CN107946968A - Method for reducing substation's temperature and dust content - Google Patents

Method for reducing substation's temperature and dust content Download PDF

Info

Publication number
CN107946968A
CN107946968A CN201711218420.7A CN201711218420A CN107946968A CN 107946968 A CN107946968 A CN 107946968A CN 201711218420 A CN201711218420 A CN 201711218420A CN 107946968 A CN107946968 A CN 107946968A
Authority
CN
China
Prior art keywords
water
substation
upper cover
temperature
vertical clapboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711218420.7A
Other languages
Chinese (zh)
Other versions
CN107946968B (en
Inventor
邱红光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lindian Chenhe Transformer Manufacturing Co.,Ltd.
Original Assignee
Ningbo Eaton Electric Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Eaton Electric Power Technology Co Ltd filed Critical Ningbo Eaton Electric Power Technology Co Ltd
Priority to CN201711218420.7A priority Critical patent/CN107946968B/en
Publication of CN107946968A publication Critical patent/CN107946968A/en
Application granted granted Critical
Publication of CN107946968B publication Critical patent/CN107946968B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/56Cooling; Ventilation
    • H02B1/565Cooling; Ventilation for cabinets
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/28Casings; Parts thereof or accessories therefor dustproof, splashproof, drip-proof, waterproof or flameproof

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The present patent application disclose it is a kind of be used for reduce substation's temperature and the method for dust content, be related to transmission & distribution electrical domain.Include the following steps:S1, connects tap water, water is flowed out from limit hole after water level is higher by limit hole by water inlet pipe;S2, transformation chamber and the cooling chamber than transformation cavity volume smaller are divided into using vertical clapboard and horizontal baffle by enclosure interior;S3, by substation's dedusting heat sink of this programme using opening upper cover after a period of time;S4, drives connecting rod to scrape water and lifts when upper cover is opened;S5, mixes the droplet that dust condenses in inner walls after the water evaporation that water is swept;S6, after upper cover is opened completely, remains in the droplet that water is scraped and flows into water outlet.This programme solves washes away the security risk that transformation case brings with water in the prior art, suitable for the cooling and dedusting of substation.

Description

Method for reducing substation's temperature and dust content
Technical field
It is more particularly to a kind of to be used to reduce substation's temperature and the method for dust content the present invention relates to transmission & distribution electrical domain.
Background technology
In order to reduce the loss of electric energy, transported when electric energy is transported by the way of high-voltage electricity, then close to use The place of electricity reduces voltage, therefore needs to use power transformation when exporting and high-voltage electricity being input to electricity consumption place electricity from power plant Stand.The capital equipment of substation is switch and transformer.Wherein switchgear includes breaker, and breaker is generally using lithium Sulphur breaker, sulfur hexafluoride breaker are a kind of breakers by the use of sulfur hexafluoride gas as arc-extinguishing medium and dielectric, Wherein sulfur hexafluoride is a kind of toxic gas for being slightly soluble in water.
Substation mainly by transformer come realize change voltage effect, and transformer to produce in operation copper loss and Iron loss, the loss of this two parts are completely converted into heat, make iron core and heating in winding, insulation ag(e)ing, influence transformer uses the longevity Life, therefore the temperature of winding is to ensure transformer safety, the vital task of normal operation during control transformer station high-voltage side bus.
Measuring transformer upper strata oil temperature is to monitor the main means of transformer winding temperature at present.In order to ensure power transformation station owner The safe operation of change, it is necessary to which auxiliary temperature-reducing is carried out to transforming plant main transformer of the upper strata oil temperature more than 80 DEG C.Chinese patent CN104319669B discloses a kind of substation with spray cooling device, including stores oil pit, positioned at the goose stored above oil pit Boulder bed, and the ground floor above pebble layer, and the main transformer on ground floor top surface, on the outer circumferential surface of main transformer Equipped with heat sink, which further includes a set of spray cooling device that mist cooling is carried out to heat sink, mist cooling dress Put including water source, compression pump, water-supply-pipe, spray equipment and pressure pump control apparatus;Spray equipment include horizontal spray tube and Nozzle, spray tube are fixed in half eminence of main transformer along the orientation of heat sink on main transformer with main transformer, and nozzle is along spray tube Axial direction be arranged in order, and one piece of heat sink on each nozzle face main transformer sprays heat sink;On compression pump Equipped with inlet opening and apopore, the inlet opening connection water source of compression pump, the first end of water-supply-pipe connects the apopore of compression pump, The second end connection spray tube of water-supply-pipe.
But cooled down using such scheme to transformer, due to directly rushing at heat sink using current, current may During impact security risk is caused into distribution box.
The content of the invention
It is a kind of for reducing substation's temperature and the method for dust content the invention is intended to provide, to solve in the prior art The security risk that transformation case brings is washed away with water.
It is real by following device in the method for reducing substation's temperature and dust content in using this programme It is existing:
The device includes housing, upper cover, water inlet pipe and limit hole, and the enclosure interior is equipped with partition plate, and the partition plate is by shell Internal body portion is transformation chamber and cooling chamber, and the partition plate includes vertical clapboard and horizontal baffle, and the horizontal baffle is to recessed Sunken bent plate, leaves the mortar joint for allowing dust to pass through between horizontal baffle and vertical clapboard, the water inlet pipe is arranged on horizontal baffle Top, the inner wall of the housing for the intracavitary that cools down are scraped equipped with water, and the water, which is scraped, is equipped with connecting rod, and the connecting rod connects upper cover, described Housing, which is equipped with, abuts the water outlet that water when upper cover is in opening is scraped.
Being used for of this programme dress reduces substation's temperature and the method for dust content includes the following steps:
S1, connects tap water, water is flowed out from limit hole after water level is higher by limit hole by water inlet pipe;
S2, transformation chamber and the drop than transformation cavity volume smaller are divided into using vertical clapboard and horizontal baffle by enclosure interior Warm chamber;
S3, by substation's dedusting heat sink of this programme using opening upper cover after a period of time;
S4, drives connecting rod to scrape water and lifts when upper cover is opened;
S5, mixes the droplet that dust condenses in inner walls after the water evaporation that water is swept;
S6, after upper cover is opened completely, remains in the droplet that water is scraped and flows into water outlet.
Using this programme when being used to reduce the method for substation's temperature and dust content, first by water inlet pipe connection originally Water, the heat that transformation intracavitary produces make the water on horizontal baffle accelerate evaporation, and heat is taken away during water evaporation, and evaporate Steam wraps the dust gone around in air, avoids dust accretions from influencing the heat dissipation of transformation intracavitary, and vapor encounters inner walls Condense into droplet to stay in housing, the droplet condensed into slides downwards from limit hole along housing and discharges, when opening upper cover is to shell When being overhauled in vivo, opening upper cover makes connecting rod drive water to scrape upward movement, and the droplet for staying in enclosure interior is scraped into water outlet.
Transformation chamber and cooling chamber separated with partition plate and avoids vapor and transformation intracavitary workpiece is made moist oxidation, to lower recess Horizontal baffle can fill more water compared to straight horizontal baffle so that the effect of evaporative heat loss is more preferable;The dust of transformation intracavitary It can be adsorbed onto on workpiece so that workpiece temperature reduction is slack-off, part dust can be right from transformation chamber into cooling chamber after setting mortar joint Taken away afterwards by vapor;Being arranged on the water inlet pipe above horizontal baffle can guide to current on horizontal baffle, the water then having more Discharged from limit hole, using the tap water of flowing water can be made to be always maintained at and ambient temperature compared to using water level detector this programme Unanimously, so as to strengthen cooling-down effect.
Housing is divided into cooling chamber and transformation chamber by this programme by partition plate, adds water to make water be subject to come from transformation chamber in cooling chamber Heat of vaporization, herein in connection with the dust in air while the vapor evaporated takes away heat, vapor run into housing condensation Into droplet, slide from housing and discharged again from limit hole, when upper cover is opened, water is scraped also to be taken up by the connecting rod being connected with upper cover So that remaining droplet is discharged from water outlet on housing, reach the mesh to the cooling of transformation case on the premise of current scour is not utilized 's.
Further, involved in step S5 to water scrape and be obliquely installed, the water outlet scrapes lowest point against water.Compared to level The water of setting is scraped, and the water being obliquely installed scrapes the droplet that can be controlled and be scraped and flows to lowest point, is discharged hence into water outlet.
Further, involved in step S2 to vertical clapboard be equipped with drainage trough, the drainage trough has storage condensation The condensate layer of water.Compared to the vertical clapboard of drainage trough is not provided with when there is condensed water on vertical clapboard, condensed water is along drainage Groove flows into condensate layer storage.
Further, involved in step S2 to vertical clapboard can be pulled down from housing.Compared to the vertical clapboard that cannot be removed Cleaned after taking-up simpler.
Further, involved in step S2 to the vertical clapboard be made of waterproof heat-conducting insulation material.Heat Conduction Material is more Easily the moisture of cooling intracavitary is then prevented to enter transformation chamber the heat transfer of transformation chamber to cooling chamber, vertical clapboard waterproof, Vertical clapboard can take moisture when in use, therefore prevent partition plate powered so as to ensure that the peace of staff using insulating materials Entirely.
Further, involved in step S3 to upper lid be equipped with venthole.It can be expelled directly out equipped with steam after venthole, The dust entered from venthole is pulled away also with the steam emerged from venthole.
Brief description of the drawings
Fig. 1 is the schematic perspective view that the embodiment upper cover of substation's dedusting heat sink of the present invention is opened;
Fig. 2 is the schematic perspective view that the embodiment upper cover of substation's dedusting heat sink of the present invention is closed;
Fig. 3 is that the embodiment of substation's dedusting heat sink of the present invention hides the schematic perspective view of housing;
Fig. 4 is the schematic perspective view of the embodiment cooling cavity segment of substation's dedusting heat sink of the present invention.
Embodiment
Below by the further details of explanation of embodiment:
Reference numeral in Figure of description includes:Housing 1, upper cover 2, water inlet pipe 3, limit hole 4, water outlet 5, water scrapes 6, Vertical clapboard 7, horizontal baffle 8, mortar joint 9, drainage trough 10, venthole 11, transformation chamber 12, cooling chamber 13.
Embodiment is basic as shown in attached drawing 1, attached drawing 2, attached drawing 3:
It is used to reduce substation's temperature and the method for dust content in the present embodiment, is realized by following device:
Including housing 1, upper cover 2, water inlet pipe 3 and limit hole 4, housing 1 is internally provided with partition plate, and partition plate is by 1 inside points of housing For transformation chamber 12 and cooling chamber 13, partition plate includes vertical clapboard 7 and horizontal baffle 8, and the material of partition plate is in the present embodiment TT700-5 rubber, vertical clapboard 7 are equipped with drainage trough 10, and drainage trough 10 has the condensate layer of storage condensed water, the present embodiment In drainage trough 10 be rectangular recess, 10 minimum point of drainage trough is one jiao of rectangular recess, and is set at this angle of minimum point There is the through hole for leading to condensate layer, vertical clapboard 7 can be pulled down from housing 1, and 7 side wall of vertical clapboard is equipped with protrusion in the present embodiment, The groove with male cooperation is equipped with housing 1 so that vertical clapboard 7 can be in movement in vertical direction, and horizontal baffle 8 is to recessed Sunken bent plate, leaves the mortar joint 9 for allowing dust to pass through between horizontal baffle 8 and vertical clapboard 7, water inlet pipe 3 is arranged on horizontal baffle 8 Top, 1 part of housing to cool down in chamber 13 scrape 6 equipped with water, and water is scraped 6 and is obliquely installed, and water scrapes the folder of 6 and horizontal plane in the present embodiment Angle is 7 °, and as shown in Figure 4, water outlet 5 scrapes the setting of 6 lowest points against water, and water scrapes 6 and is equipped with connecting rod, on the connecting rod connects Lid 2, the housing 1 are equipped with the water outlet 5 that the water abutted when upper cover 2 is in opening scrapes 6.
Being used for of this programme dress reduces substation's temperature and the method for dust content includes the following steps:
S1, connects tap water, water is flowed out from limit hole 4 after water level is higher by limit hole 4 by water inlet pipe 3;
S2, using vertical clapboard 7 and horizontal baffle 8 by 1 inside division of housing into transformation chamber 12 and than 12 volume of transformation chamber The cooling chamber 13 of smaller;
S3, upper cover 2 is opened after substation's dedusting heat sink of this programme is used a period of time;
S4, drives connecting rod that water is scraped 6 and lifts when upper cover 2 is opened;
S5, water mix the droplet that dust condenses in 1 inner wall of housing after scraping 6 water evaporations swept;
S6, after upper cover 2 is opened completely, remains in the droplet that water is scraped on 6 and flows into water outlet 5.
Using this programme substation's dedusting heat sink when, water inlet pipe 3 is first connected into tap water, is produced in transformation chamber 12 Heat water on horizontal baffle 8 is accelerated evaporation, heat is taken away during water evaporation, and the steam evaporated is wrapped in air The dust gone around, the heat dissipation for avoiding dust accretions from influencing in transformation chamber 12, vapor, which encounters 1 inner wall of housing and condenses into droplet, to be stayed In housing 1, the droplet condensed into along housing 1, from limit hole 4 discharge downwards by landing, and when opening, upper cover 2 is interior to housing 1 to be carried out During maintenance, opening upper cover 2 makes connecting rod drive water to scrape 6 upward movements, and the droplet stayed in inside housing 1 is scraped into water outlet 5.
Transformation chamber 12 and cooling chamber 13 separated with partition plate and avoids vapor and workpiece is made moist oxidation, to The horizontal baffle 8 of lower recess can fill more water compared to straight horizontal baffle 8 so that the effect of evaporative heat loss is more preferable;Inclination is set The water brush put scrapes 6 compared to horizontally disposed water, and the water being obliquely installed, which scrapes 6, can control the droplet scraped to flow to lowest point, from And it is discharged into water outlet 5;Drainage trough 10 is set to compare the vertical clapboard 7 for being not provided with drainage trough 10 on vertical clapboard 7 When having condensed water, condensed water flows into condensate layer storage along drainage trough 10;The vertical clapboard 7 that can be pulled down from housing 1 is not compared to The vertical clapboard 7 that can be removed cleans simpler after taking-up;Dust in transformation chamber 12 can be adsorbed onto on workpiece so that work The reduction of part temperature is slack-off, and part dust can enter cooling chamber 13 from transformation chamber 12 and then be taken away by vapor after setting mortar joint 9;If Current can be guided on horizontal baffle 8 by putting the water inlet pipe 3 above horizontal baffle 8, and the water then having more is discharged from limit hole 4, It is consistent with ambient temperature compared to that can be always maintained at water using the tap water of flowing using water level detector this programme, so as to strengthen Cooling-down effect.
Above-described is only the embodiment of the present invention, and the general knowledge such as known concrete structure and characteristic is not made herein in scheme Excessive description, technical field that the present invention belongs to is all before one skilled in the art know the applying date or priority date Ordinary technical knowledge, can know the prior art all in the field, and with using normal experiment hand before the date The ability of section, one skilled in the art can improve and implement under the enlightenment that the application provides with reference to self-ability This programme, some typical known features or known method should not implement the application as one skilled in the art Obstacle.It should be pointed out that for those skilled in the art, without departing from the structure of the invention, it can also make Go out several modifications and improvements, these should also be considered as protection scope of the present invention, these effects implemented all without the influence present invention Fruit and practical applicability.The scope of protection required by this application should be based on the content of the claims, the tool in specification The records such as body embodiment can be used for the content for explaining claim.

Claims (6)

1. for reducing substation's temperature and the method for dust content, it is characterised in that realized by following device:The device bag Include housing, upper cover, water inlet pipe and limit hole;
The enclosure interior is equipped with partition plate, and enclosure interior is divided into transformation chamber and cooling chamber by the partition plate, and the partition plate includes perpendicular Straight baffle and horizontal baffle, the horizontal baffle are downward concave bent plate, are left between horizontal baffle and vertical clapboard and allow ash The mortar joint that dirt passes through, the water inlet pipe are arranged on above horizontal baffle, and the inner wall of the housing for the intracavitary that cools down is scraped equipped with water, described Water, which is scraped, is equipped with connecting rod, and the connecting rod connects upper cover, and the housing is equipped with what the water abutted when upper cover is in opening was scraped Water outlet;
Include the following steps:
S1, connects tap water, water is flowed out from limit hole after water level is higher by limit hole by water inlet pipe;
S2, transformation chamber and the cooling than transformation cavity volume smaller are divided into using vertical clapboard and horizontal baffle by enclosure interior Chamber;
S3, by substation's dedusting heat sink of this programme using opening upper cover after a period of time;
S4, drives connecting rod to scrape water and lifts when upper cover is opened;
S5, mixes the droplet that dust condenses in inner walls after the water evaporation that water is swept;
S6, after upper cover is opened completely, remains in the droplet that water is scraped and flows into water outlet.
2. according to claim 1 be used to reduce substation's temperature and the method for dust content, it is characterised in that:Step S5 Involved in water scrape and be obliquely installed, the water outlet scrapes lowest point against water.
3. according to claim 1 be used to reduce substation's temperature and the method for dust content, it is characterised in that:Step S2 Involved in vertical clapboard be equipped with drainage trough, the drainage trough has the condensate layer of storage condensed water.
4. according to claim 1 be used to reduce substation's temperature and the method for dust content, it is characterised in that:Step S2 Involved in vertical clapboard can be pulled down from housing.
5. according to claim 1 be used to reduce substation's temperature and the method for dust content, it is characterised in that:Step S2 Involved in the vertical clapboard be made of waterproof heat-conducting insulation material.
6. according to claim 1 be used to reduce substation's temperature and the method for dust content, it is characterised in that:Step S3 Involved in upper lid be equipped with venthole.
CN201711218420.7A 2017-11-28 2017-11-28 For reducing the method for substation's temperature and dust content Active CN107946968B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711218420.7A CN107946968B (en) 2017-11-28 2017-11-28 For reducing the method for substation's temperature and dust content

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711218420.7A CN107946968B (en) 2017-11-28 2017-11-28 For reducing the method for substation's temperature and dust content

Publications (2)

Publication Number Publication Date
CN107946968A true CN107946968A (en) 2018-04-20
CN107946968B CN107946968B (en) 2019-07-09

Family

ID=61950332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711218420.7A Active CN107946968B (en) 2017-11-28 2017-11-28 For reducing the method for substation's temperature and dust content

Country Status (1)

Country Link
CN (1) CN107946968B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112152110A (en) * 2020-10-05 2020-12-29 胡晓霖 Electric power cabinet with vibration damping mount
CN117013377A (en) * 2023-06-30 2023-11-07 国网江苏省电力有限公司靖江市供电分公司 Box-type substation

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6374628B2 (en) * 2000-01-19 2002-04-23 Knuerr-Mechanik Fuer Die Elektronik Aktiengesellschaft Cooling device
CN203932718U (en) * 2014-04-22 2014-11-05 国家电网公司 A kind of band heater terminal box
CN205410838U (en) * 2016-02-20 2016-08-03 江中(北京)厨房设备工贸有限公司 Energy -concerving and environment -protective two door seafood steaming cabinet stove
CN104319669B (en) * 2014-10-30 2016-09-07 国网上海市电力公司 A kind of transformer station with spray cooling device
CN206628720U (en) * 2017-03-31 2017-11-10 国网宁夏电力公司宁东供电公司 High-tension switch cabinet heats dehumidification by condensation device
CN107671050A (en) * 2017-10-27 2018-02-09 天津城建大学 Automatically cleaning photovoltaic collecting system based on lotus leaf hydrophobicity principle
CN107834382A (en) * 2017-10-24 2018-03-23 郑州天舜电子技术有限公司 Water cooling radiating type power distribution panel
CN108934136A (en) * 2018-07-07 2018-12-04 国网安徽省电力有限公司淮北供电公司 A kind of electrical cabinet with moisture-proof construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6374628B2 (en) * 2000-01-19 2002-04-23 Knuerr-Mechanik Fuer Die Elektronik Aktiengesellschaft Cooling device
CN203932718U (en) * 2014-04-22 2014-11-05 国家电网公司 A kind of band heater terminal box
CN104319669B (en) * 2014-10-30 2016-09-07 国网上海市电力公司 A kind of transformer station with spray cooling device
CN205410838U (en) * 2016-02-20 2016-08-03 江中(北京)厨房设备工贸有限公司 Energy -concerving and environment -protective two door seafood steaming cabinet stove
CN206628720U (en) * 2017-03-31 2017-11-10 国网宁夏电力公司宁东供电公司 High-tension switch cabinet heats dehumidification by condensation device
CN107834382A (en) * 2017-10-24 2018-03-23 郑州天舜电子技术有限公司 Water cooling radiating type power distribution panel
CN107671050A (en) * 2017-10-27 2018-02-09 天津城建大学 Automatically cleaning photovoltaic collecting system based on lotus leaf hydrophobicity principle
CN108934136A (en) * 2018-07-07 2018-12-04 国网安徽省电力有限公司淮北供电公司 A kind of electrical cabinet with moisture-proof construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112152110A (en) * 2020-10-05 2020-12-29 胡晓霖 Electric power cabinet with vibration damping mount
CN117013377A (en) * 2023-06-30 2023-11-07 国网江苏省电力有限公司靖江市供电分公司 Box-type substation
CN117013377B (en) * 2023-06-30 2024-05-24 国网江苏省电力有限公司靖江市供电分公司 Box-type substation

Also Published As

Publication number Publication date
CN107946968B (en) 2019-07-09

Similar Documents

Publication Publication Date Title
CN107946968B (en) For reducing the method for substation's temperature and dust content
US20210203138A1 (en) Ventilation and heat dissipation box-type substation
CN107959248B (en) A kind of open air dust-proof radiating high-voltage appliance switch cabinet
CN210379786U (en) Low-voltage electrical equipment control cabinet
CN205646473U (en) Power switch cabinet dust removal dehumidification integrated device
CN107845967B (en) Substation's dedusting cooling device
CN211151197U (en) Stainless steel distribution box
CN104752997B (en) The cleaning device of overhead transmission line
CN211293025U (en) High-voltage intelligent integrated metering box
KR101362562B1 (en) A eaf roof with spray cooled type
CN110492367A (en) A kind of high voltage power distributing cabinet
CN116565736A (en) Fully-buried preassembled transformer substation
CN206864911U (en) A kind of waterproof electrical switch board
CN216720732U (en) Intelligent box-type substation
CN106786111B (en) A kind of micro- water treatment heating device of general GIS gas chamber
CN111430110B (en) Cooling system of power transformer of underground substation
CN108462063A (en) A kind of high-tension switch cabinet
CN208209263U (en) One kind having dehumidification function circuit system control cabinet
CN213635628U (en) Water cooling device for power transformer
CN108598949A (en) A kind of heat dissipation type power equipment box
KR20120126170A (en) System and Method For Preventing Condensing In The Underground Space
CN206432563U (en) A kind of 10KV switch cubicles of KYN28 12
CN206293795U (en) Top cover of box type transformer substation
CN220172614U (en) Dampproofing power cabinet device
CN219067526U (en) High-voltage distribution switch control equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240521

Address after: 163000, location of Hongqi Town Government in Lindian County, Daqing City, Heilongjiang Province

Patentee after: Lindian Chenhe Transformer Manufacturing Co.,Ltd.

Country or region after: China

Address before: Room 403, auxiliary building, Chuangye building, 66 academician Road, high tech Zone, Ningbo, Zhejiang 315000

Patentee before: NINGBO EATON POWER TECHNOLOGY CO.,LTD.

Country or region before: China