CN107905936A - A kind of rural ecology hydroelectric power system - Google Patents

A kind of rural ecology hydroelectric power system Download PDF

Info

Publication number
CN107905936A
CN107905936A CN201711492533.6A CN201711492533A CN107905936A CN 107905936 A CN107905936 A CN 107905936A CN 201711492533 A CN201711492533 A CN 201711492533A CN 107905936 A CN107905936 A CN 107905936A
Authority
CN
China
Prior art keywords
controller
signal
rural
power
power generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711492533.6A
Other languages
Chinese (zh)
Inventor
尹小林
赵海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Zichen Technology Development Co Ltd
Original Assignee
Changsha Zichen Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Zichen Technology Development Co Ltd filed Critical Changsha Zichen Technology Development Co Ltd
Priority to CN201711492533.6A priority Critical patent/CN107905936A/en
Publication of CN107905936A publication Critical patent/CN107905936A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B13/00Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B3/00Machines or engines of reaction type; Parts or details peculiar thereto
    • F03B3/16Stators
    • F03B3/18Stator blades; Guide conduits or vanes, e.g. adjustable
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2220/00Application
    • F05B2220/70Application in combination with
    • F05B2220/706Application in combination with an electrical generator
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/50Hydropower in dwellings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

A kind of rural ecology hydroelectric power system, including N number of rural family expenses hydraulic power generator, N >=2, and be electrically connected with power supply control apparatus, cable and grid-connection control device, N number of rural area family expenses hydraulic power generator with power supply control apparatus;The rural family expenses hydraulic power generator includes charge for remittance enhancing device, power generator, with power supply unit and stent, charge for remittance enhancing device is the tubaeform catchment tray or cylinder expanded and middle part circular arc reduces in both ends, charge for remittance enhancing device is fixed on stent, power generator is fixed on charge for remittance enhancing device, is connected with power supply unit with power generator.The present invention does not destroy rural ecosystem topography and geomorphology, does not influence the Coun-try River ecological balance, it is not required to cut-off dam making water storage, the ground that can be ploughed and herd is not lost, and installation and arrangement are simple, rural area efficiently can be served using Coun-try River irrigation canals and ditches step flow kinetic energy, got rich beneficial to wide rural area or mountain village to the environmental utilization of water resource and extra earning.

Description

A kind of rural ecology hydroelectric power system
Technical field
The present invention relates to electricity generation system, is specifically related to a kind of rural ecology hydroelectric power system.
Background technology
Modern life and production all be unable to do without electric power.But it is current still based on Coal-fired Thermal Power, electric power used is to use Mineral matter energy coal combustion is converted into steam and can generate electricity, and gained electric power is only about 1/3rd of coal-fired energy, is first produced big The greenhouse gases CO of amount2And SO2、CO、NOxAnd uncompleted burned carbon hydrogen compound, ball ecological environment is destroyed, second fire coal is converted into It has lost about 2/3rds energy during electric power, long-distance sand transport also has loss, and invests huge.
In clean energy resource field, current hydroelectric project and wind energy project investment are huge, and especially water power needs to shut off to build Dam water storage, influences natural, ecological very big, even results in water biological species extinction, is also also easy to produce dam body and bursts to collapse and cause people's life wealth The loss of production.And on the other hand, China region is broad, and topography and geomorphology is complicated, mountain stream, Kan Ba, the irrigation canals and ditches in vast rural area and mountain village Countless, although the limited flow of the sub-thread current of these mountain streams, Kan Ba, irrigation canals and ditches, ten thousand streams enter rivers, and thousand rivers are returned greatly Sea, countless irrigation canals and ditches, Kan Ba, the current total flow in streams are far longer than great rivers, spread all over the numerous mountains on wide topography and geomorphology The total kinetic energy of streams hundred times of great rivers flowing water of water total kinetic energy of ten thousand canal of ten thousand gullys and thousand ditches.At present, mountains and rivers the earth is spread all at this In the case that the streams bank canal flow kinetic energy almost all of different geographical different landforms wastes, many rural areas or mountain village are still Long-term short of electricity has a power failure, and the Modern Live and extra earning to many rural people cause inconvenience.
For this reason, many spontaneous fund-raising cut-off dam making reservoir impoundment power generations in rural area, also constantly planning sets location cut-off dam making for local government Power generation.But this cut-off dam making reservoir impoundment power generation engineering, first destroys the natural ecological environment in ecosystem streams, has flooded preciousness Soil of ploughing, damaged substantial amounts of natural, ecological landscape;Second quantities is big, construction period length, and investment is big;Three by rainy season Big with dry season influence, electricity, the voltage for the electricity that floods are big with water flow fluctuation, influence security appliance use;It is moreover primary The step kinetic energy efficiency of streams irrigation canals and ditches flowing water is too low, and most flow kinetic energies lose during water storage, especially largely Step gully flow kinetic energy through dam body damp completely loss.Meanwhile water storage builds a dam and has also seriously affected part ploughing and weeding livestock farm The extra earning of the people, and be that the security of the lives and property of downstream people brings the potential drowned risk of dam break.
The content of the invention
The technical problems to be solved by the invention are to overcome the shortcomings of above-mentioned background technology, there is provided one kind does not destroy rural area Ecosystem topography and geomorphology, do not influence the Coun-try River ecological balance, is not required to cut-off dam making water storage, the ground that can be ploughed and herd is not lost, and pacify Dress and arrangement are simple, and maintenance is easy to use, efficiently can serve rural rural area using Coun-try River irrigation canals and ditches step flow kinetic energy Ecological hydroelectric power system.
It is a kind of rural ecology hydroelectric power system that the present invention, which solves the technical solution that its technical problem uses, including ladder Level is arranged on N number of rural family expenses hydraulic power generator in one or more streams and/or irrigation canals and ditches and/or river, N >=2, Yi Jipei Power supply control apparatus, cable and grid-connection control device, N number of rural family expenses hydraulic power generator that step is set are supplied by cable with matching somebody with somebody Controller for electric consumption is electrically connected, described to be directly electrically connected with power supply control apparatus with user load or by grid-connection control device and electricity Net is electrically connected;The rural family expenses hydraulic power generator includes charge for remittance enhancing device, power generator, with power supply unit and stent, Charge for remittance enhancing device is the tubaeform catchment tray or cylinder expanded and middle part circular arc reduces in both ends, and charge for remittance enhancing device is fixed on branch On frame, power generator is fixed on charge for remittance enhancing device, is connected with power supply unit with power generator;The rural family expenses waterpower Electric organ further includes debris part flow arrangement, and debris part flow arrangement bottom is connected with charge for remittance enhancing device input end.
Further, it is described to include controller, bus-bar, signal acquisition module, processing module, alarm with power supply control apparatus Module, display module, inverter module and energy storage device;The cable includes power cable and signal cable, the rural area family expenses The quantity of hydraulic power generator and controller is N number of, and the power output end of each rural area family expenses hydraulic power generator passes through electric power Cable is connected with the power input end of corresponding controller;Power output end per controller is connected with bus-bar;First The signal input part of controller is connected by signal cable and the input interface of signal acquisition module, the signal of first controller Output terminal is connected with the signal input part of second controller, the signal output part of second controller and the 3rd controller Signal input part connects, and the signal output part of the N-1 controller is connected with the signal input part of n-th controller, n-th control The signal output part of device processed is connected with terminal resistance;Output interface, display module and the alarm module of the signal acquisition module It is connected with processing module, the input port of the inverter module, the terminals of energy storage system are connected with bus-bar;It is described grid-connected Control device is connected with bus-bar.
Further, it is described to include controller, bus-bar, signal acquisition module, processing module, alarm with power supply control apparatus Module, display module, inverter module and energy storage device;The cable includes power cable and signal cable, the rural area family expenses The quantity of hydraulic power generator and controller is N number of, and N is even number, N/2 rural family expenses hydraulic power generator and N/2 controller It is divided into one group, is A groups, remaining N/2 rural family expenses hydraulic power generator and N/2 controller is divided into another group, are B groups, A groups In B groups, the electric power of the power output end of each rural area family expenses hydraulic power generator by power cable with corresponding controller Input terminal is connected;Power output end per controller is connected with bus-bar;In A groups, the signal input part of first controller Connected by signal cable and the input interface of signal acquisition module, the signal output part of first controller is controlled with second The signal input part connection of device, the signal output part of second controller are connected with the signal input part of the 3rd controller, the The signal output part of N/2-1 controller is connected with the signal input part of the N/2 controller, the signal of the N/2 controller Output terminal is connected with terminal resistance 33;In B groups, the signal input part of first controller passes through signal cable and signal acquisition mould The input interface connection of block, the signal output part of first controller are connected with the signal input part of second controller, and second The signal output part of a controller is connected with the signal input part of the 3rd controller, the signal output of the N/2-1 controller End is connected with the signal input part of the N/2 controller, and the signal output part of the N/2 controller is connected with terminal resistance;Institute The output interface, display module and alarm module for stating signal acquisition module are connected with processing module, the inverter module it is defeated Entrance, the terminals of energy storage system are connected with bus-bar;The grid-connection control device is connected with bus-bar.
Further, the catchment tray of the charge for remittance enhancing device is equipped with the induction type LED directly to be powered by power generator Headlamp and acousto-optic adornment.
Further, the rural family expenses hydraulic power generator is preferably on rural family expenses hydraulic power generator of the ecology without influence, Also charge for remittance synergy hydraulic power generator or other, which can be selected, can collect the hydroelectric installation of current synergy, can also receive with other small-sized Hydroelectric installation or equipment.
The rural ecology hydroelectric power system of the present invention is used on rural family expenses hydraulic power generator of the ecological environment without influence, The step flow kinetic energy of Coun-try River irrigation canals and ditches is directly utilized, one can be arranged in the case where not changing ecological environment with step Or a plurality of streams irrigation canals and ditches or the continual and steady efficiency power generation of multiple rural family expenses hydraulic power generators along the river in flowing water, and will be all Single ecological hydraulic power generator, which generates electricity, to automatically control controller rectifying and wave-filtering by signal acquisition and Display processing module Collected in after voltage stabilizing in bus-bar or energy storage device, another mistake is changed into rural customer power supply or is state's household electrical appliances by grid-connection control device Net power supply, is rural extra earning while rural area is serviced.
Compared with prior art, advantages of the present invention is as follows:
(1)Suitable for wide rural area or mountain village, cut-off dam making is not required to, under conditions of ecological environment is not influenced, is set with step It is placed in rural irrigation canals and ditches streams and along the river multiple rural family expenses hydraulic power generator efficiency power generations with debris part flow arrangement in current And electricity generation system network is formed, quick for installation, small investment is quick, beneficial to the rural ecosystem topography and geomorphology of protection, protection rural area The ecological balance, beneficial to rural Ecological Civilization Construction.
(2)It is far longer than great rivers total flow using total flow, step water flow dynamic energy is far longer than river waterflow and always moves Can Coun-try River irrigation canals and ditches flowing water and generating power by water current, and implement to manage concentratedly and power along the river, solution rural that can be inexpensive Power demand, beneficial to environmental protection.
(3)The ecological water force generating system installation of this rural area is simple, and maintenance is easy to use, in the case where preserving the ecological environment Can highly effective and safe using Coun-try River irrigation canals and ditches and the continual and steady power generation of current step flow kinetic energy along the river, beneficial to wide rural area Or the environmental utilization of water resource and extra earning are got rich in mountain village.
Brief description of the drawings
Fig. 1 is the structure diagram of the embodiment of the present invention 1.
Fig. 2 is the structure diagram of the rural family expenses hydraulic power generator of embodiment illustrated in fig. 1.
Fig. 3 is the structure diagram of the embodiment of the present invention 2.
Fig. 4 is the structure diagram of the embodiment of the present invention 3.
In figure:1- rural areas family expenses hydraulic power generator, 110- debris part flow arrangements, 111- charge for remittance enhancing devices, 112- power generations Device, 113- stents, 2- match somebody with somebody power supply control apparatus, 21- controllers, 22- bus-bars, 23- signal acquisition modules, 24- processing moulds Block, 25- alarm modules, 26- display modules, 27- inverter modules, 28- energy storage devices, 3- cables, 31- power cables, 32- signals Cable, 33- terminal resistances, 4- grid-connection control devices.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further detail the present invention.
Embodiment 1
With reference to Fig. 1, the present embodiment is the rural ecology hydroelectric power system for a gully flowing water, including rural family expenses waterpower Electric organ 1, with power supply control apparatus 2, cable 3 and grid-connection control device 4, include controller 21, confluence with power supply control apparatus 2 Row 22, signal acquisition module 23, processing module 24, alarm module 25, display module 26, inverter module 27 and energy storage device 28; Cable 3 includes power cable 31 and signal cable 32, the quantity of rural family expenses hydraulic power generator 1 and controller 21 be it is N number of, often Power input end of the power output end of a rural area family expenses hydraulic power generator 1 by power cable 31 with corresponding controller 21 It is connected;Power output end per controller 21 is connected with bus-bar 22;The signal input part of first controller 21 passes through letter Number cable 32 is connected with the input interface of signal acquisition module 23, the signal output part of first controller 21 and second control The signal input part connection of device 21, the signal input part company of the signal output part of second controller 21 and the 3rd controller 21 Connect, and so on, the signal output part of the N-1 controller 21 is connected with the signal input part of n-th controller 21, n-th The signal output part of controller 21 is connected with terminal resistance 33;Output interface, display module 26 and the report of signal acquisition module 23 Alert module 25 is connected with processing module 24, the input port of inverter module 27, the terminals of energy storage system 28 with bus-bar 22 Connection;Grid-connection control device 4 is connected with bus-bar 22.
With reference to Fig. 2, rural family expenses hydraulic power generator 1 includes debris part flow arrangement 110, charge for remittance enhancing device 111, power generation dress Put 112 and stent 113.
Charge for remittance enhancing device 111 is the catchment tray of the tubaeform expansion in both ends and the contraction of middle part circular arc, and catchment tray by setting relatively The two blocks of charge for remittance plates and the bottom plate composition arranged on two pieces of charge for remittance plate bottoms put,
Debris part flow arrangement 110 is arranged on 111 input end of charge for remittance enhancing device, and debris part flow arrangement 110 is in pyramid-shaped, pyramid bottom End is connected with the input end of charge for remittance enhancing device 111, is connected with stent 113 at the top of pyramid, the fixation of power generator 112 in charge for remittance In enhancing device 111.
Debris part flow arrangement 110 is used to prevent the branch or the impact sandstone of weeds or entrainment in streams or waterfall flow And organism in water enters in charge for remittance enhancing device 111, and prevent branch, weeds, impact sandstone and organism in water accumulation, make tree Branch, weeds, impact sandstone and organism in water branch to both sides and flow away with current;Charge for remittance enhancing device 111 can collect and speedup Current, improve water flow dynamic energy, improve the generating efficiency of power generator 112;Stent 113 is consolidating for rural family expenses hydraulic power generator 1 Determine component;Charge for remittance synergy hydraulic power generator 1 can be fixed in streams and waterfall;Power generator 112 is used to utilize generating power by water current.
In use, by rural 1 step of family expenses hydraulic power generator(Step:Set gradually by water (flow) direction)It is fixed on streams stream In water, by generating electricity on rural family expenses hydraulic power generator 1 of the ecological environment without influence, gathered by signal acquisition module 23 each The electric signal of controller 21, and processing module 24 is transmitted to, electric power signal respective value is manually set on display module 25, is led to Processing module 24 is crossed to contrast, and 21 voltage of adjustment control device make it stable after by bus-bar 22 connect energy storage device 28, by electricity It can be stored in energy storage device 28, be customer power supply by inverter module 27 or be state by 4 inversion grid connection of grid-connection control device Family's power grid power supply, present system can monitor the state of each rural family expenses hydraulic power generator 1 in real time, in electric signal exception or failure When alarm signal to alarm module 27 sent by processing module 24 alarm.
N=10 in the present embodiment, i.e., the quantity of rural family expenses hydraulic power generator 1 and controller 21 is 10.
Embodiment 2
With reference to Fig. 3, the present embodiment is differed only in embodiment 1:The present embodiment is the rural area life for a plurality of gully flowing water State hydroelectric power system, N/2 rural family expenses hydraulic power generator 1 and N/2 controller 21 are divided into one group, are A groups, remaining N / 2 rural family expenses hydraulic power generators 1 and N/2 controller 21 are divided into another group, be B groups, in A groups and B groups, each rural family The power output end of device 1 of generating electricity from water power is connected by power cable 31 with the power input end of corresponding controller 21;Often The power output end of controller 21 is connected with bus-bar 22;In A groups, the signal input part of first controller 21 passes through signal Cable 32 is connected with the input interface of signal acquisition module 23, the signal output part and second controller of first controller 21 21 signal input part connection, the signal input part company of the signal output part of second controller 21 and the 3rd controller 21 Connect, and so on, the signal output part of the N/2-1 controller 21 is connected with the signal input part of the N/2 controller 21, the The signal output part of N/2 controller 21 is connected with terminal resistance 33;In B groups, the signal input part of first controller 21 leads to The input interface that signal cable 32 is crossed with signal acquisition module 23 is connected, the signal output part of first controller 21 and second The signal input part connection of controller 21, the signal input of the signal output part and the 3rd controller 21 of second controller 21 End connection, and so on, the signal input part company of the signal output part of the N/2-1 controller 21 and the N/2 controller 21 Connect, the signal output part of the N/2 controller 21 is connected with terminal resistance 33.Remaining is the same as embodiment 1.
In use, by N/2 in A groups rural 1 step of family expenses hydraulic power generator(Step:Set gradually by water (flow) direction) It is fixed in a streams flowing water, N/2 rural 1 step of family expenses hydraulic power generator in B groups is fixed on another streams stream In water, by generating electricity on rural family expenses hydraulic power generator 1 of the ecological environment without influence, gathered by signal acquisition module 23 each The electric signal of controller 21, and processing module 24 is transmitted to, electric power signal respective value is manually set on display module 25, is led to Processing module 24 is crossed to contrast, and 21 voltage of adjustment control device make it stable after by bus-bar 22 connect energy storage device 28, by electricity It can be stored in energy storage device 28, be customer power supply by inverter module 27 or be state by 4 inversion grid connection of grid-connection control device Family's power grid power supply, present system can monitor the state of each rural family expenses hydraulic power generator 1 in real time, in electric signal exception or failure When alarm signal to alarm module 27 sent by processing module 24 alarm.
Embodiment 3
With reference to Fig. 4, the present embodiment and embodiment 1 difference lies in:The present embodiment is rural ecology hydroelectric power system, comprising 200 charge for remittance synergy hydraulic power generators 1 and 200 controllers 21.Debris part flow arrangement 110 is in hemisphere planar, hemisphere face bottom Be connected with the input end of charge for remittance enhancing device 111, be connected with stent 113 at the top of hemisphere face, the fixation of power generator 112 in charge for remittance In enhancing device 111.It is both provided with directly being supplied by power generator 112 on the catchment tray of each rural family expenses hydraulic power generator 1 The induction type LED illumination lamp and acousto-optic adornment of electricity.Remaining is the same as embodiment 1.
Those skilled in the art can carry out various modifications and variations to the present invention, if these modifications and variations are at this Within the scope of invention claim and its equivalent technologies, then these modifications and variations are also within protection scope of the present invention.
The prior art that the content not being described in detail in specification is known to the skilled person.

Claims (4)

  1. A kind of 1. rural ecology hydroelectric power system, it is characterised in that:One or more streams and/or ditch are arranged on including step N number of rural family expenses hydraulic power generator in canal and/or river, N >=2, and filled with power supply control apparatus, cable and cutting-in control Put, N number of rural family expenses hydraulic power generator that step is set is electrically connected by cable with power supply control apparatus, described to match somebody with somebody for automatically controlled Device processed is directly electrically connected with user load or is electrically connected by grid-connection control device with power grid;The rural family expenses waterpower hair Electric appliance includes charge for remittance enhancing device, power generator, with power supply unit and stent, charge for remittance enhancing device for the tubaeform expansion in both ends and The catchment tray or cylinder that middle part circular arc reduces, charge for remittance enhancing device are fixed on stent, and power generator is fixed on charge for remittance synergy dress Put, be connected with power supply unit with power generator;The rural family expenses hydraulic power generator further includes debris part flow arrangement, debris Part flow arrangement bottom is connected with charge for remittance enhancing device input end.
  2. 2. rural ecology hydroelectric power system as claimed in claim 1, it is characterised in that:It is described to include with power supply control apparatus Controller, bus-bar, signal acquisition module, processing module, alarm module, display module, inverter module and energy storage device;It is described Cable includes power cable and signal cable, and the quantity of the rural area family expenses hydraulic power generator and controller is N number of, each township The power output end of village's family expenses hydraulic power generator is connected by power cable with the power input end of corresponding controller;Often control The power output end of device processed is connected with bus-bar;The signal input part of first controller passes through signal cable and signal acquisition The input interface connection of module, the signal output part of first controller are connected with the signal input part of second controller, the The signal output part of two controllers is connected with the signal input part of the 3rd controller, the signal output of the N-1 controller End is connected with the signal input part of n-th controller, and the signal output part of n-th controller is connected with terminal resistance;The letter Output interface, display module and the alarm module of number acquisition module are connected with processing module, the input port of the inverter module, The terminals of energy storage system are connected with bus-bar;The grid-connection control device is connected with bus-bar.
  3. 3. rural ecology hydroelectric power system as claimed in claim 1, it is characterised in that:It is described to include with power supply control apparatus Controller, bus-bar, signal acquisition module, processing module, alarm module, display module, inverter module and energy storage device;It is described Cable includes power cable and signal cable, and the quantity of the rural area family expenses hydraulic power generator and controller is N number of, and N is even Number, N/2 rural family expenses hydraulic power generator and N/2 controller are divided into one group, are A groups, remaining N/2 rural service water Power electric organ and N/2 controller are divided into another group, are B groups, in A groups and B groups, the electric power of each rural area family expenses hydraulic power generator Output terminal is connected by power cable with the power input end of corresponding controller;Per controller power output end with remittance Stream row's connection;In A groups, the signal input part of first controller is connected by signal cable and the input interface of signal acquisition module Connect, the signal output part of first controller is connected with the signal input part of second controller, the signal of second controller Output terminal is connected with the signal input part of the 3rd controller, the signal output part of the N/2-1 controller and the N/2 control The signal input part connection of device, the signal output part of the N/2 controller are connected with terminal resistance 33;In B groups, first control The signal input part of device is connected by signal cable and the input interface of signal acquisition module, the signal output of first controller End is connected with the signal input part of second controller, the signal output part of second controller and the signal of the 3rd controller Input terminal connects, and the signal output part of the N/2-1 controller is connected with the signal input part of the N/2 controller, N/2 The signal output part of controller is connected with terminal resistance;Output interface, display module and the alarm mould of the signal acquisition module Block is connected with processing module, and the input port of the inverter module, the terminals of energy storage system are connected with bus-bar;It is described simultaneously Net control device is connected with bus-bar.
  4. 4. the rural ecology hydroelectric power system as described in one of claim 1-3, it is characterised in that:The charge for remittance enhancing device Catchment tray or cylinder be equipped with directly by power generator power supply induction type LED illumination lamp and acousto-optic adornment.
CN201711492533.6A 2017-12-30 2017-12-30 A kind of rural ecology hydroelectric power system Pending CN107905936A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711492533.6A CN107905936A (en) 2017-12-30 2017-12-30 A kind of rural ecology hydroelectric power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711492533.6A CN107905936A (en) 2017-12-30 2017-12-30 A kind of rural ecology hydroelectric power system

Publications (1)

Publication Number Publication Date
CN107905936A true CN107905936A (en) 2018-04-13

Family

ID=61872263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711492533.6A Pending CN107905936A (en) 2017-12-30 2017-12-30 A kind of rural ecology hydroelectric power system

Country Status (1)

Country Link
CN (1) CN107905936A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1873219A (en) * 2005-06-03 2006-12-06 通用电气公司 System and method for operating a wind farm under high wind speed conditions
CN101951014A (en) * 2010-10-29 2011-01-19 上海致远绿色能源有限公司 Wind-light-diesel commercial power integral power supply system
CN202340124U (en) * 2011-12-12 2012-07-18 辽宁省电力有限公司锦州供电公司 Small intelligent bidirectional self-adaptive photovoltaic grid-connected power generation system
CN103397975A (en) * 2013-08-16 2013-11-20 重庆同利实业有限公司 Standard floating pipe type hydroelectric generator
CN103615350A (en) * 2013-12-20 2014-03-05 冯柯霖 River flow energy conversion system
EP3035481A1 (en) * 2014-12-17 2016-06-22 Siemens Aktiengesellschaft Turbine device for converting hydrokinetic power into electrical power, system for converting hydrokinetic power into electrical power for an electrical power grid, and method for feeding electrical power into an electrical power grid
CN106523252A (en) * 2016-12-07 2017-03-22 李伟 Dam-free submerged hydroelectric generation system
CN207945039U (en) * 2017-12-30 2018-10-09 长沙紫宸科技开发有限公司 Rural ecology hydroelectric power system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1873219A (en) * 2005-06-03 2006-12-06 通用电气公司 System and method for operating a wind farm under high wind speed conditions
CN101951014A (en) * 2010-10-29 2011-01-19 上海致远绿色能源有限公司 Wind-light-diesel commercial power integral power supply system
CN202340124U (en) * 2011-12-12 2012-07-18 辽宁省电力有限公司锦州供电公司 Small intelligent bidirectional self-adaptive photovoltaic grid-connected power generation system
CN103397975A (en) * 2013-08-16 2013-11-20 重庆同利实业有限公司 Standard floating pipe type hydroelectric generator
CN103615350A (en) * 2013-12-20 2014-03-05 冯柯霖 River flow energy conversion system
EP3035481A1 (en) * 2014-12-17 2016-06-22 Siemens Aktiengesellschaft Turbine device for converting hydrokinetic power into electrical power, system for converting hydrokinetic power into electrical power for an electrical power grid, and method for feeding electrical power into an electrical power grid
CN106523252A (en) * 2016-12-07 2017-03-22 李伟 Dam-free submerged hydroelectric generation system
CN207945039U (en) * 2017-12-30 2018-10-09 长沙紫宸科技开发有限公司 Rural ecology hydroelectric power system

Similar Documents

Publication Publication Date Title
Spänhoff Current status and future prospects of hydropower in Saxony (Germany) compared to trends in Germany, the European Union and the World
Harby et al. Pumped storage hydropower
CN207945039U (en) Rural ecology hydroelectric power system
CN107910901A (en) A kind of environmental charge for remittance synergy hydroelectric power system for being adapted to streams/waterfall
CN207765968U (en) It is adapted to the environmental charge for remittance synergy hydroelectric power system of streams/waterfall
CN107939593A (en) A kind of ecotype streams waterfall charge for remittance synergy hydraulic power generator
CN107905936A (en) A kind of rural ecology hydroelectric power system
CN207920769U (en) Environmental streams waterfall charge for remittance synergy hydraulic power generator
CN204039997U (en) Water-power plant
CN107910902B (en) Rural household energy-gathering synergistic wind power generation system
US20180030950A1 (en) Anti-drought and anti-flood by still water circulation generation
Obaid Seasonal-water dams: a great potential for hydropower generation in Saudi Arabia
WO1997021922A1 (en) Total electric water system
Salem Water and hydropower for sustainable development of Qattara depression as a national project in Egypt
WO2019126834A8 (en) Runner, hydraulic turbine, hydraulic turbine module and the turbine system for generating electricity
Safi et al. Modelling flood reservoir integrated with pumped hydropower storage for electricity production using HOMER
CN203872110U (en) Solar energy photovoltaic power plant and water power plant integrated power supply apparatus constructed in reservoir
Wang et al. Analysis of voltage variations of Taiwan Power System connected with a large-scale offshore wind farm
CN202991329U (en) Water power generating station
CN202645822U (en) Siphonage multistage hydraulic power generation system
Grecu Studies upon valorisation of nonconventional green energy generated from integrated system in the historical context of Fagaras Mountains.
Pali et al. A novel approach for hydropower generation using photovoltaic electricity as driving energy
CN204511757U (en) New hydropower generation station
CN204476650U (en) Hydroelectric power plant
Manikandan et al. A review on the various environmental imapcts of renewable energy technologies

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination