CN107947027B - Installation method of lightning protection pin insulator installation tool for distribution overhead line - Google Patents
Installation method of lightning protection pin insulator installation tool for distribution overhead line Download PDFInfo
- Publication number
- CN107947027B CN107947027B CN201711426408.5A CN201711426408A CN107947027B CN 107947027 B CN107947027 B CN 107947027B CN 201711426408 A CN201711426408 A CN 201711426408A CN 107947027 B CN107947027 B CN 107947027B
- Authority
- CN
- China
- Prior art keywords
- puncture
- wire
- clamp
- opening
- lightning protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000012212 insulator Substances 0.000 title claims abstract description 24
- 238000009826 distribution Methods 0.000 title claims abstract description 19
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000009434 installation Methods 0.000 title claims description 22
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims abstract description 24
- 229910052782 aluminium Inorganic materials 0.000 claims abstract description 24
- 238000009413 insulation Methods 0.000 claims description 13
- 238000010276 construction Methods 0.000 claims description 8
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 claims description 8
- 125000006850 spacer group Chemical group 0.000 claims description 7
- 239000004020 conductor Substances 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 abstract description 2
- 230000009194 climbing Effects 0.000 abstract 1
- 230000000149 penetrating effect Effects 0.000 abstract 1
- 241001503987 Clematis vitalba Species 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
- H02G1/04—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/14—Extreme weather resilient electric power supply systems, e.g. strengthening power lines or underground power cables
Landscapes
- Insulators (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种配电架空线路防雷针式绝缘子安装工具的安装方法,属于供电检修维护技术领域。The invention relates to an installation method of a lightning protection pin type insulator installation tool for an overhead line of power distribution, and belongs to the technical field of power supply inspection and maintenance.
背景技术Background technique
供电系统为弱化线树矛盾,提升配电架空线路防异物能力,近年来配电架空线路绝缘化率不断提升,随之而来的就是线路防雷问题,目前架空绝缘导线防雷多采用防雷针式绝缘子线路防雷害设备。The power supply system is to weaken the line tree contradiction and improve the ability of the distribution overhead line to prevent foreign objects. In recent years, the insulation rate of the distribution overhead line has been continuously improved, followed by the problem of line lightning protection. At present, the lightning protection of overhead insulated wires mostly adopts lightning protection Pin insulator line lightning protection equipment.
防雷针式绝缘子上端采用穿刺线夹,穿透架空绝缘导线绝缘层与内部铝绞线进行接触,下端采用放电间隙,对雷击造成的过电压及过电流进行释放。The upper end of the lightning protection needle type insulator adopts a piercing clamp to penetrate the insulating layer of the overhead insulated wire and make contact with the internal aluminum stranded wire, and the lower end adopts a discharge gap to release the overvoltage and overcurrent caused by lightning.
按照施工要求,防雷针式绝缘子安装必须采用专业的扭力扳手,根据扳手的力矩变化进行操作,确保穿刺仅穿透绝缘外皮,不对内部铝绞线造成损伤,避免由于铝绞线损伤造成的载流量下降及导线断线事故。但是,市面上的扭力扳手卖价昂贵,并且重量比普通扳手重,工作人员携带扭力扳手攀上电杆十分费力,且作业时也十分笨重;另外,采用扭力扳手,紧固穿刺线夹螺栓时还必须同时观察扭力数据,费时费力,操作十分不便。According to the construction requirements, professional torque wrench must be used for the installation of lightning protection pin insulators, and the operation should be carried out according to the torque change of the wrench to ensure that the puncture only penetrates the insulation outer skin without causing damage to the internal aluminum stranded wire, and avoids the load caused by the damage of the aluminum stranded wire. Flow drop and wire disconnection accidents. However, the torque wrench on the market is expensive and weighs more than ordinary wrenches. It is very laborious for the staff to carry the torque wrench to climb the pole, and it is also very cumbersome during operation; It is also necessary to observe the torque data at the same time, which is time-consuming and labor-intensive, and the operation is very inconvenient.
发明内容Contents of the invention
本发明的目的是提供一种配电架空线路防雷针式绝缘子安装工具的安装方法,防雷针式绝缘子安装不必使用专业的扭力扳手,使用普通活动扳手即可完成安装,减少大批量购买扭力扳手发生的费用,便于携带,减轻登杆人员携带扭力扳手造成的不便,采用活动扳手紧固到位即可,提升施工效率,解决背景技术存在的上述问题。The purpose of the present invention is to provide a method for installing lightning protection pin insulator installation tools for power distribution overhead lines. It is not necessary to use a professional torque wrench for the installation of lightning protection pin insulators, and the installation can be completed by using an ordinary adjustable wrench, which reduces the torque required for mass purchases. The cost of the wrench is easy to carry, and the inconvenience caused by the climber to carry the torque wrench can be reduced, and the adjustable wrench can be used to tighten it in place, which improves the construction efficiency and solves the above-mentioned problems in the background technology.
本发明的技术方案是:Technical scheme of the present invention is:
一种配电架空线路防雷针式绝缘子安装工具,包含上穿刺线夹,下穿刺线夹、螺母,螺杆、绝缘底座、铁心引线、绝缘外套和开口垫片,所述下穿刺线夹设置在绝缘底座顶部,上穿刺线夹设置在下穿刺线夹的上方,上穿刺线夹和下穿刺线夹之间设有空隙,螺杆为两个,相互对称设置,螺杆的下端贯穿上穿刺线夹后固定在下穿刺线夹上,螺杆的上端设有螺母,螺母位于上穿刺线夹的上方;上穿刺线夹和下穿刺线夹之间的中间部位设有穿线口,绝缘导线从穿线口中穿过,上穿刺线夹位于穿线口的部位上垂直向下设有穿刺,穿刺刺穿绝缘导线的绝缘层后与绝缘导线内的铝绞线相接触;开口垫片为两个,均为C形结构,分别对称套设在螺杆的底端两侧,位于上穿刺线夹和下穿刺线夹之间的空隙中,两个开口垫片的开口方向相对;铁心引线与下穿刺线夹相连接,铁心引线的外面设有绝缘外套。A lightning protection needle insulator installation tool for power distribution overhead lines, comprising an upper puncture clamp, a lower puncture clamp, a nut, a screw, an insulating base, a core lead wire, an insulating jacket and an opening gasket, and the lower puncture clamp is set on On the top of the insulating base, the upper puncture wire clamp is set above the lower puncture wire clamp, and there is a gap between the upper puncture wire clamp and the lower puncture wire clamp. On the lower puncture wire clamp, the upper end of the screw rod is provided with a nut, and the nut is located above the upper puncture wire clamp; the middle part between the upper puncture wire clamp and the lower puncture wire clamp is provided with a threading opening, and the insulated wire passes through the threading opening. The puncture clamp is located on the part of the threading opening and is provided with a puncture vertically downward. The puncture pierces the insulation layer of the insulated wire and then contacts the aluminum stranded wire in the insulated wire; there are two opening gaskets, both of which are C-shaped structures, respectively It is symmetrically sleeved on both sides of the bottom end of the screw, and is located in the gap between the upper puncture wire clamp and the lower puncture wire clamp. The opening directions of the two opening gaskets are opposite; It has an insulating jacket on the outside.
所述两片开口垫片,厚度相等,其厚度根据上穿刺线夹和下穿刺线夹所夹持的绝缘导线内部铝绞线直径确定:夹紧上穿刺线夹,上穿刺线夹的穿刺刺穿绝缘导线的绝缘层后与绝缘导线内的铝绞线恰好相接触,此时上穿刺线夹和下穿刺线夹之间的距离就是开口垫片的厚度;开口垫片放置在下穿刺线夹上,由于开口垫片的限定,保证上穿刺线夹的穿刺恰好与绝缘导线内的铝绞线相接触后,不能再对绝缘导线施加力量,保护绝缘导线不受损害。The two opening gaskets have the same thickness, and their thicknesses are determined according to the diameter of the aluminum stranded wire inside the insulated wire clamped by the upper puncture wire clip and the lower puncture wire clip: clamp the upper puncture wire clip, and the puncture of the upper puncture wire clip After passing through the insulation layer of the insulated wire, it is just in contact with the aluminum stranded wire in the insulated wire. At this time, the distance between the upper puncture wire clamp and the lower puncture wire clamp is the thickness of the opening gasket; the opening gasket is placed on the lower puncture wire clamp. , due to the limitation of the opening gasket, ensure that the puncture of the upper puncture clamp is just in contact with the aluminum stranded wire in the insulated wire, and no force can be applied to the insulated wire to protect the insulated wire from damage.
开口垫片的C形结构,为了适应在两侧插入上穿刺线夹和下穿刺线夹之间,不会受到螺杆的影响。The C-shaped structure of the opening gasket is inserted between the upper puncture wire clip and the lower puncture wire clip in order to adapt to both sides, and will not be affected by the screw rod.
所述绝缘底座设置在电杆的横担上。The insulating base is arranged on the cross arm of the electric pole.
所述铁心引线与避雷器相连接。The lead wires of the iron core are connected with the lightning arrester.
一种配电架空线路防雷针式绝缘子安装方法,包含如下步骤:A method for installing lightning protection pin insulators for distribution overhead lines, comprising the following steps:
①首先,在地面上,将与电杆上相同型号的绝缘导线放入与电杆上相同型号防雷绝缘子的上穿刺线夹和下穿刺线夹之间,利用扭力扳手紧固螺杆上端的螺母,使上穿刺线夹的穿刺刺穿绝缘导线的绝缘层后与绝缘导线内的铝绞线相接触;① First, on the ground, put the insulated wire of the same type as that on the pole between the upper and lower piercing clamps of the lightning protection insulator of the same type as that on the pole, and tighten the nut on the upper end of the screw with a torque wrench , so that the puncture of the upper puncture clamp pierces the insulation layer of the insulated wire and then contacts the aluminum stranded wire in the insulated wire;
②利用游标卡尺测量上穿刺线夹与下穿刺线夹之间的距离;制作两个开口垫片,均为C形结构,开口垫片的厚度等于游标卡尺所测量出来的上穿刺线夹与下穿刺线夹之间距离;②Measure the distance between the upper puncture wire clip and the lower puncture wire clip with a vernier caliper; make two opening gaskets, both of which are C-shaped structures, and the thickness of the opening gasket is equal to the upper puncture wire clamp and the lower puncture wire measured by the vernier caliper distance between clips;
③施工时,携带普通扳手和开口垫片攀登到电杆上,在上穿刺线夹和下穿刺线夹之间的螺杆两侧,分别垫入开口垫片,两个开口垫片的开口方向相对;采用普通扳手紧固螺杆上端的螺母,上穿刺线夹的穿刺刺穿绝缘导线的绝缘层后,与绝缘导线内的铝绞线相接触,此时上穿刺线夹压紧在开口垫片上,由于开口垫片的限定,保证上穿刺线夹的穿刺恰好与绝缘导线内的铝绞线相接触后,不能再对绝缘导线施加力量;③During construction, climb onto the pole with a common wrench and an open spacer, and insert open spacers on both sides of the screw between the upper puncture wire clamp and the lower puncture line clamp, and the opening directions of the two open spacers are opposite to each other. ;Tighten the nut on the upper end of the screw rod with a common wrench. After the puncture of the upper puncture clamp pierces the insulation layer of the insulated wire, it contacts the aluminum stranded wire in the insulated wire. At this time, the upper puncture clamp is pressed tightly on the opening gasket , due to the limitation of the opening gasket, ensure that the puncture of the upper puncture clamp is just in contact with the aluminum stranded wire in the insulated wire, and no force can be applied to the insulated wire;
④最后,用普通扳手将紧固螺杆上端的螺母拧紧,完成配电架空线路防雷针式绝缘子安装。④ Finally, use a common wrench to tighten the nut on the upper end of the fastening screw to complete the installation of the lightning protection insulator for the distribution overhead line.
本发明的有益效果:可以减少大批量购买专业扭力扳手发生的费用,减轻登杆人员携带扭力扳手造成的不便,提高工作效率;且该方法操作简单,容易掌握,并能保证准确性,缩短了停电时间、减少了用户的不理解、减轻了工作人员的工作量;以前需要一个小时完成的工作,现在仅需要十分钟,大大提高了工作效率。Beneficial effects of the present invention: it can reduce the cost of purchasing professional torque wrenches in large quantities, reduce the inconvenience caused by carrying torque wrenches for climbers, and improve work efficiency; and the method is simple to operate, easy to master, and can ensure accuracy, shortening the The power outage time reduces the user's misunderstanding and reduces the workload of the staff; the work that used to take an hour to complete now only takes ten minutes, which greatly improves the work efficiency.
附图说明Description of drawings
图1为本发明结构示意图;Fig. 1 is a structural representation of the present invention;
图2为本发明开口垫片结构示意图;Fig. 2 is a schematic structural view of the opening gasket of the present invention;
图中:上穿刺线夹1、下穿刺线夹2、螺母3、螺杆4、绝缘底座5、铁心引线6、绝缘外套7、开口垫片8、穿刺9、穿线口10。In the figure: upper
具体实施方式Detailed ways
下面结合附图和实施例对本发明做进一步的说明:Below in conjunction with accompanying drawing and embodiment the present invention will be further described:
一种配电架空线路防雷针式绝缘子安装工具,包含上穿刺线夹1、下穿刺线夹2、螺母3、螺杆4、绝缘底座5、铁心引线6、绝缘外套7和开口垫片8,所述下穿刺线夹2设置在绝缘底座5顶部,上穿刺线夹1设置在下穿刺线夹2的上方,上穿刺线夹1和下穿刺线夹2之间设有空隙,螺杆4为两个,相互对称设置,螺杆4的下端贯穿上穿刺线夹1后固定在下穿刺线夹2上,螺杆4的上端设有螺母3,螺母3位于上穿刺线夹1的上方;上穿刺线夹1和下穿刺线夹2之间的中间部位设有穿线口10,绝缘导线从穿线口10中穿过,上穿刺线夹1位于穿线口的部位上垂直向下设有穿刺9,穿刺9刺穿绝缘导线的绝缘层后与绝缘导线内的铝绞线相接触;开口垫片8为两个,均为C形结构,分别对称套设在螺杆4的底端两侧,位于上穿刺线夹1和下穿刺线夹2之间的空隙中,两个开口垫片的开口方向相对;铁心引线6与下穿刺线夹2相连接,铁心引线6的外面设有绝缘外套7。A lightning protection pin insulator installation tool for distribution overhead lines, comprising an
所述两片开口垫片,厚度相等,其厚度根据上穿刺线夹1和下穿刺线夹2所夹持的绝缘导线内部铝绞线直径确定:夹紧上穿刺线夹1,上穿刺线夹1的穿刺9刺穿绝缘导线的绝缘层后与绝缘导线内的铝绞线恰好相接触,此时上穿刺线夹1和下穿刺线夹2之间的距离就是开口垫片的厚度;开口垫片8放置在下穿刺线夹2上,由于开口垫片8的限定,保证上穿刺线夹1的穿刺9恰好与绝缘导线内的铝绞线相接触后,不能再对绝缘导线施加力量,保护绝缘导线不受损害。The two opening gaskets have the same thickness, and their thicknesses are determined according to the diameter of the aluminum stranded wire inside the insulated wire clamped by the upper
开口垫片8的C形结构,为了适应在两侧插入上穿刺线夹1和下穿刺线夹2之间,不会受到螺杆4的影响。The C-shaped structure of the
所述绝缘底座5设置在电杆的横担上。The
所述铁心引线6与避雷器相连接。The
一种配电架空线路防雷针式绝缘子安装方法,包含如下步骤:A method for installing lightning protection pin insulators for distribution overhead lines, comprising the following steps:
①首先,在地面上,将与电杆上相同型号的绝缘导线放入与电杆上相同型号防雷绝缘子的上穿刺线夹和下穿刺线夹之间,利用扭力扳手紧固螺杆上端的螺母,使上穿刺线夹的穿刺刺穿绝缘导线的绝缘层后与绝缘导线内的铝绞线相接触;① First, on the ground, put the insulated wire of the same type as that on the pole between the upper and lower piercing clamps of the lightning protection insulator of the same type as that on the pole, and tighten the nut on the upper end of the screw with a torque wrench , so that the puncture of the upper puncture clamp pierces the insulation layer of the insulated wire and then contacts the aluminum stranded wire in the insulated wire;
②利用游标卡尺测量上穿刺线夹与下穿刺线夹之间的距离;制作两个开口垫片,均为C形结构,开口垫片8的厚度等于游标卡尺所测量出来的上穿刺线夹与下穿刺线夹之间距离;②Use the vernier caliper to measure the distance between the upper puncture wire clamp and the lower puncture wire clamp; make two opening gaskets, both of which are C-shaped structures, and the thickness of the
③施工时,携带普通扳手和开口垫片8攀登到电杆上,在上穿刺线夹1和下穿刺线夹2之间的螺杆两侧,分别垫入开口垫片,两个开口垫片的开口方向相对;采用普通扳手紧固螺杆上端的螺母,上穿刺线夹1的穿刺9刺穿绝缘导线的绝缘层后,与绝缘导线内的铝绞线相接触,此时上穿刺线夹1压紧在开口垫片上,由于开口垫片8的限定,保证上穿刺线夹1的穿刺9恰好与绝缘导线内的铝绞线相接触后,不能再对绝缘导线施加力量;③During construction, climb onto the electric pole with a common wrench and
④最后,用普通扳手将紧固螺杆上端的螺母拧紧,完成配电架空线路防雷针式绝缘子安装。④ Finally, use a common wrench to tighten the nut on the upper end of the fastening screw to complete the installation of the lightning protection insulator for the distribution overhead line.
本发明可以先在车间内将各种型号的配电架空线路防雷针式绝缘子与绝缘导线之间进行匹配的开口垫片制作好,批量制作,施工时,选择适应的开口垫片,提高施工效率。The present invention can firstly manufacture various types of opening gaskets for matching between lightning protection pin insulators and insulated wires of distribution overhead lines in the workshop, and make them in batches. During construction, select suitable opening gaskets to improve construction efficiency. efficiency.
所述开口垫片,安装完毕后可以取下再用;也可以不取下,一次性使用。The opening gasket can be removed and reused after installation; it can also be used once without removing.
还可以利用缝隙测量卡尺进行改造,将卡尺卡片顶端改造为开口垫片的形式,根据测量数据,施工时在上、下穿刺线夹中间的螺杆外,垫入与测量距离相同厚度的卡尺卡片。The gap measuring caliper can also be used for transformation, and the top of the caliper card is transformed into the form of an open gasket. According to the measurement data, a caliper card with the same thickness as the measurement distance is placed outside the screw in the middle of the upper and lower puncture clamps during construction.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711426408.5A CN107947027B (en) | 2017-12-26 | 2017-12-26 | Installation method of lightning protection pin insulator installation tool for distribution overhead line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711426408.5A CN107947027B (en) | 2017-12-26 | 2017-12-26 | Installation method of lightning protection pin insulator installation tool for distribution overhead line |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107947027A CN107947027A (en) | 2018-04-20 |
CN107947027B true CN107947027B (en) | 2023-06-30 |
Family
ID=61940126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711426408.5A Active CN107947027B (en) | 2017-12-26 | 2017-12-26 | Installation method of lightning protection pin insulator installation tool for distribution overhead line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107947027B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05199636A (en) * | 1992-01-16 | 1993-08-06 | Chubu Electric Power Co Inc | Lightning protection device in distribution line |
CN101325104A (en) * | 2007-06-15 | 2008-12-17 | 上海兆邦电力器材有限公司 | Lightning protection post insulator |
CN203013960U (en) * | 2012-12-26 | 2013-06-19 | 刘晓华 | Insulating piercing connector |
CN207603091U (en) * | 2017-12-26 | 2018-07-10 | 国网冀北电力有限公司唐山供电公司 | A kind of distribution overhead line lightning rod type insulator installation tool |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104779020A (en) * | 2015-03-31 | 2015-07-15 | 国家电网公司 | Asymmetric piercing electrode for piercing type lightning arrester |
-
2017
- 2017-12-26 CN CN201711426408.5A patent/CN107947027B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05199636A (en) * | 1992-01-16 | 1993-08-06 | Chubu Electric Power Co Inc | Lightning protection device in distribution line |
CN101325104A (en) * | 2007-06-15 | 2008-12-17 | 上海兆邦电力器材有限公司 | Lightning protection post insulator |
CN203013960U (en) * | 2012-12-26 | 2013-06-19 | 刘晓华 | Insulating piercing connector |
CN207603091U (en) * | 2017-12-26 | 2018-07-10 | 国网冀北电力有限公司唐山供电公司 | A kind of distribution overhead line lightning rod type insulator installation tool |
Also Published As
Publication number | Publication date |
---|---|
CN107947027A (en) | 2018-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105185566B (en) | Transformer high-voltage lead wire fabrication processing and its producing device | |
CN203217071U (en) | A current transformer experimental wiring device | |
CN112213361B (en) | A device and method for monitoring the corrosion and loosening of bolts in a transmission tower | |
CN105092380A (en) | Device for testing comprehensive performance of round wire concentric lay overhead electrical stranded conductor | |
CN207603091U (en) | A kind of distribution overhead line lightning rod type insulator installation tool | |
CN107947027B (en) | Installation method of lightning protection pin insulator installation tool for distribution overhead line | |
CN204205093U (en) | Electricity testing grounding ring | |
CN206894148U (en) | A kind of laborsaving high-voltage cable insulating layer stripper | |
CN202111410U (en) | High-voltage transmission line conductor butt joint and fixing device | |
CN206740045U (en) | Wire diameter measures specific purpose tool | |
CN203705482U (en) | Dedicated wiring clamping tool for testing insulating property of lightning arrester | |
CN204903302U (en) | Concentric turntable hollow wire comprehensive properties testing arrangement of circle line | |
CN211206567U (en) | A substation bus test wiring device | |
CN210466935U (en) | Power distribution network standardized transformer station teaching work instrument | |
CN208297561U (en) | A kind of rapid wiring device of the electrical pressure test of insulating tool | |
CN108365560B (en) | Semi-automatic replacement tool for jumper wire and hook wire clamp of overhead transmission line | |
CN208026767U (en) | A high-voltage pile head test device for plug-in transformers | |
CN206673143U (en) | A kind of Multifunction altitude test connection pincers | |
CN106644199A (en) | Real-time signal monitoring system-based electrodynamic force experimental measurement method | |
CN216310044U (en) | High-altitude wiring clamp | |
CN202817591U (en) | Connector for insulating operating lever and power-testing pen | |
CN207603162U (en) | A kind of novel hinge wire clamp | |
CN207730925U (en) | Electric energy meter field examines voltage sampling apparatus | |
CN203551668U (en) | An auxiliary ground resistance measuring apparatus | |
CN105717364B (en) | The measurement method of single lightning conducter iron pipe tower power frequency earthing resistance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |