CN107908487A - Task control management method, device, equipment and computer-readable recording medium - Google Patents

Task control management method, device, equipment and computer-readable recording medium Download PDF

Info

Publication number
CN107908487A
CN107908487A CN201711101604.5A CN201711101604A CN107908487A CN 107908487 A CN107908487 A CN 107908487A CN 201711101604 A CN201711101604 A CN 201711101604A CN 107908487 A CN107908487 A CN 107908487A
Authority
CN
China
Prior art keywords
task
pending
server
configuration information
result information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711101604.5A
Other languages
Chinese (zh)
Other versions
CN107908487B (en
Inventor
赖金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Life Insurance Company of China Ltd
Original Assignee
Ping An Life Insurance Company of China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Life Insurance Company of China Ltd filed Critical Ping An Life Insurance Company of China Ltd
Priority to CN201711101604.5A priority Critical patent/CN107908487B/en
Publication of CN107908487A publication Critical patent/CN107908487A/en
Application granted granted Critical
Publication of CN107908487B publication Critical patent/CN107908487B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/54Interprogram communication
    • G06F9/547Remote procedure calls [RPC]; Web services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2209/00Indexing scheme relating to G06F9/00
    • G06F2209/54Indexing scheme relating to G06F9/54
    • G06F2209/541Client-server
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2209/00Indexing scheme relating to G06F9/00
    • G06F2209/54Indexing scheme relating to G06F9/54
    • G06F2209/549Remote execution

Abstract

The invention discloses a kind of task control management method, device, equipment and computer-readable recording medium, which comprises the following steps:When detecting task configuring request, task configuration information is obtained from the task configuring request, and pending task, pending tactful and pending server are obtained from the task configuration information;By the pending task and the pending strategy transmission to the pending server, so that the pending server is based on pending task described in the pending strategy execution;The execution result information for the pending task that the pending server returns is received, and stores the execution result information.The present invention can be uniformly controlled management execution task, realize the flexible control of execution task, receive the execution result information that server returns, and be capable of the implementation status of effective monitor task, easy to be safeguarded when tasks carrying fails.

Description

Task control management method, device, equipment and computer-readable recording medium
Technical field
The present invention relates to Internet technical field, more particularly to a kind of task control management method, device, equipment and calculating Machine readable storage medium storing program for executing.
Background technology
With the fast development of Internet technology, the configuration of mobile terminal is higher and higher, and user can pacify in the terminal Program application is filled, to extend the function of mobile terminal.The program application installed in mobile terminal, which is typically necessary, network Work under environment, such as wechat, Alipay or Tencent's video etc., applied when the program in mobile terminal and establish data with server After connection, the program application in mobile terminal can carry out data service access with the webserver.
With the surge of number of users, single server can not be met the requirements, and therefore, it is necessary to be using server cluster Program application offer service.Each server in server cluster can perform different tasks, but the triggering of task is mainly led to Cross timer to be triggered, it is necessary to set task in advance and perform the time, can not realize the flexible control of task, also can not be effective Monitor task implementation status, be not easy to management service.Therefore, the flexible control of task how is realized, and it is how effective The implementation status of monitor task is current urgent problem to be solved.
The above is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that the above is existing skill Art.
The content of the invention
It is a primary object of the present invention to provide a kind of task control management method, device, equipment and computer-readable deposit Storage media, it is intended to solve how to realize the flexible control of task, and how the technology of the implementation status of effective monitoring task is asked Topic.
To achieve the above object, the present invention provides a kind of task control management method, the task control management method bag Include following steps:
When detecting task configuring request, task configuration information is obtained from the task configuring request, and from described Pending task, pending tactful and pending server are obtained in task configuration information;
By the pending task and the pending strategy transmission to the pending server, for described pending Server is based on pending task described in the pending strategy execution;
The execution result information for the pending task that the pending server returns is received, and stores the execution Result information.
Alternatively, it is described by the pending task and the pending strategy transmission to the pending server step Before, the task control management method further includes:
Task configuration information is obtained from database with interval preset time, and whether more to detect the task configuration information Newly;
When detecting the task configuration information renewal, pending task is obtained from the task configuration information, is treated Implementation strategy and pending server.
Alternatively, the step of whether the detection task configuration information updates includes:
Obtain the setup time of the task configuration information, and judge the setup time whether with history setup time phase Together;
If the setup time is different from history setup time, judge that the task configuration information has updated;
If the setup time is identical with history setup time, judge that the task configuration information does not update.
Alternatively, the execution result information for receiving the pending task that the pending server returns, and After the step of storing the execution result information, the task control management method further includes:
Judge whether the pending task runs succeeded according to the execution result information;
In the pending tasks carrying failure, obtained from the execution result information and perform failure cause, and shown Show the execution failure cause.
Alternatively, it is described to judge that the step of whether pending task runs succeeded is wrapped according to the execution result information Include:
Judge to whether there is successfully label in the execution result information;
If there is successfully label in the execution result information, the pending tasks carrying success is judged;
If successfully label is not present in the execution result information, the pending tasks carrying failure is judged.
Alternatively, it is described according to the execution result information judge the step of whether pending task runs succeeded it Afterwards, the task control management method further includes:
In the pending tasks carrying failure, judge execution failure cause in the execution result information whether with Default failure cause is identical;
When execution failure cause in the execution result information is identical with default failure cause, by described pending Business and the pending strategy are transmitted to the pending server again.
In addition, to achieve the above object, the present invention also provides a kind of task control managing device, the task control management Device includes:
Acquisition module is detected, for when detecting task configuring request, task to be obtained from the task configuring request Configuration information, and pending task, pending tactful and pending server are obtained from the task configuration information;
Transport module, for by the pending task and the pending strategy transmission to the pending server, So that the pending server is based on pending task described in the pending strategy execution;
Memory module is received, the implementing result letter of the pending task returned for receiving the pending server Breath, and store the execution result information.
The present invention also provides a kind of task control management equipment, the task control management equipment includes:Memory, processing Device and the task control management program that can be run on the memory and on the processor is stored in, the task control pipe Reason program realizes following steps when being performed by the processor:
When detecting task configuring request, task configuration information is obtained from the task configuring request, and from described Pending task, pending tactful and pending server are obtained in task configuration information;
By the pending task and the pending strategy transmission to the pending server, for described pending Server is based on pending task described in the pending strategy execution;
The execution result information for the pending task that the pending server returns is received, and stores the execution Result information.
The present invention also provides a kind of computer-readable recording medium, task is stored with the computer-readable recording medium Control supervisor, the task control management program realize following steps when being executed by processor:
When detecting task configuring request, task configuration information is obtained from the task configuring request, and from described Pending task, pending tactful and pending server are obtained in task configuration information;
By the pending task and the pending strategy transmission to the pending server, for described pending Server is based on pending task described in the pending strategy execution;
The execution result information for the pending task that the pending server returns is received, and stores the execution Result information.
The present invention provides a kind of task control management method, device, equipment and computer-readable recording medium, when detecting During task configuring request, task configuration information is obtained from the task configuring request, and obtain and treat from the task configuration information Execution task, pending tactful and pending server, then treat the pending task and the pending strategy transmission to this Execute server, so that the pending server is based on the pending strategy execution pending task, finally receives this and waits to hold The execution result information for the pending task that row server returns, and the execution result information is stored, this programme passes through unification Execution task is managed, execution task can be configured, and the execution multiplexed transport of configuration to corresponding server is performed, realization is held The flexible control of row task, in addition, receive the execution result information that server returns, is capable of the execution feelings of effective monitor task Condition, easy to be safeguarded when tasks carrying fails.
Brief description of the drawings
Fig. 1 is the device structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of task control management method first embodiment of the present invention;
Fig. 3 is the flow diagram of task control management method second embodiment of the present invention;
Fig. 4 is the refinement flow diagram whether the detection task configuration information described in Fig. 3 updates step;
Fig. 5 is the flow diagram of task control management method 3rd embodiment of the present invention;
Fig. 6 is judges whether the pending task runs succeeded step described in Fig. 5 according to the execution result information Refinement flow diagram;
Fig. 7 is the high-level schematic functional block diagram of task control managing device first embodiment of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:When detecting task configuring request, from the task configuring request Middle acquisition task configuration information, and pending task, pending tactful and pending service are obtained from the task configuration information Device, then by the pending task and the pending strategy transmission to the pending server, for the pending server base In the pending strategy execution pending task, the execution for the pending task that the pending server returns finally is received Result information, and store the execution result information.
Each server in server cluster can perform different tasks, but the triggering of task mainly by timer into Row triggering can not realize the flexible control of task, it is necessary to set task in advance and perform the time, also can not effective monitor task Implementation status, be not easy to management service.Therefore, how to realize the flexible control of task, and how effective monitoring task Implementation status is current urgent problem to be solved.
The present invention provides a solution, and this programme can configure execution task by being managed collectively execution task, and The execution multiplexed transport of configuration to corresponding server is performed, the flexible control of execution task is realized, in addition, receiving server The execution result information of return, is capable of the implementation status of effective monitor task, easy to be safeguarded when tasks carrying fails.
As shown in Figure 1, the device structure schematic diagram for the hardware running environment that Fig. 1, which is the embodiment of the present invention, to be related to.
Equipment of the embodiment of the present invention can be PC or smart mobile phone, tablet computer, pocket computer etc. with aobvious Show the packaged type terminal device of function.
As shown in Figure 1, the equipment can include:Processor 1001, such as CPU, communication bus 1002, user interface 1003, network interface 1004, memory 1005.Wherein, communication bus 1002 is used for realization the connection communication between these components. User interface 1003 can include display screen (Display), input unit such as keyboard (Keyboard), optional user interface 1003 can also include standard wireline interface and wireless interface.Network interface 1004 can optionally connect including the wired of standard Mouth, wave point (such as WI-FI interfaces).Memory 1005 can be high-speed RAM memory or the memory of stabilization (non-volatile memory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned processor 1001 storage device.
Alternatively, terminal can also include camera, RF (Radio Frequency, radio frequency) circuit, sensor, audio Circuit, WiFi module etc..Wherein, sensor ratio such as optical sensor, motion sensor and other sensors.Specifically, light Sensor may include ambient light sensor and proximity sensor, wherein, ambient light sensor can according to the light and shade of ambient light come The brightness of display screen is adjusted, proximity sensor can close display screen and/or backlight when equipment is moved in one's ear.As movement One kind of sensor, gravity accelerometer can detect in all directions the size of (generally three axis) acceleration, when static It can detect that size and the direction of gravity, application (such as horizontal/vertical screen switching, dependent game, magnetic available for identification equipment posture Power meter pose calibrating), Vibration identification correlation function (such as pedometer, tap) etc.;Certainly, equipment can also configure gyroscope, gas The other sensors such as meter, hygrometer, thermometer, infrared ray sensor are pressed, details are not described herein.
It will be understood by those skilled in the art that the device structure shown in Fig. 1 does not form the restriction to equipment, can wrap Include than illustrating more or fewer components, either combine some components or different components arrangement.
As shown in Figure 1, it can lead to as in a kind of memory 1005 of computer-readable storage medium including operating system, network Believe module, Subscriber Interface Module SIM and task control management program.
In the equipment shown in Fig. 1, network interface 1004 is mainly used for connecting background server, is carried out with background server Data communication;User interface 1003 is mainly used for connecting client (user terminal), with client into row data communication;And processor 1001 can be used for calling the task control management program stored in memory 1005, and perform following steps:
When detecting task configuring request, task configuration information is obtained from the task configuring request, and from described Pending task, pending tactful and pending server are obtained in task configuration information;
By the pending task and the pending strategy transmission to the pending server, for described pending Server is based on pending task described in the pending strategy execution;
The execution result information for the pending task that the pending server returns is received, and stores the execution Result information.
Further, processor 1001 can be used for calling the task control management program stored in memory 1005, also Perform following steps:
Task configuration information is obtained from database with interval preset time, and whether more to detect the task configuration information Newly;
When detecting the task configuration information renewal, pending task is obtained from the task configuration information, is treated Implementation strategy and pending server.
Further, processor 1001 can be used for calling the task control management program stored in memory 1005, also Perform following steps:
Obtain the setup time of the task configuration information, and judge the setup time whether with history setup time phase Together;
If the setup time is different from history setup time, judge that the task configuration information has updated;
If the setup time is identical with history setup time, judge that the task configuration information does not update.
Further, processor 1001 can be used for calling the task control management program stored in memory 1005, also Perform following steps:
Judge whether the pending task runs succeeded according to the execution result information;
In the pending tasks carrying failure, obtained from the execution result information and perform failure cause, and shown Show the execution failure cause.
Further, processor 1001 can be used for calling the task control management program stored in memory 1005, also Perform following steps:
Judge to whether there is successfully label in the execution result information;
If there is successfully label in the execution result information, the pending tasks carrying success is judged;
If successfully label is not present in the execution result information, the pending tasks carrying failure is judged.
Further, processor 1001 can be used for calling the task control management program stored in memory 1005, also Perform following steps:
In the pending tasks carrying failure, judge the execution failure cause in the execution result information whether be Default failure cause;
When execution failure cause in the execution result information is default failure cause, will the pending task with The pending strategy is transmitted to the pending server again.
The specific embodiment of task control management equipment of the present invention and each specific implementation of following task control management methods Example is essentially identical, and therefore not to repeat here.
The present invention also provides a kind of task control management method.
With reference to Fig. 2, Fig. 2 is the flow diagram of task control management method first embodiment of the present invention.
In the present embodiment, which includes:
Step S101, when detecting task configuring request, task configuration information is obtained from the task configuring request, And pending task, pending tactful and pending server are obtained from the task configuration information;
The task control management method is applied to task control management equipment, which can be with server Each execute server length connection in cluster, carries out data interaction by network interface and each execute server, each holds Row server possesses server identification, which is used to uniquely represent execute server, which can be The IP address of execute server, or unique special numbering.The task control management equipment, which can control, each performs service The execution task of device and the implementation strategy for performing task.Task control management equipment is configured in the receiving user of the task to be referred to When making, task configuration interface is shown, which shows task config option, and user can be configured based on the task of display Option selects task configuration information, also can incoming task configuration information, so as to configure execution task, execute server and perform plan Slightly etc., and when receiving the task configuration information preservation instruction that user is triggered based on the task configuration interface, according to the task Configuration information preserves instruction and stores the task configuration information to database.
The task configuration information is stored to database, triggers task configuring request, the task control management equipment Whether Detection task configuring request is triggered, and is specially that field information is obtained from default storage region in real time or periodically, and sentence Whether the disconnected field information is preset field information, when the field information is preset field information, judges task configuring request It is triggered, at this time, task configuration information is obtained from the task configuring request, and obtains from the task configuration information pending Task, pending tactful and pending server.The task configuration information includes pending task, pending tactful and pending Server etc., the implementation strategy are included in the one or many execution tasks of some time point execution, perform one every preset time Secondary or be performed a plurality of times and task and be immediately performed one or many execution task dispatchings, which can be the execution specified Server or random execute server, can be more execute servers or separate unit execute server etc., the execution task Type include inventory export class, such as activity registration inventory export, data statistics class, as client healthy behavior index count, Data land class, and database, and other industry are synchronized to from other application program with information as examinee data is landed from caching Business logical process, such as business personnel's leaving office data processing and ordinary user staging business person.It should be noted that pending Business, pending tactful and pending server can be configured by those skilled in the art according to actual conditions, the present embodiment pair This is not specifically limited.
Step S102, by the pending task and the pending strategy transmission to the pending server, for The pending server is based on pending task described in the pending strategy execution;
The task control management equipment obtains pending task, pending tactful and pending clothes from task configuration information It is engaged in after device, obtains the server identification of the pending server, and the pending server is obtained based on the service identifiers IP address, the IP address for being then based on the pending server treat the pending task and pending strategy transmission to corresponding Execute server, so that the pending server receives the pending task of task control management equipment transmission and pending plan Slightly, and according to the pending strategy execution pending task, then after the execution task is completed, generation is corresponding to perform knot Fruit information, and the execution result information is back to task control management equipment, for example, the pending strategy is to be immediately performed one Secondary, which is activity registration inventory export, then the pending server immediately register from database by reading activity Inventory, and the execution result information of generation activity registration inventory export task, and activity registration inventory and implementing result are believed Breath is back to task control management equipment.
Step S103, receives the execution result information for the pending task that the pending server returns, and deposits Store up the execution result information.
The task control management equipment receives the execution result information for the pending task that the pending server returns, And the execution result information is stored, which includes running succeeded, performs failure or perform failure cause etc..Example Such as, which is online marathon registration inventory export, and implementation strategy is performs when 1 is small, the pending service Device is inventory Export server, then task control management equipment by online marathon register inventory derived from pending task, often The implementation strategy that task is performed when 1 is small is sent to inventory Export server, then the inventory Export server receiving it is online Marathon registration inventory export task and when the implementation strategy of task is performed when 1 is small, with every 1 it is small when perform the once line horse Pull loose registration inventory export task, i.e., when 1 is small from service database export line marathon register inventory, and every time it is complete During into online marathon registration inventory export task, corresponding execution result information is back to task control management equipment.
In specific implementation, which also periodically can read task configuration information from database, and Obtain the task configuration information is currently configured the time, which is compared with history setup time, if The time is currently configured after history setup time, then can be determined that task configuration information has renewal, matches somebody with somebody confidence from task at this time Pending task, pending tactful and pending server are obtained in breath, then by the pending task and the pending strategy It is transmitted to the pending server.
In the present embodiment, the present invention obtains task when detecting task configuring request from the task configuring request Configuration information, and pending task, pending tactful and pending server are obtained from the task configuration information, then should Pending task and the pending strategy transmission are to the pending server, so that the pending server is based on the pending plan The pending task is slightly performed, finally receives the execution result information for the pending task that the pending server returns, and The execution result information is stored, this programme can configure execution task by being managed collectively execution task, and by the execution of configuration Multiplexed transport to corresponding server performs, and realizes the flexible control of execution task, in addition, receiving the execution knot that server returns Fruit information, is capable of the implementation status of effective monitor task, easy to be safeguarded when tasks carrying fails.
Further, with reference to Fig. 3, based on above-mentioned first embodiment, it is proposed that the of task control management method of the present invention Two embodiments, difference lies in before step S102, which further includes with previous embodiment:
Step S104, task configuration information is obtained with interval preset time from database, and detects the task configuration Whether information updates;
It should be noted that the present invention is based on previous embodiment, it is proposed that another kind control manages the specific of execution task Mode, is only explained below, other to can refer to previous embodiment.
The task control management equipment obtains task configuration information with interval preset time from database, and detects this Whether business configuration information updates.
Specifically, it is the refinement flow diagram of step S104 described in Fig. 3 with reference to Fig. 4, Fig. 4, step S104 includes:
Step S1041, obtains the setup time of the task configuration information, and judge the setup time whether with history Setup time is identical;
Step S1042, if the setup time is different from history setup time, judges the task configuration information more Newly;
Step S1043, if the setup time is identical with history setup time, judges the task configuration information not more Newly.
After the task control management equipment obtains task configuration information with interval preset time from database, obtaining should The setup time of task configuration information, and judge whether the setup time is identical with history setup time, if the setup time It is different from history setup time, then it can be determined that the task configuration information has updated, it is therefore desirable to which the task of renewal is matched somebody with somebody into confidence Pending task and pending strategy transmission in breath is to corresponding pending server, if the setup time and history configuration Time is identical, then can be determined that the task configuration information does not update, therefore without pending task and pending tactful transmission. It should be noted that history setup time storage is in a register, and initial value is 0, is getting task configuration information During setup time, the history setup time stored in register is updated to the task configuration information got, so that next time makes With the preset time can be configured by those skilled in the art according to actual conditions, this is not limited specifically in the present embodiment System.
Step S105, when detecting the task configuration information renewal, obtains from the task configuration information and waits to hold Row task, pending tactful and pending server.
The task control management equipment is when detecting task configuration information renewal, from the task configuration information of the renewal It is middle to obtain pending task, pending tactful and pending server, and by the pending task and the pending strategy transmission To the pending server, so that the pending server is based on the pending strategy execution pending task, and receives and be somebody's turn to do The execution result information for the pending task that pending server returns, and store the execution result information.
In the present embodiment, whether the present invention has more with the task configuration information in the preset time Test database of interval Newly, can be in task configuration information update, the task configuration information based on renewal carries out the control management of execution task, reduces The number of operations of user.
Further, with reference to Fig. 5, task control management method of the present invention is proposed based on above-mentioned first or second embodiments 3rd embodiment, difference lies in after step S103, which further includes with previous embodiment:
Step S106, judges whether the pending task runs succeeded according to the execution result information;
It should be noted that the present invention proposes a kind of specific monitor mode of execution task based on previous embodiment, with Under be only explained, it is other to can refer to previous embodiment.
The task control management equipment is receiving the execution result information for the pending task that pending server returns When, judge whether the pending task runs succeeded according to the execution result information.
Specifically, it is the refinement flow diagram of step S106 described in Fig. 5 with reference to Fig. 6, Fig. 6, step S106 includes:
Step S1061, judges to whether there is successfully label in the execution result information;
Step S1062, if there is successfully label in the execution result information, judge the pending tasks carrying into Work(;
Step S1063, if successfully label is not present in the execution result information, judges the pending tasks carrying Failure.
The task control management equipment is receiving the execution result information for the pending task that pending server returns When, judge to whether there is successfully label in the execution result information, can if there is successfully label in the execution result information To judge the pending tasks carrying success, if successfully label is not present in execution result information, this pending is judged Business performs failure.
Step S107, in the pending tasks carrying failure, obtains from the execution result information and performs failure Reason, and show the execution failure cause.
The task control management equipment is obtained from the execution result information and performed when the pending tasks carrying fails Failure cause, and show the execution failure cause so that user can be solved the problems, such as based on the execution failure cause.
Alternatively, in the present embodiment, after step S106, further include:
In the pending tasks carrying failure, judge execution failure cause in the execution result information whether with Default failure cause is identical;
When execution failure cause in the execution result information is identical with default failure cause, by described pending Business and the pending strategy are transmitted to the pending server again.
It should be noted that the present invention proposes the specific monitor mode of another execution task based on previous embodiment, Only it is explained below, it is other to can refer to previous embodiment.
The task control management equipment judges the execution in the execution result information when the pending tasks carrying fails Whether failure cause is identical with default failure cause, if the execution failure cause in the execution result information and default failure are former Because identical, then the pending task and the pending strategy are transmitted to the pending server again, for the pending clothes Business device re-executes the pending task based on pending strategy, if the execution failure cause is different from default failure cause, Then show the execution failure cause.For example, the default failure cause disconnects for network, which disconnects for network, Then when network reconnects, the pending task and the pending strategy are transmitted to the pending server again.Need Illustrate, which can be set by those skilled in the art according to actual conditions, and the present embodiment does not make this to have Body limits.
In the present embodiment, the present invention can carry out execution task when performing mission failure based on failure cause is performed Execution again, the frequency of failure of less execution task, in addition, also show perform failure cause, easy to user safeguard.
The present invention also provides a kind of task control managing device.
With reference to Fig. 7, Fig. 7 is the high-level schematic functional block diagram of task control managing device first embodiment of the present invention.
In the present embodiment, which includes:
Acquisition module 101 is detected, for when detecting task configuring request, obtaining and appointing from the task configuring request Business configuration information, and pending task, pending tactful and pending server are obtained from the task configuration information;
Transport module 102, for by the pending task and the pending strategy transmission to the pending service Device, so that the pending server is based on pending task described in the pending strategy execution;
Memory module 103 is received, the execution knot of the pending task returned for receiving the pending server Fruit information, and store the execution result information.
Further, the detection acquisition module 101, is additionally operable to:
Task configuration information is obtained from database with interval preset time, and whether more to detect the task configuration information Newly;
When detecting the task configuration information renewal, pending task is obtained from the task configuration information, is treated Implementation strategy and pending server.
Further, the detection acquisition module 101, is additionally operable to:
Obtain the setup time of the task configuration information, and judge the setup time whether with history setup time phase Together;
If the setup time is different from history setup time, judge that the task configuration information has updated;
If the setup time is identical with history setup time, judge that the task configuration information does not update.
Further, the task control managing device further includes:
Judgment module, for judging whether the pending task runs succeeded according to the execution result information;
Display module is obtained, in the pending tasks carrying failure, being obtained from the execution result information Failure cause is performed, and shows the execution failure cause.
Further, the judgment module, is additionally operable to:
Judge to whether there is successfully label in the execution result information;
If there is successfully label in the execution result information, the pending tasks carrying success is judged;
If successfully label is not present in the execution result information, the pending tasks carrying failure is judged.
Further, the judgment module, is additionally operable in the pending tasks carrying failure, judges described to perform knot Whether the execution failure cause in fruit information is identical with default failure cause;
The transport module, the execution failure cause being additionally operable in the execution result information and default failure cause phase Meanwhile the pending task and the pending strategy are transmitted to the pending server again.
The specific embodiment of task control managing device of the present invention and each specific implementation of above-mentioned task control management method Example is essentially identical, and therefore not to repeat here.
In addition, the embodiment of the present invention also proposes a kind of computer-readable recording medium, the computer-readable recording medium On be stored with task control management program, the task control management program realizes following steps when being executed by processor:
When detecting task configuring request, task configuration information is obtained from the task configuring request, and from described Pending task, pending tactful and pending server are obtained in task configuration information;
By the pending task and the pending strategy transmission to the pending server, for described pending Server is based on pending task described in the pending strategy execution;
The execution result information for the pending task that the pending server returns is received, and stores the execution Result information.
Further, following steps are realized when the task control management program is executed by processor:
Task configuration information is obtained from database with interval preset time, and whether more to detect the task configuration information Newly;
When detecting the task configuration information renewal, pending task is obtained from the task configuration information, is treated Implementation strategy and pending server.
Further, following steps are realized when the task control management program is executed by processor:
Obtain the setup time of the task configuration information, and judge the setup time whether with history setup time phase Together;
If the setup time is different from history setup time, judge that the task configuration information has updated;
If the setup time is identical with history setup time, judge that the task configuration information does not update.
Further, following steps are realized when the task control management program is executed by processor:
Judge whether the pending task runs succeeded according to the execution result information;
In the pending tasks carrying failure, obtained from the execution result information and perform failure cause, and shown Show the execution failure cause.
Further, following steps are realized when the task control management program is executed by processor:
Judge to whether there is successfully label in the execution result information;
If there is successfully label in the execution result information, the pending tasks carrying success is judged;
If successfully label is not present in the execution result information, the pending tasks carrying failure is judged.
Further, following steps are realized when the task control management program is executed by processor:
In the pending tasks carrying failure, judge execution failure cause in the execution result information whether with Default failure cause is identical;
When execution failure cause in the execution result information is identical with default failure cause, by described pending Business and the pending strategy are transmitted to the pending server again.
The specific embodiment of computer-readable recording medium of the present invention is each specific real with above-mentioned task control management method It is essentially identical to apply example, therefore not to repeat here.
It should be noted that herein, term " comprising ", "comprising" or its any other variant are intended to non-row His property includes, so that process, method, article or system including a series of elements not only include those key elements, and And other elements that are not explicitly listed are further included, or further include as this process, method, article or system institute inherently Key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including this Also there are other identical element in the process of key element, method, article or system.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on such understanding, technical scheme substantially in other words does the prior art Going out the part of contribution can be embodied in the form of software product, which is stored in one as described above In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions use so that a station terminal equipment (can be mobile phone, Computer, server, air conditioner, or network equipment etc.) perform method described in each embodiment of the present invention.
It these are only the preferred embodiment of the present invention, be not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure or equivalent flow shift that bright specification and accompanying drawing content are made, is directly or indirectly used in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of task control management method, it is characterised in that the task control management method comprises the following steps:
When detecting task configuring request, task configuration information is obtained from the task configuring request, and from the task Pending task, pending tactful and pending server are obtained in configuration information;
By the pending task and the pending strategy transmission to the pending server, for the pending service Device is based on pending task described in the pending strategy execution;
The execution result information for the pending task that the pending server returns is received, and stores the implementing result Information.
2. task control management method as claimed in claim 1, it is characterised in that described by the pending task and described Before pending strategy transmission to the pending server step, the task control management method further includes:
Task configuration information is obtained from database with interval preset time, and detects whether the task configuration information updates;
When detecting task configuration information renewal, pending task, pending is obtained from the task configuration information Tactful and pending server.
3. task control management method as claimed in claim 2, it is characterised in that the detection task configuration information is The step of no renewal, includes:
The setup time of the task configuration information is obtained, and judges whether the setup time is identical with history setup time;
If the setup time is different from history setup time, judge that the task configuration information has updated;
If the setup time is identical with history setup time, judge that the task configuration information does not update.
4. the task control management method as any one of claim 1-3, it is characterised in that wait to hold described in the reception The execution result information for the pending task that row server returns, and the step of store the execution result information after, The task control management method further includes:
Judge whether the pending task runs succeeded according to the execution result information;
In the pending tasks carrying failure, obtained from the execution result information and perform failure cause, and show institute State execution failure cause.
5. task control management method as claimed in claim 4, it is characterised in that described to be sentenced according to the execution result information The step of whether pending task of breaking runs succeeded includes:
Judge to whether there is successfully label in the execution result information;
If there is successfully label in the execution result information, the pending tasks carrying success is judged;
If successfully label is not present in the execution result information, the pending tasks carrying failure is judged.
6. task control management method as claimed in claim 4, it is characterised in that described to be sentenced according to the execution result information After the step of whether pending task of breaking runs succeeded, the task control management method further includes:
In the pending tasks carrying failure, judge the execution failure cause in the execution result information whether with presetting Failure cause is identical;
When execution failure cause in the execution result information is identical with default failure cause, by the pending task and The pending strategy is transmitted to the pending server again.
7. a kind of task control managing device, it is characterised in that the task control managing device includes:
Acquisition module is detected, for when detecting task configuring request, task configuration to be obtained from the task configuring request Information, and pending task, pending tactful and pending server are obtained from the task configuration information;
Transport module, for by the pending task and the pending strategy transmission to the pending server, for The pending server is based on pending task described in the pending strategy execution;
Memory module is received, the execution result information of the pending task returned for receiving the pending server, And store the execution result information.
8. task control managing device as claimed in claim 7, it is characterised in that the detection acquisition module, is additionally operable to:
Task configuration information is obtained from database with interval preset time, and detects whether the task configuration information updates;
When detecting task configuration information renewal, pending task, pending is obtained from the task configuration information Tactful and pending server.
9. a kind of task control management equipment, it is characterised in that the task control management equipment includes:Memory, processor And the task control management program that can be run on the memory and on the processor is stored in, the task control management Program realizes following steps when being performed by the processor:
When detecting task configuring request, task configuration information is obtained from the task configuring request, and from the task Pending task, pending tactful and pending server are obtained in configuration information;
By the pending task and the pending strategy transmission to the pending server, for the pending service Device is based on pending task described in the pending strategy execution;
The execution result information for the pending task that the pending server returns is received, and stores the implementing result Information.
10. a kind of computer-readable recording medium, it is characterised in that task control is stored with the computer-readable recording medium Management program processed, the task control management program realize following steps when being executed by processor:
When detecting task configuring request, task configuration information is obtained from the task configuring request, and from the task Pending task, pending tactful and pending server are obtained in configuration information;
By the pending task and the pending strategy transmission to the pending server, for the pending service Device is based on pending task described in the pending strategy execution;
The execution result information for the pending task that the pending server returns is received, and stores the implementing result Information.
CN201711101604.5A 2017-11-08 2017-11-08 Task control management method, device and equipment and computer readable storage medium Active CN107908487B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711101604.5A CN107908487B (en) 2017-11-08 2017-11-08 Task control management method, device and equipment and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711101604.5A CN107908487B (en) 2017-11-08 2017-11-08 Task control management method, device and equipment and computer readable storage medium

Publications (2)

Publication Number Publication Date
CN107908487A true CN107908487A (en) 2018-04-13
CN107908487B CN107908487B (en) 2020-11-24

Family

ID=61844483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711101604.5A Active CN107908487B (en) 2017-11-08 2017-11-08 Task control management method, device and equipment and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN107908487B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109542591A (en) * 2018-10-17 2019-03-29 深圳壹账通智能科技有限公司 Task compensation deals method, apparatus, computer equipment and storage medium
CN109684095A (en) * 2018-12-26 2019-04-26 北京奇艺世纪科技有限公司 A kind of task processing method and task distributing equipment
CN110009381A (en) * 2018-12-27 2019-07-12 香港乐蜜有限公司 A kind of active configuration method, apparatus, electronic equipment and storage medium
CN110347492A (en) * 2019-07-15 2019-10-18 深圳前海乘势科技有限公司 Distributed task dispatching method and apparatus based on time parameter method
CN111694671A (en) * 2020-06-12 2020-09-22 北京金山云网络技术有限公司 Big data component management method, device, server, electronic equipment and system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006338197A (en) * 2005-05-31 2006-12-14 Fujitsu Ltd Transaction control program, transaction control method, and transaction processing system
CN101009583A (en) * 2006-01-24 2007-08-01 华为技术有限公司 Execution method of the scheduled task and execution task of management task, and its terminal device
US7412701B1 (en) * 2002-04-22 2008-08-12 Cisco Technology, Inc. Method for network management using a virtual machine in a network device
CN101707543A (en) * 2009-11-30 2010-05-12 北京中科大洋科技发展股份有限公司 Enterprise media bus system supporting multi-task type and enterprise media bus method supporting multi-task type
CN102567106A (en) * 2010-12-30 2012-07-11 中国移动通信集团云南有限公司 Task scheduling method, system and device
CN106557356A (en) * 2015-09-25 2017-04-05 阿里巴巴集团控股有限公司 A kind of task processing method and device
CN106681810A (en) * 2016-12-08 2017-05-17 乐视控股(北京)有限公司 Task docking processing customized management method, device and electronic equipment
CN107203814A (en) * 2017-04-26 2017-09-26 消检通(深圳)科技有限公司 A kind of management of fire fighting equipment method, device and readable storage medium storing program for executing
CN107291547A (en) * 2016-03-31 2017-10-24 阿里巴巴集团控股有限公司 A kind of task scheduling processing method, apparatus and system
CN107330771A (en) * 2017-07-24 2017-11-07 杨润丁 Task management method and device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7412701B1 (en) * 2002-04-22 2008-08-12 Cisco Technology, Inc. Method for network management using a virtual machine in a network device
JP2006338197A (en) * 2005-05-31 2006-12-14 Fujitsu Ltd Transaction control program, transaction control method, and transaction processing system
CN101009583A (en) * 2006-01-24 2007-08-01 华为技术有限公司 Execution method of the scheduled task and execution task of management task, and its terminal device
CN101707543A (en) * 2009-11-30 2010-05-12 北京中科大洋科技发展股份有限公司 Enterprise media bus system supporting multi-task type and enterprise media bus method supporting multi-task type
CN102567106A (en) * 2010-12-30 2012-07-11 中国移动通信集团云南有限公司 Task scheduling method, system and device
CN106557356A (en) * 2015-09-25 2017-04-05 阿里巴巴集团控股有限公司 A kind of task processing method and device
CN107291547A (en) * 2016-03-31 2017-10-24 阿里巴巴集团控股有限公司 A kind of task scheduling processing method, apparatus and system
CN106681810A (en) * 2016-12-08 2017-05-17 乐视控股(北京)有限公司 Task docking processing customized management method, device and electronic equipment
CN107203814A (en) * 2017-04-26 2017-09-26 消检通(深圳)科技有限公司 A kind of management of fire fighting equipment method, device and readable storage medium storing program for executing
CN107330771A (en) * 2017-07-24 2017-11-07 杨润丁 Task management method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
晚来风急: "任务和调度:理解批量处理的关键设计", 《HTTPS://YQ.ALIYUN.COM/ARTICLES/219570》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109542591A (en) * 2018-10-17 2019-03-29 深圳壹账通智能科技有限公司 Task compensation deals method, apparatus, computer equipment and storage medium
CN109684095A (en) * 2018-12-26 2019-04-26 北京奇艺世纪科技有限公司 A kind of task processing method and task distributing equipment
CN109684095B (en) * 2018-12-26 2021-03-23 北京奇艺世纪科技有限公司 Task processing method and task distribution equipment
CN110009381A (en) * 2018-12-27 2019-07-12 香港乐蜜有限公司 A kind of active configuration method, apparatus, electronic equipment and storage medium
CN110347492A (en) * 2019-07-15 2019-10-18 深圳前海乘势科技有限公司 Distributed task dispatching method and apparatus based on time parameter method
CN111694671A (en) * 2020-06-12 2020-09-22 北京金山云网络技术有限公司 Big data component management method, device, server, electronic equipment and system
CN111694671B (en) * 2020-06-12 2023-09-01 北京金山云网络技术有限公司 Big data component management method, device, server, electronic equipment and system

Also Published As

Publication number Publication date
CN107908487B (en) 2020-11-24

Similar Documents

Publication Publication Date Title
CN107908487A (en) Task control management method, device, equipment and computer-readable recording medium
CN106844137A (en) The monitoring method and device of server
US20160241589A1 (en) Method and apparatus for identifying malicious website
CN108989266A (en) A kind of processing method for preventing webpage from kidnapping and client and server
CN108353094A (en) For M2M service layers across resource subscription
US20150156257A1 (en) Application service providing method and system, and related device
CN108304205A (en) A kind of update method of application program, terminal and computer readable storage medium
JP6739648B2 (en) Wireless network type detection method and apparatus and electronic device
CN106557962A (en) Method of payment, apparatus and system
CN104580177B (en) Resource provider method, device and system
CN108616499A (en) A kind of method for authenticating of application program, terminal and computer readable storage medium
CN108804484A (en) The data measures and procedures for the examination and approval, equipment and computer readable storage medium
CN107896249A (en) Across a network area data access method, device, equipment and storage medium
CN110399583A (en) Page display method, device, electronic equipment and storage medium
CN108549826A (en) Method of calibration, terminal, server and the readable storage medium storing program for executing of application program
CN107479798A (en) Multi-screen interaction method and device
CN110035181A (en) It is a kind of to apply card theme setting method and terminal fastly
CN107807830A (en) Medical software update method and server based on cluster
CN111475359B (en) System testing method, device and storage medium under multi-message interaction scene
CN106209918A (en) The method of a kind of internet security management and terminal
CN108039956A (en) Using monitoring method, system and computer-readable recording medium
CN107943666A (en) Client performance Data Trend Monitor method, apparatus and computer-readable recording medium
CN108037963A (en) Automatic deployment method, device and the computer-readable recording medium of device software
CN108182090A (en) Flash plug-in loading methods and device based on blink kernels
CN109802945A (en) A kind of data transmission method and terminal device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant