CN107959591A - Ground county adjusts fixed setting method and device - Google Patents
Ground county adjusts fixed setting method and device Download PDFInfo
- Publication number
- CN107959591A CN107959591A CN201711333653.1A CN201711333653A CN107959591A CN 107959591 A CN107959591 A CN 107959591A CN 201711333653 A CN201711333653 A CN 201711333653A CN 107959591 A CN107959591 A CN 107959591A
- Authority
- CN
- China
- Prior art keywords
- switching node
- node
- neighbor
- switching
- protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/12—Discovery or management of network topologies
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
- H04L41/0659—Management of faults, events, alarms or notifications using network fault recovery by isolating or reconfiguring faulty entities
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0677—Localisation of faults
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0803—Configuration setting
- H04L41/0823—Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Environmental & Geological Engineering (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Fixed setting method and device are adjusted the present invention provides a kind of ground county, this method includes:Switching network topological diagram is obtained in real time;Pass through the mobile agent access target switching node;Collect the configuration protection information of all of its neighbor switching node;The load importance of all of its neighbor switching node is calculated based on configuration protection information;If load importance is more than pre-set threshold value, protection level increase, corresponding cooperation time increase preset duration.It is a kind of expansible protection level that the ground county of the present invention, which adjusts fixed setting method; protection boundary can downstream be extended to responsible consumer; coordinate upwards with substation transformer; a set of definite value relatively-stationary on the basis of substation transformer is formd, setting principle enriches, it is contemplated that the power demand of user side; adapt to intelligent network distribution construction; it is single to alleviate existing distribution network protection setting principle, lays particular stress on and considers system side safe operation, and ignores the technical problem of user side.
Description
Technical field
The present invention relates to the technical field of distribution network protection, and fixed setting method and dress are adjusted more particularly, to a kind of ground county
Put.
Background technology
As what " first-class power distribution network " was built deepens continuously, the construction to power distribution network is constantly elapsed to user side, original
Level-one matching relationship is only stayed easily to cause very much the problem of bypassing the immediate leadership tripping to the way of feeder line downstream user side.But it is used as system side to transport
The consideration of row safety is, it is necessary to which the characteristic of quick protection act excision failure also causes two aspects to form conflict.It is meanwhile another
From the aspects of, for power distribution network, its degree of automation is continuously improved, therefore also is intended to simplify as far as possible for setting principle, consolidates
Change, greatly to realize power distribution automation strategy.Based on this, best solution should be power distribution protection setting principle
The modularization of each scheme, immobilization, and by different demands, to realize the free switching between each protection module scheme.
Existing power distribution protection thought can be divided into two classes, and one is the construction for strengthening power distribution automation, by largely believing
Breath transmits, and formation be based on wide area protection strategy, and the reliability of protection is built on the reliability, timely of network service by this mode
In property;On the other hand, it is based on current existing protection facility, is aided in by limited communication, find a kind of improved guarantor
Maintaining method, to improve the power supply quality of distribution and power supply reliability.Latter method, can also be while economical rationality is ensured
When network lacks, cooperation and correct action that local protection is basically completed between protection still may rely on.It is and most economical rational
Mode is to select a set of integration scenario wherein, that is, ensures the fixation of protection scheme, and can be transmitted by simple command information
Taking over seamlessly between completion scheme.
To sum up, existing distribution network protection setting principle is single, lays particular stress on and considers system side safe operation, and ignores user side
Problem.
The content of the invention
In view of this, fixed setting method and device are adjusted it is an object of the invention to provide ground county, it is existing to alleviate
Distribution network protection setting principle is single, lays particular stress on and considers system side safe operation, and ignores the technical problem of user side.
In a first aspect, fixed setting method is adjusted an embodiment of the present invention provides a kind of ground county, the described method includes:
Switching network topological diagram is obtained in real time, wherein, the switching network topological diagram includes multiple switch node;
By the mobile agent access target switching node, wherein, the target switch node is switching network topology
Any one node in figure;
The configuration protection information of all of its neighbor switching node is collected, wherein, all of its neighbor switching node is the mesh
Mark the direct-connected all switching nodes of switching node;
The load importance of all of its neighbor switching node is calculated based on the configuration protection information;
If the load importance is more than pre-set threshold value, protection level increase, corresponding cooperation time increase is preset
Duration, wherein, the protection level is less than 3.
With reference to first aspect, an embodiment of the present invention provides the first possible embodiment of first aspect, wherein, receive
The configuration protection information of collection all of its neighbor switching node includes:
Judge the target switch node goes out whether the number of degrees are 0;
If it is described go out the number of degrees be 0, terminate access;
If it is described go out the number of degrees be 0, it is determined that direct-connected lower floor's switching node with the target switch node;
Using with the direct-connected lower floor's switching node of the target switch node as all of its neighbor switching node;
Collect the configuration protection information of all of its neighbor switching node.
With reference to first aspect, an embodiment of the present invention provides second of possible embodiment of first aspect, wherein, such as
Load importance described in fruit is not more than pre-set threshold value, then described to protect level not increase, and the corresponding cooperation time is constant.
With reference to first aspect, an embodiment of the present invention provides the third possible embodiment of first aspect, wherein, base
Include in the load importance that the configuration protection information calculates all of its neighbor switching node:
Weights are assigned for all of its neighbor switching node;
Calculate all of its neighbor switching node weights and;
Using the weights of all of its neighbor switching node and the load importance as all of its neighbor switching node.
With reference to first aspect, an embodiment of the present invention provides the 4th kind of possible embodiment of first aspect, wherein, institute
State the mobile agent and include id information, after completion task, the mobile agent disappears the mobile agent automatically.
Second aspect, the embodiment of the present invention additionally provide a kind of ground county and adjust fixed setting device, and described device includes:
Acquisition module, for obtaining switching network topological diagram in real time, wherein, the switching network topological diagram includes multiple
Switching node;
Access modules, for by the mobile agent access target switching node, wherein, the target switch node is institute
State any one node in switching network topological diagram;
Collection module, for collecting the configuration protection information of all of its neighbor switching node, wherein, all of its neighbor switch
Node is the direct-connected all switching nodes of the target switch node;
Computing module, the load for calculating all of its neighbor switching node based on the configuration protection information are important
Property;
First result output module, if the load importance is more than pre-set threshold value, protection level increase is corresponding
Coordinate time increase preset duration, wherein, the protection level is less than 3.
With reference to second aspect, an embodiment of the present invention provides the first possible embodiment of second aspect, wherein, institute
Stating collection module includes:
Judging unit, goes out whether the number of degrees are 0 for judge the target switch node;
Terminate access unit, if it is described go out the number of degrees be 0, terminate access;
Determination unit, if it is described go out the number of degrees be 0, it is determined that direct-connected lower floor's joint with the target switch node
Point;
First setup unit, for using with the direct-connected lower floor's switching node of the target switch node as all neighbours
Connect switching node;
Collector unit, for collecting the configuration protection information of all of its neighbor switching node.
With reference to second aspect, an embodiment of the present invention provides second of possible embodiment of second aspect, wherein, institute
Device is stated to further include:
Second result output module, it is described to protect level not increase if the load importance is not more than pre-set threshold value
Add, the corresponding cooperation time is constant.
With reference to second aspect, an embodiment of the present invention provides the third possible embodiment of second aspect, wherein, institute
Stating computing module includes:
Assignment unit, for assigning weights for all of its neighbor switching node;
Computing unit, for calculate all of its neighbor switching node weights and;
Second setup unit, for using the weights of all of its neighbor switching node and as all of its neighbor joint
The load importance of point.
With reference to second aspect, an embodiment of the present invention provides the 4th kind of possible embodiment of second aspect, wherein, institute
State the mobile agent and include id information, after completion task, the mobile agent disappears the mobile agent automatically.
The embodiment of the present invention brings following beneficial effect:Fixed setting is adjusted an embodiment of the present invention provides a kind of ground county
Method and device, this method include:Switching network topological diagram is obtained in real time, wherein, switching network topological diagram includes multiple open
Artis;By the mobile agent access target switching node, wherein, target switch node is appointing in switching network topological diagram
One node of meaning;The configuration protection information of all of its neighbor switching node is collected, wherein, all of its neighbor switching node is target switch
The direct-connected all switching nodes of node;The load importance of all of its neighbor switching node is calculated based on configuration protection information;If
Load importance is more than pre-set threshold value, then protects level increase, and the corresponding cooperation time increases preset duration, wherein, protective layer
Level is less than 3.
In existing distribution network protection, the problem of generally laying particular stress on the safe operation for considering system side, and ignore user side, protection
Level is single.Compared with existing distribution network protection, adjusted an embodiment of the present invention provides a kind of ground county in fixed setting method, first
Switching network topological diagram is obtained in real time, then by the mobile agent access target switching node, collects all of its neighbor switching node
Configuration protection information, the load importance of all of its neighbor switching node is calculated based on configuration protection information, if last load
Importance is more than pre-set threshold value, then protects level increase, corresponding cooperation time increase preset duration.The ground county adjustment of the present invention
Fixed setting method is a kind of expansible protection level, can will protection boundary downstream extend to responsible consumer, upwards with
Substation transformer coordinates, and forms a set of definite value relatively-stationary on the basis of substation transformer, setting principle is enriched, examined
The power demand of user side is considered, has adapted to intelligent network distribution construction, it is single to alleviate existing distribution network protection setting principle, lays particular stress on and considers
System side safe operation, and ignore the technical problem of user side.
Other features and advantages of the present invention will illustrate in the following description, also, partly become from specification
Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages are in specification, claims
And specifically noted structure is realized and obtained in attached drawing.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate
Appended attached drawing, is described in detail below.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in describing below
Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor
Put, other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is the flow chart that a kind of ground county provided in an embodiment of the present invention adjusts fixed setting method;
Fig. 2 is the protection scheme level distribution schematic diagram expansible based on cooperation border provided in an embodiment of the present invention;
Fig. 3 is the schematic diagram provided in an embodiment of the present invention based on the protection scheme for coordinating border extension;
Fig. 4 is the method flow of the configuration protection information of collection all of its neighbor switching node provided in an embodiment of the present invention
Figure;
Fig. 5 (a) is the schematic diagram of connection figure G provided in an embodiment of the present invention;
The order that Fig. 5 (b) is figure G provided in an embodiment of the present invention abuts list;
The adjacent chain type that Fig. 5 (c) is figure G provided in an embodiment of the present invention abuts list;
Fig. 6 is that the load provided in an embodiment of the present invention that all of its neighbor switching node is calculated based on configuration protection information is important
The flow chart of property;
Fig. 7 is the structure diagram that a kind of ground county provided in an embodiment of the present invention adjusts fixed setting device.
Icon:
11- acquisition modules;12- access modules;13- collection modules;14- computing modules;15- the first result output modules.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with attached drawing to the present invention
Technical solution be clearly and completely described, it is clear that described embodiment is part of the embodiment of the present invention, rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Lower all other embodiments obtained, belong to the scope of protection of the invention.
It is fixed to a kind of ground county adjustment disclosed in the embodiment of the present invention first to set for ease of understanding the present embodiment
The method of determining describes in detail.
Embodiment one:
A kind of ground county adjusts fixed setting method, and with reference to figure 1, this method includes:
S102, obtain switching network topological diagram in real time, wherein, switching network topological diagram includes multiple switch node;
In embodiments of the present invention, the executive agent of this method adjusts fixed integral system, that is, one for ground county
The platform of distribution network protection.Switching network topological diagram is after the completion of frame net, it becomes possible to acquires, is stored in network topology database
In, which is not unalterable, and when network structure changes, which will be real-time
Refresh.
S104 by the mobile agent access target switching node, wherein, target switch node be switching network topological diagram in
Any one node;
Adjust to be undoubtedly in fixed setting method in ground county as the research hotspot the mobile agent that distributed intelligence calculates and compare
Preferable selection.It is with initiative, social (agent intercommunications), and the advantages of to the adaptability of environment, adapts to
In power grid Distributed Calculation judges the characteristics of.Realizing cooperation herein by this technology, border is expansible adjusts integrated programme.
Specifically, when accessing, access generally is proceeded by from feeder switch, it is as the initial of relaying configuration
Level, is then accessed, that is, target switch node most starts to open for feeder line by the mobile agent along switching network topological diagram
Close, the embodiment of the present invention is not particularly limited it.
S106, the configuration protection information for collecting all of its neighbor switching node, wherein, all of its neighbor switching node is opened for target
The direct-connected all switching nodes of artis;
Configuration protection independently set by user, when have configuration protect when, configuration protection then put 1, without when, configuration protect
Shield is set to 0.
S108, the load importance based on configuration protection information calculating all of its neighbor switching node;
The load importance with configuration protection all of its neighbor switching node it is related, particular content will hereinafter into
Row description.
If S110, load importance are more than pre-set threshold value, protection level increase, corresponding cooperation time increase is preset
Duration, wherein, protection level is less than 3.
The pre-set threshold value is also user's sets itself, and the embodiment of the present invention is not particularly limited it, if load weight
The property wanted is more than pre-set threshold value, then protection level increase, corresponding cooperation time increase preset duration.
In existing distribution network protection, the problem of generally laying particular stress on the safe operation for considering system side, and ignore user side, protection
Level is single.Compared with existing distribution network protection, adjusted an embodiment of the present invention provides a kind of ground county in fixed setting method, first
Switching network topological diagram is obtained in real time, then by the mobile agent access target switching node, collects all of its neighbor switching node
Configuration protection information, the load importance of all of its neighbor switching node is calculated based on configuration protection information, if last load
Importance is more than pre-set threshold value, then protects level increase, corresponding cooperation time increase preset duration.The ground county adjustment of the present invention
Fixed setting method is a kind of expansible protection level, can will protection boundary downstream extend to responsible consumer, upwards with
Substation transformer coordinates, and forms a set of definite value relatively-stationary on the basis of substation transformer, setting principle is enriched, examined
The power demand of user side is considered, has adapted to intelligent network distribution construction, it is single to alleviate existing distribution network protection setting principle, lays particular stress on and considers
System side safe operation, and ignore the technical problem of user side.
First the distribution of protection scheme level is introduced below:
As shown in Fig. 2, this is one coordinates signal by a three-level for coordinating border to extend to feeder line downstream panel switches
Figure.This pattern is mainly considered to exit the snap action section of feeder switch 2., reserves one and coordinates the time differential to give down
3. the panel switches of trip, are not in thus the situation that level trips that jumps when downstream fault.Specifically, 3. downstream that ought be occurs
During failure, ta3It is small, then 3. user's panel switches first trip, coordinate time feeder switch 2. can just trip by one, avoid
Jump when downstream fault the situation of level tripping.
But under present circumstances, if it is the problem that electric system needs to weigh to exit instantaneous section, it is contemplated that system
Stabilization safe operation, and the fault-resistant impact capacity of equipment particularly transformer, if exiting should carry out according to different situations
Selection.As shown in Fig. 2, generally guarding at present, take still be two-stage Graded coordination system, as time ruler mark blackboard divides in figure
Shown, there are t at this timea2=ta30.When using this ta2=ta30Situation when, when downstream fault 3., because ta2=
ta30, so 2. 3. feeder switch trips at the same time with user's panel switches, here it is the situation of jump level tripping.Used in the present invention
Scheme be two-stage Graded coordination scheme.
Here the characteristics of in order to using the mobile agent, define corresponding electrical network feature again.It is real in electric network protection
An existing protection first has to accurately judge faulty equipment, and equipment is done as minimum unit and is cut off from power grid.But due to
Power grid can not often distinguish substation feeder and the protection of downstream user side as the afterbody of power grid, Preservation tactics
It can only be cut off with tripping at the same time after failure as same fault object.And opened for user side equipped with breaker and accordingly
In the case of closing and protecting, then protection cooperation border is needed to extend downwardly, and feeder line also reserves certain adapted space, with shape
Layered level mating protection relation, carrys out isolated fault with the fault outage region of minimum level and minimum.How key is to electricity
Net topology structure forms the guarantor that information can flexibly be integrated by graphic characteristics with switchgear distribution and related protective nature analysis
Shield scheme.
As shown in figure 3, for the short circuit of radius of electricity supply, its protection cooperation should adopt traditional protection configuration, and (level that jumps is jumped
Lock), i.e., instantaneous one section of feeder switch is retained, coordinate border so far.And for radius of electricity supply length circuit, then
It is considered as protecting with downstream branch and is engaged, reserves level-one or two-stage cooperation is differential, form complete matching relationship.To reach
The purpose of failure is precisely cut off during failure as far as possible.Certain this Graded coordination is also contemplated that the economic benefit of user, and system is set
Standby horizontal, the demand of institute with specific load etc., integrates and judges.
Therefore the propulsion on protection border how is carried out, then is transmitted by the comprehensive analysis and order of information.If from information
Processing and the angle integrated, it is believed that be that level framework is carried out by topological analysis and relevant relaying configuration grade, then
By possessing the point of branch's relaying configuration, to it according to its significance level, can be divided by its load character, then shape
Into weighted value, the level for determining protection by these weighted values divides.Specifically released again in the form of network information Node distribution
Upper figure.
County adjusts the overall process of fixed setting method and is described the above over the ground, below to being directed to
Particular content describes in detail.
Alternatively, with reference to figure 4, collecting the configuration protection information of all of its neighbor switching node includes:
S401, judge target switch node go out whether the number of degrees are 0;
As shown in Fig. 5 (a), 5 (b), 5 (c), the TE for being distributed in each switch, it is straight to preserve this switching node in database
Connect connected using this node as starting point, the order adjoining list using destination node as direction point.Such as in Fig. 5, node number is 4
Node, there is the destination node of two connections, is respectively 2 nodes and 3 nodes.The information in Ri rows can be represented with bit vector, it is right
Only store and control oneself relevant node connection figure in each TE, so each node only corresponds to a row vector.First is section
Period, second are the branch's number (spending) that is connected, and the 3rd is connected specific node number.Using in JAVA class libraries
Java.util bags create a vector, there is three-dimensional, are the vectorial reality that an actual connecting node is each dimension again in the third dimension
Example object, its dimension are determined by the degree parameter of the second dimension.When the network structure of system changes, i.e., when this switch
When the corresponding connection number of degrees and connecting node change, when often connecting a new node or reducing by a node, it will make
The number of degrees increase one or subtract one, match with network real-time architecture.
For 5 (a), when target switch node is 3, go out the number of degrees for 2, it is corresponding to be switching node 1 and open
Artis 3;When target switch node is 2, it is 4 to go out the number of degrees, and corresponding is switching node 1, switching node 3, joint
Point 4 and switching node 5 (i.e. lower floor's switching node).
If S402, go out the number of degrees for 0, terminate and access;
If S403, go out the number of degrees be 0, it is determined that the lower floor switching node direct-connected with target switch node;
Illustrated so that target switch node is 3 as an example, the lower floor switching node direct-connected with target switch node is respectively
Switching node 1 and switching node 4.
S404, using the lower floor switching node direct-connected with target switch node as all of its neighbor switching node;
All of its neighbor switching node using switching node 1 and switching node 4 as target switch node 3.
S405, the configuration protection information for collecting all of its neighbor switching node.
Specifically, configuration protection information is user's setting, there is configuration protection then to put 1, be configured without protection and then set to 0.Receive
Collect the configuration protection information of switching node 1 and switching node 4.
Alternatively, with reference to figure 6, the load importance of all of its neighbor switching node is calculated based on configuration protection information to be included:
S601, be that all of its neighbor switching node assigns weights;
Specifically, the imparting of weights has user independently to set.
S602, calculate all of its neighbor switching node weights and;
S603, using the weights of all of its neighbor switching node and the load importance as all of its neighbor switching node.
If load importance is more than pre-set threshold value, protection level increase, the corresponding cooperation time increases preset duration,
Wherein, level is protected to be less than 3.
As exceeded pre-set threshold value, then its upper strata protective layer level rises load importance, corresponding to coordinate the time to add Δ T.Specifically
, as shown in Fig. 5 (a), for target switch node 3, (load importance is more than for its last requirement for meeting configuration protection
Pre-set threshold value), then, protection level adds 1 grade, and upper strata protection level (i.e. 2) is corresponding to coordinate time increase preset duration.
Alternatively, the mobile agent includes id information, and after completion task, the mobile agent disappears the mobile agent automatically.
In order to meet the analysis requirement of real-time, after the analysis agent positioned at host determines failure switch, it will be produced
Raw the mobile agent, in order to avoid it searches for the time of destination server, the analysis agent of host provides the target of dynamic agent
The address (ID) of server, the setting in this path can be registered realization in the mobile agent manager.And in this, as
The ID (unique mark) of this task of the mobile agent.Operation content (OPERATION) is write in the content of the mobile agent
(content).After the mobile agent reaches destination server, according to the mission requirements of itself, using local data resource into
Row corresponding analysis.Need exist for knowing present node be connected directly with each branch switch, then using local data storehouse, by number
According to the satisfactory each point transmission trip signal of content in storehouse.Here each TE is required to have the number being connected directly with this node
According to library storage resource, direct relation occurs because only being switched with itself, takes limited memory source.When this task is complete
Cheng Hou, the information that the mobile agent need to only be successfully completed to one work of host loopback where manager itself, manager will
This task is unregistered according to ID, this mobile agent disappears automatically, by the Garbage Collector of host and each TE by its time
Receive, discharge its internal resource utilized.ID therein is the unique mark of a mobile agent, whole from its generation to disappearing
In a life cycle, no matter it is moved to the arbitrary point in network, it can all register this mark, and area is carried out with other agent
Point.Here it is also pointed out that be either host system database, or the related network topology database of switch of each TE,
All belong to permanent data base (persistent), can refresh in real time because of the change of network structure, but not disappear.Divide with more than
The mobile agent (instant) property of division life is different.
It is to be collected by the mobile agent according to system topology information that Zhong Di of embodiment of the present invention counties, which adjust fixed setting method,
Analysis is drawn, therefore the strategy provided is expansible protection level, and original protection boundary is downstream extended to important use
Family, coordinates with substation transformer upwards, forms a set of definite value relatively-stationary on the basis of substation transformer;It is aided with the same time
Demarcation switch and the intermediate switch of long transmission line and its corresponding protection section are engaged, and overcome original protection scheme to depend on line
Road length, is influenced not ensureing to coordinate the characteristics of selective by the method for operation.
Embodiment two:
A kind of ground county adjusts fixed setting device, and with reference to figure 7, which includes:
Acquisition module 11, for obtaining switching network topological diagram in real time, wherein, switching network topological diagram includes multiple open
Artis;
Access modules 12, for by the mobile agent access target switching node, wherein, target switch node is switch
Any one node in network topological diagram;
Collection module 13, for collecting the configuration protection information of all of its neighbor switching node, wherein, all of its neighbor joint
Point is the direct-connected all switching nodes of target switch node;
Computing module 14, for calculating the load importance of all of its neighbor switching node based on configuration protection information;
First result output module 15, if load importance is more than pre-set threshold value, protection level increase is corresponding to match somebody with somebody
Time increase preset duration is closed, wherein, protection level is less than 3.
Adjusted an embodiment of the present invention provides a kind of ground county in fixed setting device, first obtain switching network topology in real time
Figure, then by the mobile agent access target switching node, collects the configuration protection information of all of its neighbor switching node, is based on
The load importance that protection information calculates all of its neighbor switching node is configured, if last load importance is more than pre-set threshold value,
Then protect level increase, corresponding cooperation time increase preset duration.It is a kind of that the ground county of the present invention, which adjusts fixed setting device,
Expansible protection level, can downstream extend to responsible consumer by protection boundary, coordinate upwards with substation transformer, shape
Into a set of definite value relatively-stationary on the basis of substation transformer, setting principle enriches, it is contemplated that the electricity consumption of user side needs
Ask, adapt to intelligent network distribution construction, it is single to alleviate existing distribution network protection setting principle, lays particular stress on and considers system side safe operation, and
Ignore the technical problem of user side.
Alternatively, collection module includes:
Judging unit, goes out whether the number of degrees are 0 for judge target switch node;
Access unit is terminated, if it is 0 to go out the number of degrees, terminates and accesses;
Determination unit, if it is not 0 to go out the number of degrees, it is determined that the lower floor switching node direct-connected with target switch node;
First setup unit, for using the lower floor switching node direct-connected with target switch node as all of its neighbor joint
Point;
Collector unit, for collecting the configuration protection information of all of its neighbor switching node.
Alternatively, device further includes:
Second result output module, if load importance is not more than pre-set threshold value, protects level not increase, corresponding
Coordinate the time constant.
Alternatively, computing module includes:
Assignment unit, for assigning weights for all of its neighbor switching node;
Computing unit, for calculate all of its neighbor switching node weights and;
Second setup unit, for using the weights of all of its neighbor switching node and the load as all of its neighbor switching node
Importance.
Alternatively, the mobile agent includes id information, and after completion task, the mobile agent disappears the mobile agent automatically.
The ground county that the embodiment of the present invention is provided adjusts the computer program product of fixed setting method and device, including deposits
The computer-readable recording medium of program code is stored up, the instruction that said program code includes can be used for performing previous methods implementation
Method described in example, specific implementation can be found in embodiment of the method, and details are not described herein.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description
With the specific work process of device, the corresponding process in preceding method embodiment is may be referred to, details are not described herein.
In addition, in the description of the embodiment of the present invention, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, Ke Yishi
Connection inside two elements.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in invention.
If the function is realized in the form of SFU software functional unit and is used as independent production marketing or in use, can be with
It is stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words
The part to contribute to the prior art or the part of the technical solution can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be
People's computer, server, or network equipment etc.) perform all or part of step of each embodiment the method for the present invention.
And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
In the description of the present invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ",
The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to
Easy to describe the present invention and simplify description, rather than instruction or imply signified device or element must have specific orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ",
" the 3rd " is only used for description purpose, and it is not intended that instruction or hint relative importance.
Finally it should be noted that:Embodiment described above, is only the embodiment of the present invention, to illustrate the present invention
Technical solution, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair
It is bright to be described in detail, it will be understood by those of ordinary skill in the art that:Any one skilled in the art
The invention discloses technical scope in, it can still modify the technical solution described in previous embodiment or can be light
It is readily conceivable that change, or equivalent substitution is carried out to which part technical characteristic;And these modifications, change or replacement, do not make
The essence of appropriate technical solution departs from the spirit and scope of technical solution of the embodiment of the present invention, should all cover the protection in the present invention
Within the scope of.Therefore, protection scope of the present invention answers the scope of the claims of being subject to.
Claims (10)
1. a kind of ground county adjusts fixed setting method, it is characterised in that the described method includes:
Switching network topological diagram is obtained in real time, wherein, the switching network topological diagram includes multiple switch node;
By the mobile agent access target switching node, wherein, the target switch node is in the switching network topological diagram
Any one node;
The configuration protection information of all of its neighbor switching node is collected, wherein, all of its neighbor switching node is opened for the target
The direct-connected all switching nodes of artis;
The load importance of all of its neighbor switching node is calculated based on the configuration protection information;
If the load importance is more than pre-set threshold value, protection level increase, the corresponding cooperation time increases preset duration,
Wherein, the protection level is less than 3.
2. according to the method described in claim 1, it is characterized in that, collect the configuration protection information bag of all of its neighbor switching node
Include:
Judge the target switch node goes out whether the number of degrees are 0;
If it is described go out the number of degrees be 0, terminate access;
If it is described go out the number of degrees be 0, it is determined that direct-connected lower floor's switching node with the target switch node;
Using with the direct-connected lower floor's switching node of the target switch node as all of its neighbor switching node;
Collect the configuration protection information of all of its neighbor switching node.
If 3. according to the method described in claim 1, it is characterized in that, the load importance is not more than pre-set threshold value,
Described to protect level not increase, the corresponding cooperation time is constant.
4. according to the method described in claim 1, it is characterized in that, all of its neighbor is calculated based on the configuration protection information
The load importance of switching node includes:
Weights are assigned for all of its neighbor switching node;
Calculate all of its neighbor switching node weights and;
Using the weights of all of its neighbor switching node and the load importance as all of its neighbor switching node.
5. according to the method described in claim 1, it is characterized in that,
The mobile agent includes id information, and after completion task, the mobile agent disappears the mobile agent automatically
Lose.
6. a kind of ground county adjusts fixed setting device, it is characterised in that described device includes:
Acquisition module, for obtaining switching network topological diagram in real time, wherein, the switching network topological diagram includes multiple switch
Node;
Access modules, for by the mobile agent access target switching node, wherein, the target switch node is opened to be described
Close any one node in network topological diagram;
Collection module, for collecting the configuration protection information of all of its neighbor switching node, wherein, all of its neighbor switching node
For all switching nodes that the target switch node is direct-connected;
Computing module, for calculating the load importance of all of its neighbor switching node based on the configuration protection information;
First result output module, if the load importance is more than pre-set threshold value, protection level increase, corresponding cooperation
Time increases preset duration, wherein, the protection level is less than 3.
7. device according to claim 6, it is characterised in that the collection module includes:
Judging unit, goes out whether the number of degrees are 0 for judge the target switch node;
Terminate access unit, if it is described go out the number of degrees be 0, terminate access;
Determination unit, if it is described go out the number of degrees be 0, it is determined that direct-connected lower floor's switching node with the target switch node;
First setup unit, for the lower floor switching node direct-connected with the target switch node to be opened as all of its neighbor
Artis;
Collector unit, for collecting the configuration protection information of all of its neighbor switching node.
8. device according to claim 6, it is characterised in that described device further includes:
Second result output module, it is described to protect level not increase if the load importance is not more than pre-set threshold value, it is right
The cooperation time answered is constant.
9. device according to claim 6, it is characterised in that the computing module includes:
Assignment unit, for assigning weights for all of its neighbor switching node;
Computing unit, for calculate all of its neighbor switching node weights and;
Second setup unit, for using the weights of all of its neighbor switching node and as all of its neighbor switching node
Load importance.
10. device according to claim 6, it is characterised in that
The mobile agent includes id information, and after completion task, the mobile agent disappears the mobile agent automatically
Lose.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711333653.1A CN107959591B (en) | 2017-12-13 | 2017-12-13 | Setting method and device for adjusting and setting county and county |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711333653.1A CN107959591B (en) | 2017-12-13 | 2017-12-13 | Setting method and device for adjusting and setting county and county |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107959591A true CN107959591A (en) | 2018-04-24 |
CN107959591B CN107959591B (en) | 2020-10-16 |
Family
ID=61957908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711333653.1A Active CN107959591B (en) | 2017-12-13 | 2017-12-13 | Setting method and device for adjusting and setting county and county |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107959591B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112002163A (en) * | 2020-08-17 | 2020-11-27 | 武汉生物工程学院 | Learning auxiliary system based on mobile agent |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090112375A1 (en) * | 2007-10-30 | 2009-04-30 | Bogdan Cristian Popescu | System and method for control of power distribution |
CN101938117A (en) * | 2010-10-14 | 2011-01-05 | 山东大学 | Current differential protection method for smart distribution network |
CN105356432A (en) * | 2015-11-30 | 2016-02-24 | 江苏省电力公司盐城供电公司 | Multi-linked distribution network fault power-losing area topology identification system and method based on Multi-Agent |
-
2017
- 2017-12-13 CN CN201711333653.1A patent/CN107959591B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090112375A1 (en) * | 2007-10-30 | 2009-04-30 | Bogdan Cristian Popescu | System and method for control of power distribution |
CN101938117A (en) * | 2010-10-14 | 2011-01-05 | 山东大学 | Current differential protection method for smart distribution network |
CN105356432A (en) * | 2015-11-30 | 2016-02-24 | 江苏省电力公司盐城供电公司 | Multi-linked distribution network fault power-losing area topology identification system and method based on Multi-Agent |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112002163A (en) * | 2020-08-17 | 2020-11-27 | 武汉生物工程学院 | Learning auxiliary system based on mobile agent |
Also Published As
Publication number | Publication date |
---|---|
CN107959591B (en) | 2020-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhou et al. | Distributed control and communication strategies in networked microgrids | |
Zidan et al. | Fault detection, isolation, and service restoration in distribution systems: State-of-the-art and future trends | |
CN108879706A (en) | A kind of automatic voltage control system | |
CN102947801B (en) | malicious attack detection and analysis | |
CN107895954A (en) | The enhancing disturbance management of electric power pool | |
Ustun et al. | Implementation of Dijkstra's algorithm in a dynamic microgrid for relay hierarchy detection | |
CN104578153B (en) | A kind of topological structure of electric recognition methods | |
CN103093276B (en) | Urban power grid risk assessment method | |
CN101202451A (en) | System for controlling wide area damp of electrical power system and method thereof | |
CN103683515B (en) | A kind of power distribution network optimization based on MAS technology and control method | |
CN103020335A (en) | Method for automatically converting distribution network geographic wiring diagram into region orthogonal diagram | |
CN102255319B (en) | Electrical network voltage wattless real time control assessment method based on section data extraction and system thereof | |
CN102403792A (en) | Multi-Agent power grid self-adapting intelligent coordination protection control method and control system | |
CN104361184A (en) | Automatic layout and wiring system and method of power grid | |
CN115037054A (en) | Commutation switch intelligent terminal based on three-phase self-balancing and low-voltage fault location isolation | |
CN105046011B (en) | The electrical device status rapid analysis method calculated based on distributed electrical net topology | |
CN108233324A (en) | Electric network model and computational methods based on more power type relay protection setting calculations | |
CN107959591A (en) | Ground county adjusts fixed setting method and device | |
Santhoshkumar et al. | Transient and small signal stability improvement in microgrid using AWOALO with virtual synchronous generator control scheme | |
CN105337314A (en) | Multisource coordination control fault treatment method based on distributed power supply black start technology | |
Li et al. | Cellular automata-based simulation of cross-space transmission of Energy Local Area Network risks: A case study of a power supply station in Beijing | |
CN105790256B (en) | Power distribution network access distributed generation unit critical path recognition methods based on multi-agent technology | |
CN102270847B (en) | Online detection method for intelligent AVC (Automatic Voltage Control) system and device thereof | |
Gao et al. | Concepts, structure and developments of high-reliability cyber-physical fusion based coordinated planning for distribution system | |
CN104268328A (en) | Real-time dada based electromagnetic closed loop conductive operation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |