CN107942861A - A kind of remote equipment management-control method - Google Patents
A kind of remote equipment management-control method Download PDFInfo
- Publication number
- CN107942861A CN107942861A CN201711207387.8A CN201711207387A CN107942861A CN 107942861 A CN107942861 A CN 107942861A CN 201711207387 A CN201711207387 A CN 201711207387A CN 107942861 A CN107942861 A CN 107942861A
- Authority
- CN
- China
- Prior art keywords
- equipment
- server platform
- timing
- write
- collector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/048—Monitoring; Safety
Abstract
The present invention relates to a kind of remote equipment management-control method, including:S1, front end system define collection point read-write state and the collection read-write driving of equipment end collector, and equipment end collector information is set to issued state;S2, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection read-write driving definition, front end system timing check whether the configuration information of equipment end collector changes from server platform;Gathered data is uploaded onto the server platform for front end system monitoring by S3, the timing of equipment end collector, and timing obtains from server platform and requires the data of write-in and be written in equipment.Compared with prior art, the present invention solves the problem of operation maintenance personnel novel maintenance Architectural Equipment facility, and the centralized management of Architectural Equipment facility can be realized by the means of novel maintenance, reduces the implementation lower deployment cost of system, and has saved human cost.
Description
Technical field
The present invention relates to intelligent building technical field, more particularly, to a kind of remote equipment management-control method.
Background technology
In traditional automatic building control system, system is substantially based on local network deployment, the data of system and equipment
This uses direct-connected mode to collected end group, and such processing advantage is efficient for the read and write access put, but shortcoming is also
It will be apparent that maintenance personal at building scene, can not must timely recognize the fortune of equipment once outgoing operation maintenance personnel
Market condition, once equipment alarm, operation maintenance personnel is difficult to carry out remote maintenance by system, in nowadays types of applications all to big number
According under, the trend of the times of cloud platform, intensive management, original conventional art framework, hence it is evident that be not suitable with current development need.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of remote equipment management and control
Method.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of remote equipment management-control method, including:
S1, front end system define collection point read-write state and the collection read-write driving of equipment end collector, and equipment end is adopted
Storage information is set to issued state;
S2, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection is read
Driving definition is write, front end system timing checks whether the configuration information of equipment end collector changes from server platform;
Gathered data is uploaded onto the server platform for front end system monitoring by S3, the timing of equipment end collector, and periodically
Obtained from server platform and require the data of write-in and be written in equipment.
Preferably, configuration information of the front end system timing from server platform inspection equipment end collector in the step S2
If changing, related configuration information, automatic deployment to local, and the service of restarting are obtained from server platform.
Preferably, the gathered data platform that uploads onto the server is supplied front end system by the timing of equipment end collector in the step S3
The process of system monitoring specifically includes:
The gathered data of driving acquisition equipment is read and write in the timing of equipment end collector by gathering, and in real time by gathered data
Server platform storage is reached, front end system timing obtains gathered data from server platform.
Preferably, gathered data timing of the equipment end collector timing by gathering the equipment for reading and writing driving acquisition is logical
The diagnostic module for crossing setting is diagnosed, if finding data exception, is alarmed.
Preferably, the timing of equipment end collector obtains the data for requiring to write from server platform and writes in the step S3
After entering into equipment, equipment end collector, which also needs to write data into situation, feeds back to server platform.
Preferably, the front end system shows the collection number obtained from server platform in the form of system equipment configuration figure
According to.
Compared with prior art, the present invention has the following advantages:
1st, solve the problem of operation maintenance personnel novel maintenance Architectural Equipment facility, can be realized and built by the means of novel maintenance
The centralized management of installations and facilities is built, facilitates property to concentrate superior resources to manage the installations and facilities group of property concentratedly, is improved
O&M quality, reduces the implementation lower deployment cost of system, and has saved human cost, meets the big of intensive management to realize
The O&M cloud platform of data high concurrent provides reliable guarantee.
2nd, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection is read
Driving definition is write, the guarantee front end system that upgrades in time redefines collection point.
3rd, front end system timing checks the change of the configuration information of equipment end collector from server platform, and believes setting
Upgrade in time during breath change, ensure the accuracy of collection point information in front end system, avoid caused by the information change of collection point
Gathered data mistake.
Brief description of the drawings
Fig. 1 is flow chart of the method for the present invention.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention
Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to
Following embodiments.
Embodiment
As shown in Figure 1, a kind of remote equipment management-control method, including:
S1, front end system define collection point read-write state and the collection read-write driving of equipment end collector, and equipment end is adopted
Storage information is set to issued state;
S2, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection is read
Driving definition is write, front end system timing checks whether the configuration information of equipment end collector changes from server platform;
Gathered data is uploaded onto the server platform for front end system monitoring by S3, the timing of equipment end collector, and periodically
Obtained from server platform and require the data of write-in and be written in equipment.
Collector includes various equipment groups, the harvester of equipment that O&M is needed in building construction in step S1.
Front end system represents the system that directly operates of operation maintenance personnel, in step S2 front end system timing examined from server platform
If the configuration information for looking into equipment end collector changes, related configuration information is obtained from server platform, automatic deployment arrives
It is local, and the service of restarting.The front end system monitoring information that step S2 ensure that correctly reflects the collection number of physical device end collector
According to so that operation maintenance personnel recognizes the correct operating condition of equipment in time.
In step S3 in terms of device parameter is read, equipment end collector starts local acquisition module, periodically passes through collection
The collection read-write driving of module obtains the gathered data of equipment, and in real time by the data uploading module of collector by gathered data
Upload onto the server platform, in the data memory module of write service device platform, number of the front end system timing from server platform
According to gathered data is obtained in memory module, it is shown on system equipment configuration figure, completes the remotely monitoring to installations and facilities group.
The gathered data of equipment end collector is diagnosed by the backstage diagnostic module of setting in real time in step S3, according to
The diagnostic model of definition writes diagnostic result database, by alarm mould after the time interval real-time diagnosis of setting goes out result
Block is to abnormal conditions Realtime Alerts.
The timing of equipment end collector is obtained by device parameter writing module from server platform in step S3 requires write-in
The content for needing to write, is written in equipment, then writes data into situation and pass through text by data by gathering read-write driving
Feed back to server platform.
Claims (6)
- A kind of 1. remote equipment management-control method, it is characterised in that including:S1, front end system define collection point read-write state and the collection read-write driving of equipment end collector, by equipment end collector Information is set to issued state;S2, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection read-write is driven Dynamic definition, front end system timing check whether the configuration information of equipment end collector changes from server platform;Gathered data is uploaded onto the server platform for front end system monitoring by S3, the timing of equipment end collector, and periodically from clothes Business device platform obtains the data for requiring write-in and is written in equipment.
- A kind of 2. remote equipment management-control method according to claim 1, it is characterised in that front end system in the step S2 If timing checks that the configuration information of equipment end collector changes from server platform, correlation is obtained from server platform and is set Confidence ceases, automatic deployment to local, and the service of restarting.
- 3. a kind of remote equipment management-control method according to claim 1, it is characterised in that equipment end is adopted in the step S3 Storage timing by gathered data upload onto the server platform for front end system monitoring process specifically include:The gathered data of driving acquisition equipment is read and write in the timing of equipment end collector by gathering, and is in real time uploaded to gathered data Server platform stores, and front end system timing obtains gathered data from server platform.
- A kind of 4. remote equipment management-control method according to claim 3, it is characterised in that the equipment end collector timing The gathered data timing that the equipment that driving obtains is read and write by gathering is diagnosed by the diagnostic module of setting, if finding data It is abnormal, then alarm.
- 5. a kind of remote equipment management-control method according to claim 1, it is characterised in that equipment end is adopted in the step S3 Storage timing is obtained from server platform requires the data of write-in and after being written in equipment, and equipment end collector is also needed number Server platform is fed back to according to write-in situation.
- 6. a kind of remote equipment management-control method according to claim 1, it is characterised in that the front end system is set with system The form of standby configuration figure shows the gathered data obtained from server platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711207387.8A CN107942861A (en) | 2017-11-27 | 2017-11-27 | A kind of remote equipment management-control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711207387.8A CN107942861A (en) | 2017-11-27 | 2017-11-27 | A kind of remote equipment management-control method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107942861A true CN107942861A (en) | 2018-04-20 |
Family
ID=61950119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711207387.8A Pending CN107942861A (en) | 2017-11-27 | 2017-11-27 | A kind of remote equipment management-control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107942861A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112416439A (en) * | 2019-08-20 | 2021-02-26 | 广州弘度信息科技有限公司 | Remote restarting system of server and control method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101839732A (en) * | 2010-03-26 | 2010-09-22 | 北京师范大学 | Vegetation structure parameter measurement device based on wireless sensor network |
CN103843282A (en) * | 2011-09-30 | 2014-06-04 | 三星电子株式会社 | Apparatus and method for integrally managing maintenance of electronic devices |
US20150293511A1 (en) * | 2012-10-29 | 2015-10-15 | Assaf Laufer | Appliances control devices and methods |
CN105554164A (en) * | 2016-02-02 | 2016-05-04 | 东莞理工学院 | Remote monitoring and management system |
CN105912341A (en) * | 2016-04-27 | 2016-08-31 | 乐视控股(北京)有限公司 | Configuration method of calibration parameter of sensor, and electronic equipment |
CN106300679A (en) * | 2016-09-29 | 2017-01-04 | 中国南方电网有限责任公司电网技术研究中心 | The system and method for transformer substation remote monitoring |
CN107204865A (en) * | 2016-03-17 | 2017-09-26 | 福建华渔未来教育科技有限公司 | The equipment of terminal system maintaining method, monitoring device and long distance monitoring |
-
2017
- 2017-11-27 CN CN201711207387.8A patent/CN107942861A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101839732A (en) * | 2010-03-26 | 2010-09-22 | 北京师范大学 | Vegetation structure parameter measurement device based on wireless sensor network |
CN103843282A (en) * | 2011-09-30 | 2014-06-04 | 三星电子株式会社 | Apparatus and method for integrally managing maintenance of electronic devices |
US20150293511A1 (en) * | 2012-10-29 | 2015-10-15 | Assaf Laufer | Appliances control devices and methods |
CN105554164A (en) * | 2016-02-02 | 2016-05-04 | 东莞理工学院 | Remote monitoring and management system |
CN107204865A (en) * | 2016-03-17 | 2017-09-26 | 福建华渔未来教育科技有限公司 | The equipment of terminal system maintaining method, monitoring device and long distance monitoring |
CN105912341A (en) * | 2016-04-27 | 2016-08-31 | 乐视控股(北京)有限公司 | Configuration method of calibration parameter of sensor, and electronic equipment |
CN106300679A (en) * | 2016-09-29 | 2017-01-04 | 中国南方电网有限责任公司电网技术研究中心 | The system and method for transformer substation remote monitoring |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112416439A (en) * | 2019-08-20 | 2021-02-26 | 广州弘度信息科技有限公司 | Remote restarting system of server and control method thereof |
CN112416439B (en) * | 2019-08-20 | 2024-03-05 | 广州弘度信息科技有限公司 | Remote restarting system of server and control method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3115858B1 (en) | Centralized monitoring system and monitoring method for unmanned aerial vehicle to patrol power transmission line | |
TWI741505B (en) | Topology processing method, device and system | |
CN102616613B (en) | Elevator monitoring system | |
CN106383763B (en) | Data center's intelligent trouble detects alarm system | |
CN107908166B (en) | Manufacturing MES data acquisition system of automobile based on industry internet | |
CN106846530A (en) | A kind of property movement cruising inspection system and method based on NFC technique | |
CN111260325A (en) | Bridge construction progress management system based on BIM | |
CN103245912A (en) | Analytical and diagnostic method for running states of wind turbines | |
CN113419298B (en) | Multi-parameter hydrological meteorological data acquisition device | |
CN110264716A (en) | A kind of intelligent transportation system and application method based on Internet of Things | |
CN107784649A (en) | Plug test remote alarming system and method based on image recognition | |
CN116345685A (en) | Power distribution network digital inspection method based on 3D virtual reality technology | |
CN107942861A (en) | A kind of remote equipment management-control method | |
CN101609571A (en) | A kind of on-line monitoring attendance checking system | |
CN110320503A (en) | A kind of X-band weather radar standard output controller system | |
CN111158763B (en) | Equipment instruction processing system for intelligent management and control of building | |
CN104759471A (en) | Method for remotely capturing hot-rolled strip steel tracking signal | |
CN207895500U (en) | A kind of personnel channel's attendance checking system with picture control function | |
CN116521478A (en) | Board state monitoring method, system, electronic equipment and medium | |
CN211375047U (en) | X-band weather radar standard output controller system | |
CN111553497A (en) | Equipment working state detection method and device of multimedia terminal | |
CN208953929U (en) | A kind of remote on-line monitoring device | |
CN107979174A (en) | A kind of work flow operation method based on Regulation system | |
CN113158842A (en) | Identification method, system, device and medium | |
CN111147512A (en) | Remote control system of Ethernet camera |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180420 |