CN107963515A - The service sequence adjustment system of textile machine - Google Patents

The service sequence adjustment system of textile machine Download PDF

Info

Publication number
CN107963515A
CN107963515A CN201710958230.2A CN201710958230A CN107963515A CN 107963515 A CN107963515 A CN 107963515A CN 201710958230 A CN201710958230 A CN 201710958230A CN 107963515 A CN107963515 A CN 107963515A
Authority
CN
China
Prior art keywords
textile machine
service sequence
maintenance
configuration part
order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710958230.2A
Other languages
Chinese (zh)
Other versions
CN107963515B (en
Inventor
林茂
正井哲司
福原修
福原修一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=60153108&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN107963515(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Publication of CN107963515A publication Critical patent/CN107963515A/en
Application granted granted Critical
Publication of CN107963515B publication Critical patent/CN107963515B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H63/00Warning or safety devices, e.g. automatic fault detectors, stop-motions ; Quality control of the package
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/06Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H13/00Other common constructional features, details or accessories
    • D01H13/14Warning or safety devices, e.g. automatic fault detectors, stop motions ; Monitoring the entanglement of slivers in drafting arrangements
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H13/00Other common constructional features, details or accessories
    • D01H13/32Counting, measuring, recording or registering devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/31Textiles threads or artificial strands of filaments

Abstract

A kind of service sequence adjustment system of textile machine, it possesses:First textile machine of more than 1, it carries out the first fiber aggregate the first processing;Multiple second textile machines, it is supplied to the second fiber aggregate for having been carried out the first processing by the first textile machine and having been formed, and the second fiber aggregate to being supplied carries out second processing, generates the 3rd fiber aggregate;Operation information obtaining section, it obtains the operation information for the operating condition for representing the first textile machine;Order configuration part, service sequence when it is determined to multiple second textile machine putting maintenance into practice based on order set in advance, and determined service sequence is adjusted based on the operation information obtained by operation information obtaining section;And prompting part, it prompts the service sequence after being adjusted by order configuration part.

Description

The service sequence adjustment system of textile machine
Technical field
Service sequence the present invention relates to textile machine adjusts system.
Background technology
There are a kind of system for the textile machine for possessing generation fiber aggregate.For example, in patent document (Japanese Unexamined Patent Publication 1-183530 publications) in, describe following system:Possess multiple spinning frames of generation yarn, as generation fiber aggregate That is, the textile machine of yarn, and multiple automatic bobbin winders of winding yarn.
, it is necessary to for each textile machine in the system of the textile machine as described above for possessing generation fiber aggregate Carry out the maintenance such as oil.For example, it is contemplated that the textile machine to the subsequent handling in the process to generating fiber aggregate implements dimension In the case of shield, shadow can be produced by operating of the operating condition of the textile machine of subsequent handling to the textile machine in preceding process Ring.
It should illustrate that preceding process is not limited to close process before subsequent handling (previous procedure), bag Include relative to subsequent handling, forward two procedures or than forward process.Therefore, multiple weaving looms in subsequent handling During tool putting maintenance into practice, pursue and suppress influence that the operating to the textile machine in preceding process is brought while carrying out subsequent handling In textile machine maintenance.
The content of the invention
For this reason, it can be adjusted it is an object of the invention to provide a kind of according to the operating condition of the textile machine in preceding process The service sequence adjustment system of textile machine that is whole and prompting the order safeguarded for multiple textile machines in subsequent handling System.
The service sequence adjustment system of the textile machine of the present invention possesses:First textile machine of more than 1, it is to first Fiber aggregate carries out the first processing;Multiple second textile machines, it is supplied to has carried out above-mentioned first by the first textile machine The second fiber aggregate formed is handled, and the second fiber aggregate to being supplied carries out second processing, generates the 3rd fiber Aggregation;Operation information obtaining section, it obtains the operation information for the operating condition for representing the first textile machine;Order configuration part, Service sequence when it is determined to multiple second textile machine putting maintenance into practice based on order set in advance, and based on by operating letter The operation information that breath obtaining section obtains adjusts determined service sequence;And prompting part, it is prompted by order configuration part tune Service sequence after whole.
, can be according to the operating of the first textile machine in preceding process in the service sequence adjustment system of the textile machine State, to adjust and prompt the service sequence of multiple second textile machines in subsequent handling.Therefore, upkeep operation person passes through root Implement the maintenance of the second textile machine according to suggested service sequence, can be while suppressing the operating condition to the first textile machine The influence that brings, while implementing the maintenance of the second textile machine.It should illustrate that the first textile machine is not limited to the second weaving The textile machine used before machinery in adjacent process or two procedures more forward than the second textile machine are more leaned on The textile machine used in preceding process.
Can also be that order configuration part is repeated according to the cycle of regulation respectively:Determined based on order set in advance The step of service sequence of second textile machine and the step of adjust determined service sequence based on operation information.Thus, it is suitable The decision and adjustment of service sequence can be repeated in sequence configuration part.
Can also be that order configuration part is according to the week shorter than the cycle based on order set in advance decision service sequence Phase, based on operation information adjustment and maintenance order.Thus, even if the operating condition of spinning frame often changes, order configuration part also can The change for enough catering to operating condition carries out the adjustment of service sequence.
Can also be that the service sequence adjustment system of textile machine possesses more the first textile machines, for 1 first spinning Loom tool, correspondence is established using 1 or more the second textile machines as the supply destination of the second fiber aggregate, order Configuration part is being calculated until next the first textile machine can be supplied the second fiber aggregate to the based on operation information Time that is, supply stand-by period untill two textile machines, and in the case of adjustment and maintenance order, with preferential pair and supply etc. Treat that the time establishes the mode of corresponding second textile machine putting maintenance into practice, adjustment for the first more than stipulated time textile machine Service sequence.For example, in the case where the supply stand-by period is longer, even if during this period stopping the second textile machine and implementing Safeguard, the influence that the operating to the first textile machine in preceding process produces is also smaller.Therefore, by with preferential pair with supply etc. Treat that the time establishes the mode of corresponding second textile machine putting maintenance into practice for more than the stipulated time the first textile machine and adjusts Service sequence, even if so that make the second textile machine stop and putting maintenance into practice, can also suppress in preceding process first weaving The operating of machinery has an impact.
Can also be that order configuration part can also be in order to implement the second textile machine to calculate based on the supply stand-by period The Slack Time safeguarded and stop the second textile machine, the Slack Time calculated by order configuration part is also prompted in prompting part. In this case, Slack Time when upkeep operation person will appreciate that putting maintenance into practice.
Can also be, it is suitable in the case where that should be multiple maintenance contents to the maintenance content that the second textile machine is implemented Sequence configuration part adjustment and maintenance order in a manner of the preferential maintenance content for implementing within the supply stand-by period to terminate.Thus, Even if implementing the maintenance of the second textile machine, also suppress the operating on the first textile machine and bring influence.
Can also be that order configuration part is also based on the current position of upkeep operation person come adjustment and maintenance order.Thus, tie up Shield operator can be carried out efficiently upkeep operation.
Can also be that the maintenance content of the maintenance carried out to the second textile machine is also prompted in prompting part.In this case, tie up Shield operator will appreciate that maintenance content and Slack Time.Thus, be capable of deciding whether can be in Slack Time by upkeep operation person Interior putting maintenance into practice is simultaneously implemented.
Can also be that prompting part is based on the instruction from upkeep operation person according to the rule of regulation to suggested reminder item Mesh is ranked up.Thus, the judgement and upkeep operation that the service sequence adjustment system of textile machine can be for upkeep operation person Carry out a variety of supports.
Can also the first textile machine be to generate yarn from the first fiber aggregate, and wind generated yarn and generate As the spinning frame of the yarn feeding bobbin of the second fiber aggregate, the second textile machine is given birth to from above-mentioned yarn feeding bobbin winding yarn Into the automatic bobbin winder of the package as the 3rd fiber aggregate.For example, in possessing the system of spinning frame and automatic bobbin winder, Sometimes spinning frame becomes the speed control level segment of the production capacity of system entirety.In this case, from the viewpoint of production capacity From the point of view of, operating of the upkeep operation of automatic bobbin winder to spinning frame is had an impact and (is stopped processing).Therefore, lead to The service sequence that the operating condition based on spinning machine determines automatic bobbin winder is crossed, is capable of the production capacity drop of suppression system entirety It is low.
Can also spinning frame and automatic bobbin winder be respectively arranged with more, for 1 spinning frame, by 1 automatic bobbin winder Correspondence is established as the supply destination of yarn feeding bobbin.
In accordance with the invention it is possible to the operating condition of the textile machine in preceding process is adjusted and prompted to subsequent handling In multiple textile machines safeguard order.
Brief description of the drawings
Fig. 1 is the figure of the schematic construction for the service sequence adjustment system for representing embodiment.
The frame of existing functional structure centered on Fig. 2 is the management control unit for representing the prompting processing to carry out service sequence Figure.
Fig. 3 is the figure for the display picture example for representing display unit.
(a) of Fig. 4 is the figure for the display picture example for representing display unit.
(b) of Fig. 4 is the figure for the display picture example for representing display unit.
Fig. 5 is the flow chart for the flow that the prompting for the service sequence for representing to be carried out by management control unit is handled.
Fig. 6 is the figure of the schematic construction for the service sequence adjustment system for representing variation.
Fig. 7 is the figure of the schematic construction for the service sequence adjustment system for representing other variations.
Embodiment
Hereinafter, the embodiments of the present invention will be described with reference to the drawings.It should illustrate that in the description of the drawings for same Key element marks same symbol, and omits repeat specification.
The service sequence adjustment system of present embodiment, is the dimension for the textile machine that adjustment handles fiber aggregate The system of shield order.Fiber aggregate refers to yarn (Yarn), sliver (Sliver), rove (Rover), yardage roll (Lap), netted Fiber product or the fibrous materials such as thing (Web), yarn fabric and braid.In addition, fiber aggregate can also be to be wound with slightly The roving bobbin of yarn and yarn feeding bobbin or the package for being wound with yarn.In the present embodiment, as fiber aggregate Processing, to generating yarn from rove, the generated yarn of winding and form (generation) yarn feeding bobbin, wound yarn feeding bobbin Yarn recoil and is formed (generation) be wrapped situation illustrate.As shown in Figure 1, service sequence adjusts system (textile machine Service sequence adjustment system) 1 possess:Multiple spinning frames (the first textile machine) 2, multiple automatic bobbin winders (the second weaving loom Tool) 3 and managing device 5.In the present embodiment, spinning frame 2 and automatic bobbin winder 3 are each provided with 3 respectively.Wherein, carefully The number of units of yarn machine 2 and automatic bobbin winder 3 is not limited to respective 3.
Spinning frame 2 carries out the processing of generation yarn.Spinning frame 2 possesses spun yarn control device 22 and multiple spun yarn units 21. Spun yarn unit 21 carries out generating yarn from rove, winds generated yarn and forms yarn feeding bobbin (the second fiber aggregate) B Processing (first processing).It should illustrate that the rove that rove has been wound in fly frame (not shown) is supplied to spun yarn unit 21 Bobbin (the first fiber aggregate).Spun yarn control device 22 controls the action of multiple spun yarn units 21.
Here, spinning frame 2 is configured to so-called collective doffing formula (Simultaneous doffing type).That is, spun yarn Machine 2 stores the multiple empty bobbins transferred out using bobbin transfer device 33 from winder unit 31 in advance, and empty bobbin is same When be positioned over each spun yarn unit 21, start simultaneously at the winding of yarn.If in each spun yarn unit 21 winding of yarn terminate and Yarn feeding bobbin B is formed, then spinning frame 2 is carried out at the same time doff (Duffing) whole yarn feeding bobbin B.Then, spinning frame 2 is from support Disk 33a extracts stored empty bobbin and is positioned over each spun yarn unit 21 at the same time again, replaces, by the yarn feeding after doffing Bobbin B is positioned over pallet 33a at the same time.
Automatic bobbin winder 3 is supplied yarn feeding bobbin B from spinning frame 2, and is carried out from the yarn feeding bobbin B winding yarns supplied And form the processing (second processing) of package (the 3rd fiber aggregate) P.Automatic bobbin winder 3 possesses:Winder control device 32, Bobbin transfer device 33 and multiple winder units 31.Bobbin transfer device 33 will be positioned over the yarn feeding bobbin B of pallet 33a to Each winder unit 31 is transferred.
Winder unit 31 is wound with the package P of the yarn of specific length from yarn feeding bobbin B unwinding yarns, formation.Doff Machine control device 32 controls the action of multiple winder units 31 and the action of bobbin transfer device 33.
Here, for convenience of description, 3 spinning frames 2 are set to spinning frame 2A, spinning frame 2B and spinning frame 2C. Equally, 3 automatic bobbin winders 3 are set to automatic bobbin winder 3A, automatic bobbin winder 3B and automatic bobbin winder 3C.In this reality Apply in mode, bobbin transfer device 33 receives yarn feeding bobbin B from a spinning frame 2 and yarn feeding bobbin B is transferred.That is, For 1 spinning frame 2, the supply destination using 1 automatic bobbin winder 3 as yarn feeding bobbin B, makes spinning frame 2 and automatic winding Machine 3, which is established, to be corresponded to.
Specifically, the bobbin transfer device 33 of automatic bobbin winder 3A receives yarn feeding bobbin B and by yarn feeding from spinning frame 2A Bobbin B is transferred to the winder unit 31 of automatic bobbin winder 3A.The bobbin transfer device 33 of automatic bobbin winder 3B is from spinning frame 2B Receive yarn feeding bobbin B and transfer yarn feeding bobbin B to the winder unit 31 of automatic bobbin winder 3B.The cylinder of automatic bobbin winder 3C Pipe transfer device 33 receives yarn feeding bobbin B and winder unit by from yarn feeding bobbin B to automatic bobbin winder 3C from spinning frame 2C 31 transfers.
Managing device 5 is the device of overall management spinning frame 2 and automatic bobbin winder 3.Managing device 5 possesses display unit and (carries Show portion) 51 and management control unit 52.It is to have such as CPU (Central Processing Unit), ROM to manage control unit 52 (Read Only Memory)、RAM(Random Access Memory)、EEPROM(Electrically Erasable Programmable Read Only Memory) and communication unit etc. electronic control unit.Control unit 52 is managed by ROM institutes The program of storage is loaded into RAM, is performed using EEPROM numerical value stored etc. and using CPU, thus performs various processing.
Management control unit 52 can be by the spun yarn control device 22 that communications cable L and each spinning frame 2 possess and respective The winder control device 32 that dynamic winder 3 possesses communicates.Management control unit 52 determines real to multiple automatic bobbin winders 3 Apply service sequence when safeguarding.Display unit 51 is the equipment that can be shown to the information of display etc..Display unit 51 is shown (prompting) adjusted by management control unit 52 after service sequence.
It should illustrate that spinning frame 2A~2C and automatic bobbin winder 3A~3C are imparted for identifying their own body Numbering.Managing device 5 can identify spinning frame 2A in integrally management spinning frame 2 and automatic bobbin winder 3 using body numbering ~2C and automatic bobbin winder 3A~3C.
Next, the details that the prompting of the service sequence to being carried out in managing device 5 is handled illustrates.Such as figure Shown in 2, the spun yarn control device 22 of spinning frame 2 possesses operation information sending part 22a.Operation information sending part 22a is by communication Cable L sends the operation information being indicated to the operating condition for possessing the spinning frame 2 of operation information sending part 22a to pipe Manage device 5.
Here, operation information include this period untill spinning frame 2 then doffs yarn feeding bobbin B that is, Doff the stand-by period.In addition, it is to be in stopping in operating that operation information, which can also include spinning frame 2 (spun yarn unit 21), Information in only.Information in the stopping can also include because etc. stopped the state of operating bobbin to be replaced, because of failure and It stopped the state of operating.In addition, operation information can also include the off line information for representing can not to communicate with spinning frame 2. It should illustrate that as the example that can not be communicated with spinning frame 2, can enumerate because of the power-off of spinning frame 2 and Situation about can not communicate, and situation about can not communicate by the generation problem such as communications cable L etc..In addition, as fortune Transfer the letter an example of breath, can also include the running efficiency of spinning frame 2, yarn output and stop because of failure Time etc..
Management control unit 52 functionally possesses operation information obtaining section 52a, maintenance period storage part 52b, order and sets Portion 52c and display control unit 52d.Operation information obtaining section 52a obtains the operation information from spinning frame 2 by communications cable L The operation information that sending part 22a is sent.
Maintenance period storage part 52b stores the maintenance period of automatic bobbin winder 3.The maintenance period is according to set in advance Cycle of the defined cycle to multiple automatic bobbin winder 3A~3C putting maintenance into practice.For example, maintenance period is based on automatic bobbin winder 3 Duration of runs etc. is preset.The maintenance period is set for each maintenance content.Specifically, as maintenance content, example Lifting has the oiling of 31 each several part of winder unit, part replacement and cleaning etc., the oiling of 33 each several part of bobbin transfer device, portion Part replacement and cleaning etc..Maintenance period and content are preset such as the producer as automatic bobbin winder 3.
The maintenance period that order configuration part 52c is stored based on maintenance period storage part 52b, determines to multiple automatic bobbin winders During maintenance during 3A~3C putting maintenance into practice (time of putting maintenance into practice).Here, order configuration part 52c can be with no more than advance Opportunity before the mode of the maintenance period of setting will be separated by specified time limit with the opportunity that maintenance period reaches is set as maintenance phase Between.Hereinafter, the maintenance implemented based on maintenance period is known as " periodic maintenance ".
In addition, order configuration part 52c determines to implement multiple automatic bobbin winder 3A~3C based on order set in advance Service sequence during periodic maintenance.For example, in the case where that will oil automatic bobbin winder 3A~3C as periodic maintenance, Need to determine service sequence, so that upkeep operation person can carry out operation in order to each automatic bobbin winder 3A~3C.Therefore, it is suitable Sequence configuration part 52c determines the service sequence based on order set in advance.Here, order configuration part 52c can for example be used Service sequence is determined for the body numbering of automatic bobbin winder 3A~3B settings, as order set in advance.In addition, order Configuration part 52c sequentially can also determine service sequence in addition to being numbered using body according to set in advance other, as Order set in advance.
Here, in the maintenance of automatic bobbin winder 3, except there is periodic maintenance, also unscheduled maintenance in addition.For example, conduct Unscheduled maintenance, enumerates what produced by individual difference of automatic bobbin winder 3 etc. specific carried out for automatic bobbin winder 3 Oil, clean or part replacement etc. is safeguarded.The information of the unscheduled maintenance can be inputted by operator of automatic bobbin winder 3 etc. Managing device 5, can also automatically be judged whether the needs of unscheduled maintenance by the grade of winder control device 32 and input management dress Put 5.The information for inputting the unscheduled maintenance of managing device 5 includes:Object is safeguarded during implementing unscheduled maintenance, with becoming The related information in position and maintenance content etc..
During order configuration part 52c is based on implementing unscheduled maintenance, it is non-fixed to be added in the service sequence of periodic maintenance Phase safeguards.Thus, determine to contain the service sequence of periodic maintenance and the maintenance of unscheduled maintenance using order configuration part 52c.
Also, order configuration part 52c is after service sequence is determined, based on what is obtained by operation information obtaining section 52a Operation information adjusts determined service sequence.Specifically, order configuration part 52c is based on operation information, for each thin Yarn machine 2, calculate then can supply yarn feeding bobbin B time that is, the confession untill each automatic bobbin winder 3 until each spinning frame 2 To the stand-by period.Order configuration part 52c can based on the stand-by period of doffing that such as operation information is included, in order to utilize spun yarn Machine 2 winds the time needed for yarn feeding bobbin B and at least any one time in the time stopped by 2 failure of spinning frame, comes Calculate the supply stand-by period.In addition, as long as the information that order configuration part 52c service firing information is included, then can also use Except the stand-by period of doffing, in order to wind time needed for yarn feeding bobbin B using spinning frame 2 and stop because of 2 failure of spinning frame Time beyond information, come calculate supply the stand-by period.
In the case of adjustment and maintenance order, first, in spinning frame 2A~2C, selection calculates order configuration part 52c The supply stand-by period be more than stipulated time spinning frame 2.Order configuration part 52c adjustment and maintenances order, preferentially to implement pin The dimension of the automatic bobbin winder 3 of the correspondence of the supply destination as yarn feeding bobbin B is established to selected spinning frame 2 Shield.
It should illustrate that preferential putting maintenance into practice refers to the maintenance implemented in advance compared with other are safeguarded.That is, preferential dimension will be answered The service sequence of shield shifts to an earlier date and (shifts to an earlier date order) or the service sequence of the maintenance in addition to preferential maintenance is answered is transferred to Ying You After the service sequence of first maintenance.
For example, be set to the service sequence that order configuration part 52c determined be automatic bobbin winder 3A, automatic bobbin winder 3B, from The order of dynamic winder 3C.In addition, the supply stand-by period for being set to spinning frame 2B is more than the stipulated time, spinning frame 2A, 2C's Supply the stand-by period insufficient stipulated time.In this case, supplied from spinning frame 2B to automatic bobbin winder 3B yarn feeding bobbin B it Preceding having time, therefore by implementing the maintenance of automatic bobbin winder 3B during this period, the operating to spinning frame 2B can be suppressed and caused Influence such case.Therefore, order configuration part 52c adjustment and maintenances order, it is preferential to implement with the supply stand-by period to be the stipulated time Spinning frame 2B above establishes the maintenance of corresponding automatic bobbin winder 3B.
In addition, for example, the maintenance of automatic bobbin winder 3 there is a situation where while implement multiple maintenance contents.In this case, Can also be that order configuration part 52c is in the service sequence based on supply stand-by period adjustment automatic bobbin winder 3, adjustment and maintenance Sequentially, the preferential maintenance content for implementing within the supply stand-by period to terminate.
For example, the supply stand-by period for being set to spinning frame 2B is more than the stipulated time.In addition, it is set to automatic bobbin winder 3B's There is maintenance content that is multiple while implementing in maintenance.In this case, order configuration part 52c is carrying out automatic bobbin winder 3B In multiple maintenance contents, the maintenance content that can terminate within the supply stand-by period is selected.Order configuration part 52c can also make institute The service sequence of the maintenance content of selection shifts to an earlier date, preferentially to implement selected maintenance content.Thus, by implementing automatic winding The maintenance of machine 3B, can suppress the operating to spinning frame 2B and impact such case.
In addition, for example, the weaving loom in the process more forward than spinning frame 2 can be obtained there are operation information obtaining section 52a The situation of the operation information of tool (such as fly frame etc.).In this case, order configuration part 52c can also replace spinning frame 2 Operating condition, and the dimension of automatic bobbin winder 3 is adjusted based on the operation information of the textile machine in the process more forward than spinning frame 2 Shield order.For example, in the case where fly frame etc. stops for a long time, can predict, though at current time spinning frame 2 In operating, but because wait rove supply and spinning frame 2 stops at the appointed time.For example, expecting spinning frame 2B not Long after stop in the case of, order configuration part 52c can also delay automatic bobbin winder 3B maintenance during (delay safeguard it is suitable Sequence), to be not in the operating of spinning frame 2B is stopped such case because implementing the maintenance of automatic bobbin winder 3B.For example, During order configuration part 52c can also adjust the maintenance of automatic bobbin winder 3B, make during the maintenance of automatic bobbin winder 3B with spun yarn Machine 2B is overlapping during stopping, and as the operating stopping that will not making spinning frame 2B because of the maintenance of implementation automatic bobbin winder 3B Period.Wherein, in the case of during the maintenance of extension automatic bobbin winder 3, order configuration part 52c is with no more than set in advance During the mode of maintenance period is set.
In addition, the supply stand-by period that order configuration part 52c is also included based on operation information, can be for reality to calculate Apply the Slack Time safeguarded and stop automatic bobbin winder 3.For example, order configuration part 52c can will supply the stand-by period as Slack Time, alternatively, will can also be waited for the supply stand-by period plus the time obtained from the stipulated time or from supply The time obtained by the stipulated time is subtracted in time as Slack Time.Waited in addition, order configuration part 52c can also be based on supply Time and other information in addition to the stand-by period is supplied determine Slack Time.Also, order configuration part 52c is not limited to The supply stand-by period that service firing information is included, can also be based on the information in addition to the stand-by period is supplied (for example, spun yarn Machine 2 is the information etc. being in operating in stopping) determining Slack Time.
Periodic maintenance and the unscheduled maintenance of automatic bobbin winder 3 are repeated according to the cycle of regulation by order configuration part 52c The decision of service sequence and the adjustment to service sequence of operating condition based on spinning frame 2.It should illustrate that order is set Portion 52c can carry out the decision of the service sequence of automatic bobbin winder 3 and the operating condition based on spinning frame 2 with the identical cycle The adjustment to service sequence, the decision of the service sequence of automatic bobbin winder 3 can also be carried out with different cycle and based on thin The adjustment to service sequence of the operating condition of yarn machine 2.The operating condition of spinning frame 2 often changes.Therefore, order configuration part 52c can also be according to short defined cycle in the cycle of the decision of the service sequence than automatic bobbin winder 3 (such as within 10 minutes Deng) carry out the adjustment to service sequence of the operating condition based on spinning frame 2.
Order configuration part 52c make the maintenance that will be determined during, the body numbering of safeguarding object, service sequence, maintenance Content and Slack Time etc. establish corresponding timetable data.Order configuration part 52c is for example whenever progress automatic bobbin winder 3 Service sequence adjustment when renewal time table data.
The timetable data made by order configuration part 52c are converted to prescribed form by display control unit 52d, and make it aobvious It is shown in display unit 51.Whenever the renewal time table data in the 52c of order configuration part, display control unit 52d renewal display units 51 Display.Upkeep operation person is by observing display unit 51, maintenance when will appreciate that for multiple 3 putting maintenance into practice of automatic bobbin winder Order etc..
For example, timetable data picture example SC1 as shown in Figure 3 can be converted to calendar like that by display control unit 52d Display format, and it is shown in display unit 51.The picture example SC1 of Fig. 3 for example shows the March under on March 3 at this time point Timetable data.Show that the 20XX upkeep operations that should implement on March 12 there are 6 in this example, what March 13 should implement Upkeep operation has 3 etc..In this case, whether upkeep operation person will appreciate that needs to carry out at how many maintenances on how many Reason.
It should illustrate that in the picture example SC1 shown in Fig. 3, also reflection has fortune of the order configuration part 52c based on spinning frame 2 Turn state and do the service sequence after adjustment.Reflecting the situation for the service sequence for thering is order configuration part 52c to do after adjustment, be Such as the operating condition based on spinning frame 2, the predetermined upkeep operation that will be carried out originally March 13 based on maintenance period, It is changed to the situation on March 12.
In addition, for example, display control unit 52d can be by picture the example SC2's and Fig. 4 of timetable data such as (a) of Fig. 4 (b) picture example SC3 is converted to sheet format like that, and it is shown in display unit 51.Picture example SC2 tables shown in (a) of Fig. 4 Show the details for the Maintenance Significant Items that certain one day specific (being herein March 12) should be implemented.Picture example SC3 shown in (b) of Fig. 4 Represent the whole Maintenance Significant Items that should implement March.It should illustrate that, the picture of (a) of Fig. 4 same with the picture example SC1 shown in Fig. 3 The picture example SC3 of (b) of example SC2 and Fig. 4 shows the Maintenance Significant Items at 3 this time point of March.These tables, which include, becomes operation The body numbering of the automatic bobbin winder 3 of object, maintenance position (place), maintenance content, Slack Time etc..In addition, the picture example The upkeep operation of the table of SC2, SC3 puts in order as by the service sequence after order configuration part 52c adjustment.Upkeep operation person By observing the table, the service sequence of the operating condition based on spinning frame 2 and the automatic bobbin winder 3 determined will appreciate that.
The display format of timetable data shown in this picture example SC1~SC3 can pass through the switching of upkeep operation person Operation etc. switches.Upkeep operation person for example can indicate display format using the touch panel to overlap in display unit 51 Switching, can also use the switching for being arranged at the instruction display format such as the switch at the position different from display unit 51.For example, Fig. 4 (a) shown in picture example SC2 can also by the calendar display format shown in the picture example SC1 in Fig. 3 to March 12 Part touch etc. and be shown.
In the case of timetable data shown in (a) and (b) of Fig. 4 that Fig. 4 is shown with sheet format, display control unit 52d Can also have according to regulation rule for each display project (body numbering, place, maintenance content and Slack Time) into The ranking function (Sort function) of row sequence.The display sequence can based on the instruction from upkeep operation person come into OK.
For example, there is following situation:Be provided with spinning frame 2 and automatic bobbin winder 3 etc. it is multiple, be provided with spinning frame 2 and from In the case that the factory of the dynamic grade of winder 3 is larger, upkeep operation person needs the time to move between body or between unit. In this case, upkeep operation person, can be from close to current location for example by pressing body number order sequence Maintenance Significant Items Body start efficiently to carry out upkeep operation in order.In addition, for example, upkeep operation person passes through in the place of upkeep operation (maintenance position) sequence Maintenance Significant Items, can concentrate the upkeep operation for carrying out identical place.For example, upkeep operation person by Slack Time sequence Maintenance Significant Items, can carry out upkeep operation in order since the longer operation of Slack Time.In this way, due to Ranking function with Maintenance Significant Items, a variety of supports are carried out so as to the judgement for upkeep operation person and upkeep operation.
Here, the Slack Time shown in (b) of (a) of Fig. 4 and Fig. 4 be calculate on March 3 at this time point it is more than needed when Between.Therefore, it is rich even if then safeguarding that day, maintenance content are different if identical body as shown in (a) of Fig. 4 and (b) of Fig. 4 The remaining time is also identical.It is same in the Maintenance Significant Items compared to the current date of (March 3) rearward, due to sometimes compared to adjustment Order afterwards carries out upkeep operation earlier, so the Slack Time of each body to currently calculating is gone forward side by side together with Maintenance Significant Items one Mark is gone.
In addition, in the example shown in (a) of Fig. 4 and (b) of Fig. 4, except " bobbin device for supplying:The periodic maintenance such as cleaning " It is same in addition, include " element number 1 as unscheduled maintenance:Part replacement (splicer) " etc..
It should illustrate that (a) of Fig. 3, Fig. 4 and the picture example shown in (b) of Fig. 4 they are an example, display control unit 52d It can be based on the various display picture datas of timetable data creating and it is shown in display unit 51.
Next, illustrated using the flow that the prompting of service sequences of the Fig. 5 to being carried out by management control unit 52 is handled. Perform the processing shown in Fig. 5 repeatedly according to the cycle of regulation as described above.As shown in figure 5, order configuration part 52c determines to include The service sequence (S101) of periodic maintenance and the maintenance of unscheduled maintenance.Order configuration part 52c is based on until spinning frame 2 can Then the time untill supply yarn feeding bobbin B that is, supply stand-by period, to adjust determined service sequence (S102).Should Illustrate, order configuration part 52c in the case where there is the supply stand-by period for the spinning frame 2 more than stipulated time safeguard suitable The adjustment of sequence, in the case where being the spinning frame 2 more than stipulated time there is no the supply stand-by period without service sequence Adjustment.
Order configuration part 52c can be in order to the processing of 3 putting maintenance into practice of automatic bobbin winder to calculate based on the supply stand-by period And the Slack Time (S103) for stopping automatic bobbin winder 3.It should illustrate that order configuration part 52c can be to for automatic winding Whole safeguard that machine 3 is implemented calculates Slack Time, can also calculate Slack Time only for defined safeguard.
Order configuration part 52c is made based on service sequence after the service sequence or decision that are determined and adjustment etc. Timetable data (S104).Timetable data are converted to prescribed form by display control unit 52d, and it is shown in display unit 51 (S105)。
Present embodiment is formed as described above, can be according to thin in preceding process in the service sequence adjusts system 1 The operating condition of yarn machine 2, to adjust and prompt the service sequence of the automatic bobbin winder 3 in subsequent handling.Therefore, upkeep operation person , can be while suppressing the operating condition to spinning frame 2 by implementing the maintenance of automatic bobbin winder 3 according to suggested service sequence The influence brought is while implement the maintenance of automatic bobbin winder 3.
Order configuration part 52c is calculated before spinning frame 2 can then supply yarn feeding bobbin B based on operation information Time that is, supply stand-by period.Order configuration part 52c adjusts automatic bobbin winder 3 based on the supply stand-by period calculated Service sequence.For example, in the case where the supply stand-by period is longer, even if making the spinning frame 2 longer with the supply stand-by period Establish corresponding automatic bobbin winder 3 and stop simultaneously putting maintenance into practice, the influence that the operating to spinning frame 2 produces is also smaller.Therefore, lead to Adjustment service sequence is crossed, preferential implementation establishes corresponding automatic with the supply stand-by period for the spinning frame 2 more than stipulated time The maintenance of winder 3, even if so that make automatic bobbin winder 3 stop and putting maintenance into practice, can also suppress to spinning frame 2 operating production It is raw to influence.
Order configuration part 52c calculates the Slack Time that stop for putting maintenance into practice automatic bobbin winder 3.Display control Portion 52d processed makes the Slack Time be also shown in display unit 51.Thus, upkeep operation person, which will appreciate that, implements automatic bobbin winder 3 Slack Time when safeguarding.For example, safeguard for unscheduled maintenance and Slack Time it is shorter in the case of, after the maintenance can be made Implement etc., upkeep operation person itself based on Slack Time come judge safeguard implementation during etc..
In addition, display control unit 52d makes maintenance content be also shown in display unit 51.In this case, upkeep operation person energy Enough grasp maintenance content and Slack Time.Thus, upkeep operation person be capable of deciding whether can in Slack Time putting maintenance into practice And implemented.
For example, in the system for possessing spinning frame 2 and automatic bobbin winder 3, spinning frame 2 becomes the production of system entirety sometimes The speed control level segment of ability.In this case, from the viewpoint of production capacity, automatic bobbin winder 3 is not preferably made Operating of the upkeep operation to spinning frame 2 has an impact and (stops operating).Therefore, determined by the operating condition based on spinning frame 2 Determine the service sequence of automatic bobbin winder 3, being capable of the production capacity of suppression system entirety reduces.
More than, embodiments of the present invention are illustrated, the present invention is not limited to the above embodiment.For example, At least a portion for the embodiment that can also be recorded by more than is combined.
As shown in Figure 1, spinning frame 2 is using the supply for 1 spinning frame 2 by 1 automatic bobbin winder 3 as yarn feeding bobbin B The mode of destination establishes correspondence.But it is not limited thereto, service sequence as shown in Figure 6 adjustment system 1A is such, spinning frame 2 Two automatic bobbin winders 3A, 3B can also be established as the supply destination of yarn feeding bobbin B for 1 spinning frame 2A and corresponded to. In addition, be not limited to establish 1 or two automatic bobbin winders 3 with 1 spinning frame 2 it is corresponding, can also be by more than 3 Automatic bobbin winder 3 is corresponding with 1 foundation of spinning frame 2.In addition, service sequence adjustment system 1B as shown in Figure 7 is such, can also To regard more automatic bobbin winders 3 as the supply mesh that yarn feeding bobbin B is supplied using bobbin transfer device 33 for more spinning frames 2 The mode on ground establish correspondence.
In addition, it is not limited to from the bobbin transfer device 33 of automatic bobbin winder 3 from spinning frame 2 to automatic bobbin winder 3 Winder unit 31 transfers yarn feeding bobbin B.Can also be configured to, by other devices in addition to bobbin transfer device 33 or Operators etc. transfer yarn feeding bobbin B from spinning frame 2 to automatic bobbin winder 3.It is same in this case, can be by 1 automatic network Yarn machine 3 is established for 1 spinning frame 2 and corresponded to, and more automatic bobbin winders 3 can be established correspondence for 1 spinning frame 2, also may be used More automatic bobbin winders 3 are established correspondence for more spinning frames 2.In these cases, it is also same with embodiment, can Carry out decision and adjustment of service sequence etc..
In addition, display unit 51 is not limited to be arranged at managing device 5.For example, display unit 51 can also be disposed on carefully The display unit of yarn control device 22 or winder control device 32.Alternatively, display unit 51 can also be upkeep operation, person can The display picture of the mobile terminal of carrying.Though in addition, with the spun yarn control device 22 of spinning frame 2 and the doff of automatic bobbin winder 3 Machine control device 32, said in case of being communicated with the management control unit 52 of managing device 5 by communications cable L It is bright, but can also be by wirelessly communicating.
In addition, in order configuration part 52c adjustment and maintenance orders, for example, it is also possible to except preceding process textile machine also I.e. outside operation information of spinning frame 2 etc., also based on the current position of upkeep operation person come adjustment and maintenance order.The maintenance is made Dealer can be set to based on the adjustment that current position carries out, when carrying out upkeep operation successively according to Maintenance Significant Items, it is contemplated that The adjustment (make traveling time shorten such adjustment) of traveling time when being moved to the place for then carrying out upkeep operation.Should Illustrate, the spun yarn control device 22 or winder control that order configuration part 52c can be according to such as upkeep operation person current operation The body numbering of device 32 processed or positional information of mobile terminal for being held of upkeep operation person etc., come the person that grasps upkeep operation Current position.Or, order configuration part 52c can also have been carried out according to such as upkeep operation person spun yarn control device 22, The position of the input operation of winder control device 32 or mobile terminal etc., come the current position for the person that grasps upkeep operation. In this way, the position for passing through the person that further contemplates upkeep operation ground adjustment and maintenance order, can making upkeep operation, person is efficiently safeguarded Operation.
In addition, in embodiments, though having prompted service sequence using display unit 51, display unit 51 can also be replaced Display and by from loudspeaker (prompting part) export sound come prompting maintenance order.
In embodiments, though adjusting the feelings of the service sequence of automatic bobbin winder 3 with the operating condition based on spinning frame 2 It is illustrated exemplified by condition, but is not limited to apply in spinning frame 2 and automatic bobbin winder 3.Formed for example, it is also possible to apply The drawing frame of the sliver for the rope form that the fiber that alignd forms, the spinning sliver by drawing frame generation and generate yarn and form winding The spinning frame of the package P of the yarn generated.In this case, the dimension of spinning frame is adjusted according to the operating condition of drawing frame Shield order.In addition, it is not limited in such as spinning frame and automatic bobbin winder or drawing frame and the spun yarn from ripe bar worsted yarn Using the present invention in the textile machine used in machine process continuous like that.For example, it is also possible in such as fly frame and automatic winding The textile machine application present invention used in machine process discontinuous like that.
In addition, in the above-described embodiment, though textile machine (spinning frame 2 and automatic bobbin winder 3 with adjustment generation yarn Deng) service sequence in case of be illustrated, but it's not limited to that.Also the fibre of generation in addition to yam can be adjusted Tie up textile machine (carding machine, drawing frame, carding machine, weaving loom, the volume of aggregation (sliver, rove, yarn fabric, braid etc.) Loom etc.) service sequence.

Claims (11)

1. a kind of service sequence adjustment system of textile machine, wherein, possess:
First textile machine of more than 1, it carries out the first fiber aggregate the first processing;
Multiple second textile machines, it is supplied to the second fibre for having been carried out first processing by first textile machine and having been formed Aggregation is tieed up, and second fiber aggregate to being supplied carries out second processing, generates the 3rd fiber aggregate;
Operation information obtaining section, it obtains the operation information for the operating condition for representing first textile machine;
Order configuration part, maintenance when it is determined to the multiple second textile machine putting maintenance into practice based on order set in advance Sequentially, the service sequence determined is adjusted and based on the operation information obtained by the operation information obtaining section; And
Prompting part, it prompts the service sequence after being adjusted by the order configuration part.
2. the service sequence adjustment system of textile machine according to claim 1, wherein,
The order configuration part is repeated according to the cycle of regulation respectively:Determine that described second spins based on order set in advance The step of service sequence of loom tool and based on the operation information adjustment determined the service sequence the step of.
3. the service sequence adjustment system of textile machine according to claim 2, wherein,
The order configuration part is according to the cycle shorter than the cycle based on order set in advance decision service sequence, based on described Operation information adjusts the service sequence.
4. the service sequence adjustment system of the textile machine according to any one of claims 1 to 3, wherein,
Possess more first textile machines, for 1 first textile machine, 1 or more described second is spun Loom tool establishes correspondence as the supply destination of second fiber aggregate,
The order configuration part based on the operation information come calculate until first textile machine next can be by institute State the second fiber aggregate to supply the time untill second textile machine that is, supply the stand-by period, and adjust the dimension In the case of shield order, established as first the textile machine more than stipulated time using preferential Dui and the supply stand-by period The mode of the corresponding second textile machine putting maintenance into practice, adjusts the service sequence,.
5. the service sequence adjustment system of textile machine according to claim 4, wherein,
The order configuration part can also be in order to implement second textile machine to calculate based on the supply stand-by period The Slack Time safeguarded and stop second textile machine,
Also prompt the Slack Time calculated by the order configuration part in the prompting part.
6. the service sequence adjustment system of textile machine according to claim 4 or 5, wherein,
In the case where that should be multiple maintenance contents to the maintenance content that second textile machine is implemented, the order setting Portion adjusts the service sequence in a manner of the preferential maintenance content for implementing within the supply stand-by period to terminate.
7. the service sequence adjustment system of the textile machine according to any one of claim 1~6, wherein,
The order configuration part adjusts the service sequence also based on the current position of upkeep operation person.
8. the service sequence adjustment system of the textile machine according to any one of claim 1~7, wherein,
Also prompt the maintenance content of the maintenance carried out to second textile machine in the prompting part.
9. the service sequence adjustment system of the textile machine according to any one of claim 1~8, wherein,
Suggested prompting project is arranged according to the rule of regulation based on the instruction from upkeep operation person the prompting part Sequence.
10. the service sequence adjustment system of the textile machine according to any one of claim 1~9, wherein,
First textile machine is to generate yarn from first fiber aggregate, and winds the yarn generated and give birth to Into the spinning frame of the yarn feeding bobbin as second fiber aggregate,
Second textile machine is to generate the volume as the 3rd fiber aggregate from the yarn feeding bobbin winding yarn The automatic bobbin winder of dress.
11. the service sequence adjustment system of textile machine according to claim 10, wherein,
The spinning frame and the automatic bobbin winder are respectively arranged with more,
For 1 spinning frame, established pair using 1 automatic bobbin winder as the supply destination of the yarn feeding bobbin Should.
CN201710958230.2A 2016-10-20 2017-10-16 Maintenance sequence adjustment system for textile machinery Active CN107963515B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016205824A JP2018065661A (en) 2016-10-20 2016-10-20 Maintenance order adjustment system for textile machine
JP2016-205824 2016-10-20

Publications (2)

Publication Number Publication Date
CN107963515A true CN107963515A (en) 2018-04-27
CN107963515B CN107963515B (en) 2020-11-17

Family

ID=60153108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710958230.2A Active CN107963515B (en) 2016-10-20 2017-10-16 Maintenance sequence adjustment system for textile machinery

Country Status (3)

Country Link
EP (1) EP3312122B1 (en)
JP (1) JP2018065661A (en)
CN (1) CN107963515B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706564A (en) * 2018-10-11 2019-05-03 东华大学 The dispatching method of spinning workshop connector trolley and the system for using the dispatching method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102019111775A1 (en) * 2019-05-07 2020-11-12 Saurer Spinning Solutions Gmbh & Co. Kg Method for controlling a service unit
DE102019116707A1 (en) * 2019-06-19 2020-12-24 TRüTZSCHLER GMBH & CO. KG Method and device for managing textile machines and systems equipped therewith
CN112859782B (en) * 2021-01-12 2022-02-08 福建省莆田市双驰科技有限公司 Dynamic dispatching method for flying loom group based on industrial internet

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01183530A (en) * 1988-01-08 1989-07-21 Murata Mach Ltd Spinning winder
US5347449A (en) * 1990-04-24 1994-09-13 Maschinenfabrik Rieter Ag Method for eliminating malfunctions, in particular in spinning machines
EP1006069A2 (en) * 1998-11-30 2000-06-07 W. SCHLAFHORST AG & CO. Cross-winding machine and method for operating a cross-winding machine
EP1057907A1 (en) * 1999-05-31 2000-12-06 Barco N.V. Spinning mill processing control systems and methods
DE102006007992A1 (en) * 2005-03-01 2006-10-19 Maschinenfabrik Rieter Ag Computer controlled textile machine, has machine control provided with software for preparing operation device driving data
CN101749727A (en) * 2008-12-09 2010-06-23 上海交技发展股份有限公司 High-cost performance system for controlling combustion redundancy of coal-fired heat transfer material heater
CN103010840A (en) * 2011-09-20 2013-04-03 村田机械株式会社 A yarn winding apparatus and an operation original location adjusting method
CN104597861A (en) * 2013-10-31 2015-05-06 村田机械株式会社 Setting control device, textile device, yarn coiler and spinner
CN104846492A (en) * 2015-05-12 2015-08-19 青岛环球集团股份有限公司 Combined spinning-winding conveying system
WO2016016739A1 (en) * 2014-07-31 2016-02-04 MARZOLI MACHINES TEXTILE S.r.l. System for monitoring physical parameters of textile machinery and method of predictive maintenance
US20160132051A1 (en) * 2013-06-05 2016-05-12 Furuno Electric Co., Ltd. Navigation device and method of notifying service life of component

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4012930A1 (en) * 1990-04-24 1991-10-31 Rieter Ag Maschf Spinner stoppage clearance - has priorities for separate services set by a process control computer for max. efficiency

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01183530A (en) * 1988-01-08 1989-07-21 Murata Mach Ltd Spinning winder
US5347449A (en) * 1990-04-24 1994-09-13 Maschinenfabrik Rieter Ag Method for eliminating malfunctions, in particular in spinning machines
EP1006069A2 (en) * 1998-11-30 2000-06-07 W. SCHLAFHORST AG & CO. Cross-winding machine and method for operating a cross-winding machine
EP1057907A1 (en) * 1999-05-31 2000-12-06 Barco N.V. Spinning mill processing control systems and methods
DE102006007992A1 (en) * 2005-03-01 2006-10-19 Maschinenfabrik Rieter Ag Computer controlled textile machine, has machine control provided with software for preparing operation device driving data
CN101749727A (en) * 2008-12-09 2010-06-23 上海交技发展股份有限公司 High-cost performance system for controlling combustion redundancy of coal-fired heat transfer material heater
CN103010840A (en) * 2011-09-20 2013-04-03 村田机械株式会社 A yarn winding apparatus and an operation original location adjusting method
US20160132051A1 (en) * 2013-06-05 2016-05-12 Furuno Electric Co., Ltd. Navigation device and method of notifying service life of component
CN104597861A (en) * 2013-10-31 2015-05-06 村田机械株式会社 Setting control device, textile device, yarn coiler and spinner
WO2016016739A1 (en) * 2014-07-31 2016-02-04 MARZOLI MACHINES TEXTILE S.r.l. System for monitoring physical parameters of textile machinery and method of predictive maintenance
CN104846492A (en) * 2015-05-12 2015-08-19 青岛环球集团股份有限公司 Combined spinning-winding conveying system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706564A (en) * 2018-10-11 2019-05-03 东华大学 The dispatching method of spinning workshop connector trolley and the system for using the dispatching method
CN109706564B (en) * 2018-10-11 2020-04-07 东华大学 Dispatching method of spun yarn workshop joint trolley and system adopting same

Also Published As

Publication number Publication date
EP3312122A1 (en) 2018-04-25
CN107963515B (en) 2020-11-17
EP3312122B1 (en) 2019-04-17
JP2018065661A (en) 2018-04-26

Similar Documents

Publication Publication Date Title
CN107963515A (en) The service sequence adjustment system of textile machine
JPH03167324A (en) Method and device for operating production line at spinning mill
CN106958057B (en) Method and device for producing elastic core yarn
EP3305953A1 (en) Yarn winding system, spinning frame, automatic winder, and yarn winding method
JP2002087703A (en) Machine unit information display system for fiber machine
CN106948050B (en) Method for adjusting the production of the yarn batch on weaving loom
CN101348957A (en) Method for operating a spinning frame
WO2016194484A1 (en) Yarn winding system, automatic winder, spinning frame and yarn winding method
WO2019227241A8 (en) Ring spinning system and method for operating same
WO2016194486A1 (en) Yarn winding system, automatic winder, spinning frame and yarn winding method
JP2018193198A (en) Productive capacity display controller and method and automatic winder
CN109898200A (en) A kind of ring throstle intelligent control method and control system
CN100494031C (en) Method and device for optimizing operating parameters on an work station of spinning machine
CN104176558B (en) yarn winding machine
CN103803345B (en) The method for solving disconnection problem when by yarn winding to cross-wound bobbin tube
CN205152478U (en) Silk wrapper
CN105217376B (en) The update method of mechanical, textile machine system and fiber machinery the setting value of fiber
CN106319698A (en) Spinning station of a spinning machine and method for operating a spinning station
JP7328997B2 (en) Automatic ring spinning equipment and method for automatically operating ring spinning equipment
JP2023138043A (en) Yarn processing facility
CN216335908U (en) System for managing textile equipment
JP2016044365A (en) Textile machine and data updating method
WO1992015737A1 (en) Process and device for controlling a reticulated installation
JP2018177449A (en) Management apparatus and yarn winding system
CN208471270U (en) It is a kind of for produce play synthetic fibre bobbin-winding machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant