CN107942958B - A kind of industrial control system and method for internet of things oriented - Google Patents

A kind of industrial control system and method for internet of things oriented Download PDF

Info

Publication number
CN107942958B
CN107942958B CN201710954607.7A CN201710954607A CN107942958B CN 107942958 B CN107942958 B CN 107942958B CN 201710954607 A CN201710954607 A CN 201710954607A CN 107942958 B CN107942958 B CN 107942958B
Authority
CN
China
Prior art keywords
task
node
local
edge calculations
calculations server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710954607.7A
Other languages
Chinese (zh)
Other versions
CN107942958A (en
Inventor
许方敏
叶桓宇
赵成林
李斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Posts and Telecommunications
Original Assignee
Beijing University of Posts and Telecommunications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Posts and Telecommunications filed Critical Beijing University of Posts and Telecommunications
Priority to CN201710954607.7A priority Critical patent/CN107942958B/en
Publication of CN107942958A publication Critical patent/CN107942958A/en
Application granted granted Critical
Publication of CN107942958B publication Critical patent/CN107942958B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The present invention provides the industrial control system and method for a kind of internet of things oriented, and system includes local acquisition equipment, central controller, local computing node and edge calculations server node;Local acquisition equipment, for acquiring the data information of the product of local production equipment production and the performance information of local computing node;Central controller for the performance information according to the data information of product, the performance information of local computing node and edge calculations server node, and combines constraint condition, and the execution node of decision task is local computing node and/or edge calculations server node;Local computing node and edge calculations server node are used to the instruction according to central controller and the data information of product, execute task.System and method provided by the invention can effectively mitigate network data current load by the execution node of central controller decision tasks, improve information processing efficiency and algorithm speed, reduce due to calculating brought time delay.

Description

A kind of industrial control system and method for internet of things oriented
Technical field
The present invention relates to internet of things field, a kind of industrial control system more particularly, to internet of things oriented and Method.
Background technique
With the transformation and upgrade of intelligence manufacture and industrial equipment, need to collection in worksite to data information carry out various points Analysis processing, to assist some decisions.Such as on the production line of factory.To product, whether qualification makes inspection, it is necessary to adopt Collect the data information of the product, such as shape characteristic and compressive property etc., and these data informations are analyzed and processed, in turn Judge whether the product is qualified.
But whether each product is qualified related with many factors, this just needs a variety of data of carry out to each product The acquisition of information, also, the product that production line produces daily is thousands of, and this just needs us to carry out data letter to numerous products The acquisition of breath.But conventional production equipment is limited to the analysis processing capacity of product data information, it cannot be in time to product number It is believed that breath is analyzed and processed to obtain result.
Summary of the invention
The present invention provide it is a kind of overcome in the prior art conventional production equipment to the analysis processing capacity of product data information It is limited, product data information cannot be analyzed and processed in time to obtain the Industry Control of the internet of things oriented of ramification problem System and method.
According to an aspect of the present invention, a kind of industrial control system of internet of things oriented is provided, the system comprises this Ground acquires equipment, central controller, local computing node and edge calculations server node;The local acquisition equipment, is used for Acquire the data information of the product of local production equipment production and the performance information of the local computing node;The center control Device, for according to the data information of the product, the performance information of the local computing node and the edge calculations server The performance information of node, and constraint condition is combined, the execution node of decision task is the local computing node and/or the side Edge calculation server node;The local computing node, for according to the instruction of the central controller and the number of the product It is believed that breath, executes the task;The edge calculations server node, for according to the instruction of the central controller and described The data information of product executes the task.
Preferably, the constraint condition is any one in the following conditions:
The time-consuming for executing the task is most short;The energy consumption for executing the task is minimum;Execute the time-consuming and energy of the task Consumption reaches optimal balance point.
Preferably, the central controller regularly sends the result of decision to the local computing node and the edge meter Calculate server node.
Preferably, the local acquisition equipment is also used to obtain the parameter information of the local production equipment;The system It further include device controller, the device controller, for receiving the implementing result of the task, and according to the implementing result With the parameter information of the local production equipment, the operating status of the local production equipment is controlled.
According to another aspect of the present invention, a kind of industrial control method of internet of things oriented is provided, which comprises S1 obtains the data information of product, the performance information of local computing node and the edge calculations service of local production equipment production The performance information of device node;S2, according to the data information of the product, the performance information of the local computing node and the side The performance information of edge calculation server node, and constraint condition is combined, the execution node of decision task is the local computing section Point and/or the edge calculations server node.
Preferably, the method also includes S3, receive the implementing result of the task, and according to the implementing result and The parameter information of the local production equipment controls the operating status of the local production equipment.
Preferably, step S2 is specifically included:
If the constraint condition is that the time-consuming of the execution task is most short, the local computing node is executed into described appoint The total time-consuming amount of business, the total time-consuming amount for executing the task with the edge calculations server node is compared, by executing The shorter node of the total time-consuming amount of task is stated, as the execution node;
If the constraint condition is to execute the energy consumption minimum of the task, the local computing node is executed into described appoint The energy input of business, the energy input for executing the task with the edge calculations server node are compared, and will execute described appoint The lesser node of the energy input of business, as the execution node;
If the constraint condition is that the time-consuming for executing the task and energy consumption reach optimal balance point, according to the local Calculate node executes the total time-consuming amount of the task and its weight, the edge calculations server node execute the total of the task Time-consuming amount and its weight, the local computing node execute energy input and its weight and the edge calculations service of the task Device node executes the energy input and its weight of the task, determines the execution node.
Preferably, the edge calculations server node executes the total time-consuming amount of the task, is obtained by following parameter:
T is measured in the data information transfer of the product to the time-consuming of the edge calculations server nodeTransData, described Be engaged in the queuing delay amount D in the edge calculations server nodeQueue, the edge calculations server node execution is described to appoint The time-consuming amount D of businessRemoteWhen the implementing result being sent to the passback of device controller with the edge calculations server node The amount of prolonging DResult
Preferably, the local computing node executes the energy input W of the taskLocalFor,
Wherein, k=10-26,fi lThe computer in the local computing node is represented for i-th The CPU that a task can be assigned to calculates frequency, Fi lIndicate the maximum cpu frequency that computer can reach, CiIt has indicated At the computer CPU periodicity that i-th of task needs, TiIndicate the peak response time delay that i-th of task allows, i is positive integer;
The edge calculations server node executes the energy input W of the taskRemoteFor,
Wherein, PtrFor send and receive the product data information power, DiThe data volume of i-th of task is represented, VLocalIndicate the port speed of the local data information sending port, i is positive integer.
Preferably, the value range of the weight is 0~1.
The industrial control system and method for a kind of internet of things oriented provided by the invention, pass through central controller decision tasks Execution node, can effectively mitigate network data current load, improve information processing efficiency and algorithm speed, reduce due to meter Time delay brought by calculating.
Detailed description of the invention
Fig. 1 is according to a kind of structural schematic diagram of the industrial control system of internet of things oriented provided in an embodiment of the present invention;
Fig. 2 is according to a kind of task execution node of the industrial control system of internet of things oriented provided in an embodiment of the present invention Decision process timing diagram;
Fig. 3 is according to provided in an embodiment of the present invention a kind of in the case where executing node is edge calculations server node The timing diagram of industrial control process;
Fig. 4 is according to a kind of industry in the case where executing node and being local computing node provided in an embodiment of the present invention The timing diagram of control process;
Fig. 5 be according to it is provided in an embodiment of the present invention it is a kind of executing node be local computing node and edge calculations service The timing diagram of industrial control process in the case where device node;
Fig. 6 is according to a kind of flow chart of the industrial control method of internet of things oriented provided in an embodiment of the present invention.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
In order to mitigate network data current load, information processing efficiency and algorithm speed are improved, reduces and is brought by calculating Time delay, the present invention provides a kind of industrial control system of internet of things oriented and methods.The embodiment of the present invention answers the system For in the production line of factory, mainly using the system to carry out quality testing to the product on production line.
Fig. 1 be according to a kind of structural schematic diagram of the industrial control system of internet of things oriented provided in an embodiment of the present invention, As shown in Figure 1, the system comprises local acquisition equipment, central controller, local computing node and edge calculations server sections Point;The local acquisition equipment, the data information and the local computing section of the product for acquiring local production equipment production The performance information of point;The central controller, for the performance according to the data information of the product, the local computing node The performance information of information and the edge calculations server node, and constraint condition is combined, the execution node of decision task is institute State local computing node and/or the edge calculations server node;The local computing node, for being controlled according to the center The instruction of device processed and the data information of the product, execute the task;The edge calculations server node, for according to institute Instruction and the data information of the product for stating central controller, execute the task.
Specifically, local acquisition equipment is used to obtain the data information and local computing of the product of local production equipment production The performance information of node.
Wherein, local production equipment refers to: such as press machine and bonding machine are used to produce the mechanical equipment of product.
The data information of product refers to: the topographical property and compressive property reactor product of such as product whether a He Ge system Column index.
The performance information of local computing node and edge calculations server node refers both to: in CPU calculating frequency, computer It deposits, a series of hardware device performance indicators such as computer video memory and hard disk reading rate.
Local acquisition equipment typically refers to sensor, and the type of sensor is varied, can be to same on production line Product carries out the acquisition of a variety of data informations, and the type of data information is chosen according to the production of factory, common to pass Sensor includes but is not limited to: temperature sensor, humidity sensor and air quality sensor, the present embodiment are not construed as limiting this.
Specifically, central controller, for the performance information and edge according to the data information of product, local computing node The performance information of calculation server node, and combine constraint condition, the execution node of decision task.Wherein, executing node can be with For any one place in local computing node and edge calculations server node, or local computing node and edge calculations Server node.
It should be noted that when central controller enforcement of the judgment node is only edge calculations server node, edge meter Server node is calculated by according to the data information of product, executes task.Wherein, task can be with are as follows: to the data information of product into Row analysis processing, therefore, it is determined that whether product is qualified.Task preferably only being determined to, whether product is qualified herein, the present embodiment pair The concrete meaning of task is not construed as limiting.
It is simultaneously that local computing node and edge calculations server node refer to when executing node: task is transferred into local meter Operator node and edge calculations server process, central controller respectively need local computing node and edge calculations server node Subtask to be processed distributes.Local computing node and edge calculations server node according to the subtask that need to respectively handle, It obtains the implementing result of subtask, and respective subtask implementing result is summarized.
A kind of industrial control system of internet of things oriented provided in this embodiment, passes through holding for central controller decision tasks Row node can effectively mitigate network data current load, improve information processing efficiency and algorithm speed, reduce by calculating institute Bring time delay.
Based on the above embodiment, the constraint condition in above-described embodiment is specifically described in the present embodiment, the constraint Condition is any one in the following conditions: the time-consuming for executing the task is most short;The energy consumption for executing the task is minimum;It executes The time-consuming and energy consumption of the task reach optimal balance point.
Specifically, for various boundary conditions, central controller is different for the court verdict of task execution node.
Wherein, the time-consuming and energy consumption that execute task reach the optimal balance point in optimal balance point, examine according to actual needs Consider and determines.
A kind of industrial control system of internet of things oriented provided in this embodiment can pass through choosing by introducing constraint condition Different task execution nodes is taken, to realize that task execution time-consuming amount, energy input are minimum or time-consuming measure reaches simultaneously with energy input Optimal balance point.
Based on the above embodiment, the central controller in the present embodiment regularly sends the result of decision to the local Calculate node and the edge calculations server node.
Wherein, the result of decision are as follows: the execution node of task is only local computing node;The execution node of task is only edge Calculation server node;The execution node of task is local computing node and edge calculations server node.
A kind of industrial control system of internet of things oriented provided in this embodiment, central controller is by determining the result of decision When be sent to local computing node and edge calculations server node, can effectively mitigate network data current load, improve letter Treatment effeciency and algorithm speed are ceased, is reduced due to calculating brought time delay
Based on the above embodiment, the local acquisition equipment in the present embodiment is also used to obtain the local production equipment Parameter information;The system also includes device controller, the device controller, for receiving the execution knot of the task Fruit, and according to the parameter information of the implementing result and the local production equipment, control the operation of the local production equipment State.
Specifically, the parameter information of local production equipment refers to: the working condition of local production equipment, environment temperature and wet A series of indexs for measuring production equipment state such as degree.
Specifically, device controller receives the implementing result of task, and according to the ginseng of implementing result and local production equipment Number information controls the operating status of local production equipment, and then to obtain the product for meeting Eligibility requirements.
As a preferred embodiment, the present embodiment combination attached drawing and by specifically illustrating, to central controller to appointing The decision process that business executes node, which is made, to be illustrated.
Fig. 2 is according to a kind of task execution node of the industrial control system of internet of things oriented provided in an embodiment of the present invention Decision process timing diagram, as shown in Fig. 2, local computing unit and Local Communication Module are the built-in mould of local computing node Block, edge communications module and edge calculations unit are the built-in module in edge calculations server node.
The performance information of the data information of product and local computing node is passed through Local Communication Module by local computing unit It is sent to edge communications module.It should be noted that Local Communication Module passes through communication network for the data information of product and this The performance information of ground calculate node is sent to central controller, wherein communication network can be Industrial Ethernet, wireless ether One of net, Wifi wireless network, 3G network and 4G network are a variety of.
After edge communications module receives the data information of product and the performance information of local computing node, by product The performance information of data information and local computing node is sent to central controller.Also, edge calculations unit is by the property of itself Energy information is sent to central controller.
Central controller is according to the data information of the product received, the performance information and edge calculations of local computing node The performance information of unit is sent, the execution node of decision task, and by the result of decision, that is, task execution node feeding back to local Computing unit and edge calculations server node.To which local computing unit updates policy database according to the result of decision.
Fig. 3 is according to provided in an embodiment of the present invention a kind of in the case where executing node is edge calculations server node The timing diagram of industrial control process, as shown in figure 3, local computing unit has been received that appointing for central controller feedback at this time Business executes the court verdict of node, and it is edge calculations server node that this court verdict decision tasks, which executes node,.Then count The data information for the product that will acquire according to acquisition equipment is sent to edge communications module, the product that edge communications module will receive Data information be sent to edge calculations unit, edge calculations unit carries out at analysis according to the data information of the product received The implementing result of task is fed back to device controller to execute task by reason.Device controller according to the implementing result of task, Adjust the operating status of production equipment.
Fig. 4 is according to a kind of industry in the case where executing node and being local computing node provided in an embodiment of the present invention The timing diagram of control process, as shown in figure 4, local computing unit has been received that the task of central controller feedback is held at this time The court verdict of row node, and it is local computing node that this court verdict decision tasks, which executes node,.Then data acquisition equipment The data information for the product that will acquire is sent to local computing unit, and local computing unit is believed according to the data of the product received Breath is analyzed and processed to execute task, and the implementing result of task is fed back to device controller.Device controller according to appoint The implementing result of business adjusts the operating status of production equipment.
Fig. 5 be according to it is provided in an embodiment of the present invention it is a kind of executing node be local computing node and edge calculations service The timing diagram of industrial control process in the case where device node, as shown in figure 5, during local computing unit has been received that at this time The court verdict of the task execution node of controller feedback is entreated, and it is local computing that this court verdict decision tasks, which executes node, Node and edge calculations server node.Then central controller transfers to task at local computing node and edge calculations server Reason, and respectively subtask to be treated distributes by local computing node and edge calculations server node.Local computing section Point and edge calculations server node obtain the implementing result of respective subtask according to the subtask that need to respectively handle, and will be each Local computing unit is summarized in from the implementing result of subtask.Task action result is fed back to equipment control by local computing unit Device, device controller adjust the operating status of production equipment according to the implementing result of task.
Based on the above embodiment, the present embodiment provides a kind of industrial control method of internet of things oriented, Fig. 6 is according to this hair A kind of flow chart of the industrial control method for internet of things oriented that bright embodiment provides, as shown in Figure 6, which comprises
S1 obtains the data information of the product of local production equipment production, the performance information and edge of local computing node The performance information of calculation server node;
S2 takes according to the data information of the product, the performance information of the local computing node and the edge calculations The performance information of business device node, and constraint condition is combined, the execution node of decision task is the local computing node and/or institute State edge calculations server node.
Wherein, the data information of product, the performance information of local computing node, edge calculations of local production equipment production Performance information, constraint condition and the task of server node have made specific explanations in the above-described embodiments, the present embodiment to this not It repeats again.
A kind of industrial control method of internet of things oriented provided in this embodiment, passes through holding for central controller decision tasks Row node can effectively mitigate network data current load, improve information processing efficiency and algorithm speed, reduce by calculating institute Bring time delay.
Based on the above embodiment, the industrial control method of one of the present embodiment internet of things oriented further include:
S3 receives the implementing result of the task, and according to the parameter of the implementing result and the local production equipment Information controls the operating status of the local production equipment.
Based on the above embodiment, step S2 is specifically described in the present embodiment.Step S2 is specifically included:
If the constraint condition is that the time-consuming of the execution task is most short, the local computing node is executed into described appoint The total time-consuming amount of business, the total time-consuming amount for executing the task with the edge calculations server node is compared, by executing The shorter node of the total time-consuming amount of task is stated, as the execution node;
If the constraint condition is to execute the energy consumption minimum of the task, the local computing node is executed into described appoint The energy input of business, the energy input for executing the task with the edge calculations server node are compared, and will execute described appoint The lesser node of the energy input of business, as the execution node;
If the constraint condition is that the time-consuming for executing the task and energy consumption reach optimal balance point, according to the local Calculate node executes the total time-consuming amount of the task and its weight, the edge calculations server node execute the total of the task Time-consuming amount and its weight, the local computing node execute energy input and its weight and the edge calculations service of the task Device node executes the energy input and its weight of the task, determines the execution node.
A kind of industrial control method of internet of things oriented provided in this embodiment can pass through choosing by introducing constraint condition Different task execution nodes is taken, to realize that task execution time-consuming amount, energy input are minimum or time-consuming measure reaches simultaneously with energy input Optimal balance point.
Based on the above embodiment, the present embodiment executes the task to edge calculations server node in above-described embodiment Total time-consuming amount is specifically described.The edge calculations server node executes the total time-consuming amount of the task, passes through following ginseng Number obtains:
T is measured in the data information transfer of the product to the time-consuming of the edge calculations server nodeTransData, described Be engaged in the queuing delay amount D in the edge calculations server nodeQueue, the edge calculations server node execution is described to appoint The time-consuming amount D of businessRemoteWhen the implementing result being sent to the passback of device controller with the edge calculations server node The amount of prolonging DResult
As a preferred embodiment, the present embodiment to the industrial control method of the internet of things oriented in above-described embodiment into Row illustrates.
If constraint condition is that the time-consuming of execution task is most short, the time-consuming that local computing node executes task is calculated separately out Amount executes the time-consuming of task with edge calculations server node and measures, and the time-consuming amount of the two is compared, and time-consuming amount is shorter Node as task execution node.Central controller will execute decision process according to following manner:
As satisfaction (1-1), execution node is edge calculations server node;As satisfaction (1-2), executing node is this Ground calculate node.
Wherein,DLocalThe total time-consuming amount of task, f are executed for local computing nodei lRepresent local computing section Computer in point calculates frequency (periodicity) for the CPU that i-th of task can be assigned to, CiIt indicates to complete i-th The computer CPU periodicity that business needs.
Wherein,TTransDataFor product data information transfer to institute State the time-consuming amount of edge calculations server node, Sl i-DataRefer to the size of task scale, VLocalIndicate local data information The port speed of sending port, unit Mbps, DiFor the size of data packet, unit byte,In, W represents local computing node to the bandwidth between edge calculations server node, and unit Mbps, p represent transimission power, hiGeneration The gain of table channel, N0Indicate the Noise Parameters in channel,For the Signal to Noise Ratio (SNR) of channel.
Wherein,DQueueWhen the queuing for being task in edge calculations server node The amount of prolonging, ∑ Sr i-DataIndicate the total size of all tasks currently in the processing queue of edge calculations server node task, ∑ Ci Total periodicity is calculated for the CPU of the required by task in server queue,Edge calculation server node computing capability is represented, fi rIndicate the CPU calculating cycle number that edge calculations server node is capable of providing.
Wherein,DRemoteThe time-consuming amount of the task, C are executed for edge calculations server nodeiIt indicates Complete the computer CPU periodicity of i-th of task needs, fi rIndicate that the CPU that edge calculations server node is capable of providing is calculated Periodicity.
Wherein,SResultIndicate calculated result size, usually, SResultSize meeting It is proportional to calculative data volume Sl i-Data, i.e. Sl i-DataBigger SResultAlso bigger;VRemoteIndicate Edge Server data The port speed of information transmitting terminal mouth, unit Mbps.
Based on the above embodiment, local computing node described in the present embodiment executes the energy input W of the taskLocalAre as follows:
WLocal=k (fi l)2Ci
Wherein, k=10-26,fi lRepresenting the local computing node can for i-th of task The CPU being assigned to calculates frequency, Fi lIndicate the maximum cpu frequency that computer can reach, CiIndicate that completing i-th of task needs The computer CPU periodicity wanted, TiIndicate the peak response time delay that i-th of task allows, i is positive integer;
The edge calculations server node executes the energy input W of the taskRemoteAre as follows:
Wherein, PtrFor send and receive the product data information power, DiThe data volume of i-th of task is represented, VLocalIndicate the port speed of the local data information sending port, i is positive integer.
Specifically, if the constraint condition is to execute the energy consumption minimum of the task.Then calculate separately out local computing section The energy input and edge calculations server node of point execution task execute the energy input of task, and the energy input of the two is compared It is right, using the lesser node of energy input as task execution node.Energy consumption refers to various equipment during the work time, in order to support It calculates, transmission, store and radiate and use electric energy.In factory local, if to improve the computing capability of local computing node, just It is intended to extend production equipment operating time or increase to calculate equipment, both schemes will lead to equipment energy consumption It improves, and due to the working characteristics of equipment, distinct device energy consumption is also not quite similar, it is difficult to which logarithm carries out unified quantization;Relatively In local computing node, the energy consumption of edge calculations server node is not the focal point of user, edge calculations server node Energy consumption cost be already contained in rental service price.Central controller will execute decision process according to following manner:
As satisfaction (2-1), execution node is edge calculations server node;As satisfaction (2-2), executing node is this Ground calculate node.
Wherein, WLocalIndicate the energy consumption of local computing node;WRemoteIndicate the energy consumption of edge calculations server node.
Based on the above embodiment, the value range of the weight in the present embodiment is 0~1.
Specifically, if the constraint condition is that the time-consuming for executing the task and energy consumption reach optimal balance point, usually Different weights is assigned to two kinds of judgment conditions mentioned above, determines final strategy by comprehensively considering.Specific judgement item Part are as follows:
As satisfaction (3-1), execution node is edge calculations server node;As satisfaction (3-2), executing node is this Ground calculate node.
Wherein, DLocalThe total time-consuming amount of task, D are executed for local computing nodeRemoteIt is held for edge calculations server node The total time-consuming amount of row task, WLocalThe energy input of task, W are executed for local computing nodeRemoteFor edge calculations server node The energy input of execution task, x are weight.
It should be noted that if local production equipment is non-mobile device, since it is mostly to be directly connected to power supply, then The value range of weight is 0~0.5;If local production equipment is mobile device, since the loss of its power supply is irreversibility, Then the value range of weight is 0.5~1.
The industrial control system and method for a kind of internet of things oriented provided in this embodiment are appointed by central controller judgement The execution node of business, can effectively mitigate network data current load, improve information processing efficiency and algorithm speed, reduce due to Time delay brought by calculating.
Finally, method of the invention is only preferable embodiment, it is not intended to limit the scope of the present invention.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in protection of the invention Within the scope of.

Claims (6)

1. a kind of industrial control system of internet of things oriented, which is characterized in that acquire equipment, central controller, sheet including local Ground calculate node and edge calculations server node;
The local acquisition equipment, the data information and the local computing section of the product for acquiring local production equipment production The performance information of point;
The central controller, for according to the data information of the product, the performance information of the local computing node and institute The performance information of edge calculations server node is stated, and combines constraint condition, the execution node of decision task is the local meter Operator node and/or the edge calculations server node;
The local computing node, for executing institute according to the instruction of the central controller and the data information of the product State task;
The edge calculations server node, for according to the central controller instruction and the product data information, Execute the task;
If the constraint condition is that the time-consuming of the execution task is most short, the local computing node is executed into the task Total time-consuming amount, the total time-consuming amount for executing the task with the edge calculations server node are compared, and will execute described appoint The shorter node of the total time-consuming amount of business, as the execution node;
If the constraint condition is to execute the energy consumption minimum of the task, the local computing node is executed into the task Energy input, the energy input for executing the task with the edge calculations server node are compared, and will execute the task The lesser node of energy input, as the execution node;
If the constraint condition is that the time-consuming for executing the task and energy consumption reach optimal balance point, according to the local computing Node executes the total time-consuming amount of the task and its weight, the edge calculations server node execute the total time-consuming of the task Amount and its weight, the local computing node execute the energy input and its weight and the edge calculations server section of the task Point executes the energy input and its weight of the task, determines the execution node;
The edge calculations server node executes the total time-consuming amount of the task, is obtained by following parameter:
T is measured in the data information transfer of the product to the time-consuming of the edge calculations server nodeTransData, the task exists Queuing delay amount D in the edge calculations server nodeQueue, the edge calculations server node executes the task Time-consuming amount DRemoteThe implementing result is sent to the passback delay volume of device controller with the edge calculations server node DResult
The local computing node executes the energy input W of the taskLocalFor,
WLocal=k (fi l)2Ci
Wherein, k=10-26,fi lThe computer in the local computing node is represented for i-th of task The CPU that can be assigned to calculates frequency, Fi lIndicate the maximum cpu frequency that computer can reach, CiIt indicates to complete i-th The computer CPU periodicity that task needs, TiIndicate the peak response time delay that i-th of task allows, i is positive integer;
The edge calculations server node executes the energy input W of the taskRemoteFor,
Wherein, PtrFor send and receive the product data information power, DiRepresent the data volume of i-th of task, VLocal Indicate the port speed of the local data information sending port, i is positive integer.
2. system according to claim 1, which is characterized in that the constraint condition is any one in the following conditions:
The time-consuming for executing the task is most short;The energy consumption for executing the task is minimum;The time-consuming and energy consumption for executing the task reach To optimal balance point.
3. system according to claim 2, which is characterized in that the central controller regularly sends the result of decision to institute State local computing node and the edge calculations server node.
4. system according to claim 3, which is characterized in that the local acquisition equipment is also used to obtain described local raw Produce the parameter information of equipment;
The system also includes device controller, the device controller, for receiving the implementing result of the task, and according to The parameter information of the implementing result and the local production equipment controls the operating status of the local production equipment.
5. a kind of industrial control method of internet of things oriented characterized by comprising
S1 obtains the data information of the product of local production equipment production, the performance information and edge calculations of local computing node The performance information of server node;
S2, according to the data information of the product, the performance information and the edge calculations server of the local computing node The performance information of node, and constraint condition is combined, the execution node of decision task is the local computing node and/or the side Edge calculation server node;
Further include:
S3, receives the implementing result of the task, and according to the parameter information of the implementing result and the local production equipment, Control the operating status of the local production equipment;
Step S2 is specifically included:
If the constraint condition is that the time-consuming of the execution task is most short, the local computing node is executed into the task Total time-consuming amount, the total time-consuming amount for executing the task with the edge calculations server node are compared, and will execute described appoint The shorter node of the total time-consuming amount of business, as the execution node;
If the constraint condition is to execute the energy consumption minimum of the task, the local computing node is executed into the task Energy input, the energy input for executing the task with the edge calculations server node are compared, and will execute the task The lesser node of energy input, as the execution node;
If the constraint condition is that the time-consuming for executing the task and energy consumption reach optimal balance point, according to the local computing Node executes the total time-consuming amount of the task and its weight, the edge calculations server node execute the total time-consuming of the task Amount and its weight, the local computing node execute the energy input and its weight and the edge calculations server section of the task Point executes the energy input and its weight of the task, determines the execution node;
The edge calculations server node executes the total time-consuming amount of the task, is obtained by following parameter:
T is measured in the data information transfer of the product to the time-consuming of the edge calculations server nodeTransData, the task exists Queuing delay amount D in the edge calculations server nodeQueue, the edge calculations server node executes the task Time-consuming amount DRemoteThe implementing result is sent to the passback delay volume of device controller with the edge calculations server node DResult
The local computing node executes the energy input W of the taskLocalFor,
WLocal=k (fi l)2Ci
Wherein, k=10-26,fi lThe computer in the local computing node is represented for i-th of task The CPU that can be assigned to calculates frequency, Fi lIndicate the maximum cpu frequency that computer can reach, CiIt indicates to complete i-th The computer CPU periodicity that task needs, TiIndicate the peak response time delay that i-th of task allows, i is positive integer;
The edge calculations server node executes the energy input W of the taskRemoteFor,
Wherein, PtrFor send and receive the product data information power, DiRepresent the data volume of i-th of task, VLocal Indicate the port speed of the local data information sending port, i is positive integer.
6. according to the method described in claim 5, it is characterized in that, the value range of the weight is 0~1.
CN201710954607.7A 2017-10-13 2017-10-13 A kind of industrial control system and method for internet of things oriented Active CN107942958B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710954607.7A CN107942958B (en) 2017-10-13 2017-10-13 A kind of industrial control system and method for internet of things oriented

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710954607.7A CN107942958B (en) 2017-10-13 2017-10-13 A kind of industrial control system and method for internet of things oriented

Publications (2)

Publication Number Publication Date
CN107942958A CN107942958A (en) 2018-04-20
CN107942958B true CN107942958B (en) 2019-06-14

Family

ID=61935284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710954607.7A Active CN107942958B (en) 2017-10-13 2017-10-13 A kind of industrial control system and method for internet of things oriented

Country Status (1)

Country Link
CN (1) CN107942958B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116881013A (en) * 2018-06-01 2023-10-13 杭州海康威视数字技术股份有限公司 Task processing method and device and cloud computing system
CN108804668A (en) * 2018-06-08 2018-11-13 珠海格力智能装备有限公司 Data processing method and device
CN108924198B (en) * 2018-06-21 2021-05-11 中国联合网络通信集团有限公司 Data scheduling method, device and system based on edge calculation
CN109388116B (en) * 2018-10-31 2021-08-20 金蝶软件(中国)有限公司 Production management method, Internet of things management system and related equipment
CN110213327A (en) * 2019-04-23 2019-09-06 广东省智能制造研究所 A kind of resource regulating method based on edge calculations, apparatus and system
WO2020252666A1 (en) * 2019-06-18 2020-12-24 西门子股份公司 Edge computing device and method for industrial internet of things, and computer-readable storage medium
CN112068954A (en) * 2020-08-18 2020-12-11 弥伦工业产品设计(上海)有限公司 Method and system for scheduling network computing resources
CN112787920B (en) * 2021-03-03 2021-11-19 厦门大学 Underwater acoustic communication edge calculation time delay and energy consumption optimization method for ocean Internet of things

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1435550A1 (en) * 2001-09-28 2004-07-07 Matsushita Electric Industrial Co., Ltd. Robot control apparatus, robot, and production facility
KR20080035031A (en) * 2000-08-22 2008-04-22 온웨이퍼 테크놀로지즈 인코포레이티드 Methods and apparatus for obtaining data for process operation, optimization, monitoring and control
CN103676803A (en) * 2012-09-14 2014-03-26 中兴通讯股份有限公司 Industrial control system
CN204614011U (en) * 2015-05-06 2015-09-02 河南中维电子科技有限公司 A kind of commercial production KXG based on technology of Internet of things

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080035031A (en) * 2000-08-22 2008-04-22 온웨이퍼 테크놀로지즈 인코포레이티드 Methods and apparatus for obtaining data for process operation, optimization, monitoring and control
EP1435550A1 (en) * 2001-09-28 2004-07-07 Matsushita Electric Industrial Co., Ltd. Robot control apparatus, robot, and production facility
CN103676803A (en) * 2012-09-14 2014-03-26 中兴通讯股份有限公司 Industrial control system
CN204614011U (en) * 2015-05-06 2015-09-02 河南中维电子科技有限公司 A kind of commercial production KXG based on technology of Internet of things

Also Published As

Publication number Publication date
CN107942958A (en) 2018-04-20

Similar Documents

Publication Publication Date Title
CN107942958B (en) A kind of industrial control system and method for internet of things oriented
Huang et al. Deep reinforcement learning for online computation offloading in wireless powered mobile-edge computing networks
Eisen et al. Learning optimal resource allocations in wireless systems
CN110928654B (en) Distributed online task unloading scheduling method in edge computing system
Wang et al. User preference based energy-aware mobile AR system with edge computing
WO2009096519A1 (en) Feedforward control method, service provision quality control device, system, program, and recording medium therefor
CN109194984A (en) A kind of video frame dispatching method based on edge calculations
CN102769551B (en) Network quality evaluation and test and the method and system of the network optimization
US20120307662A1 (en) Method for monitoring and intelligent control of the parameters in radio networks
CN111401744B (en) Dynamic task unloading method in uncertainty environment in mobile edge calculation
CN104901989B (en) A kind of Site Service offer system and method
WO2019144560A1 (en) Network quality detection method and system
CN109819057A (en) A kind of load-balancing method and system
CN104350741B (en) Method, device and its medium for the incremental preparation of the video of transmission
CN110213327A (en) A kind of resource regulating method based on edge calculations, apparatus and system
CN113472659B (en) Method and device for determining forwarding path and SDN controller
CN111524034A (en) High-reliability low-time-delay low-energy-consumption power inspection system and inspection method
WO2020093502A1 (en) Nominal bandwidth adjusting method and device
CN112835715A (en) Method and device for determining task unloading strategy of unmanned aerial vehicle based on reinforcement learning
CN114707776B (en) Carbon emission double control-based low-carbon energy consumption optimization system and method
US11700082B1 (en) Systems and methods for proactive network maintenance
CN116235529A (en) Method for implementing an ad hoc network of a plurality of access network devices and electronic device for implementing the method
CN112231009A (en) Energy capture network model task calculation unloading decision and scheduling method
CN103688587A (en) Packet scheduling in a cellular communication network for the purpose of device -to -device communications
CN105373433B (en) Multi-core CPU load-balancing method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant