A kind of remote equipment management-control method Download PDF

Info

Publication number
CN107942861A
CN107942861A CN201711207387.8A CN201711207387A CN107942861A CN 107942861 A CN107942861 A CN 107942861A CN 201711207387 A CN201711207387 A CN 201711207387A CN 107942861 A CN107942861 A CN 107942861A
Authority
CN
China
Prior art keywords
equipment
server platform
timing
write
collector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711207387.8A
Other languages
Chinese (zh)
Inventor
王兴荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Siic-Longchuang Smarter Energy Technology Co Ltd
Original Assignee
Shanghai Siic-Longchuang Smarter Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Siic-Longchuang Smarter Energy Technology Co Ltd filed Critical Shanghai Siic-Longchuang Smarter Energy Technology Co Ltd
Priority to CN201711207387.8A priority Critical patent/CN107942861A/en
Publication of CN107942861A publication Critical patent/CN107942861A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Abstract

The present invention relates to a kind of remote equipment management-control method, including:S1, front end system define collection point read-write state and the collection read-write driving of equipment end collector, and equipment end collector information is set to issued state;S2, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection read-write driving definition, front end system timing check whether the configuration information of equipment end collector changes from server platform;Gathered data is uploaded onto the server platform for front end system monitoring by S3, the timing of equipment end collector, and timing obtains from server platform and requires the data of write-in and be written in equipment.Compared with prior art, the present invention solves the problem of operation maintenance personnel novel maintenance Architectural Equipment facility, and the centralized management of Architectural Equipment facility can be realized by the means of novel maintenance, reduces the implementation lower deployment cost of system, and has saved human cost.

Description

A kind of remote equipment management-control method
Technical field
The present invention relates to intelligent building technical field, more particularly, to a kind of remote equipment management-control method.
Background technology
In traditional automatic building control system, system is substantially based on local network deployment, the data of system and equipment This uses direct-connected mode to collected end group, and such processing advantage is efficient for the read and write access put, but shortcoming is also It will be apparent that maintenance personal at building scene, can not must timely recognize the fortune of equipment once outgoing operation maintenance personnel Market condition, once equipment alarm, operation maintenance personnel is difficult to carry out remote maintenance by system, in nowadays types of applications all to big number According under, the trend of the times of cloud platform, intensive management, original conventional art framework, hence it is evident that be not suitable with current development need.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of remote equipment management and control Method.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of remote equipment management-control method, including:
S1, front end system define collection point read-write state and the collection read-write driving of equipment end collector, and equipment end is adopted Storage information is set to issued state;
S2, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection is read Driving definition is write, front end system timing checks whether the configuration information of equipment end collector changes from server platform;
Gathered data is uploaded onto the server platform for front end system monitoring by S3, the timing of equipment end collector, and periodically Obtained from server platform and require the data of write-in and be written in equipment.
Preferably, configuration information of the front end system timing from server platform inspection equipment end collector in the step S2 If changing, related configuration information, automatic deployment to local, and the service of restarting are obtained from server platform.
Preferably, the gathered data platform that uploads onto the server is supplied front end system by the timing of equipment end collector in the step S3 The process of system monitoring specifically includes:
The gathered data of driving acquisition equipment is read and write in the timing of equipment end collector by gathering, and in real time by gathered data Server platform storage is reached, front end system timing obtains gathered data from server platform.
Preferably, gathered data timing of the equipment end collector timing by gathering the equipment for reading and writing driving acquisition is logical The diagnostic module for crossing setting is diagnosed, if finding data exception, is alarmed.
Preferably, the timing of equipment end collector obtains the data for requiring to write from server platform and writes in the step S3 After entering into equipment, equipment end collector, which also needs to write data into situation, feeds back to server platform.
Preferably, the front end system shows the collection number obtained from server platform in the form of system equipment configuration figure According to.
Compared with prior art, the present invention has the following advantages:
1st, solve the problem of operation maintenance personnel novel maintenance Architectural Equipment facility, can be realized and built by the means of novel maintenance The centralized management of installations and facilities is built, facilitates property to concentrate superior resources to manage the installations and facilities group of property concentratedly, is improved O&M quality, reduces the implementation lower deployment cost of system, and has saved human cost, meets the big of intensive management to realize The O&M cloud platform of data high concurrent provides reliable guarantee.
2nd, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection is read Driving definition is write, the guarantee front end system that upgrades in time redefines collection point.
3rd, front end system timing checks the change of the configuration information of equipment end collector from server platform, and believes setting Upgrade in time during breath change, ensure the accuracy of collection point information in front end system, avoid caused by the information change of collection point Gathered data mistake.
Brief description of the drawings
Fig. 1 is flow chart of the method for the present invention.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
Embodiment
As shown in Figure 1, a kind of remote equipment management-control method, including:
S1, front end system define collection point read-write state and the collection read-write driving of equipment end collector, and equipment end is adopted Storage information is set to issued state;
S2, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection is read Driving definition is write, front end system timing checks whether the configuration information of equipment end collector changes from server platform;
Gathered data is uploaded onto the server platform for front end system monitoring by S3, the timing of equipment end collector, and periodically Obtained from server platform and require the data of write-in and be written in equipment.
Collector includes various equipment groups, the harvester of equipment that O&M is needed in building construction in step S1.
Front end system represents the system that directly operates of operation maintenance personnel, in step S2 front end system timing examined from server platform If the configuration information for looking into equipment end collector changes, related configuration information is obtained from server platform, automatic deployment arrives It is local, and the service of restarting.The front end system monitoring information that step S2 ensure that correctly reflects the collection number of physical device end collector According to so that operation maintenance personnel recognizes the correct operating condition of equipment in time.
In step S3 in terms of device parameter is read, equipment end collector starts local acquisition module, periodically passes through collection The collection read-write driving of module obtains the gathered data of equipment, and in real time by the data uploading module of collector by gathered data Upload onto the server platform, in the data memory module of write service device platform, number of the front end system timing from server platform According to gathered data is obtained in memory module, it is shown on system equipment configuration figure, completes the remotely monitoring to installations and facilities group.
The gathered data of equipment end collector is diagnosed by the backstage diagnostic module of setting in real time in step S3, according to The diagnostic model of definition writes diagnostic result database, by alarm mould after the time interval real-time diagnosis of setting goes out result Block is to abnormal conditions Realtime Alerts.
The timing of equipment end collector is obtained by device parameter writing module from server platform in step S3 requires write-in The content for needing to write, is written in equipment, then writes data into situation and pass through text by data by gathering read-write driving Feed back to server platform.

Claims (6)

  1. A kind of 1. remote equipment management-control method, it is characterised in that including:
    S1, front end system define collection point read-write state and the collection read-write driving of equipment end collector, by equipment end collector Information is set to issued state;
    S2, the timing of equipment end collector obtains the collection point read-write state of the collector by server platform and collection read-write is driven Dynamic definition, front end system timing check whether the configuration information of equipment end collector changes from server platform;
    Gathered data is uploaded onto the server platform for front end system monitoring by S3, the timing of equipment end collector, and periodically from clothes Business device platform obtains the data for requiring write-in and is written in equipment.
  2. A kind of 2. remote equipment management-control method according to claim 1, it is characterised in that front end system in the step S2 If timing checks that the configuration information of equipment end collector changes from server platform, correlation is obtained from server platform and is set Confidence ceases, automatic deployment to local, and the service of restarting.
  3. 3. a kind of remote equipment management-control method according to claim 1, it is characterised in that equipment end is adopted in the step S3 Storage timing by gathered data upload onto the server platform for front end system monitoring process specifically include:
    The gathered data of driving acquisition equipment is read and write in the timing of equipment end collector by gathering, and is in real time uploaded to gathered data Server platform stores, and front end system timing obtains gathered data from server platform.
  4. A kind of 4. remote equipment management-control method according to claim 3, it is characterised in that the equipment end collector timing The gathered data timing that the equipment that driving obtains is read and write by gathering is diagnosed by the diagnostic module of setting, if finding data It is abnormal, then alarm.
  5. 5. a kind of remote equipment management-control method according to claim 1, it is characterised in that equipment end is adopted in the step S3 Storage timing is obtained from server platform requires the data of write-in and after being written in equipment, and equipment end collector is also needed number Server platform is fed back to according to write-in situation.
  6. 6. a kind of remote equipment management-control method according to claim 1, it is characterised in that the front end system is set with system The form of standby configuration figure shows the gathered data obtained from server platform.
CN201711207387.8A 2017-11-27 2017-11-27 A kind of remote equipment management-control method Pending CN107942861A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711207387.8A CN107942861A (en) 2017-11-27 2017-11-27 A kind of remote equipment management-control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711207387.8A CN107942861A (en) 2017-11-27 2017-11-27 A kind of remote equipment management-control method

Publications (1)

Publication Number Publication Date
CN107942861A true CN107942861A (en) 2018-04-20

Family

ID=61950119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711207387.8A Pending CN107942861A (en) 2017-11-27 2017-11-27 A kind of remote equipment management-control method

Country Status (1)

Country Link
CN (1) CN107942861A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112416439A (en) * 2019-08-20 2021-02-26 广州弘度信息科技有限公司 Remote restarting system of server and control method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839732A (en) * 2010-03-26 2010-09-22 北京师范大学 Vegetation structure parameter measurement device based on wireless sensor network
CN103843282A (en) * 2011-09-30 2014-06-04 三星电子株式会社 Apparatus and method for integrally managing maintenance of electronic devices
US20150293511A1 (en) * 2012-10-29 2015-10-15 Assaf Laufer Appliances control devices and methods
CN105554164A (en) * 2016-02-02 2016-05-04 东莞理工学院 Remote monitoring and management system
CN105912341A (en) * 2016-04-27 2016-08-31 乐视控股(北京)有限公司 Configuration method of calibration parameter of sensor, and electronic equipment
CN106300679A (en) * 2016-09-29 2017-01-04 中国南方电网有限责任公司电网技术研究中心 The system and method for transformer substation remote monitoring
CN107204865A (en) * 2016-03-17 2017-09-26 福建华渔未来教育科技有限公司 The equipment of terminal system maintaining method, monitoring device and long distance monitoring

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839732A (en) * 2010-03-26 2010-09-22 北京师范大学 Vegetation structure parameter measurement device based on wireless sensor network
CN103843282A (en) * 2011-09-30 2014-06-04 三星电子株式会社 Apparatus and method for integrally managing maintenance of electronic devices
US20150293511A1 (en) * 2012-10-29 2015-10-15 Assaf Laufer Appliances control devices and methods
CN105554164A (en) * 2016-02-02 2016-05-04 东莞理工学院 Remote monitoring and management system
CN107204865A (en) * 2016-03-17 2017-09-26 福建华渔未来教育科技有限公司 The equipment of terminal system maintaining method, monitoring device and long distance monitoring
CN105912341A (en) * 2016-04-27 2016-08-31 乐视控股(北京)有限公司 Configuration method of calibration parameter of sensor, and electronic equipment
CN106300679A (en) * 2016-09-29 2017-01-04 中国南方电网有限责任公司电网技术研究中心 The system and method for transformer substation remote monitoring

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112416439A (en) * 2019-08-20 2021-02-26 广州弘度信息科技有限公司 Remote restarting system of server and control method thereof
CN112416439B (en) * 2019-08-20 2024-03-05 广州弘度信息科技有限公司 Remote restarting system of server and control method thereof

Similar Documents

Publication Publication Date Title
EP3115858B1 (en) Centralized monitoring system and monitoring method for unmanned aerial vehicle to patrol power transmission line
TWI741505B (en) Topology processing method, device and system
CN102616613B (en) Elevator monitoring system
CN106383763B (en) Data center's intelligent trouble detects alarm system
CN107908166B (en) Manufacturing MES data acquisition system of automobile based on industry internet
CN106846530A (en) A kind of property movement cruising inspection system and method based on NFC technique
CN111260325A (en) Bridge construction progress management system based on BIM
CN103245912A (en) Analytical and diagnostic method for running states of wind turbines
CN113419298B (en) Multi-parameter hydrological meteorological data acquisition device
CN110264716A (en) A kind of intelligent transportation system and application method based on Internet of Things
CN107784649A (en) Plug test remote alarming system and method based on image recognition
CN116345685A (en) Power distribution network digital inspection method based on 3D virtual reality technology
CN107942861A (en) A kind of remote equipment management-control method
CN101609571A (en) A kind of on-line monitoring attendance checking system
CN110320503A (en) A kind of X-band weather radar standard output controller system
CN111158763B (en) Equipment instruction processing system for intelligent management and control of building
CN104759471A (en) Method for remotely capturing hot-rolled strip steel tracking signal
CN207895500U (en) A kind of personnel channel's attendance checking system with picture control function
CN116521478A (en) Board state monitoring method, system, electronic equipment and medium
CN211375047U (en) X-band weather radar standard output controller system
CN111553497A (en) Equipment working state detection method and device of multimedia terminal
CN208953929U (en) A kind of remote on-line monitoring device
CN107979174A (en) A kind of work flow operation method based on Regulation system
CN113158842A (en) Identification method, system, device and medium
CN111147512A (en) Remote control system of Ethernet camera

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420