CN107909234A - Time limit based reminding method, processing method and its device of Work stream data, equipment - Google Patents

Time limit based reminding method, processing method and its device of Work stream data, equipment Download PDF

Info

Publication number
CN107909234A
CN107909234A CN201710775829.2A CN201710775829A CN107909234A CN 107909234 A CN107909234 A CN 107909234A CN 201710775829 A CN201710775829 A CN 201710775829A CN 107909234 A CN107909234 A CN 107909234A
Authority
CN
China
Prior art keywords
node
stream data
work stream
time length
duration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710775829.2A
Other languages
Chinese (zh)
Inventor
余明浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201710775829.2A priority Critical patent/CN107909234A/en
Publication of CN107909234A publication Critical patent/CN107909234A/en
Priority to PCT/CN2018/089248 priority patent/WO2019041931A1/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The present invention relates to time limit based reminding method, the device of a kind of Work stream data, and a kind of Work stream data processing method, device, storage medium and computer equipment, the time limit based reminding method of the Work stream data includes:Receive the task access request to the Work stream data on present node;The timing information of the Work stream data is obtained according to the task access request;The expectation residual time length of flow residual time length, present node and the expectation duration calculation of each subsequent node in the timing information go out the urgency that the Work stream data is in the present node;When the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, the prompt message that time limit prompting is carried out to the Work stream data is generated.The flexibility of the time limit prompting to Work stream data can be improved.

Description

Time limit based reminding method, processing method and its device of Work stream data, equipment
Technical field
The present invention relates to technical field of information processing, time limit based reminding method, dress more particularly to a kind of Work stream data Put, and a kind of Work stream data processing method, device, storage medium and computer equipment.
Background technology
Workflow (Workflow) is organized a group task to complete some business process, be to workflow and Business rule is abstracted, is broadly described between its each operating procedure.The workflow defining trigger sequence and trigger condition of task, Each task is split into multiple node tasks, each node tasks can be completed by one or more software systems, can also Completed by one or a set of people, can also be cooperated completion by one or more people with software systems.What workflow solved mainly asks Topic is:In order to realize some business objective, text is transmitted automatically by certain pre-defined rule between multiple participants using computer Shelves, information or task.
In general, every part of Work stream data is usually all equipped with the corresponding flow processing time limit, conventional method is for every The accordingly fixed node processing time limit can be all set on a pending node, which is in Work stream data stream Go to after respective nodes and be just triggered, and the Work stream data on detecting respective nodes soon close to or over when prescribe a time limit, Relative users are reminded.When may exceed flow processing due to the summation in the node processing time limit set on each node Limit, can have a Work stream data and all be timely completed processing, but the processing of whole Work stream data on each node It is a time out.Therefore, in conventional method, underaction is reminded to the time limit of Work stream data.
The content of the invention
Based on this, it is necessary to the problem of for underaction is reminded to time limit of Work stream data in conventional method, there is provided Time limit based reminding method, the device of a kind of Work stream data, and a kind of Work stream data processing method, device, storage medium and Computer equipment.
A kind of time limit based reminding method of Work stream data, the described method includes:Receive to the work fluxion on present node According to task access request;The timing information of the Work stream data is obtained according to the task access request;According to it is described when The expectation residual time length of flow residual time length, present node and the expectation duration calculation of each subsequent node in limit information go out The Work stream data is in the urgency of the present node;When the urgency level of the Work stream data of urgency reflection During more than pre-programmed emergency degree, the prompt message that time limit prompting is carried out to the Work stream data is generated.
In one of the embodiments, it is described according to the flow residual time length, the expectation residual time length of present node with And the expectation duration calculation of each subsequent node goes out the urgency that the Work stream data is in the present node, including:Obtain Take the logical relation between each subsequent node, the logical relation between node includes relation and different layers in same level The relation of level;Go out the expectation duration of corresponding level node according to the expectation duration calculation of the subsequent node in same level;Root When going out flow expectation residue according to the expectation residual time length of the present node and the expectation duration calculation of each follow-up hierarchy node It is long, when the flow it is expected that residual time length is in the expectation of hierarchy node for the expectation residual time length of the present node and each It is the sum of long;Calculate the flow residual time length and the flow and it is expected the ratio between residual time length, according to the flow residual time length and The flow it is expected that the ratio between residual time length determines that the Work stream data is in the urgency of the present node.
In one of the embodiments, it is described receive to the task access request of the Work stream data on present node it Before, the method further includes:Circulation is obtained to be processed to the Work stream data on each node the maximum duration, most completed finished Short completion duration and most probable complete duration;Duration is completed according to maximum duration, most short completion duration and the most probable completed Calculate the expectation duration of corresponding node.
A kind of Work stream data processing method, the described method includes:Acquisition convection current goes to the work fluxion on present node According to processing information;The downstream node of the Work stream data circulation is determined according to the processing information;Obtain the workflow The flow residual time length of data and the expectation duration of each subsequent node, the subsequent node include the downstream node;According to The expectation duration calculation of the flow residual time length, the expectation residual time length of present node and each subsequent node goes out the work Make the urgency that flow data is in the downstream node;Sent to service terminal corresponding with the downstream node to the work The processing message of flow data, described handle in message carry the urgency that the Work stream data is in the downstream node.
In one of the embodiments, when the corresponding upstream node of the downstream node includes multiple, obtain on each The logical relation performed between trip node, the upstream node include present node;If the logical relation be or perform relation, Then processing termination messages are sent to the corresponding service terminal of upstream node outside the present node.
In one of the embodiments, it is described according to the flow residual time length, the expectation residual time length of present node with And the expectation duration calculation of each subsequent node goes out the urgency that the Work stream data is in the downstream node, including:Obtain Take the logical relation between each subsequent node, the logical relation between node includes relation and different layers in same level The relation of level;When going out the expectation of corresponding follow-up hierarchy node according to the expectation duration calculation of the subsequent node in same level It is long;Flow is gone out according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, the flow it is expected residual time length For the sum of the expectation residual time length of the present node and each expectation duration in hierarchy node;It is remaining to calculate the flow Duration and the flow it is expected the ratio between residual time length, it is expected the ratio between residual time length according to the flow residual time length and the flow Determine the urgency of the Work stream data.
A kind of time limit alarm set of Work stream data, described device include:Task access request receiving module, for connecing Receive the task access request to the Work stream data on present node;First timing information acquisition module, for being appointed according to described Access request of being engaged in obtains the timing information of the Work stream data;First urgency computing module, for being believed according to the time limit The expectation residual time length of flow residual time length, present node and the expectation duration calculation of each subsequent node in breath go out described Work stream data is in the urgency of the present node;Time limit reminding module, for the workflow reflected when the urgency When the urgency level of data exceedes pre-programmed emergency degree, the prompt message that time limit prompting is carried out to the Work stream data is generated.
A kind of Work stream data processing unit, described device include:Processing information acquisition module, goes to for obtaining convection current The processing information of Work stream data on present node;Downstream node determining module, for determining institute according to the processing information State the downstream node of Work stream data circulation;Second timing information acquisition module, for obtaining the flow of the Work stream data The expectation duration of residual time length and each subsequent node, the subsequent node include the downstream node;Second urgency calculates Module, during for according to the expectation of the flow residual time length, the expectation residual time length of present node and each subsequent node Length calculates the urgency that the Work stream data is in the downstream node;Handle message transmission module, for it is described The corresponding service terminal of downstream node sends the processing message to the Work stream data, and the work is carried in the processing message Make the urgency that flow data is in the downstream node.
A kind of computer-readable recording medium, is stored thereon with computer program, which is executed by processor A kind of the step of time limit based reminding method of the Work stream data provided in Shi Shixian the various embodiments described above, and/or a kind of workflow The step of data processing method.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor Computer program, the processor realized when performing described program a kind of Work stream data for being provided in the various embodiments described above when The step of limiting based reminding method, and/or a kind of the step of Work stream data processing method.
Time limit based reminding method, device, storage medium and the computer equipment of above-mentioned Work stream data, pass through setting procedure The expectation duration of residual time length and each node, and according to the flow residual time length of pending Work stream data, work as prosthomere The expectation residual time length of point and the expectation duration of each subsequent node are in the urgent of present node to calculate Work stream data Degree, when the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, generates and Work stream data is carried out The prompt message that time limit reminds.So that work can be determined according to the expectation duration of each node and the residual time length of workflow The urgency level of flow data, and determine the need for carrying out time limit prompting according to urgency level, so as to improve to work The flexibility that the time limit of flow data reminds.
Correspondingly, above-mentioned Work stream data processing method, device, storage medium and computer equipment, also by setting The expectation duration of flow residual time length and each node, and according to the flow residual time length of pending Work stream data and every The expectation duration of a subsequent node calculates the urgency that Work stream data is in present node, is circulated to Work stream data The corresponding service terminal of downstream node send the processing message for carrying the urgency so that the processing in respective downstream nodes is used Family can to carry out, pending Work stream data carries out sequential processes according to the urgency, so as to improve to workflow The flexibility of data processing.
Brief description of the drawings
Fig. 1 is the time limit based reminding method of Work stream data and a kind of Work stream data processing method in one embodiment Applied environment figure;
Fig. 2 is the flow chart of the time limit based reminding method of Work stream data in one embodiment;
Fig. 3 is flow residual time length, the expectation residual time length of present node in timing information in one embodiment And the expectation duration calculation of each subsequent node goes out the flow chart that Work stream data is in the urgency of present node;
Fig. 4 is the flow chart of Work stream data processing method in one embodiment;
Logical relation schematic diagram between the part of nodes that Fig. 5 is included by Work stream data in one embodiment;
Fig. 6 is according to flow residual time length, the expectation residual time length of present node and each follow-up in one embodiment The expectation duration calculation of node goes out the flow chart that Work stream data is in the urgency of downstream node;
Fig. 7 is the structure diagram of the time limit alarm set of Work stream data in one embodiment;
Fig. 8 is the structure diagram of Work stream data processing unit in one embodiment;
Fig. 9 is the cut-away view of one embodiment Computer equipment.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not For limiting the present invention.
At the time limit based reminding method and a kind of Work stream data of a kind of Work stream data that the embodiment of the present invention is provided Reason method, can be applied in application environment as shown in Figure 1.With reference to refering to what is shown in Fig. 1, terminal 110 is logical with computer equipment 120 Network connection is crossed, terminal 110 includes but not limited to mobile phone, handheld device, tablet computer, personal digital assistant or wearable device Deng any one.BPM (Business Process Management, Business Process Management) is configured with computer equipment 120 System, and more parts of Work stream datas are stored, the data processing state of every part of Work stream data is have recorded, that is, what is circulated waits to locate The node of reason, while it is also recorded for the processing user of each data flow on each node.Processing user can be visited by terminal 110 Ask corresponding BPM systems, terminal 110 can obtain user on the BPM and generation it is pending to user itself to distributing Work stream data task access request, the related timing information of the Work stream data is obtained according to the access request, and count The urgency in present node of the Work stream data is calculated, to prompt user to handle the work immediately according to the urgency Flow data.And further, when computer equipment 120 receives terminal 110 to the processing information of corresponding Work stream data, The workflow can be calculated also according to the related timing information of the Work stream data to be circulated to the downstream node of present node On urgency, and corresponding service terminal sends the processing message to Work stream data to downstream node, in the processing message Carry the urgency that Work stream data is in downstream node.Wherein, computer equipment 120 can be that server or terminal etc. are any A kind of equipment.When the computer equipment 120 is server, can be formed with the either multiple servers of independent server Server cluster is realized.
In one embodiment, as shown in Figure 2, there is provided a kind of time limit based reminding method of Work stream data, the present embodiment It is applied to illustrate exemplified by computer equipment 120 as shown in Figure 1 in this way, which may include but unlimited In terminal or server etc. it is therein any one, this method includes:
Step S202, receives the task access request to the Work stream data on present node.
In the present embodiment, computer equipment can receive the task access request of the Work stream data on present node.When this When computer equipment is terminal, user can be received the sign-on access of BPM systems is operated, triggering phase is operated according to the sign-on access The task access request answered.When the computer equipment is server, it can receive to be accessed as the task transmitted by above-mentioned terminal and ask Ask.
Wherein, BPM systems are the system for the processing such as being inquired about Work stream data, being managed and being examined.Distribution A pending Work stream data to the user is corresponding pending task.Specifically, it is provided with BPM systems more Logical relation between a node, and each node, logical relation are for determining that the order of the circulation between each node is closed System.For every part of Work stream data, the circulation between node can be carried out according between set node and logical relation.Stream Turn the node that order is located at after present node, be the subsequent node of present node.
Present node is the pending node that relevant work flow data circulates, the work fluxion on present node According to the task data for the required processing on present node.By taking insurance as an example, the Work stream data of a certain insurance class may include The data such as insurance numbering, insurer and core insurance money volume, correspondingly, for the processing node of the Work stream data setting of the insurance class May include mechanism core guarantor handle node, centronucleus guarantor handle node, quality inspection sampling observation node, central issue hilllock processing node, General headquarters core guarantor handles node and quality inspection hilllock processing node etc..
In one embodiment, which can be the node to the user on a certain node in workflow The inquiry request of task data, the node identification and user identifier of respective nodes are carried in the task access request.Node mark Knowledge can be made of at least one therein such as the numeral of presetting digit capacity, letter, punctuation mark and other spcial characters, be used for The corresponding node of unique mark.Similarly, user identifier can include numeral, letter and punctuation mark etc. therein at least one The character string of the character of kind, for the corresponding user of unique mark.
Step S204, the timing information of Work stream data is obtained according to task access request.
It can be inquired about accordingly from computer equipment local cache or the data of storage according to the task access request of the user Work stream data and its timing information, or the task access request can be sent to server, receive by server lookup to Relevant work flow data and its timing information.The timing information includes the flow residual time length, current of corresponding Work stream data The expectation duration of the expectation residual time length of node and each follow-up hierarchy node, may also include the flow of relevant work flow data The one or more therein such as task handling duration of handling duration, each node.Every part of Work stream data generation when, Flow processing duration of the Work stream data in whole flow process is accordingly provided with, for each node in workflow, The corresponding task handling duration for being provided with node, the task handling duration of different nodes are not necessarily identical.
Specifically, when not completing the processing on all nodes also more than the flow processing duration, the Work stream data is whole Time-out is handled in a flow, the residual time length of the flow processing duration is the flow residual time length of relevant work flow data.When When Work stream data is circulated to a certain node, if stopping duration also not processed on this node exceedes appointing for respective nodes Business handling duration, then judge the processing time-out of Work stream data on this node.
The expectation duration of node is the history work fluxion gone to according to the user of record in processing respective streams on the node According to completion duration used, being used for of calculating predicts that user completes the duration of the Work stream data on the node.It is expected residue Duration is the circulation time in the circulation to respective nodes to add the expectation duration, then subtract current time it is obtained when It is long.
In one embodiment, the sum of task handling duration that a Work stream data is set on all the nodes is not yet Necessarily it is equal to the flow processing duration;The sum of expectation duration that a Work stream data is set on all the nodes is also not necessarily Equal to the flow processing duration.For example, a certain Work stream data includes 10 nodes, 10 nodes according to execution elder generation Node 1, node 2 to node 10 are sequentially followed successively by afterwards.The expectation duration that each node is set is 2 days, the stream of whole flow process Journey handling duration is 15 days.If current time is August in 2017 20 days, the generated time of the Work stream data is in August, 2017 10, present node was node 8, and the time to circulate to present node is August in 2017 20 days, then corresponding flow residual time length As 5 days, the expectation residual time length of present node was 1 day.
Specifically, computer equipment can be allocated to the user according to the user identifier inquiry carried in task access request Work stream data, and the node that each Work stream data circulates further is obtained from the Work stream data inquired Node identification, when the node identification is identical with the node identification carried in task access request, that is, judge the node identification Identical Work stream data is the pending Work stream data that is accessed, can obtain determined by the flow of Work stream data remain The expectation duration of remaining duration, the expectation residual time length of present node and each subsequent node.
Step S206, the expectation residual time length of flow residual time length, present node in timing information and each The expectation duration calculation of subsequent node goes out the urgency that Work stream data is in present node.
In the present embodiment, the urgency in present node is used to characterize circulation to the pending work on present node The urgency level in time limit of the flow data in whole flow process, the urgency are to be remained according to the expectation duration on each node and flow What remaining duration was calculated.Wherein, which can be specific numerical value, and the corresponding urgency level of different numerical value is different.
In one embodiment, can be according to the expectation residual time length of present node and the expectation duration meter of each subsequent node Calculate flow of the Work stream data in whole flow process and it is expected residual time length, remained further according to the expectation residual time length with the flow Remaining duration calculation goes out the urgency of present node.For example the two of residual time length and flow residual time length can it is expected according to the flow The difference of the ratio between person or both is used as urgency.
In one embodiment, the numerical value of urgency is smaller, then it represents that the urgency level of relevant work flow data is higher;Tightly Anxious degree is bigger, then it represents that the urgency level of the Work stream data is lower.
Step S208, when the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, generation pair Work stream data carries out the prompt message of time limit prompting.
In the present embodiment, urgency threshold value is also preset, urgency threshold value is the Work stream data for weighing Agency Whether the threshold value of certain urgency level is exceeded.Specifically, may compare size between the urgency and urgency threshold value, when less than During the urgency, it can determine that the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, can generate to work Make flow data and carry out the prompt message of time limit prompting, and show.Wherein, which can be the letter of identified urgency level Breath, the form of expression of the information can be text prompt form, or be color mark form, can also be the combination of both of the above Deng.
For example, the urgency level of task can be identified behind the task of corresponding Work stream data, goes back cocoa to phase The task for the Work stream data answered is marked with color corresponding with the urgency level, for example can be directed to low urgency level not With color mark;For the task of the Work stream data of middle urgency level, with Green Marker;For the workflow of high urgency level The task of data, with red-label;For the task of the Work stream data more than high urgency level, with density bullet.
In one embodiment, it is pending for every part when identified pending Work stream data includes more parts Work stream data, flow residual time length, the present node of every part of Work stream data can be obtained according to above-mentioned step S204 Expectation residual time length and each subsequent node expectation duration, and calculate every part of Work stream data according to step S206 and be in The urgency of present node, and according to step S208, exceed every part of Work stream data of pre-programmed emergency degree for urgency level, life Paired relevant work flow data carries out the prompt message of time limit prompting.
The time limit based reminding method of above-mentioned Work stream data, passes through the expectation of setting procedure residual time length and each node Duration, and according to the flow residual time length of pending Work stream data, the expectation residual time length of present node and each follow-up The expectation duration of node calculates the urgency that Work stream data is in present node, when the Work stream data of urgency reflection Urgency level when exceeding pre-programmed emergency degree, generate the prompt message that time limit prompting is carried out to Work stream data.So that can root The urgency level of Work stream data is determined according to the expectation duration of each node and the residual time length of workflow, and according to urgent Degree determines the need for carrying out time limit prompting, so as to improving the flexibility to the prompting of time limit of Work stream data.
In one embodiment, as shown in figure 3, step S206 includes:
Step S302, obtains the logical relation between each subsequent node, and the logical relation between node includes being in phase With the relation of level and the relation of different levels.
In the present embodiment, logical relation is for determining the circulation ordinal relation between each node.Patrolling between node The relation of collecting includes the relation of relation and different levels in same level.Same level is represented between two or more nodes Circulation order is to be in same sequence, and there is no point of priority, can be at simultaneously column processing.Two or more are not represented into level Circulation order between a node is point in the presence of priority, that is, needs sequencing and handled, the first processing of order is complete After finishing, Work stream data just circulates on node thereafter and is handled.
Step S304, goes out the expectation of corresponding level node according to the expectation duration calculation of the subsequent node in same level Duration.
In the present embodiment, the expectation duration of hierarchy node is the Work stream data predicted from circulation to the level that mutually exists together One or more nodes start, to the same level on all nodes it is processed finish, when circulating to next level, institute The duration needed.Specifically, the expectation duration of the hierarchy node can be adding for the expectation duration of each node in same level Weight average value, or the respective layer can be determined according to the specific execution relation of each node time between same level The calculating of the expectation duration of level node.The execution relation includes performing relation side by side and/or performs relation.Execution relation is side by side Circulation to the Work stream data on the node between same level is both needed to perform, negotiable to the level section after being finished The downstream node of point.Or it is that circulation to the Work stream data on the node between same level need to only perform wherein one to perform relation It is a, wherein one be performed after, then circulation to the hierarchy node downstream node.
Wherein, it is the upstream relative to the node positioned at its adjacent, preceding node for a certain node Node, is the downstream node relative to the node positioned at its adjacent, posterior node.It is corresponding, saved relative to the upstream For point, above-mentioned a certain node is the downstream node of the upstream node.
In one embodiment, the size it is expected between duration of the subsequent node in same level is may compare, when this When the execution relation of node between same level is or performs relation, the expectation duration that can choose minimum is arranged to corresponding The expectation duration of hierarchy node;It is optional when the execution relation of the node between being in same level is performs relation side by side The expectation duration of maximum is taken to be arranged to the expectation duration of corresponding level node.
Step S306, goes out according to the expectation duration calculation of the expectation residual time length of present node and each follow-up hierarchy node Flow it is expected residual time length.
In the present embodiment, flow it is expected residual time length for the expectation residual time length of present node and is each in hierarchy node The sum of expectation duration.Can be by the expectation residual time length of present node and each and the expectation duration of succeeding layer level node is folded Add, flow obtain and as relevant work flow data it is expected residual time length.
Step S308, calculation process residual time length and flow it is expected the ratio between residual time length, according to flow residual time length and stream Journey it is expected that the ratio between residual time length determines that Work stream data is in the urgency of present node.
Specifically, flow residual time length can it is expected that residual time length is divided by with flow, obtained business is directly disposed as work Make the urgency that flow data is in present node.Or corresponding weights can be set, business will be obtained and be multiplied with the weights, obtained Product is arranged to the urgency that Work stream data is in present node.
In one embodiment, whether the expectation residual time length that can detect present node is more than 0, if so, then performing above-mentioned Step S308, otherwise, it is the numerical value for representing more than pre-programmed emergency degree that can directly set corresponding urgency.Wherein, if The expectation residual time length of present node is less than or equal to 0, represents circulation to the stay time of the Work stream data on present node Prediction duration is exceeded or has reached, then the urgency level for the Work stream data that urgency directly can be arranged to reflection, which exceedes, to be preset The numerical value of urgency level.
In the present embodiment, by further obtaining the logical relation between each subsequent node, according in same level The expectation duration calculation of subsequent node go out the expectation duration of corresponding level node, the expectation residual time length of present node and each The expectation duration calculation of follow-up hierarchy node goes out flow and it is expected residual time length so that the flow calculated it is expected residual time length more It can reflect the residual time length spent needed for the estimated Work stream data handled in whole flow process of processing exactly.And according to stream Journey residual time length and flow it is expected the ratio between residual time length to determine that Work stream data is in the urgency of present node, also can be more Reflect urgency level of the Work stream data on present node exactly.
In one embodiment, the above method further include it is expected duration calculating process, the process can step S202 it Preceding execution.Specifically, which includes:Obtain the maximum completion for circulating and being processed and finishing to the Work stream data on each node Duration, most short completion duration and most probable complete duration;When completing duration, most short completion duration and most probable completion according to maximum The long expectation duration for calculating corresponding node.
In the present embodiment, maximum complete duration can be within preset period, record it is all complete in respective nodes Into in duration, a maximum completion duration of numerical value, most short duration of completing can be a minimum completion duration of respective value, most It can be the most completion duration of the identical number for completing duration occur that may complete duration.When preset period can be nearest one section Phase, for example can be nearest half a year or 1 year nearest.
Specifically, the node belonging to it and deadline can be recorded in advance for the completion duration each counted on, and will The completion duration and the node identification of affiliated node are associated.The inquiry deadline is within preset period, for each Node, with the associated all completion durations of the node identification of the node, inquiry draw respective nodes it is maximum complete duration, Most short completion duration and most probable complete duration.
In one embodiment, for a certain node, if its maximum is completed duration, most short completion duration, most probable and is completed Duration and expectation duration are respectively A, B, C and D.
The expectation duration D of the node can be then calculated according to following calculation formula:
D=(A+B+nC)/(n+2).
Wherein, n is coefficient, can be any appropriate natural number, such as, it is 4 that can set n.Calculated by above-mentioned formula Go out and it is expected duration on each node accordingly, can further improve and it is expected that the prediction user that duration is reflected is completed on the node The accuracy of the duration of Work stream data.
In one embodiment, as shown in figure 4, additionally providing a kind of Work stream data processing method, the present embodiment is with this Method be applied to computer equipment in exemplified by illustrate, the computer equipment may include but be not limited to terminal or server etc. its In any one, this method includes:
Step S402, obtains the processing information for the Work stream data that convection current is gone on present node.
In the present embodiment, computer equipment can obtain the processing information for the Work stream data that convection current is gone on present node, Deserve the computer equipment when being terminal, user's convection current in BPM systems can be received and go to Work stream data on present node Processing operation, corresponding processing information is generated according to processing operation.When the computer equipment is server, can receive by Above-mentioned terminal sends the processing information for triggering generation.
Processing information goes to the processing information of the Work stream data on present node for convection current, can be carried in the processing information User identifier so that according to the recognizable processing user for making respective handling information of the user's mark.Wherein, processing information can be To information such as the supplement to Work stream data or examination & approval.By taking processing information is approval information as an example, which is in system The approval results of upper generation.Approval results may include " to agree to ", " disagreeing ", " temporary opinion ", " solicit other people opinions ", " return Return applicant " and the approval results such as " forward other people handle ".
Step S404, the downstream node of Work stream data circulation is determined according to processing information.
It is relative to the node positioned at its adjacent, preceding node for a certain node in the present embodiment Upstream node, positioned at its adjacent, posterior node be relative to the node downstream node.It is corresponding, relative to this For upstream node, above-mentioned a certain node is the downstream node of the upstream node.Set by different types of Work stream data The node put is not necessarily identical.Computer equipment can be regular according to the circulation of the Work stream data between the individual nodes, and root Next node that the Work stream data is circulated extremely, the i.e. downstream node are determined according to first processing information.
Specifically, more set circulation models can be pre-set, the corresponding circulation rule of the model that respectively circulates is different.For giving birth to Into Work stream data, the matched circulation mould of relevant work flow data institute can be determined according to the specifying information in the Work stream data Type, according to the circulation rule and processing information defined in the circulation model, determines the downstream joint that the Work stream data circulates Point.
By taking processing information is for approval results as an example, when processing information passes through for examination & approval, it can be passed through according to the examination & approval Processing information, determine the downstream node that is circulated extremely of the Work stream data in defined circulation rule.
Step S406, obtains the flow residual time length of Work stream data and the expectation duration of each subsequent node.
In the present embodiment, can be inquired about from computer equipment local cache or the data of storage relevant work flow data and its Timing information, or the task access request can be sent to server, receive by server lookup to relevant work fluxion According to and its timing information.The timing information includes the flow residual time length of corresponding Work stream data, the expectation residue of present node The expectation duration of duration and each follow-up hierarchy node, may also include the flow processing duration, each of relevant work flow data The one or more therein such as the task handling duration of node.It is to be appreciated that the subsequent node includes downstream node.
Step S408, according to the phase of flow residual time length, the expectation residual time length of present node and each subsequent node Duration calculation is hoped to go out the urgency that Work stream data is in downstream node.
In the present embodiment, the urgency in downstream node has been handled for characterizing the Work stream data in present node Finish, circulate to downstream node, the urgency level in the time limit in whole flow process, the urgency is according to the phase on each node What prestige duration and flow residual time length were calculated.Wherein, which can be specific numerical value, and different numerical value are corresponding urgent Degree is different.
In one embodiment, the Work stream data can be gone out according to the expectation duration calculation of each subsequent node entirely flowing Flow in journey it is expected residual time length, is calculated further according to the expectation residual time length and the flow residual time length at Work stream data In the urgency of downstream node.Such as can it is expected according to the flow residual time length and flow residual time length ratio between two or Both differences are used as urgency.
Step S410, sends the processing message to Work stream data, processing disappears to service terminal corresponding with downstream node The urgency that Work stream data is in downstream node is carried in breath.
In the present embodiment, the processing user of Work stream data on each node has been preset.Specifically, pre-established every Incidence relation between the node identification of a node and the user identifier of respective handling user so that Work stream data circulates to phase When answering on node, it can determine to handle Work stream data on the node according to the node identification of the node and the incidence relation Handle the user identifier of user.
Specifically, computer equipment according to identified downstream node, can obtain the node identification association of the downstream node User identifier, identify corresponding service terminal to the user and send the message that is handled the Work stream data, wherein should The urgency that calculated Work stream data is in downstream node is carried in message so that the processing in respective downstream nodes is used Family can to carry out, pending Work stream data carries out sequential processes according to the urgency, so as to improve to workflow The flexibility of data processing.
In one embodiment, when the corresponding upstream node of downstream node include it is multiple when, obtain each upstream node it Between the logical relation that performs, upstream node includes present node;If logical relation is or performs relation, to outside present node The corresponding service terminal of upstream node send processing termination messages.
In the present embodiment, upstream node and downstream node are a kind of opposite sayings.Upstream node can correspond to multiple downstreams Node, opposite, downstream node can also correspond to multiple upstream nodes.It is also advance for multiple upstream nodes corresponding to downstream There is provided the logical relation performed between each upstream node.Logical relation includes exclusive execution relation, performs relation side by side And or execution relation etc..
Wherein, exclusive execution relation, i.e., be only capable of one of them in the plurality of upstream node and be performed;Perform pass side by side System, i.e., the plurality of upstream node needs all to be performed, just can be according to careful after the plurality of upstream node is all performed Criticize the node that result determines follow-up required examination & approval;Or performing relation, i.e., the plurality of upstream node can be all performed, but only needed After one is performed, then other upstream nodes need not be then performed.
When the corresponding upstream node of identified downstream node includes multiple, it is thus evident that the present node is downstream One in the corresponding upstream node of node.Terminal can obtain the logical relation performed between each upstream node, when for or hold During row relation, the processing knot of any one upstream node (in the present embodiment, i.e., the present node in step 202) can got After fruit, then other upstream nodes that the Work stream data is circulated extremely, can be by the handling result of the upstream node without processed Handling result as the synthesis of multiple upstream nodes.Meanwhile the processing user set on other upstream nodes can be obtained User identifier, identify corresponding service terminal to the user and send processing termination messages, with notify corresponding user without The Work stream data is handled in respective nodes.
Come using the processing to Work stream data as examination & approval processing for example, as shown in figure 5, being in another embodiment Logical relation between the part of nodes that Work stream data is included.
Wherein, node D and E is the upstream node of node F.If between node D and E it is exclusive execution relation, node D Can only have one between E to be performed, after being finished, can be determined according to handling result it is follow-up needed for examination & approval node.If It is execution relation arranged side by side between node D and E, then needs to wait node D and E to be all finished, according to the integrated treatment result Determine the node of follow-up required examination & approval.If being between node D and E or performing relation, can be performed between node D and E.Clothes Business device can be closed to another node (such as section after the handling result of one of node (such as node D) is got Point E) examination & approval, and according to the handling result determine it is follow-up needed for examination & approval node, while to the corresponding industry of another node Terminal of being engaged in sends examination & approval termination messages, which is the Work stream data gone to without convection current on another node The message examined so that the service terminal can handle other examination & approval tasks for needing to examine.
In the present embodiment, by the logical relation to setting execution between multiple upstream nodes, between corresponding upstream node Logical relation be or perform relation when, any one upstream node (than present node described above) processing information can be got When, that is, judging to complete the execution to the plurality of upstream node so that Work stream data can continue to turn processing toward downstream node-flow, Further increase the efficiency to Work stream data processing and flexibility.
In one embodiment, as shown in fig. 6, step S408 includes:
Step S602, obtains the logical relation between each subsequent node, and the logical relation between node includes being in phase With the relation of level and the relation of different levels.
Same level represents that the circulation order between two or more nodes is to be in same sequence, and there is no successively Point, can be at and column processing.It is point in the presence of priority not represent the circulation order between two or more nodes into level, i.e., Sequencing is needed to be handled, order is first be disposed after, Work stream data just circulate the section being extremely located at thereafter Handled on point.
Step S604, goes out corresponding follow-up hierarchy node according to the expectation duration calculation of the subsequent node in same level It is expected duration.
The expectation duration of the hierarchy node can be the weighted average of the expectation duration of each node in same level, Or the corresponding level node can be determined according to the specific execution relation of each node time between same level It is expected the calculating of duration.
Execution relation between node in same level includes performing relation side by side and/or performs relation.Perform side by side Relation is both needed to perform for circulation to the Work stream data on the node between same level, negotiable extremely after being finished The downstream node of hierarchy node.Or it is that circulation to the Work stream data on the node between same level only needs to perform to perform relation One of them, wherein one be performed after, then circulation to the hierarchy node downstream node.
In one embodiment, the size it is expected between duration of the subsequent node in same level is may compare, when this When the execution relation of node between same level is or performs relation, the expectation duration that can choose minimum is arranged to corresponding The expectation duration of hierarchy node;It is optional when the execution relation of the node between being in same level is performs relation side by side The expectation duration of maximum is taken to be arranged to the expectation duration of corresponding level node.
Step S606, goes out flow according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, flow phase Hope residual time length for the sum of the expectation residual time length of present node and each expectation duration in hierarchy node.
In the present embodiment, can by each and the expectation duration of succeeding layer level node is overlapped, it is obtaining and be corresponding The flow of Work stream data it is expected residual time length.
Step S608, calculation process residual time length and flow it is expected the ratio between residual time length, according to flow residual time length and stream Journey it is expected that the ratio between residual time length determines the urgency of Work stream data.
Specifically, flow residual time length can it is expected that residual time length is divided by with flow, obtained business is directly disposed as work Make the urgency that flow data is in present node.Or corresponding weights can be set, business will be obtained and be multiplied with the weights, obtained Product is arranged to the urgency that Work stream data is in present node.
In one embodiment, whether the expectation residual time length that can detect present node is more than 0, if so, then performing above-mentioned Step S308, otherwise, it is the numerical value for representing more than pre-programmed emergency degree that can directly set corresponding urgency.Wherein, if The expectation residual time length of present node is less than or equal to 0, represents circulation to the stay time of the Work stream data on present node Prediction duration is exceeded or has reached, then the urgency level for the Work stream data that urgency directly can be arranged to reflection, which exceedes, to be preset The numerical value of urgency level.
In the present embodiment, by further obtaining the logical relation between each subsequent node, according in same level The expectation duration calculation of subsequent node go out the expectation duration of corresponding level node, the expectation residual time length of present node and each The expectation duration calculation of follow-up hierarchy node goes out flow and it is expected residual time length so that the flow calculated it is expected residual time length more It can reflect the residual time length spent needed for the estimated Work stream data handled in whole flow process of processing exactly.And according to stream Journey residual time length and flow it is expected the ratio between residual time length to determine that Work stream data is in the urgency of present node, also can be more Reflect urgency level of the Work stream data on present node exactly.
In one embodiment, above-mentioned Work stream data processing method further includes the calculating process for it is expected duration, the process It can be performed before step S402.Specifically, which includes:Circulation to the Work stream data on each node is obtained to be processed Maximum duration, most short completion duration and the most probable completed finished completes duration;Duration, most short completion duration are completed according to maximum Go out the expectation duration of corresponding node with most probable completion duration calculation.
Specifically, the node belonging to it and deadline can be recorded in advance for the completion duration each counted on, and will The completion duration and the node identification of affiliated node are associated.The inquiry deadline is within preset period, for each Node, with the associated all completion durations of the node identification of the node, inquiry draw respective nodes it is maximum complete duration, Most short completion duration and most probable complete duration.
In one embodiment, for a certain node, if its maximum is completed duration, most short completion duration, most probable and is completed Duration and expectation duration are respectively A, B, C and D.
The expectation duration D of the node can be then calculated according to following calculation formula:
D=(A+B+nC)/(n+2).
Wherein, n is coefficient, can be any appropriate natural number, such as, it is 4 that can set n.Calculated by above-mentioned formula Go out and it is expected duration on each node accordingly, can further improve and it is expected that the prediction user that duration is reflected is completed on the node The accuracy of the duration of Work stream data.
In one embodiment, as shown in Figure 7, there is provided a kind of time limit alarm set of Work stream data, the device bag Include:
Task access request receiving module 702, the task for receiving to the Work stream data on present node accesses please Ask.
First timing information acquisition module 704, for obtaining the timing information of Work stream data according to task access request.
First urgency computing module 706, the expectation for flow residual time length, present node in timing information The expectation duration calculation of residual time length and each subsequent node goes out the urgency that Work stream data is in present node.
Time limit reminding module 708, the urgency level of the Work stream data for reflecting when urgency exceed pre-programmed emergency journey When spending, the prompt message that time limit prompting is carried out to Work stream data is generated.
In one embodiment, the first urgency computing module 706 is additionally operable to obtain the logic between each subsequent node Relation, the logical relation between node include the relation of relation and different levels in same level;According in identical layer The expectation duration calculation of the subsequent node of level goes out the expectation duration of corresponding level node;According to the expectation residual time length of present node Go out flow with the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, flow it is expected that residual time length is present node Expectation residual time length and the sum of each expectation duration in hierarchy node;Calculation process residual time length and flow it is expected remaining The ratio between duration, it is expected that the ratio between residual time length determines that Work stream data is in the tight of present node according to flow residual time length and flow Anxious degree.
In one embodiment, the time limit alarm set of above-mentioned Work stream data further includes:
First it is expected duration calculation module, is processed what is finished for obtaining circulation to the Work stream data on each node Maximum completes duration, most short completion duration and most probable and completes duration;Duration, most short completion duration are completed according to maximum and most may be used It can complete the expectation duration that duration calculation goes out corresponding node.
In one embodiment, as shown in Figure 8, there is provided a kind of Work stream data processing unit, the device include:
Processing information acquisition module 802, the processing information of the Work stream data on present node is gone to for obtaining convection current.
Downstream node determining module 804, for determining the downstream node of Work stream data circulation according to processing information.
Second timing information acquisition module 806, for the flow residual time length for obtaining Work stream data and each follow-up section The expectation duration of point, subsequent node include downstream node.
Second urgency computing module 808, for according to flow residual time length, the expectation residual time length of present node and The expectation duration calculation of each subsequent node goes out the urgency that Work stream data is in downstream node.
Message transmission module 810 is handled, for being sent to service terminal corresponding with downstream node to Work stream data Message is handled, handles and the urgency that Work stream data is in downstream node is carried in message.
In one embodiment, upstream node includes present node;Processing message transmission module 910 is additionally operable to work as downstream joint When the corresponding upstream node of point includes multiple, the logical relation performed between each upstream node is obtained;If logical relation be or Execution relation, then send processing termination messages to the corresponding service terminal of upstream node outside present node.
In one embodiment, the second urgency computing module 808 is additionally operable to obtain the logic between each subsequent node Relation, the logical relation between node include the relation of relation and different levels in same level;According in identical layer The expectation duration calculation of the subsequent node of level goes out the expectation duration of corresponding follow-up hierarchy node;According to each follow-up hierarchy node It is expected that duration calculation goes out flow and it is expected residual time length, flow it is expected residual time length for the expectation residual time length of present node and each The sum of expectation duration in hierarchy node;Calculation process residual time length and flow it is expected the ratio between residual time length, are remained according to flow Remaining duration and flow it is expected that the ratio between residual time length determines the urgency of Work stream data.
In one embodiment, which further includes:
Second it is expected duration calculation module, is processed what is finished for obtaining circulation to the Work stream data on each node Maximum completes duration, most short completion duration and most probable and completes duration;Duration, most short completion duration are completed according to maximum and most may be used It can complete the expectation duration that duration calculation goes out corresponding node.
Modules in above device can be realized fully or partially through software, hardware and combinations thereof.Above-mentioned each mould Block can in the form of hardware be embedded in or independently of in the computer equipment in server, can also be stored in service in a software form In memory in device, called in order to computer equipment and perform the corresponding operation of above modules.The computer equipment can Think central processing unit (CPU), microcomputer apparatus, microcontroller etc..
In one embodiment, there is provided a kind of computer-readable recording medium, is stored thereon with computer program, the meter Calculation machine program realizes a kind of time limit based reminding method of the Work stream data provided in the various embodiments described above when being executed by processor Step, and/or a kind of the step of Work stream data processing method.
In one embodiment, following steps are realized when which is executed by processor:Receive to present node On Work stream data task access request;The timing information of Work stream data is obtained according to task access request;According to when The expectation residual time length of flow residual time length, present node and the expectation duration calculation of each subsequent node in limit information go out Work stream data is in the urgency of present node;When the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency During degree, the prompt message that time limit prompting is carried out to Work stream data is generated.
In one embodiment, realize that the flow in timing information is remaining when which is executed by processor The expectation duration calculation of duration, the expectation residual time length of present node and each subsequent node goes out Work stream data and is in current The urgency of node, comprises the following steps:Obtain the logical relation between each subsequent node, the logical relation bag between node Include the relation of relation and different levels in same level;According to the expectation duration calculation of the subsequent node in same level Go out the expectation duration of corresponding level node;During according to the expectation of the expectation residual time length of present node and each follow-up hierarchy node The long flow that calculates it is expected residual time length, and flow it is expected residual time length for the expectation residual time length of present node and is each in layer The sum of expectation duration of level node;Calculation process residual time length and flow it is expected the ratio between residual time length, according to flow residual time length It is expected that the ratio between residual time length determines that Work stream data is in the urgency of present node with flow.
In one embodiment, following steps are also realized when which is executed by processor:Obtain and circulate to every Work stream data on a node maximum duration, most short completion duration and the most probable completed finished that be processed completes duration;Root According to the maximum expectation duration for completing duration, most short completion duration and most probable and completing duration calculation and going out corresponding node.
In one embodiment, following steps are realized when which is executed by processor:Obtain convection current and go to and work as The processing information of Work stream data on front nodal point;The downstream node of Work stream data circulation is determined according to processing information;Obtain The flow residual time length of Work stream data and the expectation duration of each subsequent node, subsequent node include downstream node;According to stream The expectation duration calculation of journey residual time length, the expectation residual time length of present node and each subsequent node goes out at Work stream data In the urgency of downstream node;The processing message to Work stream data, processing are sent to service terminal corresponding with downstream node The urgency that Work stream data is in downstream node is carried in message.
In one embodiment, following steps are also realized when which is executed by processor:When downstream node pair When the upstream node answered includes multiple, the logical relation performed between each upstream node is obtained, upstream node includes working as prosthomere Point;If logical relation is or performs relation, processing is sent eventually to the corresponding service terminal of upstream node outside present node Only message.
In one embodiment, realized when which is executed by processor according to flow residual time length, current The expectation residual time length of node and the expectation duration calculation of each subsequent node go out Work stream data and are in the tight of downstream node Anxious degree, comprises the following steps:Obtain the logical relation between each subsequent node, the logical relation between node includes being in phase With the relation of level and the relation of different levels;Gone out according to the expectation duration calculation of the subsequent node in same level after corresponding to The expectation duration of continuous hierarchy node;Flow is gone out according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, stream Journey it is expected residual time length for the sum of the expectation residual time length of present node and each expectation duration in hierarchy node;Calculate stream Journey residual time length and flow it is expected the ratio between residual time length, it is expected that the ratio between residual time length determines work according to flow residual time length and flow Make the urgency of flow data.
In one embodiment, following steps are also realized when which is executed by processor:Obtain and circulate to every Work stream data on a node maximum duration, most short completion duration and the most probable completed finished that be processed completes duration;Root According to the maximum expectation duration for completing duration, most short completion duration and most probable and completing duration calculation and going out corresponding node.
In one embodiment, there is provided a kind of computer equipment, including memory, processor and storage are on a memory And the computer program that can be run on a processor, when processor executive program, realize the one kind provided in the various embodiments described above The step of time limit based reminding method of Work stream data, and/or a kind of the step of Work stream data processing method.
Specifically, the computer equipment can be server or terminal etc. it is therein any one.Terminal includes but unlimited In mobile phone, tablet computer, portable notebook or intelligent wearable device etc..As shown in figure 9, set for one embodiment Computer Standby internal structure schematic diagram.The computer equipment includes processor, memory and the network interface connected by system bus. Wherein, the processor of the computer equipment is used to provide calculating and control ability, supports the operation of whole computer equipment.Storage Device is used to store data, instruction code etc., at least one computer program is stored on memory, which can be processed Device performs, to realize the Work stream data processing method suitable for computer equipment provided in the embodiment of the present application.Memory It may include non-volatile memory mediums such as magnetic disc, CD, read-only memory (Read-Only Memory, ROM) etc..Example Such as, in one embodiment, memory includes non-volatile memory medium and built-in storage.Non-volatile memory medium is stored with Operating system, database and computer program.It is stored with the database and is used for realization each embodiment of the above is provided one The time limit based reminding method and/or the relevant data of Work stream data processing method of kind Work stream data, for example can store corresponding Work stream data etc..The computer program can performed by processor, provided for each embodiment more than realizing one The time limit based reminding method and/or Work stream data processing method of kind Work stream data.Built-in storage in computer equipment is non- Operating system, database and computer program in volatile storage medium provide the running environment of cache.Network interface Can be Ethernet card or wireless network card etc., for communicating with exterior terminal or server.Those skilled in the art can The structure shown to understand, in Fig. 9, only with the block diagram of the relevant part-structure of application scheme, is not formed to this Shen Please the restriction of computer equipment that is applied thereon of scheme, specific computer equipment can include it is more more than shown in figure or Less component, either combines some components or is arranged with different components.Such as the computer equipment may also include it is aobvious Display screen, the display screen can be used for showing corresponding Work stream data and time limit reminder message etc..Display screen can be touch-screen, For example be capacitance plate or electrical screen, the clicking operation of the control of the touch screen display can be acted on by reception, generation is corresponding Instruction.
In one embodiment, following steps are realized during the processor executive program:Receive to the work on present node The task access request of flow data;The timing information of Work stream data is obtained according to task access request;According in timing information Flow residual time length, the expectation duration calculation of the expectation residual time length of present node and each subsequent node go out work fluxion According to the urgency in present node;When the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, Generate the prompt message that time limit prompting is carried out to Work stream data.
In one embodiment, realized during the processor executive program flow residual time length in timing information, when The expectation residual time length of front nodal point and the expectation duration calculation of each subsequent node go out Work stream data and are in present node Urgency, comprises the following steps:Obtain the logical relation between each subsequent node, the logical relation between node includes being in The relation of same level and the relation of different levels;Correspondence is gone out according to the expectation duration calculation of the subsequent node in same level The expectation duration of hierarchy node;According to the expectation residual time length of present node and the expectation duration calculation of each follow-up hierarchy node Go out flow and it is expected residual time length, flow it is expected residual time length for the expectation residual time length of present node and is each in hierarchy node The sum of expectation duration;Calculation process residual time length and flow it is expected the ratio between residual time length, according to flow residual time length and flow It is expected that the ratio between residual time length determines that Work stream data is in the urgency of present node.
In one embodiment, following steps are also realized during the processor executive program:Circulation is obtained to each node Work stream data maximum duration, most short completion duration and the most probable completed finished that be processed complete duration;According to maximum complete Into duration, most short duration and the most probable completed complete the expectation duration that duration calculation goes out corresponding node.
In one embodiment, following steps are realized during the processor executive program:Convection current is obtained to go on present node Work stream data processing information;The downstream node of Work stream data circulation is determined according to processing information;Obtain work fluxion According to flow residual time length and each subsequent node expectation duration, subsequent node includes downstream node;During according to flow residue The expectation duration calculation of long, the expectation residual time length of present node and each subsequent node goes out Work stream data and is in downstream joint The urgency of point;The processing message to Work stream data is sent to service terminal corresponding with downstream node, handles and is taken in message The urgency of downstream node is in Work stream data.
In one embodiment, following steps are also realized during the processor executive program:When the corresponding upstream of downstream node When node includes multiple, the logical relation performed between each upstream node is obtained, upstream node includes present node;If logic Relation is or performs relation, then sends processing termination messages to the corresponding service terminal of upstream node outside present node.
In one embodiment, realized during the processor executive program according to flow residual time length, the phase of present node The expectation duration calculation of residual time length and each subsequent node is hoped to go out the urgency that Work stream data is in downstream node, including Following steps:Obtain the logical relation between each subsequent node, the logical relation between node is included in same level The relation of relation and different levels;Corresponding follow-up level section is gone out according to the expectation duration calculation of the subsequent node in same level The expectation duration of point;Flow is gone out according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, flow it is expected surplus The sum of the expectation residual time length of a length of present node and each expectation duration in hierarchy node when remaining;When calculation process is remaining Long and flow it is expected the ratio between residual time length, it is expected that the ratio between residual time length determines Work stream data according to flow residual time length and flow Urgency.
In one embodiment, following steps are also realized during the processor executive program:Circulation is obtained to each node Work stream data maximum duration, most short completion duration and the most probable completed finished that be processed complete duration;According to maximum complete Into duration, most short duration and the most probable completed complete the expectation duration that duration calculation goes out corresponding node.
One of ordinary skill in the art will appreciate that realize all or part of flow in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program.The computer program is storable on memory, for example is stored in In one non-volatile computer read/write memory medium.The program is performed, it can be achieved that including the implementation of such as above-mentioned each method The flow of example.
Any reference used in the present invention to memory, storage, database or other media may include non-volatile Memory.Suitable nonvolatile memory may include read-only storage (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, its description is more specific and detailed, but simultaneously Cannot therefore it be construed as limiting the scope of the patent.It should be pointed out that come for those of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

  1. A kind of 1. time limit based reminding method of Work stream data, it is characterised in that the described method includes:
    Receive the task access request to the Work stream data on present node;
    The timing information of the Work stream data is obtained according to the task access request;
    The expectation residual time length of flow residual time length, present node in the timing information and each subsequent node It is expected that duration calculation goes out the urgency that the Work stream data is in the present node;
    When the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, generate to the workflow Data carry out the prompt message of time limit prompting.
  2. 2. according to the method described in claim 1, it is characterized in that, when the flow in the timing information is remaining The expectation duration calculation of long, the expectation residual time length of present node and each subsequent node goes out the Work stream data and is in institute The urgency of present node is stated, including:
    Obtain the logical relation between each subsequent node, the logical relation between node include relation in same level and The relation of different levels;
    Go out the expectation duration of corresponding level node according to the expectation duration calculation of the subsequent node in same level;
    Go out flow according to the expectation duration calculation of the expectation residual time length of the present node and each follow-up hierarchy node it is expected Residual time length, the flow it is expected that residual time length is in hierarchy node for the expectation residual time length of the present node and each It is expected the sum of duration;
    Calculate the flow residual time length and the flow and it is expected the ratio between residual time length, according to the flow residual time length and described Flow it is expected that the ratio between residual time length determines that the Work stream data is in the urgency of the present node.
  3. 3. according to the method described in claim 1, it is characterized in that, in the reception to the Work stream data on present node Before task access request, the method further includes:
    Obtain circulation be processed to the Work stream data on each node finish maximum complete duration, most short completion duration and most It may complete duration;
    When going out the expectation of corresponding node according to the maximum completion duration, most short completion duration and most probable completion duration calculation It is long.
  4. A kind of 4. Work stream data processing method, it is characterised in that the described method includes:
    Obtain the processing information for the Work stream data that convection current is gone on present node;
    The downstream node of the Work stream data circulation is determined according to the processing information;
    The flow residual time length of the Work stream data and the expectation duration of each subsequent node are obtained, the subsequent node includes The downstream node;
    According to the expectation duration calculation of the flow residual time length, the expectation residual time length of present node and each subsequent node Go out the urgency that the Work stream data is in the downstream node;
    The processing message to the Work stream data, the processing message are sent to service terminal corresponding with the downstream node The middle urgency for carrying the Work stream data and being in the downstream node.
  5. 5. according to the method described in claim 4, it is characterized in that, when the corresponding upstream node of the downstream node is including multiple When, the logical relation performed between each upstream node is obtained, the upstream node includes present node;
    If the logical relation is or performs relation, sent out to the corresponding service terminal of upstream node outside the present node Send processing termination messages.
  6. It is 6. according to the method described in claim 4, it is characterized in that, described according to the flow residual time length, present node It is expected that the expectation duration calculation of residual time length and each subsequent node goes out the Work stream data and is in the downstream node Urgency, including:
    Obtain the logical relation between each subsequent node, the logical relation between node include relation in same level and The relation of different levels;
    Go out the expectation duration of corresponding follow-up hierarchy node according to the expectation duration calculation of the subsequent node in same level;
    Flow is gone out according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, the flow it is expected residual time length For the sum of the expectation residual time length of the present node and each expectation duration in hierarchy node;
    Calculate the flow residual time length and the flow and it is expected the ratio between residual time length, according to the flow residual time length and described Flow it is expected that the ratio between residual time length determines the urgency of the Work stream data.
  7. 7. the time limit alarm set of a kind of Work stream data, it is characterised in that described device includes:
    Task access request receiving module, for receiving the task access request to the Work stream data on present node;
    First timing information acquisition module, the time limit for obtaining the Work stream data according to the task access request believe Breath;
    First urgency computing module, the expectation for flow residual time length, present node in the timing information remain The expectation duration calculation of remaining duration and each subsequent node goes out the urgency that the Work stream data is in the present node;
    Time limit reminding module, the urgency level of the Work stream data for reflecting when the urgency exceed pre-programmed emergency degree When, generate the prompt message that time limit prompting is carried out to the Work stream data.
  8. 8. a kind of Work stream data processing unit, it is characterised in that described device includes:
    Processing information acquisition module, the processing information of the Work stream data on present node is gone to for obtaining convection current;
    Downstream node determining module, for determining the downstream node of the Work stream data circulation according to the processing information;
    The second timing information acquisition module, for the flow residual time length for obtaining the Work stream data and each subsequent node It is expected duration, the subsequent node includes the downstream node;
    Second urgency computing module, for according to the flow residual time length, the expectation residual time length of present node and every The expectation duration calculation of a subsequent node goes out the urgency that the Work stream data is in the downstream node;
    Message transmission module is handled, for being sent to service terminal corresponding with the downstream node to the Work stream data Message is handled, the urgency that the Work stream data is in the downstream node is carried in the processing message.
  9. 9. a kind of computer-readable recording medium, is stored thereon with computer program, it is characterised in that the computer program is located The step of reason device realizes method any one of claim 1 to 6 when performing.
  10. 10. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor Calculation machine program, it is characterised in that the processor realizes method any one of claim 1 to 6 when performing described program The step of.
CN201710775829.2A 2017-08-31 2017-08-31 Time limit based reminding method, processing method and its device of Work stream data, equipment Pending CN107909234A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710775829.2A CN107909234A (en) 2017-08-31 2017-08-31 Time limit based reminding method, processing method and its device of Work stream data, equipment
PCT/CN2018/089248 WO2019041931A1 (en) 2017-08-31 2018-05-31 Method and device for time limit reminding of workflow data, workflow data processing method and device, and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710775829.2A CN107909234A (en) 2017-08-31 2017-08-31 Time limit based reminding method, processing method and its device of Work stream data, equipment

Publications (1)

Publication Number Publication Date
CN107909234A true CN107909234A (en) 2018-04-13

Family

ID=61840084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710775829.2A Pending CN107909234A (en) 2017-08-31 2017-08-31 Time limit based reminding method, processing method and its device of Work stream data, equipment

Country Status (2)

Country Link
CN (1) CN107909234A (en)
WO (1) WO2019041931A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876312A (en) * 2018-07-18 2018-11-23 平安科技(深圳)有限公司 Case based reminding method, device, computer equipment and storage medium
CN109345184A (en) * 2018-08-01 2019-02-15 平安科技(深圳)有限公司 Nodal information processing method, device, computer equipment and storage medium based on micro- expression
WO2019041931A1 (en) * 2017-08-31 2019-03-07 平安科技(深圳)有限公司 Method and device for time limit reminding of workflow data, workflow data processing method and device, and apparatus
CN109636180A (en) * 2018-12-10 2019-04-16 拉扎斯网络科技(上海)有限公司 Object handles time limit management method, device, electronic equipment and readable storage medium storing program for executing
CN111178696A (en) * 2019-12-13 2020-05-19 中国建设银行股份有限公司 Service processing time overtime early warning method and device
CN113015112A (en) * 2021-03-15 2021-06-22 中国建设银行股份有限公司 Question list processing reminding method, device, equipment and readable storage medium
CN113282385A (en) * 2020-10-30 2021-08-20 常熟友乐智能科技有限公司 Service processing method and system based on online office equipment
CN115293655A (en) * 2022-09-30 2022-11-04 神州数码融信云技术服务有限公司 Flow control method and device, computer equipment and computer readable storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551880A (en) * 2008-03-31 2009-10-07 华为技术有限公司 Work flow time method, device and system
CN102932200A (en) * 2012-09-21 2013-02-13 东软集团股份有限公司 Monitoring method and device for information flow node processing time limit
CN106022568A (en) * 2016-05-09 2016-10-12 福建南威软件有限公司 Workflow processing method and apparatus

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140278466A1 (en) * 2013-03-15 2014-09-18 Cvs Pharmacy, Inc. Pharmacy workflow
CN104516264B (en) * 2013-09-26 2017-05-24 联想(北京)有限公司 Multi-period timing method, timer and electronic equipment using timer
CN107909234A (en) * 2017-08-31 2018-04-13 平安科技(深圳)有限公司 Time limit based reminding method, processing method and its device of Work stream data, equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551880A (en) * 2008-03-31 2009-10-07 华为技术有限公司 Work flow time method, device and system
CN102932200A (en) * 2012-09-21 2013-02-13 东软集团股份有限公司 Monitoring method and device for information flow node processing time limit
CN106022568A (en) * 2016-05-09 2016-10-12 福建南威软件有限公司 Workflow processing method and apparatus

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019041931A1 (en) * 2017-08-31 2019-03-07 平安科技(深圳)有限公司 Method and device for time limit reminding of workflow data, workflow data processing method and device, and apparatus
CN108876312A (en) * 2018-07-18 2018-11-23 平安科技(深圳)有限公司 Case based reminding method, device, computer equipment and storage medium
WO2020015143A1 (en) * 2018-07-18 2020-01-23 平安科技(深圳)有限公司 Case reminding method and apparatus, computer device and storage medium
CN109345184A (en) * 2018-08-01 2019-02-15 平安科技(深圳)有限公司 Nodal information processing method, device, computer equipment and storage medium based on micro- expression
WO2020024390A1 (en) * 2018-08-01 2020-02-06 平安科技(深圳)有限公司 Micro-expression-based node information processing method and apparatus, computer device, and storage medium
CN109345184B (en) * 2018-08-01 2023-06-06 平安科技(深圳)有限公司 Node information processing method and device based on micro-expressions, computer equipment and storage medium
CN109636180A (en) * 2018-12-10 2019-04-16 拉扎斯网络科技(上海)有限公司 Object handles time limit management method, device, electronic equipment and readable storage medium storing program for executing
CN111178696A (en) * 2019-12-13 2020-05-19 中国建设银行股份有限公司 Service processing time overtime early warning method and device
CN113282385A (en) * 2020-10-30 2021-08-20 常熟友乐智能科技有限公司 Service processing method and system based on online office equipment
CN113015112A (en) * 2021-03-15 2021-06-22 中国建设银行股份有限公司 Question list processing reminding method, device, equipment and readable storage medium
CN115293655A (en) * 2022-09-30 2022-11-04 神州数码融信云技术服务有限公司 Flow control method and device, computer equipment and computer readable storage medium
CN115293655B (en) * 2022-09-30 2023-01-20 神州数码融信云技术服务有限公司 Flow control method and device, computer equipment and computer readable storage medium

Also Published As

Publication number Publication date
WO2019041931A1 (en) 2019-03-07

Similar Documents

Publication Publication Date Title
CN107909234A (en) Time limit based reminding method, processing method and its device of Work stream data, equipment
US20200285937A1 (en) Consumption capacity prediction
CN107909330A (en) Work stream data processing method, device, storage medium and computer equipment
CN110992097B (en) Processing method and device for price of revenue product, computer equipment and storage medium
CN110322093B (en) Information processing method, information display method, information processing device and computing equipment
CN111950738A (en) Machine learning model optimization effect evaluation method and device, terminal and storage medium
CN107944000A (en) Flight freight rate update method, device, electronic equipment, storage medium
CN110471821A (en) Abnormal alteration detection method, server and computer readable storage medium
CN111694841A (en) Order mark generation method, device, server and storage medium
CN114663198A (en) Product recommendation method, device and equipment based on user portrait and storage medium
CN108279954A (en) A kind of method and device of application program sequence
CN108629560A (en) Task distributing method, electronic equipment and storage medium
CN112632179A (en) Model construction method and device, storage medium and equipment
CN113901236A (en) Target identification method and device based on artificial intelligence, electronic equipment and medium
CN110213071A (en) Verification of data method, apparatus, system, computer equipment and storage medium
CN104077288B (en) Web page contents recommend method and web page contents recommendation apparatus
Li et al. Discrete event simulation analysis of a reservation-based, one-way car-sharing system
CN109493958A (en) A kind of follow-up ways to draw up the plan, device, server and medium
CN111652282B (en) Big data-based user preference analysis method and device and electronic equipment
CN116501979A (en) Information recommendation method, information recommendation device, computer equipment and computer readable storage medium
CN104839962B (en) A kind of intelligent wallet and its information processing method and device
CN111756760A (en) User abnormal behavior detection method based on integrated classifier and related equipment
CN107844496A (en) Statistical information output intent and device
CN113935788B (en) Model evaluation method, device, equipment and computer readable storage medium
JP2008129796A (en) Computer system for estimating credit rating of telephone contractor based on telephone number

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180413