A (zh) 2017-12-02 2017-12-02 一种变电站内变压器中性点过电压评估方法

Country Status (1)

Country Link
CN (1) CN107967392A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110854809A (zh) * 2019-11-11 2020-02-28 深圳供电局有限公司 变压器中性点保护装置的检测方法及保护装置
CN112834808A (zh) * 2020-12-31 2021-05-25 广东电网有限责任公司电力科学研究院 一种雷电侵入波监测方法和系统
EP3747100B1 (en) * 2018-01-30 2022-03-16 Hitachi Energy Switzerland AG Surge arrestor dimensioning in a dc power transmission system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080243413A1 (en) * 2007-03-30 2008-10-02 General Electric Company self-adjusting voltage filtering technique compensating for dynamic errors of capacitive voltage transformers
CN102361321A (zh) * 2011-09-05 2012-02-22 四川省电力公司资阳公司 110/220kV变压器中性点经小电抗接地
CN102882201A (zh) * 2012-10-19 2013-01-16 广州供电局有限公司 基于10kV配电网中性点不同接地方式的防雷方法
CN103514320A (zh) * 2013-07-25 2014-01-15 国家电网公司 一种多直流落点地区变压器直流偏磁的仿真方法
CN103543306A (zh) * 2013-10-29 2014-01-29 国家电网公司 用于低电压穿越测试的电压跌落发生器及其控制方法
CN105811389A (zh) * 2016-03-31 2016-07-27 国家电网公司 750kV线路高抗中性点避雷器及绝缘水平参数的确定方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080243413A1 (en) * 2007-03-30 2008-10-02 General Electric Company self-adjusting voltage filtering technique compensating for dynamic errors of capacitive voltage transformers
CN102361321A (zh) * 2011-09-05 2012-02-22 四川省电力公司资阳公司 110/220kV变压器中性点经小电抗接地
CN102882201A (zh) * 2012-10-19 2013-01-16 广州供电局有限公司 基于10kV配电网中性点不同接地方式的防雷方法
CN103514320A (zh) * 2013-07-25 2014-01-15 国家电网公司 一种多直流落点地区变压器直流偏磁的仿真方法
CN103543306A (zh) * 2013-10-29 2014-01-29 国家电网公司 用于低电压穿越测试的电压跌落发生器及其控制方法
CN105811389A (zh) * 2016-03-31 2016-07-27 国家电网公司 750kV线路高抗中性点避雷器及绝缘水平参数的确定方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
屠志健等: "《电气绝缘与过电压》", 31 August 2005 *
朱德恒等: "《高电压绝缘》", 29 February 1992 *
章叔昌: "变压器中性点保护间隙及MOA的参数选择", 《江西电力》 *
许鸣昌: "110kV变压器中性点可控间隙的研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
韩雨川: "220kV部分变压器接地方式下中性点雷电过电压仿真分析及保护", 《电工技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3747100B1 (en) * 2018-01-30 2022-03-16 Hitachi Energy Switzerland AG Surge arrestor dimensioning in a dc power transmission system
CN110854809A (zh) * 2019-11-11 2020-02-28 深圳供电局有限公司 变压器中性点保护装置的检测方法及保护装置
CN110854809B (zh) * 2019-11-11 2022-04-26 深圳供电局有限公司 变压器中性点保护装置的检测方法及保护装置
CN112834808A (zh) * 2020-12-31 2021-05-25 广东电网有限责任公司电力科学研究院 一种雷电侵入波监测方法和系统
CN112834808B (zh) * 2020-12-31 2023-02-17 广东电网有限责任公司电力科学研究院 一种雷电侵入波监测方法和系统

Similar Documents

Publication Publication Date Title
CN107967392A (zh) 一种变电站内变压器中性点过电压评估方法
CN108228976A (zh) 典型发电厂避雷器配置与绝缘配合的建模方法
CN104319733A (zh) 变压器中性点接阻抗装置及其多用途直流偏磁防护方法
CN104992014A (zh) 柔性直流输电换流站避雷器型号的筛选方法
Hosseini et al. Impact of surge arrester number and placement on reliability and lightning overvoltage level in high voltage substations
Malcolm et al. Analysis of transient overvoltage phenomena due to direct lightning strikes on wind turbine blade
Abd_Elhady et al. Overvoltage investigation of wind farm under lightning strokes
King et al. Switching transients in offshore wind farms–impact on the offshore and onshore networks
CN111769518A (zh) 一种基于间隙保护和避雷器的电站变压器中性点保护方法
Abd‐Elhady et al. High‐frequency modeling of Zafarana wind farm and reduction of backflow current‐overvoltages
CN104967107B (zh) 一种抑制间歇性弧光接地过电压的方法
CN104537137A (zh) 高压电力变压器短路故障预测方法、预测装置和防御方法
Htwe Analysis and design selection of lightning arrester for distribution substation
Sekioka Simulation of lightning overvoltages in substation for lightning strike to wind turbine
Wang et al. Overvoltage and Restriction of 1000kV Long-Distance Transmission Lines in Weak System
Zhiwei et al. The lightning protection performance of back striking for double-circuit transmission line based on the distributed transmission line tower model
Wei et al. Study on Application of Metal Oxide Arresters for Transient Overvoltage Suppression in the Half-Wavelength Transmission System
Seyedi et al. Limitation of transmission line switching overvoltages
Xiao et al. Simulation analysis on lightning overvoltage of 500kV substation
Wang et al. Optimization of Lightning Protection System for 10 kV Distribution Network Based on Yalmip Toolbox
Chi et al. Comparison and analysis on Very Fast Transient Overvoltage based on 550kV GIS and 800kV GIS
Abd-Allah et al. A proper design of wind turbine grounding systems under lightning
Emrose et al. Lightning performance analysis on 400 kv transmission line of bangladesh power system network
Kessel et al. Lightning simulation of a combined overhead line/cable connected gis
Filipovic-Grcic et al. Specific aspects of overvoltage protection in hydro power plant considering AIS and GIS connection to the transmission network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180427