CN107958578A - A kind of energy management system alarm linkage method - Google Patents

A kind of energy management system alarm linkage method Download PDF

Info

Publication number
CN107958578A
CN107958578A CN201711442737.9A CN201711442737A CN107958578A CN 107958578 A CN107958578 A CN 107958578A CN 201711442737 A CN201711442737 A CN 201711442737A CN 107958578 A CN107958578 A CN 107958578A
Authority
CN
China
Prior art keywords
management system
energy management
video
alarm
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711442737.9A
Other languages
Chinese (zh)
Inventor
汪冰冰
张璐
金建超
吴宝财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Alliance Wisdom Energy Ltd By Share Ltd
Original Assignee
Jiangsu Alliance Wisdom Energy Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Alliance Wisdom Energy Ltd By Share Ltd filed Critical Jiangsu Alliance Wisdom Energy Ltd By Share Ltd
Priority to CN201711442737.9A priority Critical patent/CN107958578A/en
Publication of CN107958578A publication Critical patent/CN107958578A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B25/00Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems
    • G08B25/01Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems characterised by the transmission medium
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B19/00Alarms responsive to two or more different undesired or abnormal conditions, e.g. burglary and fire, abnormal temperature and abnormal rate of flow

Abstract

The invention discloses a kind of energy management system alarm linkage method, it carries out energy management system and video monitoring system integrated docking by building the realization of energy management system platform, so as to fulfill energy abnormal data and the alarm linkage of video monitoring, video location and alarm are carried out to exceptional data point in a manner of real-time video pop-up in energy management system man-machine interface, the reference of emergency disposal is provided in terms of data alarm and video pop-up two for administrative staff;Realize that the method for alarm linkage is mainly wrapped between the energy management system and video monitoring system:(1)Energy management system alarm information processing;(2)Video presetting bit is set;(3)Linkage is set;(4)Alert process.The present invention realizes the real-time linkage of data warning message and video monitoring picture, provides effective alarm monitoring means in real time for energy unit administrative staff, improves the work efficiency of troubleshooting.

Description

A kind of energy management system alarm linkage method
Technical field
The present invention relates to the energy and field of energy-saving technology, and in particular to a kind of energy management system alarm linkage method.
Background technology
In energy management system, abnormal data and status alert are an important rings for the safe efficient operation of guarantee system.Allusion quotation The abnormal data of type includes excessive transformer temperature, overtension, cable temperature is excessive, leakage current is excessive etc., typical different Normal state includes switch abnormal tripping, switchgear house flue gas and water logging etc..
Currently, the abnormal data for energy management system and status alert are mainly with the alarm of real-time interface, short message or postal The modes such as part alarm realize possess certain real-time, but not directly perceived enough there is also warning message, can not be with video monitoring system Linkage, cannot grasp the live real conditions for producing warning message, so as to administrative staff disposal method cannot be taken to provide More intuitively reference.And video monitoring system is referred to as real image scene, because being completely solely with energy management system Vertical two systems, it is impossible to realize real-time linkage, be only used as safety, fire-fighting purposes at present, do not formed with energy management system also It is interactive, it is impossible to effectively to lift the efficiency of management.
The content of the invention
The purpose of the present invention is mainly soft by the upper computer software of energy management system and the interface of video monitoring system Part is docked, so as to fulfill energy abnormal data and the alarm linkage of video monitoring, in energy management system man-machine interface Video location and alarm are carried out to exceptional data point in a manner of real-time video pop-up, in terms of data alarm and video pop-up two The reference of emergency disposal is provided for administrative staff.
The present invention adopts the technical scheme that:A kind of energy management system alarm linkage method, it can source capsule by building Reason system platform, which is realized, carries out energy management system and video monitoring system integrated docking, and the energy management system is used for real When monitoring site equipment and the information of monitoring is uploaded to energy management system platform in real time, the video monitoring system by regarding The video information of the real-time collection site equipment of frequency supervision equipment, and video monitoring system connects with energy management system Platform communication Connect, energy management system platform can transfer the video information of video monitoring system;Energy management system and the video monitoring system Realize that the method for alarm linkage comprises the following steps between system:
(1)Energy management system alarm information processing:To the information of energy management system monitoring on energy management system platform Alarm settings are carried out, after the alarm settings triggering of the monitor terminal of device context, are transferred to the data of energy management system platform Acquisition module carries out alert process;
(2)Video presetting bit is set:Presetting bit setting is carried out to video surveillance devices, is set according to the monitoring point position of warning message Different presetting bits are put, it is that the position that warning message occurs should be able to be completely seen in long-distance video picture that presetting bit, which sets standard, Put, circuit title and live significant data information;
(3)Linkage is set:Warning message and video by the interface module of energy management system platform to energy management system Presetting bit carries out one-to-one corresponding setting;
(4)Alert process:Energy management system is sent to energy management system platform, energy after monitoring onsite alarming real time information Management system platform calls video monitoring equipment interface, inquires about and navigates to satisfactory video surveillance devices presetting bit, Then eject video pictures in a manner of real-time automatic pop-up in energy management system man-machine interface, automatic positioning to setting in advance The video presetting bit put, and carry out automatic focusing, to allow operating personnel to be clearly seen that the video pictures of alarm point and important Field instrument parameter.
Further, the necessary operating personnel of alarm pop-up video pictures carry out true in energy management system man-machine interface It can just be closed after recognizing closing, in the case where warning message does not confirm closing, video window will be fixed on the pre- of warning message , also can auto-returned presetting bit even if manual manipulation camera turns to other positions in set.
Further, in the event of a plurality of warning message, it is corresponding that video pop-up will be fixed on a newest warning message In video presetting bit, after this warning message is identified closing, video pop-up will automatically switch to a warning message pair In the video presetting bit answered, and so on, after all warning messages are closed by artificial confirmation, video pop-up just recovers hand The dynamic state that can arbitrarily manipulate.
Further, the energy management system includes tri-layer framework, be respectively scene equipment level, transport network layer and System application layer.
Further, the scene equipment level is by installing power monitoring terminal, field controller and intelligent gateway to becoming The transformer of switchgear house, high-low circuit, indoor environment are monitored.The monitoring information includes transformer temperature, three-phase electricity Pressure, three-phase current, cable temperature, leakage current, smoke alarm, water logging alarm, invasion infrared induction and circuit switching state.
Further, the transport network layer is divided into the field control technology and backbone communication net two of field device networking Layer, and using network controller to lower progress field device networking configuration, to upper access network based on ethernet.
Further, the system application layer include database server, application server, monitor workstation and it is all kinds of should Use software.
Further, the video monitoring equipment uses the high-definition network camera with holder, is accessed by network interface Ethernet, operates web camera by host computer monitoring software.
The beneficial effects of the invention are as follows:It the composite can be widely applied to current all kinds of buildings, traffic, industrial energy management system The warning function module of system, by the device network kit of video monitoring equipment, realizes data warning message and video monitoring The real-time linkage of picture, provides effective alarm monitoring means in real time for energy unit administrative staff, improves the work of troubleshooting Make efficiency.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
Fig. 1 is the system block diagram of the present invention.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Integrated docking of the invention based on energy management system and video monitoring system, system block diagram are shown in attached drawing 1.Main skill Art scheme is described as follows.
1st, the real-time data acquisition of energy management system
Energy management system is tri-layer framework, scene equipment level, transport network layer and system application layer.
Scene equipment level is by installing power monitoring terminal, field controller, intelligent gateway etc., to the transformation of changed into switchhouse Device, high-low circuit, indoor environment are monitored, and monitoring information includes transformer temperature, three-phase voltage, three-phase current, cable Temperature, leakage current, smoke alarm, water logging alarm, invasion infrared induction, circuit switching state etc..
Transport network layer is divided into two layers of the field control technology and backbone communication net of field device networking, network controller Key equipment before being field control technology and backbone communication net, to it is lower progress field device networking configuration, to it is upper access with Too net.
System application layer includes database server, application server, monitor workstation and types of applications software etc..
2nd, video monitoring system
Video monitoring equipment uses the high-definition network camera with holder, by network interface access network based on ethernet, passes through host computer Monitoring software operates web camera.
3rd, video monitoring equipment interface software develops
Secondary open is carried out based on the device network SDK kits that video monitoring equipment manufacturer provides in energy management system software Hair, can be remotely accessed and be controlled to video monitoring equipment so as to fulfill in energy management system software, including more are taken the photograph The calling of camera photographic technique picture, video camera rotation control, camera lens extension and contraction control, automatic focusing, video presetting bit Call etc..
4th, alarm video interlink processing method
(1)Energy management system alarm information processing
Alarm settings are carried out to monitoring information on energy management system software platform, including are not limited to following:Transformer temperature Spend high setting, overtension setting, the excessive setting of electric current, the excessive setting of cable temperature, the excessive setting of leakage current, flue gas report Alert setting, the setting of water logging alarm settings, intrusion alarm, circuit tripping setting etc..
Energy management system alarm processing software module is transferred to after the triggering of above alarm settings.
(2)Video presetting bit is set
Presetting bit setting is carried out to video surveillance devices, different presetting bits are set according to the monitoring point position of warning message, it is preset Position setting standard is that position, circuit title and scene that warning message occurs should be able to be completely seen in long-distance video picture Significant data information.Illustrate:The video presetting bit of the excessive alarm of transformer temperature should be able to see transformer temperature control The temperature display data and transformer body of device;The video presetting bit of circuit tripping alarm should be able to see the accurate of trip(ping) circuit The electric current indicating meter of drawout cubicle or switchgear where title and trip(ping) circuit.The presetting bit of remaining warning message setting refers to Citing is changed or replaces above, its principle is that video presetting bit should be able to understand administrative staff alarm present situation and judgement is alarmed The order of severity help is provided.
(3)Linkage is set
One-to-one corresponding is carried out in video monitoring equipment interface software to energy management system warning message and video presetting bit to set Put, as the excessive warning message of transformer temperature corresponds to camera video presetting bit near transformer, intrusion alarm information pair Answer the camera video presetting bit near changed into switchhouse access door mouth.
(4)Specific alert process process
After energy management system monitors onsite alarming real time information, energy management system software platform calls video monitoring equipment Interface software, inquires about and navigates to satisfactory preset positions of camera.In energy management system man-machine interface with real time from The mode of window of moving ejects video pictures, and pre-set video presetting bit is arrived in automatic positioning, and carries out automatic focusing, to allow Operating personnel are clearly seen that the video pictures of alarm point and important field instrument parameter.
Alarm pop-up video pictures must operating personnel just may be used after energy management system man-machine interface carries out confirmation closing To close, in the case where warning message does not confirm closing, video window will be fixed in the presetting bit of warning message, even if hand Dynamic manipulation camera turns to other positions, also can auto-returned presetting bit.
In the event of a plurality of warning message, video pop-up will be fixed on the corresponding video presetting bit of a newest warning message On, after this warning message is identified closing, video pop-up will automatically switch to the corresponding video preprocessor of a warning message In set, and so on, after all warning messages are closed by artificial confirmation, video pop-up just recovers arbitrarily grasp manually The state of control.
(5)Illustrate
In order to further illustrate the interlink warning method in the embodiment of the present invention, do have by taking drawout cubicle circuit breaker trip as an example below Body explanation:
Each drawout cubicle is respectively mounted multifunction power monitor terminal, can monitoring breaker on off state in real time.After circuit breaker trip, Multifunction power monitor terminal monitors tripped condition, and real time information is uploaded to system software platform by network controller, Software platform calls video monitoring equipment interface software, inquires the corresponding nearest camera preset of the drawout cubicle fault message Position, the automatic spring video monitoring picture in energy management system software man-machine interface, automatic positioning to the drawout cubicle picture is simultaneously Automatic to carry out lens focusing, the electric current instruction data on drawout cubicle title and drawout cubicle should can be seen in picture.In operating personnel couple After this alarm pop-up is confirmed, video pictures can just recover to be manually operated, and no longer be limited to the preset picture of the drawout cubicle.
It should be noted that, although specific embodiment of the invention is described by taking circuit breaker trip as an example, still, this Video interlink method of alarming in invention is not limited to killer switch alarm, the video of any energy management system data alarm Linkage belongs to the scope of protection of the embodiment of the present invention.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained Cover within protection scope of the present invention.Therefore, protection scope of the present invention should it is described using scope of the claims as It is accurate..
Part that the present invention does not relate to is same as the prior art or can be realized using the prior art.

Claims (9)

  1. A kind of 1. energy management system alarm linkage method, it is characterised in that:Energy management system platform is built to realize to the energy Management system and video monitoring system carry out integrated docking, and the energy management system is used to monitor field device in real time and will supervise The information of control is uploaded to energy management system platform in real time, and the video monitoring system is gathered existing in real time by video surveillance devices The video information of field device, and video monitoring system is connected with energy management system Platform communication, energy management system platform The video information of video monitoring system can be transferred;Alarm linkage is realized between the energy management system and video monitoring system Method comprises the following steps:
    (1)Energy management system alarm information processing:To the information of energy management system monitoring on energy management system platform Alarm settings are carried out, after the alarm settings triggering of the monitor terminal of device context, are transferred to the data of energy management system platform Acquisition module carries out alert process;
    (2)Video presetting bit is set:Presetting bit setting is carried out to video surveillance devices, is set according to the monitoring point position of warning message Different presetting bits are put, it is that the position that warning message occurs should be able to be completely seen in long-distance video picture that presetting bit, which sets standard, Put, circuit title and live significant data information;
    (3)Linkage is set:Warning message and video by the interface module of energy management system platform to energy management system Presetting bit carries out one-to-one corresponding setting;
    (4)Alert process:Energy management system is sent to energy management system platform, energy after monitoring onsite alarming real time information Management system platform calls video monitoring equipment interface, inquires about and navigates to satisfactory video surveillance devices presetting bit, Then eject video pictures in a manner of real-time automatic pop-up in energy management system man-machine interface, automatic positioning to setting in advance The video presetting bit put, and carry out automatic focusing, to allow operating personnel to be clearly seen that the video pictures of alarm point and important Field instrument parameter.
  2. A kind of 2. energy management system alarm linkage method according to claim 1, it is characterised in that:The alarm pop-up Video pictures must operating personnel can just be closed after energy management system man-machine interface carries out confirmation closing, in warning message In the case of not confirming closing, video window will be fixed in the presetting bit of warning message, even if manual manipulation camera rotates , also can auto-returned presetting bit to other positions.
  3. A kind of 3. energy management system alarm linkage method according to claim 1, it is characterised in that:In the event of a plurality of Warning message, video pop-up will be fixed in the corresponding video presetting bit of a newest warning message, when this bar warning message quilt Confirming after closing, video pop-up will automatically switch in the corresponding video presetting bit of a warning message, and so on, until All warning messages are confirmed after closing that video pop-up just recovers the state that can arbitrarily manipulate manually by artificial.
  4. A kind of 4. energy management system alarm linkage method according to claim 1, it is characterised in that:The energy management System includes tri-layer framework, is respectively scene equipment level, transport network layer and system application layer.
  5. A kind of 5. energy management system alarm linkage method according to claim 4, it is characterised in that:The field device Layer is by installing power monitoring terminal, field controller and intelligent gateway transformer, high-low circuit, interior to changed into switchhouse Environment is monitored.
  6. A kind of 6. energy management system alarm linkage method according to claim 5, it is characterised in that:The monitoring information Including transformer temperature, three-phase voltage, three-phase current, cable temperature, leakage current, smoke alarm, water logging alarm, invade it is infrared Sensing and circuit switching state.
  7. A kind of 7. energy management system alarm linkage method according to claim 4, it is characterised in that:The network transmission Layer is divided into two layers of the field control technology and backbone communication net of field device networking, and is showed using network controller under Field device networking configures, to upper access network based on ethernet.
  8. A kind of 8. energy management system alarm linkage method according to claim 4, it is characterised in that:The system application Layer includes database server, application server, monitor workstation and types of applications software.
  9. A kind of 9. energy management system alarm linkage method according to claim 1, it is characterised in that:The video monitoring Equipment uses the high-definition network camera with holder, by network interface access network based on ethernet, by host computer monitoring software to net Network video camera is operated.
CN201711442737.9A 2017-12-27 2017-12-27 A kind of energy management system alarm linkage method Pending CN107958578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711442737.9A CN107958578A (en) 2017-12-27 2017-12-27 A kind of energy management system alarm linkage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711442737.9A CN107958578A (en) 2017-12-27 2017-12-27 A kind of energy management system alarm linkage method

Publications (1)

Publication Number Publication Date
CN107958578A true CN107958578A (en) 2018-04-24

Family

ID=61956412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711442737.9A Pending CN107958578A (en) 2017-12-27 2017-12-27 A kind of energy management system alarm linkage method

Country Status (1)

Country Link
CN (1) CN107958578A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108769625A (en) * 2018-07-10 2018-11-06 南京南瑞继保电气有限公司 Monitoring alarm linkage processing method, system and comprehensively monitoring equipment
CN110597148A (en) * 2019-10-10 2019-12-20 南京瑞松信息科技有限公司 Subway station energy management and control system architecture

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102469297A (en) * 2010-11-10 2012-05-23 上海宝信软件股份有限公司 Method for displaying digital video on client in linkage way
CN103325216A (en) * 2012-03-23 2013-09-25 罗普特(厦门)科技集团有限公司 Water conservancy flood prevention monitoring early warning method and system based on video monitoring

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102469297A (en) * 2010-11-10 2012-05-23 上海宝信软件股份有限公司 Method for displaying digital video on client in linkage way
CN103325216A (en) * 2012-03-23 2013-09-25 罗普特(厦门)科技集团有限公司 Water conservancy flood prevention monitoring early warning method and system based on video monitoring

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐丽等: "调理一体化模式下远程视频监控系统建设与应用分析", 《内蒙古电力技术》 *
滕井玉: "基于视频集成及智能分析的一键式程序化控制技术研究", 《电力系统保护与控制》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108769625A (en) * 2018-07-10 2018-11-06 南京南瑞继保电气有限公司 Monitoring alarm linkage processing method, system and comprehensively monitoring equipment
CN110597148A (en) * 2019-10-10 2019-12-20 南京瑞松信息科技有限公司 Subway station energy management and control system architecture

Similar Documents

Publication Publication Date Title
CN104052151B (en) Intelligent substation aided synthesis is monitored and D5000 cooler interlock platforms
CN109768620B (en) Intelligent video linkage method for substation
CN201039373Y (en) Transformer substation remote image monitoring system
CN201749547U (en) Unattended communication room safety management system
KR101635430B1 (en) The smart controller of a auto-controlling CCTV
CN104639910B (en) A kind of scene automatic tour inspection system of power system based on substation operation state
CN102566519A (en) Setting method for power tunnel monitoring system
CN102723782A (en) Substation integrated information processing platform based on hardware superposition technique
CN207651862U (en) Safe power distribution box based on Internet of Things centralized management early warning control application
CN203678537U (en) Monitoring system of electric precipitator
CN101969229B (en) On-line monitoring method for secondary circuit
CN102208996B (en) Method is monitored for the network security of digital transformer substation network-enabled intelligent equipment
CN202616876U (en) Substation visualization system based on operating perceiving
CN110086251A (en) A kind of monitoring method and system improving electric grid operating safety
CN106208372A (en) Based on visualization and the switch remote operation method of anti-error topological analysis comprehensively
CN107958578A (en) A kind of energy management system alarm linkage method
Chan et al. Internet based transmission substation monitoring
CN109245308A (en) A kind of linkage alarm method based on substation's comprehensive monitoring system
KR101717434B1 (en) The controlling system and the smart controller of broadcasting system
CN110942585A (en) Building monitoring system and monitoring method thereof
CN102611193B (en) The interaction control method of power system, Apparatus and system
CN204925767U (en) Remote intelligent monitored control system of transformer substation
CN211042306U (en) Comprehensive pipe gallery intelligent monitoring system
CN206339865U (en) A kind of distributed communication network of computer room monitoring system
CN206117830U (en) Network camera

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180424