CN107944665A - A kind of Engineering Project Information Management System and method - Google Patents
A kind of Engineering Project Information Management System and method Download PDFInfo
- Publication number
- CN107944665A CN107944665A CN201711059515.9A CN201711059515A CN107944665A CN 107944665 A CN107944665 A CN 107944665A CN 201711059515 A CN201711059515 A CN 201711059515A CN 107944665 A CN107944665 A CN 107944665A
- Authority
- CN
- China
- Prior art keywords
- information
- contract
- equipment
- management
- management module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/10—Payment architectures specially adapted for electronic funds transfer [EFT] systems; specially adapted for home banking systems
- G06Q20/102—Bill distribution or payments
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
- G06Q40/125—Finance or payroll
Abstract
The present invention relates to a kind of Engineering Project Information Management System and method.The system includes contract management module, rough cost management module, financial management module and material equipment management module;The contract management module, for management contract essential information, clear form information, modification information and paying bill information;The rough cost management module, for defining budgetary estimate classification, and management budgetary estimate amount information;The financial management module, for carrying out voucher processing, accounting item management, fixed capital management and budget needed for the completion of projects;The material equipment management module, for managing goods and materials register information, equipment register information and equipment acceptance information.Technical solution provided by the invention has effectively integrated Budgetary Estimates, contract, cost and handling of goods and materials, can be by budget needed for the completion of projects flow day-to-day, the specification management of engineering project, improves the speed of completion of works final accounts.
Description
Technical field
The present invention relates to field of computer technology, more particularly to a kind of Engineering Project Information Management System and method.
Background technology
Currently, the information management of Larger Engineering Projects depends on import ERP software platform, although can be according to project
Demand adjusts platform parameters to adapt to disparity items, but limited to the multinomial key business integration ability of different engineering projects,
Such as Budgetary Estimates, contract, finance and material equipment etc., especially to final account of project, generally require the ability after completion of works
Carry out, substantial amounts of information, which will be overstock, to cause the efficiency of management to reduce, and final accounts flow is delayed, and increases extra expenses.
The content of the invention
A set of it disclosure satisfy that engineering project, especially airport engineering project estimation, contract, finance, goods and materials are set to establish
The key business processing demand such as standby and the engineering management business norms with uniformity, improve final account of project efficiency, reduce pipe
Cost is managed, the present invention provides a kind of Engineering Project Information Management System and method.
On the one hand, the present invention provides a kind of Engineering Project Information Management System, including contract management module, rough cost pipe
Manage module, financial management module and material equipment management module;
The contract management module, believes for management contract essential information, clear form information, modification information and paying bill
Breath;
The rough cost management module, for defining budgetary estimate classification, and management budgetary estimate amount information;
The financial management module, determines for carrying out voucher processing, accounting item management, fixed capital management and completion
Calculate;
The material equipment management module, for managing goods and materials register information, equipment register information and equipment acceptance information.
On the other hand, the present invention also provides one kind engineering project information is carried out using above-mentioned Engineering Project Information Management System
The method of management, described method includes following steps:
S10, contract management module management contract essential information, clear form information, modification information and paying bill information;
S20, rough cost management module define budgetary estimate classification, and management budgetary estimate amount information;
S30, financial management module carry out voucher processing, accounting item management, fixed capital management and budget needed for the completion of projects;
S40, material equipment management module management goods and materials register information, equipment register information and equipment acceptance information.
The beneficial effect of Engineering Project Information Management System provided by the invention and method is:By contract management module,
Rough cost management module, financial management module and material equipment management module have each key business link of engineering project
Collection, structuring and the integration of data are imitated, the precipitation of engineering project data is realized and shares, so that it is determined that to Budgetary Estimates, closing
The engineering management business norms of the business processing demands such as same, finance, material equipment and foundation with uniformity.Not only can be effectively
Capital management is carried out, is closely associated project data and financial data, while carried out successively in Process of Engineering Construction
Assets registration is being built, it can be achieved that the engineering later stage clearly, quickly carries out asset handover simultaneously ancillary works budget needed for the completion of projects, raising final accounts
Efficiency, reduces management cost.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are this hairs
Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, can be with
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of block diagram of Engineering Project Information Management System provided in an embodiment of the present invention;
Fig. 2 is a kind of block diagram for Engineering Project Information Management System that another embodiment of the present invention provides;
Fig. 3 is a kind of flow diagram of engineering project information management method provided in an embodiment of the present invention.
Embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and
It is non-to be used to limit the scope of the present invention.
As shown in Figure 1, a kind of Engineering Project Information Management System provided in an embodiment of the present invention include contract management module,
Rough cost management module, financial management module and material equipment management module.
The contract management module, believes for management contract essential information, clear form information, modification information and paying bill
Breath.
The rough cost management module, for defining budgetary estimate classification, and management budgetary estimate amount information.
The financial management module, determines for carrying out voucher processing, accounting item management, fixed capital management and completion
Calculate.
The material equipment management module, for managing goods and materials register information, equipment register information and equipment acceptance information.
Specifically, system uses the hardware configuration of server+disk array+magnetic tape station, and system operation is counted on server
According to program in disk array, can be read and write by magnetic tape station.The system using two-shipper, the configuration mode of cluster, can so not improve
Resource utilization, reduces operation expense.System uses B/S (browser/server Browser/Server) software architecture,
The software configuration of layer is respectively operating system (WINDOWS SERVER), database (ORACLE 11G), middleware from top to bottom
(ORACLE AS) and application software (Three Gorges high-tech company's T GPMS platforms).System uses internal lan fixed allocation IP, with
Disk array is attached (Direct Attached Storage Direct Attached Storage, note using DAS modes:Lead to by optical fiber
Road is connected with corresponding server), server in core router, fire wall by have disabled the side such as external IP and port access
Formula achievees the purpose that to isolate with internet.Disk array uses the storage solution of RAID5, data and corresponding thereto strange
Even parity check information is stored onto each disk, to improve fault-tolerance and security, by Mission Planning Program tune in operating system
Automatic duplicating of data is realized with BAT files, and periodically write-in magnetic tape station realizes the double copies of data, dual fail-safe.
In this embodiment, contract management module, rough cost management module, financial management module and material equipment pipe are passed through
Collection, structuring and integration that module carries out each key business link of engineering project valid data are managed, realizes engineering project number
According to precipitation and shared, so that it is determined that having to the business processing such as Budgetary Estimates, contract, finance, material equipment demand and foundation
The engineering management business norms of uniformity.Capital management can not only be effectively performed, closely by project data and financial data
Be associated, at the same carry out successively in Process of Engineering Construction build assets registration, it can be achieved that the engineering later stage it is clear, quickly into
Row asset handover and ancillary works budget needed for the completion of projects, improve final accounts efficiency, reduce management cost.
Preferably, the contract management module includes contract information typing unit, modification of contract typing unit and contract branch
Pay unit.
The contract information typing unit, for the contract information of receipt of contract typing people's typing, and contract approval people
To the state approval in-formation of the contract information, wherein, the contract information includes four layers of information, and first layer information is contract base
This information, including contract title, contract value, procurement method, contract classification, contractor unit, supervisor, other side bank of deposit and
Bank of deposit's account, second layer information are contract BOQ (schedule of prices Bill Of Quotation) item information, including contract collects
Inventory item and payment inventry item, third layer information is under all payment inventry item in price list information, including second layer information
Clear item names, the amount of money, quantity, unit price and mounting budgetary estimate code, the amount of money composition contract of all inventory items in third layer information
Total amount, the 4th layer of information are slender item of offering, including the device code information mounted under inventory item.
The modification of contract typing unit, for receiving the state approval in-formation when the contract information typing unit
When, change second layer information, third layer information and the 4th layer of information in the contract information.
The contract payment unit, for receiving the paying bill information submitted by contractor unit, supervisor to the branch
Pay single information msu message and owner's unit to the approval in-formation of the paying bill information, wherein, the paying bill packet
Paying bill front cover content and paying bill are included into this item.
Contract information typing needs by typing and approval, to improve the accuracy of information.In addition, have in contract information
Four layers of information fully incorporate the information such as the equipment of each inventory item in contract, code and the corresponding amount of money, during information inquiry,
Key message will not be omitted.After approving, two to four layers of information in contract information can be changed accordingly, such as payment inventry
Item is changed to payable state, and is settled accounts by contractor unit according to paying bill information.Contract payment list is sealed including paying bill
Face content and paying bill into this item, wherein paying bill front cover content include paying odd numbers, contract number, button advance payment, button quality guarantee gold,
Detain charges for water and electricity, applicant and approved by etc., paying bill into this item then for application specific contract information in inventory item, it is only necessary to
Fill in inventory item No. and quantity.Unit price is brought into by contract information, and total price is then multiplied by unit price according to quantity and draws.Calculate
Intuitive display, to improve work efficiency.
Preferably, the financial management module is specifically used for:
The credential information of accountant's typing is received, wherein, the credential information includes voucher numbering, voucher date, borrows
Borrow subject, credit amount, voucher description, mounting contract number and pay odd numbers.
Receive msu message of the auditor to the credential information.
Receive administrative staff to the credential information transfer items and billing information.
Financial management needs the co-operation by accountant, auditor and administrative staff, accountant's typing with
After card, the personnel for being responsible for examination & verification by Finance Department audit the voucher, and Finance Department vice general manager transfers items and settles accounts.Improve financial management this
The security and accuracy of one key business.
Preferably, the material equipment management module is specifically used for:
The equipment account information and equipment acceptance list information of user's typing are received, wherein, the equipment account information mounting
Under the inventory item of contract, including the numbering of equipment, price, unit, position and model.
Determine whether the equipment of application equipment money has checked and accepted.
When the equipment for applying for equipment money has been checked and accepted, the equipment amount of money is inserted into the paying bill of contract.
First by the account information of user's recording device, the positional information in account information being capable of accurate positioning equipment position
Put, facilitate assets during budget needed for the completion of projects to check.User applies for that equipment money needs the examination of progress equipment, it is necessary to fill in equipment acceptance
It is single, equipment state arrival is changed, chooses out the specific number of units of equipment acceptance, modification equipment state has been checked and accepted, after then ratifying
Printing device receipt, finally, the equipment amount of money are automatically inserted into the paying bill of contract.
Preferably, the material equipment management module is specifically additionally operable to:
The facility information typing assets of acceptance checkout equipment are registered into catalogue.
The contract inventory item being managed not as equipment is logged in and builds assets entry.
All devices register catalogue after examination automatically into assets, and not as the contract inventory that equipment is managed
Xiang Zeke, which is manually entered, is building assets entry, it is necessary first to carries out building assets registration, determines the fast code of assets, selection collects
The inventory item of contract under this assets, changes assets form.So as to complete budget needed for the completion of projects flow, and make budget needed for the completion of projects flow day
Normalizing, improves final accounts efficiency, reduces management cost.
Preferably, as shown in Fig. 2, in an alternative embodiment of the invention, which further includes coding and system management module
And document management module.
The coding and system management module, for generating unit number, device numbering and universal coding, and are used
Family authorizes and rights management.
The document management module, for management document register information.
Coding and system management module can compile each exploiting entity of engineering project, such as projects portion, division department
Number, to each equipment, such as checked and accepted, the engineering project equipment do not checked and accepted is numbered, to the generalized flowsheet in project management with
Specification etc. is encoded, and directly obtains corresponding information by call number, coding, while the user of different stage can also be authorized
System accesses the authority with management.Document management module can manage the various document information such as contract, voucher, registration form.
Coding and system management module and document management module can make each file of system more easily be numbered and register, and make to advise greatly
Mould, the regular job of hicap are more convenient with managing.
As shown in figure 3, the embodiment of the present invention also provides one kind carries out engineering using above-mentioned Engineering Project Information Management System
The method of project information management, this method comprises the following steps:
S10, contract management module management contract essential information, clear form information, modification information and paying bill information.
S20, rough cost management module define budgetary estimate classification, and management budgetary estimate amount information.
S30, financial management module carry out voucher processing, accounting item management, fixed capital management and budget needed for the completion of projects.
S40, material equipment management module management goods and materials register information, equipment register information and equipment acceptance information.
It should be noted that since said system incorporates the function of each module, the execution of above-mentioned steps S10 to S40 is suitable
Sequence can be according to actual use demand adjustment.
Preferably, step S10 specifically includes following sub-step:
S11, the contract information of contract information typing unit receipt of contract typing people's typing, and contract approval people is to described
The state approval in-formation of contract information, wherein, the contract information includes four layers of information, and first layer information is believed substantially for contract
Breath, including contract title, contract value, procurement method, contract classification, contractor unit, supervisor, other side bank of deposit and open an account
Row account, second layer information are BOQ information of contract, including contract collects inventory item and payment inventry item, and third layer information is
Clear item names, the amount of money, quantity, unit price and mounting in price list information, including second layer information under all payment inventry items
Budgetary estimate code, the amount of money composition total Value of Contract of all inventory items in third layer information, the 4th layer of information are slender item of offering, bag
Include the device code information mounted under inventory item.
S12, modification of contract typing unit become when the contract information typing unit receives the state approval in-formation
Second layer information, third layer information and the 4th layer of information in the contract information.
S13, contract payment unit receives the paying bill information submitted by contractor unit, supervisor believes the paying bill
The msu message of breath and owner's unit to the approval in-formation of the paying bill information, wherein, the paying bill information includes paying
Single front cover content and paying bill are into this item.
Preferably, step S30 specifically includes following sub-step:
S31, receives the credential information of accountant's typing, wherein, the credential information includes voucher numbering, voucher day
Phase, debt-credit subject, credit amount, voucher description, mounting contract number and payment odd numbers.
S32, receives msu message of the auditor to the credential information.
S33, receive administrative staff to the credential information transfer items and billing information.
Preferably, step S40 specifically includes following sub-step:
S41, receives the equipment account information and equipment acceptance list information of user's typing, wherein, the equipment account information
It is articulated under the inventory item of contract, including the numbering of equipment, price, unit, position and model.
S42, determines whether the equipment of application equipment money has checked and accepted.
S43, when the equipment for applying for equipment money has been checked and accepted, the equipment amount of money is inserted into the paying bill of contract.
The facility information typing assets of acceptance checkout equipment are registered catalogue by S44;The contract that will be managed not as equipment
Inventory item, which is logged in, builds assets entry.
Reader should be understood that in the description of this specification, reference term " one embodiment ", " some embodiments ", " show
The description of example ", " specific example " or " some examples " etc. mean to combine the specific features of the embodiment or example description, structure,
Material or feature are contained at least one embodiment of the present invention or example.In the present specification, above-mentioned term is shown
The statement of meaning property need not be directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described
It may be combined in any suitable manner in any one or more of the embodiments or examples.In addition, without conflicting with each other, this
The technical staff in field can be by the different embodiments or example described in this specification and different embodiments or exemplary spy
Sign is combined and combines.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent replacement, improvement and so on, should all be included in the protection scope of the present invention.
Claims (10)
- A kind of 1. Engineering Project Information Management System, it is characterised in that including contract management module, rough cost management module, Financial management module and material equipment management module;The contract management module, for management contract essential information, clear form information, modification information and paying bill information;The rough cost management module, for defining budgetary estimate classification, and management budgetary estimate amount information;The financial management module, for carrying out voucher processing, accounting item management, fixed capital management and budget needed for the completion of projects;The material equipment management module, for managing goods and materials register information, equipment register information and equipment acceptance information.
- 2. Engineering Project Information Management System according to claim 1, it is characterised in that the contract management module includes Contract information typing unit, modification of contract typing unit and contract payment unit;The contract information typing unit, for the contract information of receipt of contract typing people's typing, and contract approval people is to institute The state approval in-formation of contract information is stated, wherein, the contract information includes four layers of information, and first layer information is believed substantially for contract Breath, including contract title, contract value, procurement method, contract classification, contractor unit, supervisor, other side bank of deposit and open an account Row account, second layer information are BOQ information of contract, including contract collects inventory item and payment inventry item, and third layer information is Clear item names, the amount of money, quantity, unit price and mounting in price list information, including second layer information under all payment inventry items Budgetary estimate code, the amount of money composition total Value of Contract of all inventory items in third layer information, the 4th layer of information are slender item of offering, bag Include the device code information mounted under inventory item;The modification of contract typing unit, for when the contract information typing unit receives the state approval in-formation, Change second layer information, third layer information and the 4th layer of information in the contract information;The contract payment unit, for receiving the paying bill information submitted by contractor unit, supervisor to the paying bill The msu message of information and owner's unit to the approval in-formation of the paying bill information, wherein, the paying bill information includes branch Single front cover content and paying bill are paid into this item.
- 3. Engineering Project Information Management System according to claim 1, it is characterised in that the financial management module is specific For:The credential information of accountant's typing is received, wherein, the credential information includes voucher numbering, voucher date, debt-credit section Mesh, credit amount, voucher description, mounting contract number and payment odd numbers;Receive msu message of the auditor to the credential information;Receive administrative staff to the credential information transfer items and billing information.
- 4. Engineering Project Information Management System according to claim 1, it is characterised in that the material equipment management module It is specifically used for:The equipment account information and equipment acceptance list information of user's typing are received, wherein, the equipment account information is articulated in conjunction Under same inventory item, including the numbering of equipment, price, unit, position and model;Determine whether the equipment of application equipment money has checked and accepted;When the equipment for applying for equipment money has been checked and accepted, the equipment amount of money is inserted into the paying bill of contract.
- 5. Engineering Project Information Management System according to claim 4, it is characterised in that the material equipment management module Specifically it is additionally operable to:The facility information typing assets of acceptance checkout equipment are registered into catalogue;The contract inventory item being managed not as equipment is logged in and builds assets entry.
- 6. Engineering Project Information Management System according to any one of claims 1 to 5, it is characterised in that further include coding And system management module and document management module;The coding and system management module, for generating unit number, device numbering and universal coding, and carry out user and award Power and rights management;The document management module, for management document register information.
- 7. one kind carries out engineering project information using such as claim 1 to 6 any one of them Engineering Project Information Management System The method of management, it is characterised in that include the following steps:S10, contract management module management contract essential information, clear form information, modification information and paying bill information;S20, rough cost management module define budgetary estimate classification, and management budgetary estimate amount information;S30, financial management module carry out voucher processing, accounting item management, fixed capital management and budget needed for the completion of projects;S40, material equipment management module management goods and materials register information, equipment register information and equipment acceptance information.
- 8. the method for engineering project information management according to claim 7, it is characterised in that step S10 specifically include as Lower sub-step:S11, the contract information of contract information typing unit receipt of contract typing people's typing, and contract approval people is to the contract The state approval in-formation of information, wherein, the contract information includes four layers of information, and first layer information is contract essential information, bag Include contract title, contract value, procurement method, contract classification, contractor unit, supervisor, other side bank of deposit and bank of deposit's account Number, second layer information is BOQ information of contract, including contract collects inventory item and payment inventry item, and third layer information is quotation Clear item names, the amount of money, quantity, unit price and mounting budgetary estimate in single information, including second layer information under all payment inventry items Code, the amount of money composition total Value of Contract of all inventory items in third layer information, the 4th layer of information is slender item of offering, including clear The device code information mounted under individual event;S12, modification of contract typing unit change institute when the contract information typing unit receives the state approval in-formation State second layer information, third layer information and the 4th layer of information in contract information;S13, contract payment unit receive the paying bill information submitted by contractor unit, supervisor to the paying bill information Msu message and owner's unit to the approval in-formation of the paying bill information, wherein, the paying bill information includes paying bill envelope Face content and paying bill are into this item.
- 9. the method for engineering project information management according to claim 7, it is characterised in that step S30 specifically include as Lower sub-step:S31, receives the credential information of accountant's typing, wherein, the credential information includes voucher numbering, voucher date, borrows Borrow subject, credit amount, voucher description, mounting contract number and pay odd numbers;S32, receives msu message of the auditor to the credential information;S33, receive administrative staff to the credential information transfer items and billing information.
- 10. the method for engineering project information management according to claim 9, it is characterised in that step S40 specifically include as Lower sub-step:S41, receives the equipment account information and equipment acceptance list information of user's typing, wherein, the equipment account information mounting Under the inventory item of contract, including the numbering of equipment, price, unit, position and model;S42, determines whether the equipment of application equipment money has checked and accepted;S43, when the equipment for applying for equipment money has been checked and accepted, the equipment amount of money is inserted into the paying bill of contract;The facility information typing assets of acceptance checkout equipment are registered catalogue by S44;The contract inventory that will be managed not as equipment Item, which is logged in, builds assets entry.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711059515.9A CN107944665A (en) | 2017-11-01 | 2017-11-01 | A kind of Engineering Project Information Management System and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711059515.9A CN107944665A (en) | 2017-11-01 | 2017-11-01 | A kind of Engineering Project Information Management System and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107944665A true CN107944665A (en) | 2018-04-20 |
Family
ID=61933216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711059515.9A Pending CN107944665A (en) | 2017-11-01 | 2017-11-01 | A kind of Engineering Project Information Management System and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107944665A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108776888A (en) * | 2018-05-24 | 2018-11-09 | 合肥亿腾工程咨询有限公司 | A kind of information management system based on completion information |
CN109961269A (en) * | 2019-03-12 | 2019-07-02 | 佛山市均林人防工程有限公司 | A kind of project in construction management method |
CN110288326A (en) * | 2019-07-04 | 2019-09-27 | 广州发展集团股份有限公司 | Project cost based on ERP and TIM system is transferred items method and system |
CN110503386A (en) * | 2019-07-23 | 2019-11-26 | 国网河北能源技术服务有限公司 | A kind of data processing system for market-oriented project |
CN111274774A (en) * | 2020-01-19 | 2020-06-12 | 叶志 | Industrial building engineering full-process automatic management system |
CN111833025A (en) * | 2020-07-20 | 2020-10-27 | 上海上咨工程造价咨询有限公司 | Track cost management method, system and storage medium thereof |
CN113610408A (en) * | 2021-08-12 | 2021-11-05 | 上海土木信息科技有限公司 | Cost and budget management system based on enterprise cost element quota |
CN114841788A (en) * | 2022-05-23 | 2022-08-02 | 北京新机场建设指挥部 | Engineering project construction management completion settlement overall process management system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080027861A1 (en) * | 1999-11-04 | 2008-01-31 | Gendler Joseph | System and method for automatic financial project management |
CN101256647A (en) * | 2008-03-31 | 2008-09-03 | 上海星露信息科技有限公司 | Item management system being suitable for garden engineering |
CN103021219A (en) * | 2012-11-27 | 2013-04-03 | 四川省电力公司技术技能培训中心 | Intelligent simulation system for power ERP service |
CN105160467A (en) * | 2015-08-26 | 2015-12-16 | 长安马自达汽车有限公司 | Engineering change control management system and method therefor |
CN106096915A (en) * | 2016-06-08 | 2016-11-09 | 国网安徽省电力公司检修公司 | A kind of engineering project data handling system |
-
2017
- 2017-11-01 CN CN201711059515.9A patent/CN107944665A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080027861A1 (en) * | 1999-11-04 | 2008-01-31 | Gendler Joseph | System and method for automatic financial project management |
CN101256647A (en) * | 2008-03-31 | 2008-09-03 | 上海星露信息科技有限公司 | Item management system being suitable for garden engineering |
CN103021219A (en) * | 2012-11-27 | 2013-04-03 | 四川省电力公司技术技能培训中心 | Intelligent simulation system for power ERP service |
CN105160467A (en) * | 2015-08-26 | 2015-12-16 | 长安马自达汽车有限公司 | Engineering change control management system and method therefor |
CN106096915A (en) * | 2016-06-08 | 2016-11-09 | 国网安徽省电力公司检修公司 | A kind of engineering project data handling system |
Non-Patent Citations (1)
Title |
---|
毛颖 等: "《建筑装饰工程招投标与合同管理 第2版》", 31 March 2015 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108776888A (en) * | 2018-05-24 | 2018-11-09 | 合肥亿腾工程咨询有限公司 | A kind of information management system based on completion information |
CN109961269A (en) * | 2019-03-12 | 2019-07-02 | 佛山市均林人防工程有限公司 | A kind of project in construction management method |
CN110288326A (en) * | 2019-07-04 | 2019-09-27 | 广州发展集团股份有限公司 | Project cost based on ERP and TIM system is transferred items method and system |
CN110503386A (en) * | 2019-07-23 | 2019-11-26 | 国网河北能源技术服务有限公司 | A kind of data processing system for market-oriented project |
CN111274774A (en) * | 2020-01-19 | 2020-06-12 | 叶志 | Industrial building engineering full-process automatic management system |
CN111833025A (en) * | 2020-07-20 | 2020-10-27 | 上海上咨工程造价咨询有限公司 | Track cost management method, system and storage medium thereof |
CN111833025B (en) * | 2020-07-20 | 2023-12-01 | 上海上咨工程造价咨询有限公司 | Track cost management method, system and storage medium thereof |
CN113610408A (en) * | 2021-08-12 | 2021-11-05 | 上海土木信息科技有限公司 | Cost and budget management system based on enterprise cost element quota |
CN114841788A (en) * | 2022-05-23 | 2022-08-02 | 北京新机场建设指挥部 | Engineering project construction management completion settlement overall process management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107944665A (en) | A kind of Engineering Project Information Management System and method | |
AU2001256575B2 (en) | Method and apparatus for managing credit inquiries within account receivables | |
US7194431B1 (en) | Method and apparatus for managing remittance processing within account receivables | |
US6807533B1 (en) | Web-based method and system for managing account receivables | |
US8442917B1 (en) | Energy distribution and marketing backoffice system and method | |
US7177828B1 (en) | Method and apparatus for managing account receivables | |
CN102096886A (en) | Credit levying business system | |
CN102044044A (en) | Group credit granting business processing method based on credit granting business system | |
US20130246257A1 (en) | Energy distribution and marketing backoffice system and method | |
Hashim et al. | Treasury reference model | |
CN102063768A (en) | Electronic ticket system using financial account certificate as basis for ticket check and method thereof | |
CN102063687A (en) | Credit business processing method based on credit business levying system | |
US20180204288A1 (en) | Cash Flow Management System | |
Hashim et al. | Core Functional Requirements for Fiscal Management Systems | |
CN102044048A (en) | Comprehensive credit granting business treatment method based on credit checking and granting business system | |
Hegar | Texas Parks and Wildlife Department | |
CN102096854A (en) | Method for processing services during credit extension on the basis of levy credit extension service system | |
General | Report Number | |
Waluvengo | Towards Enterprise Architecture for Road Transport Administration in Kenya | |
CA2406596A1 (en) | Method and apparatus for managing account receivable claims | |
JP2003316935A (en) | Management support device, management support method, and computer-readable recording medium | |
Pat | International Tax Issues in Cyberspace: Taxation of Cross-Border electronic commerce | |
CN113888157A (en) | Financing lease management interaction system | |
Thattiyakul | Ticket sales information system of Sub-tawan Co., Ltd | |
Brittain et al. | Boosting the Bottom Line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180420 |