CN107909234A - Time limit based reminding method, processing method and its device of Work stream data, equipment - Google Patents
Time limit based reminding method, processing method and its device of Work stream data, equipment Download PDFInfo
- Publication number
- CN107909234A CN107909234A CN201710775829.2A CN201710775829A CN107909234A CN 107909234 A CN107909234 A CN 107909234A CN 201710775829 A CN201710775829 A CN 201710775829A CN 107909234 A CN107909234 A CN 107909234A
- Authority
- CN
- China
- Prior art keywords
- node
- stream data
- work stream
- time length
- duration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The present invention relates to time limit based reminding method, the device of a kind of Work stream data, and a kind of Work stream data processing method, device, storage medium and computer equipment, the time limit based reminding method of the Work stream data includes:Receive the task access request to the Work stream data on present node;The timing information of the Work stream data is obtained according to the task access request;The expectation residual time length of flow residual time length, present node and the expectation duration calculation of each subsequent node in the timing information go out the urgency that the Work stream data is in the present node;When the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, the prompt message that time limit prompting is carried out to the Work stream data is generated.The flexibility of the time limit prompting to Work stream data can be improved.
Description
Technical field
The present invention relates to technical field of information processing, time limit based reminding method, dress more particularly to a kind of Work stream data
Put, and a kind of Work stream data processing method, device, storage medium and computer equipment.
Background technology
Workflow (Workflow) is organized a group task to complete some business process, be to workflow and
Business rule is abstracted, is broadly described between its each operating procedure.The workflow defining trigger sequence and trigger condition of task,
Each task is split into multiple node tasks, each node tasks can be completed by one or more software systems, can also
Completed by one or a set of people, can also be cooperated completion by one or more people with software systems.What workflow solved mainly asks
Topic is:In order to realize some business objective, text is transmitted automatically by certain pre-defined rule between multiple participants using computer
Shelves, information or task.
In general, every part of Work stream data is usually all equipped with the corresponding flow processing time limit, conventional method is for every
The accordingly fixed node processing time limit can be all set on a pending node, which is in Work stream data stream
Go to after respective nodes and be just triggered, and the Work stream data on detecting respective nodes soon close to or over when prescribe a time limit,
Relative users are reminded.When may exceed flow processing due to the summation in the node processing time limit set on each node
Limit, can have a Work stream data and all be timely completed processing, but the processing of whole Work stream data on each node
It is a time out.Therefore, in conventional method, underaction is reminded to the time limit of Work stream data.
The content of the invention
Based on this, it is necessary to the problem of for underaction is reminded to time limit of Work stream data in conventional method, there is provided
Time limit based reminding method, the device of a kind of Work stream data, and a kind of Work stream data processing method, device, storage medium and
Computer equipment.
A kind of time limit based reminding method of Work stream data, the described method includes:Receive to the work fluxion on present node
According to task access request;The timing information of the Work stream data is obtained according to the task access request;According to it is described when
The expectation residual time length of flow residual time length, present node and the expectation duration calculation of each subsequent node in limit information go out
The Work stream data is in the urgency of the present node;When the urgency level of the Work stream data of urgency reflection
During more than pre-programmed emergency degree, the prompt message that time limit prompting is carried out to the Work stream data is generated.
In one of the embodiments, it is described according to the flow residual time length, the expectation residual time length of present node with
And the expectation duration calculation of each subsequent node goes out the urgency that the Work stream data is in the present node, including:Obtain
Take the logical relation between each subsequent node, the logical relation between node includes relation and different layers in same level
The relation of level;Go out the expectation duration of corresponding level node according to the expectation duration calculation of the subsequent node in same level;Root
When going out flow expectation residue according to the expectation residual time length of the present node and the expectation duration calculation of each follow-up hierarchy node
It is long, when the flow it is expected that residual time length is in the expectation of hierarchy node for the expectation residual time length of the present node and each
It is the sum of long;Calculate the flow residual time length and the flow and it is expected the ratio between residual time length, according to the flow residual time length and
The flow it is expected that the ratio between residual time length determines that the Work stream data is in the urgency of the present node.
In one of the embodiments, it is described receive to the task access request of the Work stream data on present node it
Before, the method further includes:Circulation is obtained to be processed to the Work stream data on each node the maximum duration, most completed finished
Short completion duration and most probable complete duration;Duration is completed according to maximum duration, most short completion duration and the most probable completed
Calculate the expectation duration of corresponding node.
A kind of Work stream data processing method, the described method includes:Acquisition convection current goes to the work fluxion on present node
According to processing information;The downstream node of the Work stream data circulation is determined according to the processing information;Obtain the workflow
The flow residual time length of data and the expectation duration of each subsequent node, the subsequent node include the downstream node;According to
The expectation duration calculation of the flow residual time length, the expectation residual time length of present node and each subsequent node goes out the work
Make the urgency that flow data is in the downstream node;Sent to service terminal corresponding with the downstream node to the work
The processing message of flow data, described handle in message carry the urgency that the Work stream data is in the downstream node.
In one of the embodiments, when the corresponding upstream node of the downstream node includes multiple, obtain on each
The logical relation performed between trip node, the upstream node include present node;If the logical relation be or perform relation,
Then processing termination messages are sent to the corresponding service terminal of upstream node outside the present node.
In one of the embodiments, it is described according to the flow residual time length, the expectation residual time length of present node with
And the expectation duration calculation of each subsequent node goes out the urgency that the Work stream data is in the downstream node, including:Obtain
Take the logical relation between each subsequent node, the logical relation between node includes relation and different layers in same level
The relation of level;When going out the expectation of corresponding follow-up hierarchy node according to the expectation duration calculation of the subsequent node in same level
It is long;Flow is gone out according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, the flow it is expected residual time length
For the sum of the expectation residual time length of the present node and each expectation duration in hierarchy node;It is remaining to calculate the flow
Duration and the flow it is expected the ratio between residual time length, it is expected the ratio between residual time length according to the flow residual time length and the flow
Determine the urgency of the Work stream data.
A kind of time limit alarm set of Work stream data, described device include:Task access request receiving module, for connecing
Receive the task access request to the Work stream data on present node;First timing information acquisition module, for being appointed according to described
Access request of being engaged in obtains the timing information of the Work stream data;First urgency computing module, for being believed according to the time limit
The expectation residual time length of flow residual time length, present node and the expectation duration calculation of each subsequent node in breath go out described
Work stream data is in the urgency of the present node;Time limit reminding module, for the workflow reflected when the urgency
When the urgency level of data exceedes pre-programmed emergency degree, the prompt message that time limit prompting is carried out to the Work stream data is generated.
A kind of Work stream data processing unit, described device include:Processing information acquisition module, goes to for obtaining convection current
The processing information of Work stream data on present node;Downstream node determining module, for determining institute according to the processing information
State the downstream node of Work stream data circulation;Second timing information acquisition module, for obtaining the flow of the Work stream data
The expectation duration of residual time length and each subsequent node, the subsequent node include the downstream node;Second urgency calculates
Module, during for according to the expectation of the flow residual time length, the expectation residual time length of present node and each subsequent node
Length calculates the urgency that the Work stream data is in the downstream node;Handle message transmission module, for it is described
The corresponding service terminal of downstream node sends the processing message to the Work stream data, and the work is carried in the processing message
Make the urgency that flow data is in the downstream node.
A kind of computer-readable recording medium, is stored thereon with computer program, which is executed by processor
A kind of the step of time limit based reminding method of the Work stream data provided in Shi Shixian the various embodiments described above, and/or a kind of workflow
The step of data processing method.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor
Computer program, the processor realized when performing described program a kind of Work stream data for being provided in the various embodiments described above when
The step of limiting based reminding method, and/or a kind of the step of Work stream data processing method.
Time limit based reminding method, device, storage medium and the computer equipment of above-mentioned Work stream data, pass through setting procedure
The expectation duration of residual time length and each node, and according to the flow residual time length of pending Work stream data, work as prosthomere
The expectation residual time length of point and the expectation duration of each subsequent node are in the urgent of present node to calculate Work stream data
Degree, when the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, generates and Work stream data is carried out
The prompt message that time limit reminds.So that work can be determined according to the expectation duration of each node and the residual time length of workflow
The urgency level of flow data, and determine the need for carrying out time limit prompting according to urgency level, so as to improve to work
The flexibility that the time limit of flow data reminds.
Correspondingly, above-mentioned Work stream data processing method, device, storage medium and computer equipment, also by setting
The expectation duration of flow residual time length and each node, and according to the flow residual time length of pending Work stream data and every
The expectation duration of a subsequent node calculates the urgency that Work stream data is in present node, is circulated to Work stream data
The corresponding service terminal of downstream node send the processing message for carrying the urgency so that the processing in respective downstream nodes is used
Family can to carry out, pending Work stream data carries out sequential processes according to the urgency, so as to improve to workflow
The flexibility of data processing.
Brief description of the drawings
Fig. 1 is the time limit based reminding method of Work stream data and a kind of Work stream data processing method in one embodiment
Applied environment figure;
Fig. 2 is the flow chart of the time limit based reminding method of Work stream data in one embodiment;
Fig. 3 is flow residual time length, the expectation residual time length of present node in timing information in one embodiment
And the expectation duration calculation of each subsequent node goes out the flow chart that Work stream data is in the urgency of present node;
Fig. 4 is the flow chart of Work stream data processing method in one embodiment;
Logical relation schematic diagram between the part of nodes that Fig. 5 is included by Work stream data in one embodiment;
Fig. 6 is according to flow residual time length, the expectation residual time length of present node and each follow-up in one embodiment
The expectation duration calculation of node goes out the flow chart that Work stream data is in the urgency of downstream node;
Fig. 7 is the structure diagram of the time limit alarm set of Work stream data in one embodiment;
Fig. 8 is the structure diagram of Work stream data processing unit in one embodiment;
Fig. 9 is the cut-away view of one embodiment Computer equipment.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right
The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not
For limiting the present invention.
At the time limit based reminding method and a kind of Work stream data of a kind of Work stream data that the embodiment of the present invention is provided
Reason method, can be applied in application environment as shown in Figure 1.With reference to refering to what is shown in Fig. 1, terminal 110 is logical with computer equipment 120
Network connection is crossed, terminal 110 includes but not limited to mobile phone, handheld device, tablet computer, personal digital assistant or wearable device
Deng any one.BPM (Business Process Management, Business Process Management) is configured with computer equipment 120
System, and more parts of Work stream datas are stored, the data processing state of every part of Work stream data is have recorded, that is, what is circulated waits to locate
The node of reason, while it is also recorded for the processing user of each data flow on each node.Processing user can be visited by terminal 110
Ask corresponding BPM systems, terminal 110 can obtain user on the BPM and generation it is pending to user itself to distributing
Work stream data task access request, the related timing information of the Work stream data is obtained according to the access request, and count
The urgency in present node of the Work stream data is calculated, to prompt user to handle the work immediately according to the urgency
Flow data.And further, when computer equipment 120 receives terminal 110 to the processing information of corresponding Work stream data,
The workflow can be calculated also according to the related timing information of the Work stream data to be circulated to the downstream node of present node
On urgency, and corresponding service terminal sends the processing message to Work stream data to downstream node, in the processing message
Carry the urgency that Work stream data is in downstream node.Wherein, computer equipment 120 can be that server or terminal etc. are any
A kind of equipment.When the computer equipment 120 is server, can be formed with the either multiple servers of independent server
Server cluster is realized.
In one embodiment, as shown in Figure 2, there is provided a kind of time limit based reminding method of Work stream data, the present embodiment
It is applied to illustrate exemplified by computer equipment 120 as shown in Figure 1 in this way, which may include but unlimited
In terminal or server etc. it is therein any one, this method includes:
Step S202, receives the task access request to the Work stream data on present node.
In the present embodiment, computer equipment can receive the task access request of the Work stream data on present node.When this
When computer equipment is terminal, user can be received the sign-on access of BPM systems is operated, triggering phase is operated according to the sign-on access
The task access request answered.When the computer equipment is server, it can receive to be accessed as the task transmitted by above-mentioned terminal and ask
Ask.
Wherein, BPM systems are the system for the processing such as being inquired about Work stream data, being managed and being examined.Distribution
A pending Work stream data to the user is corresponding pending task.Specifically, it is provided with BPM systems more
Logical relation between a node, and each node, logical relation are for determining that the order of the circulation between each node is closed
System.For every part of Work stream data, the circulation between node can be carried out according between set node and logical relation.Stream
Turn the node that order is located at after present node, be the subsequent node of present node.
Present node is the pending node that relevant work flow data circulates, the work fluxion on present node
According to the task data for the required processing on present node.By taking insurance as an example, the Work stream data of a certain insurance class may include
The data such as insurance numbering, insurer and core insurance money volume, correspondingly, for the processing node of the Work stream data setting of the insurance class
May include mechanism core guarantor handle node, centronucleus guarantor handle node, quality inspection sampling observation node, central issue hilllock processing node,
General headquarters core guarantor handles node and quality inspection hilllock processing node etc..
In one embodiment, which can be the node to the user on a certain node in workflow
The inquiry request of task data, the node identification and user identifier of respective nodes are carried in the task access request.Node mark
Knowledge can be made of at least one therein such as the numeral of presetting digit capacity, letter, punctuation mark and other spcial characters, be used for
The corresponding node of unique mark.Similarly, user identifier can include numeral, letter and punctuation mark etc. therein at least one
The character string of the character of kind, for the corresponding user of unique mark.
Step S204, the timing information of Work stream data is obtained according to task access request.
It can be inquired about accordingly from computer equipment local cache or the data of storage according to the task access request of the user
Work stream data and its timing information, or the task access request can be sent to server, receive by server lookup to
Relevant work flow data and its timing information.The timing information includes the flow residual time length, current of corresponding Work stream data
The expectation duration of the expectation residual time length of node and each follow-up hierarchy node, may also include the flow of relevant work flow data
The one or more therein such as task handling duration of handling duration, each node.Every part of Work stream data generation when,
Flow processing duration of the Work stream data in whole flow process is accordingly provided with, for each node in workflow,
The corresponding task handling duration for being provided with node, the task handling duration of different nodes are not necessarily identical.
Specifically, when not completing the processing on all nodes also more than the flow processing duration, the Work stream data is whole
Time-out is handled in a flow, the residual time length of the flow processing duration is the flow residual time length of relevant work flow data.When
When Work stream data is circulated to a certain node, if stopping duration also not processed on this node exceedes appointing for respective nodes
Business handling duration, then judge the processing time-out of Work stream data on this node.
The expectation duration of node is the history work fluxion gone to according to the user of record in processing respective streams on the node
According to completion duration used, being used for of calculating predicts that user completes the duration of the Work stream data on the node.It is expected residue
Duration is the circulation time in the circulation to respective nodes to add the expectation duration, then subtract current time it is obtained when
It is long.
In one embodiment, the sum of task handling duration that a Work stream data is set on all the nodes is not yet
Necessarily it is equal to the flow processing duration;The sum of expectation duration that a Work stream data is set on all the nodes is also not necessarily
Equal to the flow processing duration.For example, a certain Work stream data includes 10 nodes, 10 nodes according to execution elder generation
Node 1, node 2 to node 10 are sequentially followed successively by afterwards.The expectation duration that each node is set is 2 days, the stream of whole flow process
Journey handling duration is 15 days.If current time is August in 2017 20 days, the generated time of the Work stream data is in August, 2017
10, present node was node 8, and the time to circulate to present node is August in 2017 20 days, then corresponding flow residual time length
As 5 days, the expectation residual time length of present node was 1 day.
Specifically, computer equipment can be allocated to the user according to the user identifier inquiry carried in task access request
Work stream data, and the node that each Work stream data circulates further is obtained from the Work stream data inquired
Node identification, when the node identification is identical with the node identification carried in task access request, that is, judge the node identification
Identical Work stream data is the pending Work stream data that is accessed, can obtain determined by the flow of Work stream data remain
The expectation duration of remaining duration, the expectation residual time length of present node and each subsequent node.
Step S206, the expectation residual time length of flow residual time length, present node in timing information and each
The expectation duration calculation of subsequent node goes out the urgency that Work stream data is in present node.
In the present embodiment, the urgency in present node is used to characterize circulation to the pending work on present node
The urgency level in time limit of the flow data in whole flow process, the urgency are to be remained according to the expectation duration on each node and flow
What remaining duration was calculated.Wherein, which can be specific numerical value, and the corresponding urgency level of different numerical value is different.
In one embodiment, can be according to the expectation residual time length of present node and the expectation duration meter of each subsequent node
Calculate flow of the Work stream data in whole flow process and it is expected residual time length, remained further according to the expectation residual time length with the flow
Remaining duration calculation goes out the urgency of present node.For example the two of residual time length and flow residual time length can it is expected according to the flow
The difference of the ratio between person or both is used as urgency.
In one embodiment, the numerical value of urgency is smaller, then it represents that the urgency level of relevant work flow data is higher;Tightly
Anxious degree is bigger, then it represents that the urgency level of the Work stream data is lower.
Step S208, when the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, generation pair
Work stream data carries out the prompt message of time limit prompting.
In the present embodiment, urgency threshold value is also preset, urgency threshold value is the Work stream data for weighing Agency
Whether the threshold value of certain urgency level is exceeded.Specifically, may compare size between the urgency and urgency threshold value, when less than
During the urgency, it can determine that the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, can generate to work
Make flow data and carry out the prompt message of time limit prompting, and show.Wherein, which can be the letter of identified urgency level
Breath, the form of expression of the information can be text prompt form, or be color mark form, can also be the combination of both of the above
Deng.
For example, the urgency level of task can be identified behind the task of corresponding Work stream data, goes back cocoa to phase
The task for the Work stream data answered is marked with color corresponding with the urgency level, for example can be directed to low urgency level not
With color mark;For the task of the Work stream data of middle urgency level, with Green Marker;For the workflow of high urgency level
The task of data, with red-label;For the task of the Work stream data more than high urgency level, with density bullet.
In one embodiment, it is pending for every part when identified pending Work stream data includes more parts
Work stream data, flow residual time length, the present node of every part of Work stream data can be obtained according to above-mentioned step S204
Expectation residual time length and each subsequent node expectation duration, and calculate every part of Work stream data according to step S206 and be in
The urgency of present node, and according to step S208, exceed every part of Work stream data of pre-programmed emergency degree for urgency level, life
Paired relevant work flow data carries out the prompt message of time limit prompting.
The time limit based reminding method of above-mentioned Work stream data, passes through the expectation of setting procedure residual time length and each node
Duration, and according to the flow residual time length of pending Work stream data, the expectation residual time length of present node and each follow-up
The expectation duration of node calculates the urgency that Work stream data is in present node, when the Work stream data of urgency reflection
Urgency level when exceeding pre-programmed emergency degree, generate the prompt message that time limit prompting is carried out to Work stream data.So that can root
The urgency level of Work stream data is determined according to the expectation duration of each node and the residual time length of workflow, and according to urgent
Degree determines the need for carrying out time limit prompting, so as to improving the flexibility to the prompting of time limit of Work stream data.
In one embodiment, as shown in figure 3, step S206 includes:
Step S302, obtains the logical relation between each subsequent node, and the logical relation between node includes being in phase
With the relation of level and the relation of different levels.
In the present embodiment, logical relation is for determining the circulation ordinal relation between each node.Patrolling between node
The relation of collecting includes the relation of relation and different levels in same level.Same level is represented between two or more nodes
Circulation order is to be in same sequence, and there is no point of priority, can be at simultaneously column processing.Two or more are not represented into level
Circulation order between a node is point in the presence of priority, that is, needs sequencing and handled, the first processing of order is complete
After finishing, Work stream data just circulates on node thereafter and is handled.
Step S304, goes out the expectation of corresponding level node according to the expectation duration calculation of the subsequent node in same level
Duration.
In the present embodiment, the expectation duration of hierarchy node is the Work stream data predicted from circulation to the level that mutually exists together
One or more nodes start, to the same level on all nodes it is processed finish, when circulating to next level, institute
The duration needed.Specifically, the expectation duration of the hierarchy node can be adding for the expectation duration of each node in same level
Weight average value, or the respective layer can be determined according to the specific execution relation of each node time between same level
The calculating of the expectation duration of level node.The execution relation includes performing relation side by side and/or performs relation.Execution relation is side by side
Circulation to the Work stream data on the node between same level is both needed to perform, negotiable to the level section after being finished
The downstream node of point.Or it is that circulation to the Work stream data on the node between same level need to only perform wherein one to perform relation
It is a, wherein one be performed after, then circulation to the hierarchy node downstream node.
Wherein, it is the upstream relative to the node positioned at its adjacent, preceding node for a certain node
Node, is the downstream node relative to the node positioned at its adjacent, posterior node.It is corresponding, saved relative to the upstream
For point, above-mentioned a certain node is the downstream node of the upstream node.
In one embodiment, the size it is expected between duration of the subsequent node in same level is may compare, when this
When the execution relation of node between same level is or performs relation, the expectation duration that can choose minimum is arranged to corresponding
The expectation duration of hierarchy node;It is optional when the execution relation of the node between being in same level is performs relation side by side
The expectation duration of maximum is taken to be arranged to the expectation duration of corresponding level node.
Step S306, goes out according to the expectation duration calculation of the expectation residual time length of present node and each follow-up hierarchy node
Flow it is expected residual time length.
In the present embodiment, flow it is expected residual time length for the expectation residual time length of present node and is each in hierarchy node
The sum of expectation duration.Can be by the expectation residual time length of present node and each and the expectation duration of succeeding layer level node is folded
Add, flow obtain and as relevant work flow data it is expected residual time length.
Step S308, calculation process residual time length and flow it is expected the ratio between residual time length, according to flow residual time length and stream
Journey it is expected that the ratio between residual time length determines that Work stream data is in the urgency of present node.
Specifically, flow residual time length can it is expected that residual time length is divided by with flow, obtained business is directly disposed as work
Make the urgency that flow data is in present node.Or corresponding weights can be set, business will be obtained and be multiplied with the weights, obtained
Product is arranged to the urgency that Work stream data is in present node.
In one embodiment, whether the expectation residual time length that can detect present node is more than 0, if so, then performing above-mentioned
Step S308, otherwise, it is the numerical value for representing more than pre-programmed emergency degree that can directly set corresponding urgency.Wherein, if
The expectation residual time length of present node is less than or equal to 0, represents circulation to the stay time of the Work stream data on present node
Prediction duration is exceeded or has reached, then the urgency level for the Work stream data that urgency directly can be arranged to reflection, which exceedes, to be preset
The numerical value of urgency level.
In the present embodiment, by further obtaining the logical relation between each subsequent node, according in same level
The expectation duration calculation of subsequent node go out the expectation duration of corresponding level node, the expectation residual time length of present node and each
The expectation duration calculation of follow-up hierarchy node goes out flow and it is expected residual time length so that the flow calculated it is expected residual time length more
It can reflect the residual time length spent needed for the estimated Work stream data handled in whole flow process of processing exactly.And according to stream
Journey residual time length and flow it is expected the ratio between residual time length to determine that Work stream data is in the urgency of present node, also can be more
Reflect urgency level of the Work stream data on present node exactly.
In one embodiment, the above method further include it is expected duration calculating process, the process can step S202 it
Preceding execution.Specifically, which includes:Obtain the maximum completion for circulating and being processed and finishing to the Work stream data on each node
Duration, most short completion duration and most probable complete duration;When completing duration, most short completion duration and most probable completion according to maximum
The long expectation duration for calculating corresponding node.
In the present embodiment, maximum complete duration can be within preset period, record it is all complete in respective nodes
Into in duration, a maximum completion duration of numerical value, most short duration of completing can be a minimum completion duration of respective value, most
It can be the most completion duration of the identical number for completing duration occur that may complete duration.When preset period can be nearest one section
Phase, for example can be nearest half a year or 1 year nearest.
Specifically, the node belonging to it and deadline can be recorded in advance for the completion duration each counted on, and will
The completion duration and the node identification of affiliated node are associated.The inquiry deadline is within preset period, for each
Node, with the associated all completion durations of the node identification of the node, inquiry draw respective nodes it is maximum complete duration,
Most short completion duration and most probable complete duration.
In one embodiment, for a certain node, if its maximum is completed duration, most short completion duration, most probable and is completed
Duration and expectation duration are respectively A, B, C and D.
The expectation duration D of the node can be then calculated according to following calculation formula:
D=(A+B+nC)/(n+2).
Wherein, n is coefficient, can be any appropriate natural number, such as, it is 4 that can set n.Calculated by above-mentioned formula
Go out and it is expected duration on each node accordingly, can further improve and it is expected that the prediction user that duration is reflected is completed on the node
The accuracy of the duration of Work stream data.
In one embodiment, as shown in figure 4, additionally providing a kind of Work stream data processing method, the present embodiment is with this
Method be applied to computer equipment in exemplified by illustrate, the computer equipment may include but be not limited to terminal or server etc. its
In any one, this method includes:
Step S402, obtains the processing information for the Work stream data that convection current is gone on present node.
In the present embodiment, computer equipment can obtain the processing information for the Work stream data that convection current is gone on present node,
Deserve the computer equipment when being terminal, user's convection current in BPM systems can be received and go to Work stream data on present node
Processing operation, corresponding processing information is generated according to processing operation.When the computer equipment is server, can receive by
Above-mentioned terminal sends the processing information for triggering generation.
Processing information goes to the processing information of the Work stream data on present node for convection current, can be carried in the processing information
User identifier so that according to the recognizable processing user for making respective handling information of the user's mark.Wherein, processing information can be
To information such as the supplement to Work stream data or examination & approval.By taking processing information is approval information as an example, which is in system
The approval results of upper generation.Approval results may include " to agree to ", " disagreeing ", " temporary opinion ", " solicit other people opinions ", " return
Return applicant " and the approval results such as " forward other people handle ".
Step S404, the downstream node of Work stream data circulation is determined according to processing information.
It is relative to the node positioned at its adjacent, preceding node for a certain node in the present embodiment
Upstream node, positioned at its adjacent, posterior node be relative to the node downstream node.It is corresponding, relative to this
For upstream node, above-mentioned a certain node is the downstream node of the upstream node.Set by different types of Work stream data
The node put is not necessarily identical.Computer equipment can be regular according to the circulation of the Work stream data between the individual nodes, and root
Next node that the Work stream data is circulated extremely, the i.e. downstream node are determined according to first processing information.
Specifically, more set circulation models can be pre-set, the corresponding circulation rule of the model that respectively circulates is different.For giving birth to
Into Work stream data, the matched circulation mould of relevant work flow data institute can be determined according to the specifying information in the Work stream data
Type, according to the circulation rule and processing information defined in the circulation model, determines the downstream joint that the Work stream data circulates
Point.
By taking processing information is for approval results as an example, when processing information passes through for examination & approval, it can be passed through according to the examination & approval
Processing information, determine the downstream node that is circulated extremely of the Work stream data in defined circulation rule.
Step S406, obtains the flow residual time length of Work stream data and the expectation duration of each subsequent node.
In the present embodiment, can be inquired about from computer equipment local cache or the data of storage relevant work flow data and its
Timing information, or the task access request can be sent to server, receive by server lookup to relevant work fluxion
According to and its timing information.The timing information includes the flow residual time length of corresponding Work stream data, the expectation residue of present node
The expectation duration of duration and each follow-up hierarchy node, may also include the flow processing duration, each of relevant work flow data
The one or more therein such as the task handling duration of node.It is to be appreciated that the subsequent node includes downstream node.
Step S408, according to the phase of flow residual time length, the expectation residual time length of present node and each subsequent node
Duration calculation is hoped to go out the urgency that Work stream data is in downstream node.
In the present embodiment, the urgency in downstream node has been handled for characterizing the Work stream data in present node
Finish, circulate to downstream node, the urgency level in the time limit in whole flow process, the urgency is according to the phase on each node
What prestige duration and flow residual time length were calculated.Wherein, which can be specific numerical value, and different numerical value are corresponding urgent
Degree is different.
In one embodiment, the Work stream data can be gone out according to the expectation duration calculation of each subsequent node entirely flowing
Flow in journey it is expected residual time length, is calculated further according to the expectation residual time length and the flow residual time length at Work stream data
In the urgency of downstream node.Such as can it is expected according to the flow residual time length and flow residual time length ratio between two or
Both differences are used as urgency.
Step S410, sends the processing message to Work stream data, processing disappears to service terminal corresponding with downstream node
The urgency that Work stream data is in downstream node is carried in breath.
In the present embodiment, the processing user of Work stream data on each node has been preset.Specifically, pre-established every
Incidence relation between the node identification of a node and the user identifier of respective handling user so that Work stream data circulates to phase
When answering on node, it can determine to handle Work stream data on the node according to the node identification of the node and the incidence relation
Handle the user identifier of user.
Specifically, computer equipment according to identified downstream node, can obtain the node identification association of the downstream node
User identifier, identify corresponding service terminal to the user and send the message that is handled the Work stream data, wherein should
The urgency that calculated Work stream data is in downstream node is carried in message so that the processing in respective downstream nodes is used
Family can to carry out, pending Work stream data carries out sequential processes according to the urgency, so as to improve to workflow
The flexibility of data processing.
In one embodiment, when the corresponding upstream node of downstream node include it is multiple when, obtain each upstream node it
Between the logical relation that performs, upstream node includes present node;If logical relation is or performs relation, to outside present node
The corresponding service terminal of upstream node send processing termination messages.
In the present embodiment, upstream node and downstream node are a kind of opposite sayings.Upstream node can correspond to multiple downstreams
Node, opposite, downstream node can also correspond to multiple upstream nodes.It is also advance for multiple upstream nodes corresponding to downstream
There is provided the logical relation performed between each upstream node.Logical relation includes exclusive execution relation, performs relation side by side
And or execution relation etc..
Wherein, exclusive execution relation, i.e., be only capable of one of them in the plurality of upstream node and be performed;Perform pass side by side
System, i.e., the plurality of upstream node needs all to be performed, just can be according to careful after the plurality of upstream node is all performed
Criticize the node that result determines follow-up required examination & approval;Or performing relation, i.e., the plurality of upstream node can be all performed, but only needed
After one is performed, then other upstream nodes need not be then performed.
When the corresponding upstream node of identified downstream node includes multiple, it is thus evident that the present node is downstream
One in the corresponding upstream node of node.Terminal can obtain the logical relation performed between each upstream node, when for or hold
During row relation, the processing knot of any one upstream node (in the present embodiment, i.e., the present node in step 202) can got
After fruit, then other upstream nodes that the Work stream data is circulated extremely, can be by the handling result of the upstream node without processed
Handling result as the synthesis of multiple upstream nodes.Meanwhile the processing user set on other upstream nodes can be obtained
User identifier, identify corresponding service terminal to the user and send processing termination messages, with notify corresponding user without
The Work stream data is handled in respective nodes.
Come using the processing to Work stream data as examination & approval processing for example, as shown in figure 5, being in another embodiment
Logical relation between the part of nodes that Work stream data is included.
Wherein, node D and E is the upstream node of node F.If between node D and E it is exclusive execution relation, node D
Can only have one between E to be performed, after being finished, can be determined according to handling result it is follow-up needed for examination & approval node.If
It is execution relation arranged side by side between node D and E, then needs to wait node D and E to be all finished, according to the integrated treatment result
Determine the node of follow-up required examination & approval.If being between node D and E or performing relation, can be performed between node D and E.Clothes
Business device can be closed to another node (such as section after the handling result of one of node (such as node D) is got
Point E) examination & approval, and according to the handling result determine it is follow-up needed for examination & approval node, while to the corresponding industry of another node
Terminal of being engaged in sends examination & approval termination messages, which is the Work stream data gone to without convection current on another node
The message examined so that the service terminal can handle other examination & approval tasks for needing to examine.
In the present embodiment, by the logical relation to setting execution between multiple upstream nodes, between corresponding upstream node
Logical relation be or perform relation when, any one upstream node (than present node described above) processing information can be got
When, that is, judging to complete the execution to the plurality of upstream node so that Work stream data can continue to turn processing toward downstream node-flow,
Further increase the efficiency to Work stream data processing and flexibility.
In one embodiment, as shown in fig. 6, step S408 includes:
Step S602, obtains the logical relation between each subsequent node, and the logical relation between node includes being in phase
With the relation of level and the relation of different levels.
Same level represents that the circulation order between two or more nodes is to be in same sequence, and there is no successively
Point, can be at and column processing.It is point in the presence of priority not represent the circulation order between two or more nodes into level, i.e.,
Sequencing is needed to be handled, order is first be disposed after, Work stream data just circulate the section being extremely located at thereafter
Handled on point.
Step S604, goes out corresponding follow-up hierarchy node according to the expectation duration calculation of the subsequent node in same level
It is expected duration.
The expectation duration of the hierarchy node can be the weighted average of the expectation duration of each node in same level,
Or the corresponding level node can be determined according to the specific execution relation of each node time between same level
It is expected the calculating of duration.
Execution relation between node in same level includes performing relation side by side and/or performs relation.Perform side by side
Relation is both needed to perform for circulation to the Work stream data on the node between same level, negotiable extremely after being finished
The downstream node of hierarchy node.Or it is that circulation to the Work stream data on the node between same level only needs to perform to perform relation
One of them, wherein one be performed after, then circulation to the hierarchy node downstream node.
In one embodiment, the size it is expected between duration of the subsequent node in same level is may compare, when this
When the execution relation of node between same level is or performs relation, the expectation duration that can choose minimum is arranged to corresponding
The expectation duration of hierarchy node;It is optional when the execution relation of the node between being in same level is performs relation side by side
The expectation duration of maximum is taken to be arranged to the expectation duration of corresponding level node.
Step S606, goes out flow according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, flow phase
Hope residual time length for the sum of the expectation residual time length of present node and each expectation duration in hierarchy node.
In the present embodiment, can by each and the expectation duration of succeeding layer level node is overlapped, it is obtaining and be corresponding
The flow of Work stream data it is expected residual time length.
Step S608, calculation process residual time length and flow it is expected the ratio between residual time length, according to flow residual time length and stream
Journey it is expected that the ratio between residual time length determines the urgency of Work stream data.
Specifically, flow residual time length can it is expected that residual time length is divided by with flow, obtained business is directly disposed as work
Make the urgency that flow data is in present node.Or corresponding weights can be set, business will be obtained and be multiplied with the weights, obtained
Product is arranged to the urgency that Work stream data is in present node.
In one embodiment, whether the expectation residual time length that can detect present node is more than 0, if so, then performing above-mentioned
Step S308, otherwise, it is the numerical value for representing more than pre-programmed emergency degree that can directly set corresponding urgency.Wherein, if
The expectation residual time length of present node is less than or equal to 0, represents circulation to the stay time of the Work stream data on present node
Prediction duration is exceeded or has reached, then the urgency level for the Work stream data that urgency directly can be arranged to reflection, which exceedes, to be preset
The numerical value of urgency level.
In the present embodiment, by further obtaining the logical relation between each subsequent node, according in same level
The expectation duration calculation of subsequent node go out the expectation duration of corresponding level node, the expectation residual time length of present node and each
The expectation duration calculation of follow-up hierarchy node goes out flow and it is expected residual time length so that the flow calculated it is expected residual time length more
It can reflect the residual time length spent needed for the estimated Work stream data handled in whole flow process of processing exactly.And according to stream
Journey residual time length and flow it is expected the ratio between residual time length to determine that Work stream data is in the urgency of present node, also can be more
Reflect urgency level of the Work stream data on present node exactly.
In one embodiment, above-mentioned Work stream data processing method further includes the calculating process for it is expected duration, the process
It can be performed before step S402.Specifically, which includes:Circulation to the Work stream data on each node is obtained to be processed
Maximum duration, most short completion duration and the most probable completed finished completes duration;Duration, most short completion duration are completed according to maximum
Go out the expectation duration of corresponding node with most probable completion duration calculation.
Specifically, the node belonging to it and deadline can be recorded in advance for the completion duration each counted on, and will
The completion duration and the node identification of affiliated node are associated.The inquiry deadline is within preset period, for each
Node, with the associated all completion durations of the node identification of the node, inquiry draw respective nodes it is maximum complete duration,
Most short completion duration and most probable complete duration.
In one embodiment, for a certain node, if its maximum is completed duration, most short completion duration, most probable and is completed
Duration and expectation duration are respectively A, B, C and D.
The expectation duration D of the node can be then calculated according to following calculation formula:
D=(A+B+nC)/(n+2).
Wherein, n is coefficient, can be any appropriate natural number, such as, it is 4 that can set n.Calculated by above-mentioned formula
Go out and it is expected duration on each node accordingly, can further improve and it is expected that the prediction user that duration is reflected is completed on the node
The accuracy of the duration of Work stream data.
In one embodiment, as shown in Figure 7, there is provided a kind of time limit alarm set of Work stream data, the device bag
Include:
Task access request receiving module 702, the task for receiving to the Work stream data on present node accesses please
Ask.
First timing information acquisition module 704, for obtaining the timing information of Work stream data according to task access request.
First urgency computing module 706, the expectation for flow residual time length, present node in timing information
The expectation duration calculation of residual time length and each subsequent node goes out the urgency that Work stream data is in present node.
Time limit reminding module 708, the urgency level of the Work stream data for reflecting when urgency exceed pre-programmed emergency journey
When spending, the prompt message that time limit prompting is carried out to Work stream data is generated.
In one embodiment, the first urgency computing module 706 is additionally operable to obtain the logic between each subsequent node
Relation, the logical relation between node include the relation of relation and different levels in same level;According in identical layer
The expectation duration calculation of the subsequent node of level goes out the expectation duration of corresponding level node;According to the expectation residual time length of present node
Go out flow with the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, flow it is expected that residual time length is present node
Expectation residual time length and the sum of each expectation duration in hierarchy node;Calculation process residual time length and flow it is expected remaining
The ratio between duration, it is expected that the ratio between residual time length determines that Work stream data is in the tight of present node according to flow residual time length and flow
Anxious degree.
In one embodiment, the time limit alarm set of above-mentioned Work stream data further includes:
First it is expected duration calculation module, is processed what is finished for obtaining circulation to the Work stream data on each node
Maximum completes duration, most short completion duration and most probable and completes duration;Duration, most short completion duration are completed according to maximum and most may be used
It can complete the expectation duration that duration calculation goes out corresponding node.
In one embodiment, as shown in Figure 8, there is provided a kind of Work stream data processing unit, the device include:
Processing information acquisition module 802, the processing information of the Work stream data on present node is gone to for obtaining convection current.
Downstream node determining module 804, for determining the downstream node of Work stream data circulation according to processing information.
Second timing information acquisition module 806, for the flow residual time length for obtaining Work stream data and each follow-up section
The expectation duration of point, subsequent node include downstream node.
Second urgency computing module 808, for according to flow residual time length, the expectation residual time length of present node and
The expectation duration calculation of each subsequent node goes out the urgency that Work stream data is in downstream node.
Message transmission module 810 is handled, for being sent to service terminal corresponding with downstream node to Work stream data
Message is handled, handles and the urgency that Work stream data is in downstream node is carried in message.
In one embodiment, upstream node includes present node;Processing message transmission module 910 is additionally operable to work as downstream joint
When the corresponding upstream node of point includes multiple, the logical relation performed between each upstream node is obtained;If logical relation be or
Execution relation, then send processing termination messages to the corresponding service terminal of upstream node outside present node.
In one embodiment, the second urgency computing module 808 is additionally operable to obtain the logic between each subsequent node
Relation, the logical relation between node include the relation of relation and different levels in same level;According in identical layer
The expectation duration calculation of the subsequent node of level goes out the expectation duration of corresponding follow-up hierarchy node;According to each follow-up hierarchy node
It is expected that duration calculation goes out flow and it is expected residual time length, flow it is expected residual time length for the expectation residual time length of present node and each
The sum of expectation duration in hierarchy node;Calculation process residual time length and flow it is expected the ratio between residual time length, are remained according to flow
Remaining duration and flow it is expected that the ratio between residual time length determines the urgency of Work stream data.
In one embodiment, which further includes:
Second it is expected duration calculation module, is processed what is finished for obtaining circulation to the Work stream data on each node
Maximum completes duration, most short completion duration and most probable and completes duration;Duration, most short completion duration are completed according to maximum and most may be used
It can complete the expectation duration that duration calculation goes out corresponding node.
Modules in above device can be realized fully or partially through software, hardware and combinations thereof.Above-mentioned each mould
Block can in the form of hardware be embedded in or independently of in the computer equipment in server, can also be stored in service in a software form
In memory in device, called in order to computer equipment and perform the corresponding operation of above modules.The computer equipment can
Think central processing unit (CPU), microcomputer apparatus, microcontroller etc..
In one embodiment, there is provided a kind of computer-readable recording medium, is stored thereon with computer program, the meter
Calculation machine program realizes a kind of time limit based reminding method of the Work stream data provided in the various embodiments described above when being executed by processor
Step, and/or a kind of the step of Work stream data processing method.
In one embodiment, following steps are realized when which is executed by processor:Receive to present node
On Work stream data task access request;The timing information of Work stream data is obtained according to task access request;According to when
The expectation residual time length of flow residual time length, present node and the expectation duration calculation of each subsequent node in limit information go out
Work stream data is in the urgency of present node;When the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency
During degree, the prompt message that time limit prompting is carried out to Work stream data is generated.
In one embodiment, realize that the flow in timing information is remaining when which is executed by processor
The expectation duration calculation of duration, the expectation residual time length of present node and each subsequent node goes out Work stream data and is in current
The urgency of node, comprises the following steps:Obtain the logical relation between each subsequent node, the logical relation bag between node
Include the relation of relation and different levels in same level;According to the expectation duration calculation of the subsequent node in same level
Go out the expectation duration of corresponding level node;During according to the expectation of the expectation residual time length of present node and each follow-up hierarchy node
The long flow that calculates it is expected residual time length, and flow it is expected residual time length for the expectation residual time length of present node and is each in layer
The sum of expectation duration of level node;Calculation process residual time length and flow it is expected the ratio between residual time length, according to flow residual time length
It is expected that the ratio between residual time length determines that Work stream data is in the urgency of present node with flow.
In one embodiment, following steps are also realized when which is executed by processor:Obtain and circulate to every
Work stream data on a node maximum duration, most short completion duration and the most probable completed finished that be processed completes duration;Root
According to the maximum expectation duration for completing duration, most short completion duration and most probable and completing duration calculation and going out corresponding node.
In one embodiment, following steps are realized when which is executed by processor:Obtain convection current and go to and work as
The processing information of Work stream data on front nodal point;The downstream node of Work stream data circulation is determined according to processing information;Obtain
The flow residual time length of Work stream data and the expectation duration of each subsequent node, subsequent node include downstream node;According to stream
The expectation duration calculation of journey residual time length, the expectation residual time length of present node and each subsequent node goes out at Work stream data
In the urgency of downstream node;The processing message to Work stream data, processing are sent to service terminal corresponding with downstream node
The urgency that Work stream data is in downstream node is carried in message.
In one embodiment, following steps are also realized when which is executed by processor:When downstream node pair
When the upstream node answered includes multiple, the logical relation performed between each upstream node is obtained, upstream node includes working as prosthomere
Point;If logical relation is or performs relation, processing is sent eventually to the corresponding service terminal of upstream node outside present node
Only message.
In one embodiment, realized when which is executed by processor according to flow residual time length, current
The expectation residual time length of node and the expectation duration calculation of each subsequent node go out Work stream data and are in the tight of downstream node
Anxious degree, comprises the following steps:Obtain the logical relation between each subsequent node, the logical relation between node includes being in phase
With the relation of level and the relation of different levels;Gone out according to the expectation duration calculation of the subsequent node in same level after corresponding to
The expectation duration of continuous hierarchy node;Flow is gone out according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, stream
Journey it is expected residual time length for the sum of the expectation residual time length of present node and each expectation duration in hierarchy node;Calculate stream
Journey residual time length and flow it is expected the ratio between residual time length, it is expected that the ratio between residual time length determines work according to flow residual time length and flow
Make the urgency of flow data.
In one embodiment, following steps are also realized when which is executed by processor:Obtain and circulate to every
Work stream data on a node maximum duration, most short completion duration and the most probable completed finished that be processed completes duration;Root
According to the maximum expectation duration for completing duration, most short completion duration and most probable and completing duration calculation and going out corresponding node.
In one embodiment, there is provided a kind of computer equipment, including memory, processor and storage are on a memory
And the computer program that can be run on a processor, when processor executive program, realize the one kind provided in the various embodiments described above
The step of time limit based reminding method of Work stream data, and/or a kind of the step of Work stream data processing method.
Specifically, the computer equipment can be server or terminal etc. it is therein any one.Terminal includes but unlimited
In mobile phone, tablet computer, portable notebook or intelligent wearable device etc..As shown in figure 9, set for one embodiment Computer
Standby internal structure schematic diagram.The computer equipment includes processor, memory and the network interface connected by system bus.
Wherein, the processor of the computer equipment is used to provide calculating and control ability, supports the operation of whole computer equipment.Storage
Device is used to store data, instruction code etc., at least one computer program is stored on memory, which can be processed
Device performs, to realize the Work stream data processing method suitable for computer equipment provided in the embodiment of the present application.Memory
It may include non-volatile memory mediums such as magnetic disc, CD, read-only memory (Read-Only Memory, ROM) etc..Example
Such as, in one embodiment, memory includes non-volatile memory medium and built-in storage.Non-volatile memory medium is stored with
Operating system, database and computer program.It is stored with the database and is used for realization each embodiment of the above is provided one
The time limit based reminding method and/or the relevant data of Work stream data processing method of kind Work stream data, for example can store corresponding
Work stream data etc..The computer program can performed by processor, provided for each embodiment more than realizing one
The time limit based reminding method and/or Work stream data processing method of kind Work stream data.Built-in storage in computer equipment is non-
Operating system, database and computer program in volatile storage medium provide the running environment of cache.Network interface
Can be Ethernet card or wireless network card etc., for communicating with exterior terminal or server.Those skilled in the art can
The structure shown to understand, in Fig. 9, only with the block diagram of the relevant part-structure of application scheme, is not formed to this Shen
Please the restriction of computer equipment that is applied thereon of scheme, specific computer equipment can include it is more more than shown in figure or
Less component, either combines some components or is arranged with different components.Such as the computer equipment may also include it is aobvious
Display screen, the display screen can be used for showing corresponding Work stream data and time limit reminder message etc..Display screen can be touch-screen,
For example be capacitance plate or electrical screen, the clicking operation of the control of the touch screen display can be acted on by reception, generation is corresponding
Instruction.
In one embodiment, following steps are realized during the processor executive program:Receive to the work on present node
The task access request of flow data;The timing information of Work stream data is obtained according to task access request;According in timing information
Flow residual time length, the expectation duration calculation of the expectation residual time length of present node and each subsequent node go out work fluxion
According to the urgency in present node;When the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree,
Generate the prompt message that time limit prompting is carried out to Work stream data.
In one embodiment, realized during the processor executive program flow residual time length in timing information, when
The expectation residual time length of front nodal point and the expectation duration calculation of each subsequent node go out Work stream data and are in present node
Urgency, comprises the following steps:Obtain the logical relation between each subsequent node, the logical relation between node includes being in
The relation of same level and the relation of different levels;Correspondence is gone out according to the expectation duration calculation of the subsequent node in same level
The expectation duration of hierarchy node;According to the expectation residual time length of present node and the expectation duration calculation of each follow-up hierarchy node
Go out flow and it is expected residual time length, flow it is expected residual time length for the expectation residual time length of present node and is each in hierarchy node
The sum of expectation duration;Calculation process residual time length and flow it is expected the ratio between residual time length, according to flow residual time length and flow
It is expected that the ratio between residual time length determines that Work stream data is in the urgency of present node.
In one embodiment, following steps are also realized during the processor executive program:Circulation is obtained to each node
Work stream data maximum duration, most short completion duration and the most probable completed finished that be processed complete duration;According to maximum complete
Into duration, most short duration and the most probable completed complete the expectation duration that duration calculation goes out corresponding node.
In one embodiment, following steps are realized during the processor executive program:Convection current is obtained to go on present node
Work stream data processing information;The downstream node of Work stream data circulation is determined according to processing information;Obtain work fluxion
According to flow residual time length and each subsequent node expectation duration, subsequent node includes downstream node;During according to flow residue
The expectation duration calculation of long, the expectation residual time length of present node and each subsequent node goes out Work stream data and is in downstream joint
The urgency of point;The processing message to Work stream data is sent to service terminal corresponding with downstream node, handles and is taken in message
The urgency of downstream node is in Work stream data.
In one embodiment, following steps are also realized during the processor executive program:When the corresponding upstream of downstream node
When node includes multiple, the logical relation performed between each upstream node is obtained, upstream node includes present node;If logic
Relation is or performs relation, then sends processing termination messages to the corresponding service terminal of upstream node outside present node.
In one embodiment, realized during the processor executive program according to flow residual time length, the phase of present node
The expectation duration calculation of residual time length and each subsequent node is hoped to go out the urgency that Work stream data is in downstream node, including
Following steps:Obtain the logical relation between each subsequent node, the logical relation between node is included in same level
The relation of relation and different levels;Corresponding follow-up level section is gone out according to the expectation duration calculation of the subsequent node in same level
The expectation duration of point;Flow is gone out according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, flow it is expected surplus
The sum of the expectation residual time length of a length of present node and each expectation duration in hierarchy node when remaining;When calculation process is remaining
Long and flow it is expected the ratio between residual time length, it is expected that the ratio between residual time length determines Work stream data according to flow residual time length and flow
Urgency.
In one embodiment, following steps are also realized during the processor executive program:Circulation is obtained to each node
Work stream data maximum duration, most short completion duration and the most probable completed finished that be processed complete duration;According to maximum complete
Into duration, most short duration and the most probable completed complete the expectation duration that duration calculation goes out corresponding node.
One of ordinary skill in the art will appreciate that realize all or part of flow in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program.The computer program is storable on memory, for example is stored in
In one non-volatile computer read/write memory medium.The program is performed, it can be achieved that including the implementation of such as above-mentioned each method
The flow of example.
Any reference used in the present invention to memory, storage, database or other media may include non-volatile
Memory.Suitable nonvolatile memory may include read-only storage (ROM), programming ROM (PROM), electrically programmable ROM
(EPROM), electrically erasable ROM (EEPROM) or flash memory.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, its description is more specific and detailed, but simultaneously
Cannot therefore it be construed as limiting the scope of the patent.It should be pointed out that come for those of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
- A kind of 1. time limit based reminding method of Work stream data, it is characterised in that the described method includes:Receive the task access request to the Work stream data on present node;The timing information of the Work stream data is obtained according to the task access request;The expectation residual time length of flow residual time length, present node in the timing information and each subsequent node It is expected that duration calculation goes out the urgency that the Work stream data is in the present node;When the urgency level of the Work stream data of urgency reflection exceedes pre-programmed emergency degree, generate to the workflow Data carry out the prompt message of time limit prompting.
- 2. according to the method described in claim 1, it is characterized in that, when the flow in the timing information is remaining The expectation duration calculation of long, the expectation residual time length of present node and each subsequent node goes out the Work stream data and is in institute The urgency of present node is stated, including:Obtain the logical relation between each subsequent node, the logical relation between node include relation in same level and The relation of different levels;Go out the expectation duration of corresponding level node according to the expectation duration calculation of the subsequent node in same level;Go out flow according to the expectation duration calculation of the expectation residual time length of the present node and each follow-up hierarchy node it is expected Residual time length, the flow it is expected that residual time length is in hierarchy node for the expectation residual time length of the present node and each It is expected the sum of duration;Calculate the flow residual time length and the flow and it is expected the ratio between residual time length, according to the flow residual time length and described Flow it is expected that the ratio between residual time length determines that the Work stream data is in the urgency of the present node.
- 3. according to the method described in claim 1, it is characterized in that, in the reception to the Work stream data on present node Before task access request, the method further includes:Obtain circulation be processed to the Work stream data on each node finish maximum complete duration, most short completion duration and most It may complete duration;When going out the expectation of corresponding node according to the maximum completion duration, most short completion duration and most probable completion duration calculation It is long.
- A kind of 4. Work stream data processing method, it is characterised in that the described method includes:Obtain the processing information for the Work stream data that convection current is gone on present node;The downstream node of the Work stream data circulation is determined according to the processing information;The flow residual time length of the Work stream data and the expectation duration of each subsequent node are obtained, the subsequent node includes The downstream node;According to the expectation duration calculation of the flow residual time length, the expectation residual time length of present node and each subsequent node Go out the urgency that the Work stream data is in the downstream node;The processing message to the Work stream data, the processing message are sent to service terminal corresponding with the downstream node The middle urgency for carrying the Work stream data and being in the downstream node.
- 5. according to the method described in claim 4, it is characterized in that, when the corresponding upstream node of the downstream node is including multiple When, the logical relation performed between each upstream node is obtained, the upstream node includes present node;If the logical relation is or performs relation, sent out to the corresponding service terminal of upstream node outside the present node Send processing termination messages.
- It is 6. according to the method described in claim 4, it is characterized in that, described according to the flow residual time length, present node It is expected that the expectation duration calculation of residual time length and each subsequent node goes out the Work stream data and is in the downstream node Urgency, including:Obtain the logical relation between each subsequent node, the logical relation between node include relation in same level and The relation of different levels;Go out the expectation duration of corresponding follow-up hierarchy node according to the expectation duration calculation of the subsequent node in same level;Flow is gone out according to the expectation duration calculation of each follow-up hierarchy node and it is expected residual time length, the flow it is expected residual time length For the sum of the expectation residual time length of the present node and each expectation duration in hierarchy node;Calculate the flow residual time length and the flow and it is expected the ratio between residual time length, according to the flow residual time length and described Flow it is expected that the ratio between residual time length determines the urgency of the Work stream data.
- 7. the time limit alarm set of a kind of Work stream data, it is characterised in that described device includes:Task access request receiving module, for receiving the task access request to the Work stream data on present node;First timing information acquisition module, the time limit for obtaining the Work stream data according to the task access request believe Breath;First urgency computing module, the expectation for flow residual time length, present node in the timing information remain The expectation duration calculation of remaining duration and each subsequent node goes out the urgency that the Work stream data is in the present node;Time limit reminding module, the urgency level of the Work stream data for reflecting when the urgency exceed pre-programmed emergency degree When, generate the prompt message that time limit prompting is carried out to the Work stream data.
- 8. a kind of Work stream data processing unit, it is characterised in that described device includes:Processing information acquisition module, the processing information of the Work stream data on present node is gone to for obtaining convection current;Downstream node determining module, for determining the downstream node of the Work stream data circulation according to the processing information;The second timing information acquisition module, for the flow residual time length for obtaining the Work stream data and each subsequent node It is expected duration, the subsequent node includes the downstream node;Second urgency computing module, for according to the flow residual time length, the expectation residual time length of present node and every The expectation duration calculation of a subsequent node goes out the urgency that the Work stream data is in the downstream node;Message transmission module is handled, for being sent to service terminal corresponding with the downstream node to the Work stream data Message is handled, the urgency that the Work stream data is in the downstream node is carried in the processing message.
- 9. a kind of computer-readable recording medium, is stored thereon with computer program, it is characterised in that the computer program is located The step of reason device realizes method any one of claim 1 to 6 when performing.
- 10. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor Calculation machine program, it is characterised in that the processor realizes method any one of claim 1 to 6 when performing described program The step of.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710775829.2A CN107909234A (en) | 2017-08-31 | 2017-08-31 | Time limit based reminding method, processing method and its device of Work stream data, equipment |
PCT/CN2018/089248 WO2019041931A1 (en) | 2017-08-31 | 2018-05-31 | Method and device for time limit reminding of workflow data, workflow data processing method and device, and apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710775829.2A CN107909234A (en) | 2017-08-31 | 2017-08-31 | Time limit based reminding method, processing method and its device of Work stream data, equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107909234A true CN107909234A (en) | 2018-04-13 |
Family
ID=61840084
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710775829.2A Pending CN107909234A (en) | 2017-08-31 | 2017-08-31 | Time limit based reminding method, processing method and its device of Work stream data, equipment |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN107909234A (en) |
WO (1) | WO2019041931A1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108876312A (en) * | 2018-07-18 | 2018-11-23 | 平安科技(深圳)有限公司 | Case based reminding method, device, computer equipment and storage medium |
CN109345184A (en) * | 2018-08-01 | 2019-02-15 | 平安科技(深圳)有限公司 | Nodal information processing method, device, computer equipment and storage medium based on micro- expression |
WO2019041931A1 (en) * | 2017-08-31 | 2019-03-07 | 平安科技(深圳)有限公司 | Method and device for time limit reminding of workflow data, workflow data processing method and device, and apparatus |
CN109636180A (en) * | 2018-12-10 | 2019-04-16 | 拉扎斯网络科技(上海)有限公司 | Object handles time limit management method, device, electronic equipment and readable storage medium storing program for executing |
CN111178696A (en) * | 2019-12-13 | 2020-05-19 | 中国建设银行股份有限公司 | Service processing time overtime early warning method and device |
CN113015112A (en) * | 2021-03-15 | 2021-06-22 | 中国建设银行股份有限公司 | Question list processing reminding method, device, equipment and readable storage medium |
CN113282385A (en) * | 2020-10-30 | 2021-08-20 | 常熟友乐智能科技有限公司 | Service processing method and system based on online office equipment |
CN115293655A (en) * | 2022-09-30 | 2022-11-04 | 神州数码融信云技术服务有限公司 | Flow control method and device, computer equipment and computer readable storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101551880A (en) * | 2008-03-31 | 2009-10-07 | 华为技术有限公司 | Work flow time method, device and system |
CN102932200A (en) * | 2012-09-21 | 2013-02-13 | 东软集团股份有限公司 | Monitoring method and device for information flow node processing time limit |
CN106022568A (en) * | 2016-05-09 | 2016-10-12 | 福建南威软件有限公司 | Workflow processing method and apparatus |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140278466A1 (en) * | 2013-03-15 | 2014-09-18 | Cvs Pharmacy, Inc. | Pharmacy workflow |
CN104516264B (en) * | 2013-09-26 | 2017-05-24 | 联想(北京)有限公司 | Multi-period timing method, timer and electronic equipment using timer |
CN107909234A (en) * | 2017-08-31 | 2018-04-13 | 平安科技(深圳)有限公司 | Time limit based reminding method, processing method and its device of Work stream data, equipment |
-
2017
- 2017-08-31 CN CN201710775829.2A patent/CN107909234A/en active Pending
-
2018
- 2018-05-31 WO PCT/CN2018/089248 patent/WO2019041931A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101551880A (en) * | 2008-03-31 | 2009-10-07 | 华为技术有限公司 | Work flow time method, device and system |
CN102932200A (en) * | 2012-09-21 | 2013-02-13 | 东软集团股份有限公司 | Monitoring method and device for information flow node processing time limit |
CN106022568A (en) * | 2016-05-09 | 2016-10-12 | 福建南威软件有限公司 | Workflow processing method and apparatus |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019041931A1 (en) * | 2017-08-31 | 2019-03-07 | 平安科技(深圳)有限公司 | Method and device for time limit reminding of workflow data, workflow data processing method and device, and apparatus |
CN108876312A (en) * | 2018-07-18 | 2018-11-23 | 平安科技(深圳)有限公司 | Case based reminding method, device, computer equipment and storage medium |
WO2020015143A1 (en) * | 2018-07-18 | 2020-01-23 | 平安科技(深圳)有限公司 | Case reminding method and apparatus, computer device and storage medium |
CN109345184A (en) * | 2018-08-01 | 2019-02-15 | 平安科技(深圳)有限公司 | Nodal information processing method, device, computer equipment and storage medium based on micro- expression |
WO2020024390A1 (en) * | 2018-08-01 | 2020-02-06 | 平安科技(深圳)有限公司 | Micro-expression-based node information processing method and apparatus, computer device, and storage medium |
CN109345184B (en) * | 2018-08-01 | 2023-06-06 | 平安科技(深圳)有限公司 | Node information processing method and device based on micro-expressions, computer equipment and storage medium |
CN109636180A (en) * | 2018-12-10 | 2019-04-16 | 拉扎斯网络科技(上海)有限公司 | Object handles time limit management method, device, electronic equipment and readable storage medium storing program for executing |
CN111178696A (en) * | 2019-12-13 | 2020-05-19 | 中国建设银行股份有限公司 | Service processing time overtime early warning method and device |
CN113282385A (en) * | 2020-10-30 | 2021-08-20 | 常熟友乐智能科技有限公司 | Service processing method and system based on online office equipment |
CN113015112A (en) * | 2021-03-15 | 2021-06-22 | 中国建设银行股份有限公司 | Question list processing reminding method, device, equipment and readable storage medium |
CN115293655A (en) * | 2022-09-30 | 2022-11-04 | 神州数码融信云技术服务有限公司 | Flow control method and device, computer equipment and computer readable storage medium |
CN115293655B (en) * | 2022-09-30 | 2023-01-20 | 神州数码融信云技术服务有限公司 | Flow control method and device, computer equipment and computer readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
WO2019041931A1 (en) | 2019-03-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107909234A (en) | Time limit based reminding method, processing method and its device of Work stream data, equipment | |
US20200285937A1 (en) | Consumption capacity prediction | |
CN107909330A (en) | Work stream data processing method, device, storage medium and computer equipment | |
CN110992097B (en) | Processing method and device for price of revenue product, computer equipment and storage medium | |
CN110322093B (en) | Information processing method, information display method, information processing device and computing equipment | |
CN111950738A (en) | Machine learning model optimization effect evaluation method and device, terminal and storage medium | |
CN107944000A (en) | Flight freight rate update method, device, electronic equipment, storage medium | |
CN110471821A (en) | Abnormal alteration detection method, server and computer readable storage medium | |
CN111694841A (en) | Order mark generation method, device, server and storage medium | |
CN114663198A (en) | Product recommendation method, device and equipment based on user portrait and storage medium | |
CN108279954A (en) | A kind of method and device of application program sequence | |
CN108629560A (en) | Task distributing method, electronic equipment and storage medium | |
CN112632179A (en) | Model construction method and device, storage medium and equipment | |
CN113901236A (en) | Target identification method and device based on artificial intelligence, electronic equipment and medium | |
CN110213071A (en) | Verification of data method, apparatus, system, computer equipment and storage medium | |
CN104077288B (en) | Web page contents recommend method and web page contents recommendation apparatus | |
Li et al. | Discrete event simulation analysis of a reservation-based, one-way car-sharing system | |
CN109493958A (en) | A kind of follow-up ways to draw up the plan, device, server and medium | |
CN111652282B (en) | Big data-based user preference analysis method and device and electronic equipment | |
CN116501979A (en) | Information recommendation method, information recommendation device, computer equipment and computer readable storage medium | |
CN104839962B (en) | A kind of intelligent wallet and its information processing method and device | |
CN111756760A (en) | User abnormal behavior detection method based on integrated classifier and related equipment | |
CN107844496A (en) | Statistical information output intent and device | |
CN113935788B (en) | Model evaluation method, device, equipment and computer readable storage medium | |
JP2008129796A (en) | Computer system for estimating credit rating of telephone contractor based on telephone number |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180413 |