CN107953086A - The combination fasteners integrated production method prepared for solar bracket - Google Patents

The combination fasteners integrated production method prepared for solar bracket Download PDF

Info

Publication number
CN107953086A
CN107953086A CN201711222981.4A CN201711222981A CN107953086A CN 107953086 A CN107953086 A CN 107953086A CN 201711222981 A CN201711222981 A CN 201711222981A CN 107953086 A CN107953086 A CN 107953086A
Authority
CN
China
Prior art keywords
processing
face
right end
end platform
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711222981.4A
Other languages
Chinese (zh)
Inventor
迮才中
陶慧敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Unitary Seiko Technology Co Ltd
Original Assignee
Suzhou Unitary Seiko Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Unitary Seiko Technology Co Ltd filed Critical Suzhou Unitary Seiko Technology Co Ltd
Priority to CN201711222981.4A priority Critical patent/CN107953086A/en
Publication of CN107953086A publication Critical patent/CN107953086A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Solid-Phase Diffusion Into Metallic Material Surfaces (AREA)
  • Forging (AREA)

Abstract

The present invention is used for combination fasteners integrated production method prepared by solar bracket, including such step:According to product specification, bar is chosen, is processed for the first time on the basis of 1.5 3mm of reserved margin;Carburization Treatment is carried out, 1.8 2.2mm of carburized (case) depth chooses one end datum level, defines left end platform;Left end platform plane is processed, and is defined as following process datum level, and on the basis of follow-up processing datum, needed for machining and shaping left end platform to production;Delimit its right end face and define face;Cone tank is processed, the cone tank bottom is subject to its right end face and defines face;Processing obtains right end platform;Carry out right end platform finishing;Front side positioning holes center delimited, and processes acquisition front side location hole;Rear side kidney slot center delimited, and rear side kidney slot profile delimited as center, and processes acquisition rear side kidney slot.

Description

The combination fasteners integrated production method prepared for solar bracket
Technical field
The present invention relates to solar energy equipment technology of preparing, specifically, it shows a kind of group prepared for solar bracket Close fastener integrated production method.
Background technology
With economic and science and technology development, the use of clean energy resource is also more and more extensive, and solar energy is the weight of clean energy resource One of form, and then the use of solar energy equipment is also more and more extensive;
Solar bracket is the support member of solar energy equipment, and in solar bracket preparation process, in-between product needs Using fastener, included component is fastened using processing respectively at this stage, after obtained by spot-welded, processing technology is numerous It is miscellaneous, low production efficiency, while spot-welding technology is unstable, weld strength is more demanding, product quality problem easily occurs.
Therefore, it is necessary to a kind of combination fasteners integrated production method prepared for solar bracket is provided to solve The above problem.
The content of the invention
The object of the present invention is to provide a kind of combination fasteners integrated production method prepared for solar bracket.
The present invention is achieved through the following technical solutions above-mentioned purpose:
A kind of combination fasteners integrated production method prepared for solar bracket, including such step:
S1) according to product specification, bar is chosen, is processed for the first time on the basis of reserved margin 1.5-3mm;
S2 Carburization Treatment, carburized (case) depth 1.8-2.2mm) are carried out;
S3 one end datum level) is chosen, carries out cold-heading processing, obtains left end platform;
S4 left end platform plane) is processed, and is defined as following process datum level, and on the basis of follow-up processing datum, Needed for machining and shaping left end platform to production;
S5) on the basis of follow-up processing datum, delimit its right end face and define face;
S6 cone tank) is processed, the cone tank bottom is subject to its right end face and defines face;
S7) processing obtains right end platform;
S8) on the basis of follow-up processing datum, right end platform finishing is carried out;
S9 front side positioning holes center) delimited on the basis of follow-up processing datum, and processes acquisition front side location hole;
S10) with follow-up processing datum and front side location hole acted as reference mutual, rear side kidney slot center delimited, and as Rear side kidney slot profile delimited at center, and process acquisition rear side kidney slot.
Further, need to be placed in outdoor 2-5 days after step 2) Carburization Treatment to carry out stress release.
Further, step 3), 8) in numerical control machining center or add milling machine on carry out.
Further, step 7) on punching machine in carrying out.
Further, step 9) on drilling machine in carrying out.
Further, step 10) is obtained by wire cutting mode or in numerical control machining center processing method.
Compared with prior art, the simplified production procedure of the present invention, raising production efficiency, Improving The Quality of Products stability, greatly Width reduces production cost, and product is used without at all influence.
Brief description of the drawings
Fig. 1 is one of structure diagram of the present invention.
Fig. 2 is the second structural representation of the present invention.
Fig. 3 is the third structural representation of the present invention.
Fig. 4 is the four of the structure diagram of the present invention.
Fig. 5 is the five of the structure diagram of the present invention.
Embodiment
Embodiment 1:
A kind of combination fasteners integrated production method prepared for solar bracket of the present embodiment displaying, including it is such Step:
S1) according to product specification, bar is chosen, is processed for the first time on the basis of reserved margin 1.5mm;
S2 Carburization Treatment, carburized (case) depth 1.8mm) are carried out;
S3 one end datum level) is chosen, carries out cold-heading processing, obtains left end platform 1;
S4 1 plane of left end platform) is processed, and is defined as following process datum level 11, and is with follow-up processing datum 11 Benchmark, needed for machining and shaping left end platform 1 to production, as shown in Figure 1;
S5) on the basis of follow-up processing datum 11, delimit its right end face and define face 2, as shown in Figure 2;
S6 cone tank 21) is processed, cone tank bottom 21 is subject to its right end face and defines face 2;
S7) processing obtains right end platform 3, as shown in Figure 3;
S8) on the basis of follow-up processing datum 11, carry out right end platform 3 and repair;
S9 front side 4 center of location hole) delimited on the basis of follow-up processing datum 11, and processes acquisition front side location hole 4, With reference to Fig. 4;
S10) with 4 acted as reference mutual of follow-up processing datum 11 and front side location hole, 5 center of rear side kidney slot delimited, and with Rear side 5 profile of kidney slot delimited centered on this, and processes acquisition rear side kidney slot 5, with reference to Fig. 5.
Need to be placed in outdoor 2-5 days after step 2) Carburization Treatment to carry out stress release.
Step 3), 8) in numerical control machining center or add milling machine on carry out.
Step 7) on punching machine in carrying out.
Step 9) on drilling machine in carrying out.
Step 10) is obtained by wire cutting mode or in numerical control machining center processing method.
Embodiment 2:
A kind of combination fasteners integrated production method prepared for solar bracket of the present embodiment displaying, including it is such Step:
S1) according to product specification, bar is chosen, is processed for the first time on the basis of reserved margin 2mm;
S2 Carburization Treatment, carburized (case) depth 2mm) are carried out;
S3 one end datum level) is chosen, carries out cold-heading processing, obtains left end platform 1;
S4 1 plane of left end platform) is processed, and is defined as following process datum level 11, and is with follow-up processing datum 11 Benchmark, needed for machining and shaping left end platform 1 to production, as shown in Figure 1;
S5) on the basis of follow-up processing datum 11, delimit its right end face and define face 2, as shown in Figure 2;
S6 cone tank 21) is processed, cone tank bottom 21 is subject to its right end face and defines face 2;
S7) processing obtains right end platform 3, as shown in Figure 3;
S8) on the basis of follow-up processing datum 11, carry out right end platform 3 and repair;
S9 front side 4 center of location hole) delimited on the basis of follow-up processing datum 11, and processes acquisition front side location hole 4, With reference to Fig. 4;
S10) with 4 acted as reference mutual of follow-up processing datum 11 and front side location hole, 5 center of rear side kidney slot delimited, and with Rear side 5 profile of kidney slot delimited centered on this, and processes acquisition rear side kidney slot 5, with reference to Fig. 5.
Need to be placed in outdoor 2-5 days after step 2) Carburization Treatment to carry out stress release.
Step 3), 8) in numerical control machining center or add milling machine on carry out.
Step 7) on punching machine in carrying out.
Step 9) on drilling machine in carrying out.
Step 10) is obtained by wire cutting mode or in numerical control machining center processing method.
Embodiment 3:
A kind of combination fasteners integrated production method prepared for solar bracket of the present embodiment displaying, including it is such Step:
S1) according to product specification, bar is chosen, is processed for the first time on the basis of reserved margin 3mm;
S2 Carburization Treatment, carburized (case) depth 2.2mm) are carried out;
S3 one end datum level) is chosen, carries out cold-heading processing, obtains left end platform 1;
S4 1 plane of left end platform) is processed, and is defined as following process datum level 11, and is with follow-up processing datum 11 Benchmark, needed for machining and shaping left end platform 1 to production, as shown in Figure 1;
S5) on the basis of follow-up processing datum 11, delimit its right end face and define face 2, as shown in Figure 2;
S6 cone tank 21) is processed, cone tank bottom 21 is subject to its right end face and defines face 2;
S7) processing obtains right end platform 3, as shown in Figure 3;
S8) on the basis of follow-up processing datum 11, carry out right end platform 3 and repair;
S9 front side 4 center of location hole) delimited on the basis of follow-up processing datum 11, and processes acquisition front side location hole 4, With reference to Fig. 4;
S10) with 4 acted as reference mutual of follow-up processing datum 11 and front side location hole, 5 center of rear side kidney slot delimited, and with Rear side 5 profile of kidney slot delimited centered on this, and processes acquisition rear side kidney slot 5, with reference to Fig. 5.
Need to be placed in outdoor 2-5 days after step 2) Carburization Treatment to carry out stress release.
Step 3), 8) in numerical control machining center or add milling machine on carry out.
Step 7) on punching machine in carrying out.
Step 9) on drilling machine in carrying out.
Step 10) is obtained by wire cutting mode or in numerical control machining center processing method.
Compared with prior art, embodiment 1-3 simplification production procedure, raising production efficiency, Improving The Quality of Products stability, Production cost is greatly reduced, and product is used without at all influence.
Above-described is only some embodiments of the present invention.For those of ordinary skill in the art, not On the premise of departing from the invention design, various modifications and improvements can be made, these belong to the protection model of the present invention Enclose.

Claims (6)

  1. A kind of 1. combination fasteners integrated production method prepared for solar bracket, it is characterised in that:
    Including such step:
    S1) according to product specification, bar is chosen, is processed for the first time on the basis of reserved margin 1.5-3mm;
    S2 Carburization Treatment, carburized (case) depth 1.8-2.2mm) are carried out;
    S3 one end datum level) is chosen, carries out cold-heading processing, obtains left end platform;
    S4 left end platform plane) is processed, and is defined as following process datum level, and on the basis of follow-up processing datum, processing Needed for shaping left end platform to production;
    S5) on the basis of follow-up processing datum, delimit its right end face and define face;
    S6 cone tank) is processed, the cone tank bottom is subject to its right end face and defines face;
    S7) processing obtains right end platform;
    S8) on the basis of follow-up processing datum, right end platform finishing is carried out;
    S9 front side positioning holes center) delimited on the basis of follow-up processing datum, and processes acquisition front side location hole;
    S10) with follow-up processing datum and front side location hole acted as reference mutual, rear side kidney slot center delimited, and as center Rear side kidney slot profile delimited, and processes acquisition rear side kidney slot.
  2. 2. a kind of combination fasteners integrated production method prepared for solar bracket according to claim 1, its It is characterized in that:Need to be placed in outdoor 2-5 days after step 2) Carburization Treatment to carry out stress release.
  3. 3. a kind of combination fasteners integrated production method prepared for solar bracket according to claim 2, its It is characterized in that:Step 3), 8) in numerical control machining center or add milling machine on carry out.
  4. 4. a kind of combination fasteners integrated production method prepared for solar bracket according to claim 3, its It is characterized in that:Step 7) on punching machine in carrying out.
  5. 5. a kind of combination fasteners integrated production method prepared for solar bracket according to claim 4, its It is characterized in that:Step 9) on drilling machine in carrying out.
  6. 6. a kind of combination fasteners integrated production method prepared for solar bracket according to claim 5, its It is characterized in that:Step 10) is obtained by wire cutting mode or in numerical control machining center processing method.
CN201711222981.4A 2017-11-29 2017-11-29 The combination fasteners integrated production method prepared for solar bracket Pending CN107953086A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711222981.4A CN107953086A (en) 2017-11-29 2017-11-29 The combination fasteners integrated production method prepared for solar bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711222981.4A CN107953086A (en) 2017-11-29 2017-11-29 The combination fasteners integrated production method prepared for solar bracket

Publications (1)

Publication Number Publication Date
CN107953086A true CN107953086A (en) 2018-04-24

Family

ID=61962807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711222981.4A Pending CN107953086A (en) 2017-11-29 2017-11-29 The combination fasteners integrated production method prepared for solar bracket

Country Status (1)

Country Link
CN (1) CN107953086A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0216405A1 (en) * 1985-09-18 1987-04-01 ATELIERS DE LA HAUTE-GARONNE - ETABLISSEMENTS AURIOL & Cie S.a.R.L. Rivet, especially for composite materials
RU2107574C1 (en) * 1996-07-15 1998-03-27 Акционерное общество "Автонормаль" Process for manufacturing semi-tubular rivets
JP2005249121A (en) * 2004-03-05 2005-09-15 Nikko Planning Kk Joint for pipe connection
CN201071865Y (en) * 2007-07-05 2008-06-11 叶中洲 Connection fixer
CN201401397Y (en) * 2009-04-07 2010-02-10 潘显章 Pipe connecting piece
CN101652203A (en) * 2007-04-12 2010-02-17 埃里斯公司 Method for making a rivet and rivet obtained by said method
CN102686892A (en) * 2009-10-06 2012-09-19 伯尔霍夫连接技术有限公司 Connection between two components made of reinforced plastic and method for the production thereof
CN102821889A (en) * 2010-03-26 2012-12-12 埃里斯公司 Riveting element and associated installation tool
CN103591093A (en) * 2012-08-18 2014-02-19 李思模 Aluminium alloy section connecting device
CN103629210A (en) * 2013-11-25 2014-03-12 西安轨道交通装备有限责任公司 Detachable hinge pin connecting structure for pipe connecting
CN105324584A (en) * 2013-06-18 2016-02-10 海瑞克里兹 Assembly having a temperature-dependent self-tightening connection
CN205637557U (en) * 2016-05-14 2016-10-12 刘星杰 Scaffold frame butt joint fastener convenient to installation

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0216405A1 (en) * 1985-09-18 1987-04-01 ATELIERS DE LA HAUTE-GARONNE - ETABLISSEMENTS AURIOL & Cie S.a.R.L. Rivet, especially for composite materials
RU2107574C1 (en) * 1996-07-15 1998-03-27 Акционерное общество "Автонормаль" Process for manufacturing semi-tubular rivets
JP2005249121A (en) * 2004-03-05 2005-09-15 Nikko Planning Kk Joint for pipe connection
CN101652203A (en) * 2007-04-12 2010-02-17 埃里斯公司 Method for making a rivet and rivet obtained by said method
CN201071865Y (en) * 2007-07-05 2008-06-11 叶中洲 Connection fixer
CN201401397Y (en) * 2009-04-07 2010-02-10 潘显章 Pipe connecting piece
CN102686892A (en) * 2009-10-06 2012-09-19 伯尔霍夫连接技术有限公司 Connection between two components made of reinforced plastic and method for the production thereof
CN102821889A (en) * 2010-03-26 2012-12-12 埃里斯公司 Riveting element and associated installation tool
CN103591093A (en) * 2012-08-18 2014-02-19 李思模 Aluminium alloy section connecting device
CN105324584A (en) * 2013-06-18 2016-02-10 海瑞克里兹 Assembly having a temperature-dependent self-tightening connection
CN103629210A (en) * 2013-11-25 2014-03-12 西安轨道交通装备有限责任公司 Detachable hinge pin connecting structure for pipe connecting
CN205637557U (en) * 2016-05-14 2016-10-12 刘星杰 Scaffold frame butt joint fastener convenient to installation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
机械工业部农机工业局: "《金属材料与热处理(初、中级)》", 31 August 1987, 机械工业出版社 *
李茗: "《机械零部件测绘》", 31 May 2011, 中国电力出版社 *
锻造工艺过程及模具设计: "《锻造工艺过程及模具设计》", 31 August 2006, 中国林业出版社/北京大学出版社 *

Similar Documents

Publication Publication Date Title
CN102335811B (en) Method for manufacturing titanium-alloy sawtooth-shaped skin parts
CN104482892B (en) Spatial special casts the datum tool method of nacelle
CN103433690B (en) Casing assembly processing method
CN107953086A (en) The combination fasteners integrated production method prepared for solar bracket
CN108907617A (en) A kind of processing method for aircraft complex joint part
CN106862881A (en) Spiral bevel gear closed loop processing technique
CN203343760U (en) Spindle sleeve finish machining jig
CN207547673U (en) Die casting drilling, tapping processing unit (plant)
CN206898414U (en) One kind machining double-end knife
CN102922232A (en) Machining process for non-standard clamp components
CN205464368U (en) AB pivot angle head spindle carrier is milled at high -speed longmen
CN203853817U (en) Rotating clamp
CN206811188U (en) A kind of gang tool for processing shoulder hole
CN203185007U (en) Mould angle machining tool
CN104772607A (en) Group hole accuracy machining method of liquid engine injector plate
CN206393231U (en) A kind of high-accuracy clamp on the axles of CNC tetra- or five
CN204076241U (en) A kind of large-scale shaft centre line chalker
CN103223603B (en) Jig and process for performing precision machining on main shaft sleeve
CN206824671U (en) A kind of Efficient lathe knife rest component
CN204868095U (en) Three special hole boring machines of electronic axle hub
CN208840574U (en) A kind of machining drill bit convenient for heat dissipation
CN204893006U (en) Exempt from tool setting L shape hole sword broach shell
CN207534972U (en) A kind of timber cutter device
CN208437693U (en) A kind of dedicated multi-panel process tool
CN208178530U (en) A kind of finishing tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 2599 Linhu Avenue, Lili Town, Wujiang District, Suzhou City, Jiangsu Province

Applicant after: Jiangsu Youli Intelligent Equipment Co., Ltd.

Address before: 2599 Linhu Avenue, Lili Town, Wujiang District, Suzhou City, Jiangsu Province

Applicant before: Suzhou unitary Seiko technology Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20180424

RJ01 Rejection of invention patent application after publication