Bubbler metal mesh sub-material feedway
Technical field
The present invention relates to a kind of production line automation equipment, is specially a kind of bubbler metal mesh sub-material feedway.
Background technology
Bubbler is installed on water tap end, and bubbler can allow the water and air flowed through to be sufficiently mixed, there is sky
The addition of gas, the scouring force of water improves much, so that water consumption is effectively reduced, using water wisely.Existing foaming device structure such as Fig. 1
It is shown, including filter element 1 ', current divider 2 ', mixing wastewater with air component 3 ', bubbler body 4 ' and metal mesh 5 ', automated production
Assembled, it is necessary to which metal mesh is transported on station through transmission equipment one by one on line, when being mixed due to a large amount of metal meshes, be not easy
Separate, at present mainly by manually being split supply one by one.
The content of the invention
It is an object of the invention to provide a kind of bubbler metal mesh sub-material feedway, realize metal mesh automatic point
Material, exports single metal net in order.To achieve the above object, the present invention uses following technical scheme:
Bubbler metal mesh sub-material feedway, including some supply assemblies, metal mesh glue and take component, some blowing components, institute
The supply assembly stated is used to place metal mesh in batches, and the blowing component is used to place supply single metal net, the gold
Belonging to netting to glue takes component to include the movable machine frame and control cylinder being arranged on movable machine frame, adhesive tape placement axis and adhesive tape recycling axis,
Adhesive tape recycling axis connection has electric rotating machine, and the control cylinder is installed on adhesive tape and places between axis and adhesive tape recycling axis, control
The cylinder for adhesive tape around the home is provided with below cylinder, is provided with two discharge arms in the cylinder, discharge arm is located at cylinder two
Side, discharge arm are connected with control cylinder, and the width of adhesive tape is less than the width of cylinder, and adhesive tape places axis through cylinder body bottom by adhesive tape
Between two discharge arms on traction to adhesive tape recycling axis, movable machine frame drives cylinder and adhesive tape to glue the metal taken in supply assembly
Net, the discharge arm promote metal mesh to fall within blowing component in the case where controlling cylinder action.
Preferably, supply assembly and blowing component set two groups, and the metal mesh is glued on the movable machine frame for take component also
A middle reel is provided with, the middle reel is arranged on adhesive tape and places among axis and adhesive tape recycling axis, and control cylinder is set
There are two groups, control cylinder is arranged on adhesive tape and places between axis and adhesive tape recycling axis, and is located at middle reel both sides, adhesive tape respectively
Axis is placed from adhesive tape to draw to drawing again on middle reel to adhesive tape recycling axis.
Wherein, the supply assembly includes vibrating disk, feed frame and pusher cylinder, and vibrating disk outlet is arranged on
Top, the pusher cylinder are arranged on feed frame head end in the middle part of feed frame, and feed frame end is provided with a feeder channel, and described pushes away
Material cylinder push-rod, which stretches out, is pushed into the metal mesh on feed frame in feeder channel.
Further, the feed frame end is provided with metal mesh to level detecting apparatus.
Wherein, the blowing component includes rotary cylinder and the material platform being arranged on rotary cylinder, the blowing
Platform both sides are both provided with trough.
Further, take-off assembly is further included, the take-off assembly includes mobile machine arm and is arranged on mobile machine
Feeding pin below arm.
Wherein, the movable machine frame includes stent, vertical cylinder, horizontal air cylinder and fixed plate, the vertical cylinder
It is fixed on stent, vertical cylinder push rod side installation horizontal air cylinder, horizontal air cylinder push rod side mounting plate, the control
Cylinder, adhesive tape placement axis and adhesive tape recycling axis processed are arranged in fixed plate.
Wherein, the mobile machine arm includes feeding stent, horizontal guide rail, sliding block and feeding cylinder, the level
Guide rail is arranged on feeding stent, and the sliding block slides on horizontal guide rail, and the feeding cylinder is fixed on sliding block, institute
The feeding pin stated is arranged on below feeding cylinder.
As a result of above-mentioned structure, the present invention has the advantages that:
1. the present invention uses control cylinder to drive tape movement to supply assembly, realization to glue the purpose for taking a metal mesh every time,
So as to fulfill automation sub-material.
2. by adding a middle reel, two groups of control cylinders are set, two groups of control cylinders is carried out at the same time and viscous takes metal
Net, improves the efficiency of sub-material.
3. setting the material platform of two troughs of rotary cylinder and band, control cylinder is glued the metal mesh taken and supplied by rotating
Feeding pin feeding, while do not influence to control the continuation blowing of cylinder again, realize the close linking between process.
Brief description of the drawings
Fig. 1 is the decomposition diagram of background technology bubbler.
Fig. 2 is the structure diagram of embodiment one.
Fig. 3 is the schematic front view of Fig. 2.
Fig. 4 is the schematic top plan view of Fig. 3.
Fig. 5 is the decomposition texture schematic diagram of Fig. 2.
Fig. 6 is that metal mesh glues the structure diagram for taking component discharging state.
Fig. 7 is the side schematic view of Fig. 6.
Fig. 8 is the structure diagram of embodiment two.
Fig. 9 is the schematic front view of Fig. 8.
Figure 10 is the schematic top plan view of Fig. 9.
Primary clustering symbol description:
1:Supply assembly, 11:Vibrating disk, 12:Feed frame, 121:Feeder channel, 13:Pusher cylinder, 14:Metal mesh detects dress in place
Put, 2:Metal mesh glues pickup, and 21:Movable machine frame, 211:Stent, 212:Vertical cylinder, 213:Horizontal air cylinder, 214:It is fixed
Plate, 22:Control cylinder, 23:Adhesive tape placement axis, 24:Adhesive tape recycling axis, 25:Electric rotating machine, 26:Cylinder, 27:Discharge arm, 28:
Middle reel, 3:Blowing component, 31:Rotary cylinder, 32:Material platform, 33:Trough, 4:Take-off assembly, 41:Mobile machine arm,
411:Feeding stent, 412:Horizontal guide rail, 413:Sliding block, 414:Feeding cylinder, 42:Feeding pin, 5:Adhesive tape, 6:Metal mesh.
Embodiment
It is below in conjunction with the accompanying drawings and specific real in order to make those skilled in the art more fully understand technical scheme
Applying example, the present invention is described in further detail.
Embodiment one
As shown in Figure 2-5, present embodiment discloses a kind of bubbler metal mesh sub-material feedway, including supply assembly 1, gold
Belong to netting to glue and take component 2, blowing component 3, take-off assembly 4.
Metal mesh, which glues, takes component 2 to be put including movable machine frame 21 and the control cylinder 22, the adhesive tape that are arranged on movable machine frame 21
Axis 23 and adhesive tape recycling axis 24 are put, adhesive tape recycling axis 24 is connected with electric rotating machine 25.Adhesive tape is placed axis 23 from adhesive tape and is drawn to glue
On band recycling axis 24, control cylinder 22 is arranged on adhesive tape and places between axis 23 and adhesive tape recycling axis 24.22 lower section of control cylinder is set
It is equipped with and supplies the cylinder 26 of adhesive tape around the home, is provided with two discharge arms 27 in cylinder 26, discharge arm 27 is located at 26 two side ends of cylinder, unloads
Material bar 27 is connected with control cylinder 22, and the width H of adhesive tape is less than the width L of cylinder 26, and adhesive tape 5 places axis 23 through cylinder by adhesive tape
Between 26 discharge arms 27 of bottom two on traction to adhesive tape recycling axis 24.Movable machine frame 21 include stent 211, vertical cylinder 212,
Horizontal air cylinder 213 and fixed plate 214, vertical cylinder 212 are fixed on stent 211, and the installation of 212 push rod side of vertical cylinder is horizontal
Cylinder 213,213 push rod side mounting plate 214 of horizontal air cylinder, control cylinder 22, adhesive tape place axis 23 and adhesive tape recycling axis
24 are arranged in fixed plate 214.
Supply assembly 1 is used to place metal mesh 6 in batches.Supply assembly 1 includes vibrating disk 11, feed frame 12, pusher cylinder
13 and metal mesh to level detecting apparatus 14.The outlet of vibrating disk 11 is arranged on the top of feed frame 12, and pusher cylinder 13 is arranged on feed frame
12 head ends, 12 end of feed frame are provided with a feeder channel 121.Metal mesh is arranged on 12 end of feed frame to level detecting apparatus 14.
Blowing component 3 is used to place supply single metal net 6.Blowing component 3 includes rotary cylinder 31 and is arranged on rotation
Material platform 32 on cylinder 31,32 both sides of material platform are both provided with trough 33.
Take-off assembly 4, which is used to take single metal net 6 to production line, assembles station.Take-off assembly 4 includes mobile machine
Arm 41 and the feeding pin 42 for being arranged on the lower section of mobile machine arm 41.Mobile machine arm 41 includes feeding stent 411, horizontal guide rail
412nd, sliding block 413 and feeding cylinder 414.Horizontal guide rail 412 is arranged on feeding stent 411, and sliding block 413 is in horizontal guide rail 412
Upper slip, feeding cylinder 414 are fixed on sliding block 413, and feeding pin 42 is arranged on the lower section of feeding cylinder 414.
The implementation steps of the present invention are as follows:
(1)Operator pours into metal mesh 6 in vibrating disk 11, adhesive tape is placed entire volume adhesive tape is installed on axis 23, and by adhesive tape
Pull out, make adhesive tape from adhesive tape place axis 23 draw between 26 bottom of cylinder, two discharge arm 27, then draw to adhesive tape recycle axis
On 24, the viscosity one of adhesive tape is face-down.
(2)Vibrating disk 11 vibrates, and the vibrating disk 11 that shakes of part metals net 6 is exported guide rail to feed frame 12.
(2)Pusher cylinder 13 acts, and 13 push rod of pusher cylinder is stretched out is pushed into feed frame 12 by the metal mesh 6 on feed frame 12
Feeder channel 121 in.
(3)Metal mesh detects the metal mesh 6 in feeder channel 121 to level detecting apparatus 14, sends a signal to metal mesh
It is viscous to take component 2.
(4)Vertical cylinder 212 acts, and horizontal air cylinder 213 acts, drive fixed plate 214 be moved to feeder channel 121 just on
Side.
(5)Vertical cylinder 212 acts, and drives cylinder 26 to move downwardly in feeder channel 121, adhesive tape and a metal mesh 6
Adhesion.
(6)Vertical cylinder 212 is acted with horizontal air cylinder 213, and control fixed plate 214 is moved to directly over trough 33.
(7)As shown in Figure 6, Figure 7, control cylinder 22 acts, and charging ram moves downward in cylinder 26, charging ram contact gold
Belong to 6 edge of net metal mesh 6 is pushed out to downwards in trough 33.
(8)Electric rotating machine 25 controls adhesive tape recycling axis 24 to rotate one section, and the adhesive tape of 26 bottom of cylinder is moved to new viscosity
Section.
(9)Rotary cylinder 31 acts, and material platform 32 rotates, and the trough 33 with metal mesh 6 is rotated into take-off assembly 4
Side, feeding cylinder 414 control feeding pin 42 to be inserted into metal mesh 6, and metal mesh 6 is moved on production line assembling station.
So far an actuation cycle is completed.The present invention is rational in infrastructure, and action is continuous, realizes the automation point of metal mesh 6
Material supply.
Embodiment two
As shown in figs. 8-10, present embodiment discloses a kind of bubbler metal mesh sub-material feedway, including two groups of supply assemblies
1st, a metal mesh, which glues, takes component 2, two groups of blowing components 3, two groups of take-off assemblies 4.Supply assembly 1, blowing component 3 and take-off assembly
4 are symmetrical arranged, and metal mesh, which glues, takes component 2 positioned at centre.Supply assembly 1, the structure of blowing component 3 and take-off assembly 4 and implementation
Example one is identical.
Metal mesh, which glues, takes component 2 to include movable machine frame 21 and the two groups of control cylinders 22, one being arranged on movable machine frame 21
Adhesive tape places axis 23, adhesive tape recycling axis 24, and a middle reel 28.Adhesive tape recycling axis 24 is connected with electric rotating machine 25.It is middle
Spool 28 is arranged on adhesive tape and places among axis 23 and adhesive tape recycling axis 24, two groups of control cylinders 22 be arranged on adhesive tape place axis 23 with
Between adhesive tape recycling axis 24, and it is located at 28 both sides of middle reel respectively.Control cylinder 22 lower section is provided with for adhesive tape around the home
Cylinder 26, two discharge arms 27 are provided with cylinder 26, and discharge arm 27 is located at 26 two side ends of cylinder, discharge arm 27 and control cylinder
22 connections, the width H of adhesive tape are less than the width L of cylinder 26, and adhesive tape places axis 23 through cylinder 26 bottom two discharge arm by adhesive tape
Between 27 then traction recycles axis through being drawn between the discharge arm 27 of another cylinder 26 bottom two to adhesive tape again to middle reel 28
On 24.Movable machine frame 21 includes stent 211, vertical cylinder 212, horizontal air cylinder 213 and fixed plate 214, and vertical cylinder 212 is fixed
On stent 211, vertical cylinder push rod side installation horizontal air cylinder 213, horizontal air cylinder push rod side mounting plate 214, control
Cylinder 22 processed, adhesive tape are placed axis 23, adhesive tape recycling axis 24, middle reel 28 and are arranged in fixed plate 214.
The implementation steps of the present embodiment are identical with embodiment one, and two groups of supply assemblies, 1, two group of control cylinder 22, two groups put
Expect component 3, two groups of take-off assemblies 3 act at the same time, realize double sub-material efficiency.
On the basis of embodiment two, multigroup supply assembly 1, multigroup control cylinder 22, multigroup blowing group can also be set
Part 3, multigroup take-off assembly 4 act at the same time, realize more times of sub-material efficiency.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art the invention discloses technical scope in, the change or replacement that can readily occur in,
It should be covered by the protection scope of the present invention.