CN107956506A - 一种煤与瓦斯突出矿井顺槽布置结构 - Google Patents

一种煤与瓦斯突出矿井顺槽布置结构 Download PDF

Info

Publication number
CN107956506A
CN107956506A CN201810006206.3A CN201810006206A CN107956506A CN 107956506 A CN107956506 A CN 107956506A CN 201810006206 A CN201810006206 A CN 201810006206A CN 107956506 A CN107956506 A CN 107956506A
Authority
CN
China
Prior art keywords
hill
crossheading
exploiting field
gone down
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810006206.3A
Other languages
English (en)
Inventor
聂凯
贺坤
谭爱兵
郭军鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jincheng Coal Planning And Design Institute
Original Assignee
Jincheng Coal Planning And Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jincheng Coal Planning And Design Institute filed Critical Jincheng Coal Planning And Design Institute
Priority to CN201810006206.3A priority Critical patent/CN107956506A/zh
Publication of CN107956506A publication Critical patent/CN107956506A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F5/00Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires

Abstract

本发明公开了一种煤与瓦斯突出矿井底板岩巷顺槽布置结构,属于煤矿顺槽领域;所要解决的技术问题是提供了一种结构简单,可以减少抽采时间,提高区域抽采效果,提高区域抽采效果的突出矿井顺槽布置结构;解决该技术问题采用的技术方案为:一种煤与瓦斯突出矿井顺槽布置结构,在采区回风下山、采区轨道下山、采区运输下山之间通过联络巷相连,在采区回风下山进口处设置进风顺槽,进风顺槽上设置有多个抽采钻孔;本发明可广泛应用于煤矿顺槽领域。

Description

一种煤与瓦斯突出矿井顺槽布置结构
技术领域
本发明一种煤与瓦斯突出矿井顺槽布置结构,属于煤矿顺槽布置技术领域。
背景技术
煤矿地下采掘过程中,在极短的时间内几秒到几分钟,从煤、岩层内以极快的速度向采掘空间喷出煤岩和瓦斯的现象,称为煤与瓦斯突出,这是瓦斯的特殊涌出,也是煤矿地下开采过程中的一种动力现象,煤与瓦斯突出是矿井最为严重的灾害之一,它所产生的高速瓦斯流能够摧毁巷道设施,破坏通风系统,甚至造成风流逆转,喷出的瓦斯由几百到几万立方,造成煤流埋人,猛烈的动力效应可能导致冒顶事故的发生等,目前,国内外煤矿对煤与瓦斯突出事故都比较重视,坚持“区域防突措施先行、局部防突措施补充”的原则,现有的煤与瓦斯突出矿井在施工前需要进行长时间的瓦斯抽采,降低了工作效率,同时增加了工作时间和工作量。
发明内容
本发明克服了现有技术存在的不足,提供了一种结构简单,可以减少抽采时间,提高区域抽采效果,提高区域抽采效果的突出矿井顺槽布置结构。
为了解决上述技术问题,本发明采用的技术方案为:一种煤与瓦斯突出矿井顺槽布置结构,包括采区回风下山、采区轨道下山、采区运输下山、进风顺槽,采区回风下山、采区轨道下山、采区运输下山从左至右依次平行布置,采区回风下山进口远离采区轨道下山的一侧设置有进风顺槽,进风顺槽垂直于采区回风下山,进风顺槽与采区回风下山进口相连,采区回风下山进口与采区轨道下山进口之间设有第一联络巷,采区轨道下山进口与采区运输下山进口之间设置有第二联络巷,进风顺槽、第一联络巷、第二联络巷连通,进风顺槽上设置有多个抽采钻孔。
所述的进风顺槽内与矿井采区边界错5m设置煤层底板岩巷,所述煤层底板岩巷距上部煤层距离为15m。
所述的抽采钻孔包括多个穿层钻孔和顺层钻孔。
本发明与现有技术相比具有以下有益效果:工作面底板岩巷施工不需要预抽以及边掘边抽,可以直接施工、安全性高,顺槽上设置多个抽采钻孔,钻孔包括穿层钻孔和顺层钻孔,穿层钻孔和顺层钻孔的结合使得预抽效果好,在工作面区域预抽的同时对顺槽也进行预抽,提高了区域的抽采效果,节省预抽期。
具体实施方式
本发明一种煤与瓦斯突出矿井顺槽布置结构,包括采区回风下山、采区轨道下山、采区运输下山、进风顺槽,采区回风下山、采区轨道下山、采区运输下山从左至右依次平行布置,采区回风下山进口远离采区轨道下山的一侧设置有进风顺槽,进风顺槽垂直于采区回风下山,进风顺槽与采区回风下山进口相连,采区回风下山进口与采区轨道下山进口之间设有第一联络巷,采区轨道下山进口与采区运输下山进口之间设置有第二联络巷,进风顺槽、第一联络巷、第二联络巷连通,进风顺槽上设置有多个抽采钻孔,进风顺槽内与矿井采区边界错5m设置煤层底板岩巷,所述煤层底板岩巷距上部煤层距离为15m,抽采钻孔包括多个穿层钻孔和顺层钻孔。
本发明在使用时,在采区回风下山、采区轨道下山、采区运输下山施工完毕后,沿着采区回风下山施工设置进风顺槽,进风顺槽内与采区边界错5m布置为煤层底板岩巷,该岩巷顺槽距离上部煤层距离为15m,在底板岩巷穿层钻孔对该工作面进风顺槽进行条带区域预抽,对该区域所在的上部工作面采用先在进风顺槽施工千米钻机顺层长钻孔进行回采区域瓦斯预抽,通过联络巷将采区回风下山、采区轨道下山、采区运输下山连通,在工作区域预抽瓦斯的时候顺槽中同时进行预抽,提高区域抽采效果,节省预抽期。
上面对本发明的实施例作了详细说明,但是本发明并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。

Claims (3)

1.一种煤与瓦斯突出矿井顺槽布置结构,其特征在于:包括采区回风下山、采区轨道下山、采区运输下山、进风顺槽,采区回风下山、采区轨道下山、采区运输下山从左至右依次平行布置,采区回风下山进口远离采区轨道下山的一侧设置有进风顺槽,进风顺槽垂直于采区回风下山,进风顺槽与采区回风下山进口相连,采区回风下山进口与采区轨道下山进口之间设有第一联络巷,采区轨道下山进口与采区运输下山进口之间设置有第二联络巷,进风顺槽、第一联络巷、第二联络巷连通,进风顺槽上设置有多个抽采钻孔。
2.根据权利要求1所述的一种煤与瓦斯突出矿井顺槽布置结构,其特征在于:所述的进风顺槽内与矿井采区边界错5m设置煤层底板岩巷,所述煤层底板岩巷距上部煤层距离为15m。
3.根据权利要求1所述的一种煤与瓦斯突出矿井顺槽布置结构,其特征在于:所述的抽采钻孔包括多个穿层钻孔和顺层钻孔。
CN201810006206.3A 2018-01-04 2018-01-04 一种煤与瓦斯突出矿井顺槽布置结构 Pending CN107956506A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810006206.3A CN107956506A (zh) 2018-01-04 2018-01-04 一种煤与瓦斯突出矿井顺槽布置结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810006206.3A CN107956506A (zh) 2018-01-04 2018-01-04 一种煤与瓦斯突出矿井顺槽布置结构

Publications (1)

Publication Number Publication Date
CN107956506A true CN107956506A (zh) 2018-04-24

Family

ID=61957175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810006206.3A Pending CN107956506A (zh) 2018-01-04 2018-01-04 一种煤与瓦斯突出矿井顺槽布置结构

Country Status (1)

Country Link
CN (1) CN107956506A (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649741A (zh) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 大U套小u方式布置的巷道
CN102865092A (zh) * 2012-09-22 2013-01-09 山西晋城无烟煤矿业集团有限责任公司 回采工作面u+u型巷道通风系统
CN104847401A (zh) * 2015-04-30 2015-08-19 贵州盘江精煤股份有限公司 一种区域性防治煤与瓦斯突出煤层采煤工作面突出的方法
CN105804788A (zh) * 2016-05-16 2016-07-27 中国矿业大学 一种煤层瓦斯巷道治理方法
CN106812551A (zh) * 2016-03-30 2017-06-09 六盘水师范学院 一种山区新建高瓦斯突出矿井穿层预抽及快速掘进系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649741A (zh) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 大U套小u方式布置的巷道
CN102865092A (zh) * 2012-09-22 2013-01-09 山西晋城无烟煤矿业集团有限责任公司 回采工作面u+u型巷道通风系统
CN104847401A (zh) * 2015-04-30 2015-08-19 贵州盘江精煤股份有限公司 一种区域性防治煤与瓦斯突出煤层采煤工作面突出的方法
CN106812551A (zh) * 2016-03-30 2017-06-09 六盘水师范学院 一种山区新建高瓦斯突出矿井穿层预抽及快速掘进系统
CN105804788A (zh) * 2016-05-16 2016-07-27 中国矿业大学 一种煤层瓦斯巷道治理方法

Similar Documents

Publication Publication Date Title
CN103670496B (zh) 单一低透气性突出煤层沿空留巷与预抽区段煤层瓦斯方法
WO2016206618A1 (zh) 长壁开采n00工法
WO2018171255A1 (zh) 一种网络化优势瓦斯运移通道构建及瓦斯导流抽采方法
CN201723246U (zh) 采煤工作面瓦斯抽采排放通风结构
WO2015090128A1 (zh) 一种跳采式旺格维利采场支巷充填采煤方法
CN104832176B (zh) 一种低透气性煤层群卸压瓦斯抽采高抽巷的一巷多用布置方法
CN107905834A (zh) 一种低渗高突煤层体系化瓦斯开采方法
CN100356037C (zh) 低透气性高瓦斯软厚煤层远程卸压瓦斯抽放方法
CN103306714A (zh) 近距离煤层群底抽巷钻孔一孔三用的瓦斯治理方法
WO2015103861A1 (zh) 沿空留巷y型通风高位回风巷钻孔抽采瓦斯方法
WO2021219130A1 (zh) 煤与瓦斯突出矿井110工法开采的立体通风方法及系统
WO2021003772A1 (zh) 全矿区无煤柱留设无巷道掘进采煤方法
CN105221179A (zh) 一种高瓦斯矿井y型通风方法
CN103953345B (zh) 一种沿空小断面留巷开采方法
WO2009039776A1 (fr) Système et procédé d'exploitation pour déplacer un gaz de couche de charbon grâce à un gaz mélangé à travers un passage de drainage de pompage qui se trouve sous un puits
CN103821515A (zh) 一种对拉工作面充填采煤工艺
CN107882565A (zh) 一种无掘进无煤柱采留一体开采工艺
CN104806285A (zh) 基于地面水平井的煤矿采空区瓦斯治理方法
CN104373126A (zh) 一种钻采法矸石充填方法及设备
CN110700831A (zh) 一种智能开采条件下的煤矿生产系统
CN107503790B (zh) 快速回采综采面瓦斯综合抽放布置治理方法
WO2021031561A1 (zh) 一种煤矿井田不划分采区无掘巷无煤柱开采及施工方法
CN103485786A (zh) 一种急倾斜煤层走向长壁机械化开采方法
CN105275487B (zh) 长臂开采n00工法通风系统
CN106285770A (zh) 一种开采煤层底板泥岩作为保护层增加近距离突出煤层群透气性的方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180424

RJ01 Rejection of invention patent application after publication