CN107963554A - Heavy construction lifting component deviation correcting device - Google Patents

Heavy construction lifting component deviation correcting device Download PDF

Info

Publication number
CN107963554A
CN107963554A CN201711123270.1A CN201711123270A CN107963554A CN 107963554 A CN107963554 A CN 107963554A CN 201711123270 A CN201711123270 A CN 201711123270A CN 107963554 A CN107963554 A CN 107963554A
Authority
CN
China
Prior art keywords
plate
cylinder
fixed
babinet
building element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711123270.1A
Other languages
Chinese (zh)
Other versions
CN107963554B (en
Inventor
李红立
柴彬堂
王贵珍
张玉林
谯川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Vocational Institute of Engineering
Original Assignee
Chongqing Vocational Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Vocational Institute of Engineering filed Critical Chongqing Vocational Institute of Engineering
Priority to CN201711123270.1A priority Critical patent/CN107963554B/en
Publication of CN107963554A publication Critical patent/CN107963554A/en
Application granted granted Critical
Publication of CN107963554B publication Critical patent/CN107963554B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets

Abstract

The present invention relates to the realm of building construction, discloses a kind of heavy construction lifting component deviation correcting device, including some struts for being fixed on hanging ring bottom and the babinet for being fixed on hanging body bottom, some struts are fixedly connected with fixed plate jointly;Several control cylinders are installed in babinet, correction unit is equipped with the middle part of babinet, correction unit includes central bore, and the top of central bore is circumferentially fixed there are several counterweight chambers;The bottom of box is provided with several and pushes against unit, and each unit that pushes against corresponds to a control cylinder respectively, and it is opposite with corresponding control unit position to push against unit.This programme automatically can rectify a deviation the building element for producing offset, and can provide holding power during correction for building element, prevent building element from being fallen down in offset, enhance security during building element transhipment.

Description

Heavy construction lifting component deviation correcting device
Technical field
The invention belongs to the realm of building construction.
Background technology
In construction, coordinate hanging apparatus by various building element single-pieces, the combination after assembly with crane Part or the roof system of entirety, tower structure etc. are sling, and are installed to the operation on design position.Hanging apparatus mainly by hanging ring, hang Body and hoist cable, which are connected with each other, to be formed, and building element easily produces offset in hoisting process, tilts, and building element is producing offset When, one end of weighting can drive hanging body to offset downward, and it is direct to be easy to one end that hanging body is offset downward for whole building component at this time Landing is got off, and there is very big security risk, and if will deviate, inclined building element be mounted directly can influence build structure The security that the accuracy of part installation and later stage use.
The content of the invention
It is an object of the invention to provide a kind of heavy construction lifting component deviation correcting device, to solve to build in background technology Build the problem of component easily produces offset in transport process.
In order to achieve the above object, base case of the invention provides heavy construction lifting component deviation correcting device, including Some struts for being fixed on hanging ring bottom and the babinet for being fixed on hanging body bottom, some struts are fixedly connected with jointly Fixed plate, the fixed plate are located at the top of hanging body;Several control cylinders are installed in the babinet, the control cylinder Output section is through hanging body and is hinged on fixed plate bottom;Correction unit is equipped with the middle part of babinet, the correction unit includes central chamber Room, the top of the central bore is circumferentially fixed several counterweight chambers, and each counterweight chamber corresponds to a control cylinder respectively, and The filler pipe that is connected with central bore is mounted on each counterweight chamber and for the water of counterweight intracavitary to be put back to central bore Draw off valve, every filler pipe are mounted on water pump close to one end of central bore, and the water pump is powered with plus taps, described Taps is added to be installed on the lower part of corresponding control cylinder;The bottom of box is provided with several and pushes against unit, each to push against unit point Not Dui Ying one control cylinder, and push against unit it is opposite with corresponding control unit position;The abutting unit includes sliding slot, institute State and slide plate is slidably connected in sliding slot, sliding slot is divided into pushing part and movable part, the pushing part and corresponding control by the slide plate Snorkel is communicated between cylinder processed, and elastic component is connected between pushing part and slide plate;The movable part bottom is provided with swing Mouthful, it is hinged with some support rods on the swing mouth;Slide plate is fixed with push plate, the push plate and support rod close to one end of movable part Offset.
The principle of this base case is:In work, when building element shifts in transport process, building element Hanging body and babinet can be driven to produce offset, when hanging body and babinet produce offset, the weighting end of hanging body and babinet can to lower swing, and Partially light end can be then swung up, and the output section due to controlling cylinder is hinged in fixed plate, so end is laid particular stress on when to lower swing, The output section of corresponding control cylinder is pulled out by fixed plate, and is gently held partially when being swung up, the output section meeting of corresponding control cylinder Extruded and slid back in control cylinder by fixed plate, the gas in control cylinder gently held partially at this time is extruded and defeated by snorkel Go out into the corresponding pushing part for pushing against unit, the gas push slide plate of input and push plate produce slip, and push plate is in moving process Support rod can be promoted around hinged spot wobble so that one end that the teeth portion of support rod bottom can be offset downward with building element offsets simultaneously The one end offset downward to building element provides a resistance, prevents building element from offseting downward position and continues to tilt and partially Move, prevent dropping for building element, enhance security during building element transhipment.
Meanwhile control the output section of cylinder to be triggered during sliding back in control cylinder partially light end is corresponding plus water is held Close so that gently the indoor water of central chamber is gradually transported to the counterweight chamber gently held partially by the starting mode of pump in the filler pipe of end, water pump partially In, gradually increase the weight gently held partially, so that hanging body, babinet and the gradual backswing of building element are entangled to equilbrium position, realization Inclined function.
During restoring balance, the control cylinder output section for laying particular stress on end is gradually consolidated for hanging body, babinet and building element Fixed board is expressed to initial position, and the control cylinder output section gently held partially then gradually retracts initial position by fixed plate, this process In the control cylinder output section gently held partially gradually with adding taps to separate, add taps to close, water pump is stopped, and gently holds partially Counterweight chamber stops plus water;In addition, the control cylinder output section gently held partially can make during initial position is retracted by fixed plate Push against the gas in unit in pushing part to return in control cylinder, at this time, slide plate returns to initial bit under the action of elastic component Put, the reset of slide plate drives push plate and support rod to also return to initial position.
The beneficial effect of this base case is:
1st, this programme automatically can rectify a deviation the building element for producing offset, and can be building during correction Component provides holding power, prevents building element from being fallen down in offset, enhances security during building element transhipment;
2nd, the correction cooperation of the unit by central bore and each counterweight chamber of this programme, can occur in hanging body and babinet The weight gently held partially toward partially light end plus water with increasing during offset, so as to play the role of correction, simple in structure and rectifying effect compared with It is good;
3rd, the abutting unit of this programme is oppositely arranged with corresponding control cylinder so that the control cylinder extruding gently held partially Gas can be transferred in the abutting unit for laying particular stress on end, and promotes the support rod for laying particular stress on end to be carried for the position that building element is offset downward For resistance, prevent building element from offseting downward continuing to tilt and deviating for position, prevent dropping for building element, enhance building Security when component is transported;
4th, the abutting unit of this programme can be carried by coordinating for slide plate, push plate and support rod to the building element for producing offset For a resistance, prevent building element from being fallen down in offset, enhance security during building element transhipment;
5th, the control cylinder of this programme can make correction unit according to the offset of hanging body and babinet and push against unit generation phase The movement answered, the effect rectified a deviation and pushed against with automatic realization, method is ingenious and simple in structure, reduces the production cost of device.
Scheme two:This is the preferred of basic scheme, and the abutting unit further includes the latch assembly on hanging ring.Lock Tight component can prevent hoist cable from producing slip when building element deviates, and further enhance building element entangling in transport process Effect partially, prevents building element from producing offset by a larger margin.
Scheme three:This is preferred for scheme two, and the latch assembly includes being fixed on the locking cylinder on the inside of hanging ring, described Bottom on the inside of the output section of locking cylinder and hanging ring offsets;Locking cylinder is powered with several locking switch in parallel, each Locking switch corresponds to the lower part for being installed on a control cylinder.By the cooperation of locking switch and locking cylinder can to hoist cable into Row locking and release, can prevent hoist cable from producing slip when building element deviates, further enhance building element in transport process In correction effect and stability, prevent building element from producing offset by a larger margin.
Scheme four:This is preferred for scheme three, and the support rod bottom is fixed with teeth portion.Teeth portion can strengthen support rod and building structure Frictional force between part, so as to provide more stable resistance for building element, prevents building element from being fallen down in offset.
Scheme five:This is the preferred of basic scheme, and the control cylinder includes piston cylinder, is slidably connected in the piston cylinder There is piston plate, piston rod is connected with the piston plate, the one end of the piston rod away from piston plate is through hanging body and is hinged on Fixed plate bottom.Piston plate can be realized by the cooperation with piston rod, piston cylinder to be slided up and down and drives slide plate, push plate and supports Bar produces corresponding movement, and simple in structure, cost is relatively low.
Brief description of the drawings
Fig. 1 is the structure diagram of heavy construction lifting component deviation correcting device of the present invention;
Fig. 2 is the top view that cylinder is controlled in Fig. 1;
Fig. 3 is the top view of Tu1Zhong central bore and counterweight chamber.
Embodiment
Below by the further details of explanation of embodiment:
Reference numeral in Figure of description includes:Fixed plate 1, strut 2, babinet 3, control cylinder 4, locking cylinder 5, work Seben 6, piston rod 7, locking switch 8 plus taps 9, central bore 10, counterweight chamber 11, filler pipe 12, Draw off valve 13, cunning Groove 14, slide plate 15, push plate 16, support rod 17, swing mouth 18, spring 19, hanging ring 20, hanging body 21, hoist cable 22,
Embodiment is substantially as shown in Figure 1:
Heavy construction lifting component deviation correcting device, mainly by fixed plate 1, babinet 3, control cylinder 4, correction unit, support Tight unit is formed.Fixed plate 1 is located at the top of hanging body 21, and three struts 2 are welded between fixed plate 1 and hanging ring 20.It is such as attached Shown in Fig. 2, babinet 3 is welded on the lower face of hanging body 21, and a control gas is separately installed with four edge on 3 top of babinet Cylinder 4, control cylinder 4 are mainly made of piston cylinder, piston plate 6 and piston rod 7, and piston plate 6 is slidably connected in piston cylinder, piston One end of bar 7 is fixed on piston plate 6, and the other end of piston rod 7 through hanging body 21 and is hinged on the lower end of fixed plate 1.
As shown in Figure 3, unit of rectifying a deviation is installed on the middle part of babinet 3, and correction unit is mainly by central bore 10 and four Counterweight chamber 11 is formed, and the position of four counterweight chambers 11 is adjacent with the position of four control cylinders 4 respectively, and four counterweight chambers 11 are equal The top of central bore 10 is fixed on, Draw off valve 13 and filler pipe are mounted between each counterweight chamber 11 and central bore 10 12, Draw off valve 13 is used to the water in counterweight chamber 11 putting back to central bore 10, and filler pipe 12 is used for the water of central bore 10 It is transported in counterweight chamber 11;Filler pipe 12 is provided with water pump close to one end of central bore 10, water pump with plus taps 9 be electrically connected, Taps 9 is added to be installed on the lower part of piston cylinder and positioned at the lower section of piston plate 6.
The lower part of babinet 3 is provided with four abutting units, and four push against four edge that unit is located at 3 lower part of babinet respectively Interior, each unit that pushes against is corresponding with a control cylinder 4, and pushes against unit and be oppositely arranged with 4 position of corresponding control cylinder.Support Tight unit is mainly made of sliding slot 14, slide plate 15, push plate 16, swing mouth 18, support rod 17 and snorkel, and slide plate 15 is slidably connected at In sliding slot 14, sliding slot 14 is divided and is connected for pushing part and movable part, pushing part by snorkel with corresponding piston cylinder by slide plate 15 It is logical, and spring 19 is connected between pushing part inner wall and slide plate 15;The lower end of movable cloth, which is provided with, swings mouth 18, swings and is cut with scissors on mouth 18 Some support rods 17 are connected to, the lower end of every support rod 17 is welded with teeth portion;Slide plate 15 is welded with close to one end of movable part and pushes away Plate 16, push plate 16 offset with support rod 17.Push against unit and further include latch assembly, latch assembly includes being fixed on the inner side of hanging ring 20 Locking cylinder 5 and several locking switch 8 in parallel, the output terminal of locking cylinder 5 and the bottom of the inner side of hanging ring 20 offset, each Locking switch 8 corresponds to the lower part for being installed on a control cylinder 4.
In work, toward central bore 10 in topped up with water, when building element shifts in transport process, building element Hanging body 21 and babinet 3 can be driven to produce offset, when hanging body 21 and babinet 3 produce offset, the weighting end of hanging body 21 and babinet 3 can be to Lower swing, and partially light end can be then swung up, the piston rod 7 due to controlling cylinder 4 is hinged in fixed plate 1, so laying particular stress on end When to lower swing, the piston rod 7 and piston plate 6 of corresponding control cylinder 4 can be pulled out by fixed plate 1, and partially light end is being put upwards When dynamic, the piston rod 7 and piston plate 6 of corresponding control cylinder 4 can be extruded and slid back in piston cylinder by fixed plates 1, at this time partially light end Piston cylinder in gas be extruded and the pushing part of opposite with this piston cylinder position abutting unit be output to by snorkel In, the gas push slide plate 15 of input and push plate 16 produce and slide and stretch spring 19, and push plate 16 can push away in moving process Dynamic support rod 17 is around hinged spot wobble so that one end that the teeth portion of 17 bottom of support rod can be offset downward with building element offsets simultaneously The one end offset downward to building element provides a resistance, prevents building element from offseting downward position and continues to tilt and partially Move, prevent dropping for building element, enhance security during building element transhipment.
Meanwhile the piston rod 7 of cylinder 4 and piston plate 6 is controlled to trigger partially light end pair during sliding back in piston cylinder Answer plus taps 9 and simultaneously positive opening locking switch 8, wherein, add the triggering of taps 9 can make gently to hold in filler pipe 12 partially Water in central bore 10 is gradually transported in the counterweight chamber 11 gently held partially by starting mode of pump, water pump, make the weight gently held partially by It is cumulative plus, so that the function of correction to equilbrium position, is realized in hanging body 21, babinet 3 and the gradual backswing of building element;Locking is opened Closing 8 positive can start locking cylinder 5, and the output terminal of locking cylinder 5 gradually locks the hoist cable 22 on hanging ring 20, prevents hoist cable 22 Slip is produced when hanging body 21, babinet 3 and building element deviate, correction of the building element in transport process is further enhanced and makees With preventing building element from producing offset by a larger margin.
Hanging body 21, babinet 3 and building element lay particular stress on the piston rod 7 of end control cylinder 4 and live during restoring balance Seben 6 is gradually expressed to initial position by fixed plate 1, and the piston rod 7 and piston plate 6 of partially light end control cylinder 4 then gradual quilt Fixed plate 1 retracts initial position, and piston plate 6 of partially light end control cylinder 4 is gradually with adding taps 9 and locking switch during this 8 separation, add taps 9 to close, and adding taps 9 to close can make water pump be stopped, and the counterweight chamber 11 gently held partially stops plus water, and Locking switch 8 can return to original state so that locking cylinder 5 is reversed startup, and the output terminal of locking cylinder 5 gradually divides with hoist cable 22 From.In addition, the piston rod 7 and piston plate 6 of partially light end control cylinder 4 can make during initial position is retracted by fixed plate 1 The gas in unit in pushing part is pushed against to return in the piston cylinder of corresponding control cylinder 4, at this time, effect of the slide plate 15 in spring 19 Under return to initial position, the reset of slide plate 15 drives push plate 16 and support rod 17 to also return to initial position.
Above-described is only the embodiment of the present invention, and the general knowledge such as known concrete structure and characteristic is not made herein in scheme Excessive description., without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these should also be considered as protection scope of the present invention, these are implemented all without the influence present invention Effect and practical applicability.The scope of protection required by this application should be based on the content of the claims, in specification The records such as embodiment can be used for the content for explaining claim.

Claims (5)

1. heavy construction lifting component deviation correcting device, it is characterised in that:Including be fixed on hanging ring bottom some struts and The babinet of hanging body bottom is fixed on, some struts are fixedly connected with fixed plate jointly, and the fixed plate is located at hanging body Top;Several control cylinders are installed, the output section of the control cylinder through hanging body and is hinged on fixation in the babinet Plate bottom;Correction unit is equipped with the middle part of babinet, the correction unit includes central bore, and the top of the central bore is circumferentially solid Surely there are several counterweight chambers, each counterweight chamber corresponds to a control cylinder respectively, and is mounted on and center on each counterweight chamber The filler pipe of chamber and the Draw off valve for the water of counterweight intracavitary to be put back to central bore, every filler pipe is close to center One end of chamber is mounted on water pump, and the water pump is powered with plus taps, and described plus taps is installed on corresponding control cylinder Lower part;The bottom of box is provided with several and pushes against unit, and each unit that pushes against corresponds to a control cylinder respectively, and pushes against single It is first opposite with corresponding control unit position;The abutting unit includes sliding slot, and slide plate is slidably connected in the sliding slot, described Sliding slot is divided into pushing part and movable part by slide plate, is communicated with snorkel between the pushing part and corresponding control cylinder, and push away It is dynamic that elastic component is connected between portion and slide plate;The movable part bottom is provided with swing mouth, and some are hinged with the swing mouth Support rod;Slide plate is fixed with push plate close to one end of movable part, and the push plate offsets with support rod.
2. heavy construction lifting component deviation correcting device according to claim 1, it is characterised in that:The abutting unit is also Including the latch assembly on hanging ring.
3. heavy construction lifting component deviation correcting device according to claim 2, it is characterised in that:The latch assembly bag Include the locking cylinder being fixed on the inside of hanging ring, the bottom on the inside of the output section of the locking cylinder and hanging ring offsets;Locking cylinder Several locking switch in parallel are powered with, each locking switch corresponds to the lower part for being installed on a control cylinder.
4. heavy construction lifting component deviation correcting device according to claim 3, it is characterised in that:The support rod bottom is consolidated Surely there is teeth portion.
5. heavy construction lifting component deviation correcting device according to claim 1, it is characterised in that:The control cylinder bag Piston cylinder is included, piston plate is slidably connected in the piston cylinder, piston rod is connected with the piston plate, the piston rod is remote One end of piston plate is through hanging body and is hinged on fixed plate bottom.
CN201711123270.1A 2017-11-14 2017-11-14 Heavy construction lifting component deviation correcting device Active CN107963554B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711123270.1A CN107963554B (en) 2017-11-14 2017-11-14 Heavy construction lifting component deviation correcting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711123270.1A CN107963554B (en) 2017-11-14 2017-11-14 Heavy construction lifting component deviation correcting device

Publications (2)

Publication Number Publication Date
CN107963554A true CN107963554A (en) 2018-04-27
CN107963554B CN107963554B (en) 2018-12-28

Family

ID=62001096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711123270.1A Active CN107963554B (en) 2017-11-14 2017-11-14 Heavy construction lifting component deviation correcting device

Country Status (1)

Country Link
CN (1) CN107963554B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111348551A (en) * 2020-03-11 2020-06-30 重庆工程职业技术学院 Deviation correcting device for hoisting building components

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1243049A (en) * 1966-05-14 1971-08-18 Wilhelmus Antonius Maria Pompe A device for attachment to the lifting cable of a crane or the like for aligning a load
JPH11139759A (en) * 1997-11-10 1999-05-25 Takaya Engineering:Kk Hoisting accessory automatically indexing center of gravity
CN105540420A (en) * 2015-12-24 2016-05-04 国家电网公司 Suspension balance type conveying device
CN105584927A (en) * 2016-01-06 2016-05-18 文登蓝岛建筑工程有限公司 Device for accurately hoisting roof beam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1243049A (en) * 1966-05-14 1971-08-18 Wilhelmus Antonius Maria Pompe A device for attachment to the lifting cable of a crane or the like for aligning a load
JPH11139759A (en) * 1997-11-10 1999-05-25 Takaya Engineering:Kk Hoisting accessory automatically indexing center of gravity
CN105540420A (en) * 2015-12-24 2016-05-04 国家电网公司 Suspension balance type conveying device
CN105584927A (en) * 2016-01-06 2016-05-18 文登蓝岛建筑工程有限公司 Device for accurately hoisting roof beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111348551A (en) * 2020-03-11 2020-06-30 重庆工程职业技术学院 Deviation correcting device for hoisting building components
CN111348551B (en) * 2020-03-11 2021-08-20 重庆工程职业技术学院 Deviation correcting device for hoisting building components

Also Published As

Publication number Publication date
CN107963554B (en) 2018-12-28

Similar Documents

Publication Publication Date Title
CN107795112B (en) A kind of high maneuverability external wall aerial work platform structure
CN109051887A (en) Safety applied to concrete duct delays drop handling method
CN204174744U (en) Elevating platform
CN109928179A (en) Vertical prefabricated assembled box culvert auxiliary turning-over device and installation method
CN206233877U (en) Oil drilling machine quadruple board platform pipe arranging robot
CN104831720B (en) A kind of shoe and using method thereof
CN106593324A (en) Tube-arraying robot for racking platform of petroleum well drill and method
CN107963554A (en) Heavy construction lifting component deviation correcting device
CN204643637U (en) A kind of scissors V shape drilling rod lifting machine
CN107882317B (en) A kind of nacelle device for external wall high altitude operation
CN107724670A (en) A kind of framework laterally pushed type inside-climbing tower crane based on top module system does not fall beam and climbed method
CN104720338A (en) Hydraulic telescopic ceiling cabinet
CN209677328U (en) A kind of upper and lower a heatable brick bed device of electric hydaulic flue-cured tobacco
CN201660373U (en) Cement building prefabricated part overturn device
CN207573958U (en) The aerial device that portable extension type folds
CN110230412A (en) Superposing type villa
CN207406013U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device
CN205709746U (en) A kind of improved elevating platform
CN205369045U (en) Basket system is hung to anchor after hydraulic pressure semi -girder formula
CN104929121B (en) Excavator piling equipment
CN205687499U (en) A kind of lifting platform
CN205476379U (en) Convenient construction frame that removes
CN206615923U (en) Rough polishing is linked up with
CN204689447U (en) A kind of building materials loop wheel machine of conveniently working at night
CN208135734U (en) A kind of suspension hook distance regulating mechanism of tubular pole suspender

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant