CN107909291A - A kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes - Google Patents

A kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes Download PDF

Info

Publication number
CN107909291A
CN107909291A CN201711286804.2A CN201711286804A CN107909291A CN 107909291 A CN107909291 A CN 107909291A CN 201711286804 A CN201711286804 A CN 201711286804A CN 107909291 A CN107909291 A CN 107909291A
Authority
CN
China
Prior art keywords
scene
probability
risk
circuit breakers
integrated form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711286804.2A
Other languages
Chinese (zh)
Inventor
夏天
李劲彬
陈隽
方华亮
黄硕
王海鸣
胡傲
宋璇坤
韩柳
谷松林
冯腾
王成智
全江涛
张宇
段中平
冯英
兰剑
刘亚辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhan University WHU
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd
State Grid Economic and Technological Research Institute
Xuchang Power Supply Co of Henan Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Wuhan University WHU
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd
State Grid Economic and Technological Research Institute
Xuchang Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuhan University WHU, China Electric Power Research Institute Co Ltd CEPRI, Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd, State Grid Economic and Technological Research Institute, Xuchang Power Supply Co of Henan Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201711286804.2A priority Critical patent/CN107909291A/en
Publication of CN107909291A publication Critical patent/CN107909291A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses a kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes, this method is on the basis of the more scenes of integrated form isolation circuit breakers difference operating status are obtained by multi-scenario technique, carries out risk analysis to scene respectively.For static maximum probability scene, by losing load, load rejection situation, the replacement of integrated form isolation circuit breakers or maintenance cost etc. come calculation risk.For dynamic small probability scene, on the basis of corresponding risk indicator is calculated, real-time running data is had also combined, influence of the probability change of scene to risk is analyzed, ensure that the accuracy of small probability scene risk assessment.Have the following advantages:Risk analysis has been carried out to the more scenes of integrated form isolation circuit breakers after multi-scenario technique is handled, for small probability scene, has analyzed influence of the probability change of scene to risk.

Description

A kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes
Technical field
The present invention relates to electrical equipment technical field, is specially a kind of electricity of isolation circuit breakers containing integrated form based on more scenes Net methods of risk assessment.
Background technology
At present, integrated form isolation circuit breakers are electric control appliances important in intelligent substation, its operating status is to electricity The safety and stablization influence on system operation of Force system is great.Integrated form isolation circuit breakers are integrated with breaker in traditional substation, ground connection The elements such as switch, disconnecting switch, current transformer, monitoring device, its structure is compared in the past more complicated.Therefore, how to collection Accepted way of doing sth isolation circuit breakers operating status in power grid carries out accurate description and to the potential wind of power grid of the isolation circuit breakers containing integrated form Danger carries out the problem of analysis is one to be resolved.
In existing power grid risk assessment method, if mainly with the probability occurred with risk and the harm of generation consequence Measure to calculate static risk value.In the power grid risk assessment of the isolation circuit breakers containing integrated form, can using multi-scenario technique come The different probability operating status of integrated form isolation circuit breakers is described, by the generation and reduction of scene, it is disconnected to obtain integrated form isolation Maximum probability scene under the device difference operating status combination of road.These scenes can represent typical case's fortune of integrated form isolation circuit breakers Row state, can carry out risk assessment using these typical scenes to the power grid of the isolation circuit breakers containing integrated form.
More scenes of integrated form isolation circuit breakers operating status mainly use historical failure statistics to generate, In general more scene analysis, primarily to the risk indicator under each scene is calculated, obtained simply some Static State Indexes, not Risk under different scenes and its influence factor are made a concrete analysis of, especially probability is small but to the serious field of electric network influencing Scape.For more scene analysis of integrated form isolation circuit breakers, the risk for not only needing to calculate maximum probability scene static state refers to Mark, also need to be analyzed for some small probability scenes with reference to practical operation situation so that more objective assessment integrated form every From breaker risk status, the maintenance strategy for integrated form isolation circuit breakers is formulated and optimization lays the first stone.
The content of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of power grid of isolation circuit breakers containing integrated form based on more scenes Methods of risk assessment, in the case where integrated form isolation circuit breakers scene has generated, it is all kinds of to integrated form isolation circuit breakers not Risk analysis is carried out with operating status under probability and calculates respective risk value.In addition to the static probability large scene, it is also contemplated that potential The big scene of dynamic probability, has made a concrete analysis of the influence of its risk status and the probability change generation of scene, has more objectively commented Estimate power grid risk situation.
In order to achieve the above object, the present invention is achieved by the following technical programs:A kind of containing based on more scenes integrates Formula isolation circuit breakers power grid risk assessment method, comprises the following steps:
Step 1, it is known that obtain integrated form by historical data and utilization multi-scenario technique (scene is generated and cut down) and isolate More scenes that breaker is run in power grid, i.e., the combination of multiple integrated form isolation circuit breakers different operating statuses in power grid, Due to normal operating condition do not influence risk assessment as a result, therefore only consider malfunction under scene.All fault scenes Set S={ s1、s2、s3…sn, P (si) represent the probability that i-th of scene occurs, scene is drawn according to fault scenes probability of happening It is divided into maximum probability scene and small probability scene, wherein maximum probability scene collection is combined into Sh={ s1、s2…sj, small probability scene set For Sl={ sj、sj+1…sn, risk is expressed as R.
Step 2, analyze static maximum probability scene, maximum probability scene quantity is relatively more, caused by risk it is relatively small, it is right Overall risk assessment result has considerable influence.The more scenes of a variety of operating statuses formed for more integrated form isolation circuit breakers, Can be by losing load, load rejection situation, the replacement of integrated form isolation circuit breakers or maintenance cost etc. come calculation risk.
Step 3, static small probability scene is also to be generated by history data, and situation about actually occurring is seldom.With Static maximum probability scene is different, when more integrated form isolation circuit breakers failures occur again in operation of power networks, these scenes Actual probabilities larger fluctuation can occur, i.e., in power grid continuous service, the corresponding probability of small probability scene actually can be with The appearance of emergency situations and change, and in the case where causing consequence to compare serious conditions, the fluctuation of value-at-risk also can be more obvious.
Risk assessment to small probability scene, with greater need for historical data and real time data is combined, considers small probability scene Probability changes the shadow to risk, that is, analyzes the dynamic probability of scene.When there is a small probability scene in real-time monitoring, generally Rate, which changes, is represented by venture influence degreeΔR(Sl) it is small probability scene value-at-risk variable quantity, Δ P (Sl) The probability variable quantity occurred for scene.If k is less than certain certain value, it is believed that influence is ignored, when more than setting, Then need specifically to assess dynamic small probability scene risk, so as to ensure the powernet wind of the isolation circuit breakers containing integrated form The accuracy of dangerous probability evaluation method of failure simultaneously provides targetedly maintenance strategy.
Beneficial effect:The invention has the advantages that:1. the integrated form isolation open circuit pair after multi-scenario technique is handled The more scenes of device have carried out risk analysis;It is perfect to dynamic 2. judged probability influence of the change to risk of small probability scene The risk analysis of small probability scene.
Brief description of the drawings
Fig. 1 is the method for the present invention flow chart.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment, belongs to the scope of protection of the invention.
Embodiment:
A kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes, comprises the following steps:
Step 1:It is respectively x comprising m platform integrated form isolation circuit breakers it is assumed that in a certain regional power grid1、x2、……xm, According to multi-scenario technique, n fault scenes, scene set S={ s are obtained1、s2、s3…sn, P (si) represent what i-th of scene occurred Probability.It is assumed that with P0=0.01 is boundary line delimitation scene, respectively obtains maximum probability scene and small probability scene, is denoted as S respectivelyh= {s1、s2…sjAnd Sl={ sj、sj+1…sn}。
Step 2:Risk analysis is carried out to static maximum probability scene, these scenes are generally 1~2 integrated form isolation open circuit Device breaks down, to lose load as risk assessment index, C (si) it is that scene i is to ensure power grid security under a situation arises The load of excision required for stable operation.The online risk status of power grid is calculated, byObtain wind Dangerous situation.
Step 3:Risk analysis is carried out to dynamic small probability scene, these scenes are generally multiple integrated form isolation circuit breakers Break down, caused by coverage it is larger.According to the calculating of step 2, the risk status of small probability scene is first obtained, i.e.,With reference to real-time running data, when the extreme of more integrated form isolation circuit breakers failures occurs During scene, the probability for calculating small probability scene is changed to venture influence degree k, according to the standard of setting, judges the fluctuation of risk Situation, so as to further analyze the risk level under the scene, specifically calculates risk level and combination under small probability scene Actual operating data obtains influencing risk factors, and suitable maintenance strategy is formulated further directed to this scene.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of changes, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (1)

  1. A kind of 1. power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes, it is characterised in that including following Step:
    Step 1, integrated form isolation circuit breakers are obtained with reduction technology transported in power grid by historical data and using scene generation Capable more scenes, i.e., the combination of multiple integrated form isolation circuit breakers different operating statuses in power grid, due to normal operating condition Therefore do not influence risk assessment as a result, only consider the scene under malfunction, all fault scenes set S={ s1、s2、 s3...sn, P (si) represent the probability that i-th of scene occurs;
    Step 2, it is maximum probability scene and small probability scene, wherein maximum probability field by scene partitioning according to fault scenes probability of happening Jing Ji is combined into Sh={ s1、s2...sj, small probability scene collection is combined into Sl={ sj、sj+1...sn, risk is expressed as R;
    Step 3, static maximum probability scene is analyzed, for more of a variety of operating statuses of more integrated form isolation circuit breakers compositions Scape, by losing, load, load rejection situation, integrated form isolation circuit breakers are replaced or maintenance cost is used for calculation risk;
    Step 4, the risk assessment to small probability scene considers small probability scene, it is necessary to reference to historical data and real time data Probability changes the shadow to risk, that is, analyzes the dynamic probability of scene, when there is a small probability scene in real-time monitoring, generally Rate, which changes, is represented by venture influence degreeΔR(Sl) it is small probability scene value-at-risk variable quantity, Δ P (Sl) The probability variable quantity occurred for scene;If k is less than certain certain value, it is believed that influence is ignored, when more than setting, Then need specifically to assess dynamic small probability scene risk, so as to ensure the powernet wind of the isolation circuit breakers containing integrated form The accuracy of dangerous probability evaluation method of failure simultaneously provides targetedly maintenance strategy.
CN201711286804.2A 2017-12-07 2017-12-07 A kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes Pending CN107909291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711286804.2A CN107909291A (en) 2017-12-07 2017-12-07 A kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711286804.2A CN107909291A (en) 2017-12-07 2017-12-07 A kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes

Publications (1)

Publication Number Publication Date
CN107909291A true CN107909291A (en) 2018-04-13

Family

ID=61854565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711286804.2A Pending CN107909291A (en) 2017-12-07 2017-12-07 A kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes

Country Status (1)

Country Link
CN (1) CN107909291A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636209A (en) * 2018-12-18 2019-04-16 国家电网有限公司 A kind of online methods of risk assessment of intelligent isolation circuit breakers based on big data analysis to electric network influencing
CN116545770A (en) * 2023-07-03 2023-08-04 上海观安信息技术股份有限公司 Scene detection method, device, medium and equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636209A (en) * 2018-12-18 2019-04-16 国家电网有限公司 A kind of online methods of risk assessment of intelligent isolation circuit breakers based on big data analysis to electric network influencing
CN109636209B (en) * 2018-12-18 2022-08-30 国家电网有限公司 Online risk assessment method for influence of intelligent isolation breaker on power grid based on big data analysis
CN116545770A (en) * 2023-07-03 2023-08-04 上海观安信息技术股份有限公司 Scene detection method, device, medium and equipment
CN116545770B (en) * 2023-07-03 2023-09-01 上海观安信息技术股份有限公司 Scene detection method, device, medium and equipment

Similar Documents

Publication Publication Date Title
CN105653764B (en) Power grid safety accident risk class online evaluation and method for early warning
CN102411105B (en) Evaluation method of lightning disturbance risk of power transmission line section
CN104103019B (en) Operation risk assessment method and assessment system of power distribution network containing distributed power supply
CN101425682B (en) Electric grid relay protection constant value on-line check integrated data processing method
CN102074956B (en) Power grid risk management method and system
CN104281982B (en) A kind of transformer substation equipment state assessment method based on topological structure of electric
CN102854415A (en) Method for assessing lightning flashover risks of regional power grid lines
CN104966147A (en) Power grid operating risk analyzing method in view of base state and accident state
CN103248055B (en) A kind of solve regional power grid off-the-line after correct choosing cut the method for generator and load
CN103236666A (en) Differentiated lightning protection method for power transmission lines
CN102623990B (en) Low-frequency deloading parameter online checking method of self-adaptation power grid operation mode
CN103559654A (en) Comprehensive analysis system and method of power distribution network
CN105305391B (en) A kind of protection act evaluation method
CN102324789A (en) Intelligent substation domain control system on basis of substation control layer GOOSE (Generic Object Oriented Substation Event) and implementing method
CN104539051A (en) Online evaluation system of secondary equipment of intelligent substation
CN103884935A (en) Electric transmission line lightning-protection performance assessment method combined with distributed lightning current monitoring
CN102680833A (en) Load monitoring method and system for medium-voltage line in power distribution network
WO2014180125A1 (en) Method for security check of operation ticket based on disturbance assessment and trend analysis
KR20130049239A (en) Apparatus and method for controlling a load of power system
CN104538962A (en) Method for evaluating safety risk of power distribution network on basis of average expected value
CN105067904B (en) A kind of Lightning Warning data assessment method based on history lighting location data and power network Tripping data
CN107909291A (en) A kind of power grid risk assessment method of isolation circuit breakers containing integrated form based on more scenes
CN104253421A (en) Relay protection optimal configuration method for double-circuit lines on same pole based on substation area information sharing
CN106845757B (en) Power grid power flow transfer hazard degree evaluation method
CN106872861A (en) Super UHV Transmission Engineering circuit attacks the lightning current inversion method and system of wire directly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180413

RJ01 Rejection of invention patent application after publication