CN107902974A - A kind of high intensity compresses prefabricated section backfilling process - Google Patents
A kind of high intensity compresses prefabricated section backfilling process Download PDFInfo
- Publication number
- CN107902974A CN107902974A CN201711328636.9A CN201711328636A CN107902974A CN 107902974 A CN107902974 A CN 107902974A CN 201711328636 A CN201711328636 A CN 201711328636A CN 107902974 A CN107902974 A CN 107902974A
- Authority
- CN
- China
- Prior art keywords
- high intensity
- prefabricated section
- backfill
- raw material
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Structural Engineering (AREA)
- Organic Chemistry (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
A kind of high intensity compresses prefabricated section backfilling process, by being mixed, stirring, compressing by conventional backfill, curing process obtains high intensity and compresses prefabricated section, further increase the intensity of backfill, eliminate building body sedimentation in advance to a greater extent, the bearing capacity of ground is improved, reduces construction cost, at the same time, the generation of building waste can be reduced, building waste is fully subjected to secondary use.
Description
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of high intensity compresses prefabricated section backfilling process.
Background technology
In construction, it is necessary to return the soil tamped again, normally referred to as after the below ground engineerings such as basis are completed
" backfill ".At present, the quality of backfill is not generally high, easily causes the sinking at backfill position, causes many owners to think building body
Poor quality, there are serious quality problems, as specialty construction personnel, it is easy to be seen to be backfill and occur asking
Topic, is no any influence for building weight.
The content of the invention
In view of the deficiencies of the prior art, the present invention proposes a kind of high intensity compression prefabricated section backfilling process, can not only
The construction quality of engineering entirety is improved, reduces building body differential settlement, and reduces construction cost, is built meanwhile, it is capable to reduce
The generation of building refuse, fully carries out secondary use by building waste.
In order to solve the above technical problems, the technical solution that the present invention takes is:
The present invention proposes a kind of high intensity compression prefabricated section backfilling process, it is characterised in that comprises the following steps:
(1)Preloading block raw material are selected:Using backfill, building waste, cement, rubble, sand as preloading block raw material;
(2)The stirring of preloading block raw material:Backfill, building waste, cement, rubble, sand are put into mixer and add water
It is stirred, until stirring evenly;
(3)The compression of preloading block raw material, curing process:By step(2)The homogeneous mixture of generation is put into mould, passes through liquid
It is compressed by pressure device in the mold, is cured it, then carries out natural curing, and it is pre- to obtain high intensity compression
Clamp dog;
(4)Prefabricated section uses:To be carried out first in foundation trench it is levelling, then by step(3)Obtained high intensity compress prefabricated section into
Row is piled up.
Further, the cement is portland cement.
Further, the mould is plastic mould.
Further, in step(3)In, the natural curing keeps having in film solidifying by the way of plastic foil covering
Bear water.
Further, in step(4)In, when stacking, piles up in the way of one along a fourth.
Further, the backfill is dirt.
The present invention provides a kind of high intensity to compress prefabricated section backfilling process, by the way that conventional backfill is mixed,
Stirring, compression, curing process obtain high intensity compression prefabricated section, further increase the intensity of backfill, to a greater extent in advance
Building body sedimentation is first eliminated, the bearing capacity of ground is improved, reduces construction cost, meanwhile, it is capable to reduce the production of building waste
It is raw, building waste is fully subjected to secondary use.
Embodiment
In order to make those skilled in the art more fully understand technical scheme, with reference to specific embodiment to this
Invention is described in further detail.The embodiments described below is exemplary, and is only used for explaining the present invention, without being understood that
For limitation of the present invention.Particular technique or condition are not specified in embodiment, according to the described skill of document in the art
Art or condition are carried out according to product description.
Following disclosure provides many different embodiments or example is used for realizing the different structure of the present invention.For letter
Change disclosure of the invention, hereinafter the component and setting of specific examples are described.Certainly, they are merely examples, and
It is not intended to limit the present invention.In addition, the present invention can repeat reference numerals, this repetition be for letter in different examples
Change with clear purpose, the relation between itself not indicating discussed various embodiments and/or setting.In addition, the present invention carries
The various specific techniques and the examples of material supplied, but those of ordinary skill in the art may realize that other techniques can
Use applied to property and/or other materials.
According to an embodiment of the invention, the present invention provides a kind of high intensity to compress prefabricated section backfilling process, its feature exists
In comprising the following steps:
(1)Preloading block raw material are selected:Using backfill, building waste, cement, rubble, sand as preloading block raw material;
(2)The stirring of preloading block raw material:Backfill, building waste, cement, rubble, sand are put into mixer and add water
It is stirred, until stirring evenly, wherein, the cement is portland cement;
(3)The compression of preloading block raw material, curing process:By step(2)The homogeneous mixture of generation is put into mould, passes through liquid
It is compressed by pressure device in the mold, is cured it, then carries out natural curing, and it is pre- to obtain high intensity compression
Clamp dog, wherein, the mould is plastic mould;
(4)Prefabricated section uses:To be carried out first in foundation trench it is levelling, then by step(3)Obtained high intensity compress prefabricated section into
Row is piled up.
According to an embodiment of the invention, in step(2)In, to ensure that it is collapse resistant and easy needed for construction that preloading block meets
The technical requirements such as property, before preloading block raw material are mixed, it is necessary to backfill, building waste, cement, rubble,
The proportioning of sand is rationally designed and optimized, to determine proportioning.In construction, the choosing of coordination in works is carried out according to actual conditions
It is fixed, and adjusted at any time according to weather in construction.
After the proportioning that a variety of materials is determined according to proportioning, after the quality that each material is weighed using dosing machine, stirring is put into
Machine is stirred, and blanking order is:Rubble, cement, sand and then lower building waste are first descended, finally descends backfill.
According to an embodiment of the invention, in step(3)In, the natural curing is protected by the way of plastic foil covering
Holding has condensation water in film, curing time is no less than 7 days.
According to an embodiment of the invention, in step(4)In, when stacking, piles up in the way of one along a fourth.
According to an embodiment of the invention, the backfill is dirt.
According to an embodiment of the invention, the present invention provides a kind of high intensity to compress prefabricated section backfilling process, by by often
The backfill of rule is mixed, stirred, being compressed, curing process obtains high intensity compression prefabricated section, further increases backfill
Intensity, eliminate the sedimentation of building body in advance to a greater extent, improve the bearing capacity of ground, reduce construction cost, meanwhile, energy
The generation of building waste is enough reduced, building waste is fully subjected to secondary use.
In the description of this specification, the description of reference term " embodiment ", " specific embodiment " etc. means to combine the reality
Specific features, material or the feature for applying example or example description are contained at least one embodiment of the present invention or example.
In this specification, schematic expression of the above terms need not be directed to identical embodiment or example.Moreover, the tool of description
Body characteristics, material or feature may be combined in any suitable manner in any one or more of the embodiments or examples.In addition, not
In the case of conflicting, those skilled in the art can by the different embodiments or example described in this specification and not
It is combined and combines with embodiment or exemplary feature.
Although the embodiment of the present invention has been shown and described above, it is to be understood that above-described embodiment is example
Property, it is impossible to limitation of the present invention is interpreted as, those of ordinary skill in the art within the scope of the invention can be to above-mentioned
Embodiment is changed, changes, replacing and modification, meanwhile, for those of ordinary skill in the art, the think of according to the application
Think, in specific embodiments and applications there will be changes.
Claims (6)
1. a kind of high intensity compresses prefabricated section backfilling process, it is characterised in that comprises the following steps:
(1)Preloading block raw material are selected:Using backfill, building waste, cement, rubble, sand as preloading block raw material;
(2)The stirring of preloading block raw material:Backfill, building waste, cement, rubble, sand are put into mixer and add water
It is stirred, until stirring evenly;
(3)The compression of preloading block raw material, curing process:By step(2)The homogeneous mixture of generation is put into mould, passes through liquid
It is compressed by pressure device in the mold, is cured it, then carries out natural curing, and it is pre- to obtain high intensity compression
Clamp dog;
(4)Prefabricated section uses:To be carried out first in foundation trench it is levelling, then by step(3)Obtained high intensity compress prefabricated section into
Row is piled up.
It is 2. according to claim 1, it is characterised in that the cement is portland cement.
It is 3. according to claim 1, it is characterised in that the mould is plastic mould.
It is 4. according to claim 1, it is characterised in that in step(3)In, the natural curing is using plastic foil covering
Mode, and keep having condensation water in film.
It is 5. according to claim 1, it is characterised in that in step(4)In, during stacking in the way of one along a fourth code
Put.
It is 6. according to claim 1, it is characterised in that the backfill is dirt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711328636.9A CN107902974A (en) | 2017-12-13 | 2017-12-13 | A kind of high intensity compresses prefabricated section backfilling process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711328636.9A CN107902974A (en) | 2017-12-13 | 2017-12-13 | A kind of high intensity compresses prefabricated section backfilling process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107902974A true CN107902974A (en) | 2018-04-13 |
Family
ID=61865430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711328636.9A Pending CN107902974A (en) | 2017-12-13 | 2017-12-13 | A kind of high intensity compresses prefabricated section backfilling process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107902974A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854248A (en) * | 2021-03-12 | 2021-05-28 | 河南绿岩工程科技有限公司 | Foundation pit backfill structure and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4313466B2 (en) * | 1999-06-10 | 2009-08-12 | 株式会社 アクア | Block for embankment |
CN101857409A (en) * | 2010-05-28 | 2010-10-13 | 北京工业大学 | Flowing backfill and preparation and construction method thereof |
CN103195070A (en) * | 2013-04-03 | 2013-07-10 | 北京四方如钢混凝土制品有限公司 | Prefabricated block for backfill and backfill method |
CN103496927A (en) * | 2013-09-03 | 2014-01-08 | 北京四方如钢混凝土制品有限公司 | Method for manufacturing solid block by using engineering waste, solid block, and backfilling method |
CN103864371A (en) * | 2014-03-17 | 2014-06-18 | 乌海市公路工程有限公司 | Backfill for checking peripheral settlement of wells and pipelines and preparation method of backfill |
CN106699069A (en) * | 2017-01-18 | 2017-05-24 | 北京工业大学 | Low-intensity groove concrete produced by using red brick construction wastes and construction technology of low-intensity groove concrete |
-
2017
- 2017-12-13 CN CN201711328636.9A patent/CN107902974A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4313466B2 (en) * | 1999-06-10 | 2009-08-12 | 株式会社 アクア | Block for embankment |
CN101857409A (en) * | 2010-05-28 | 2010-10-13 | 北京工业大学 | Flowing backfill and preparation and construction method thereof |
CN103195070A (en) * | 2013-04-03 | 2013-07-10 | 北京四方如钢混凝土制品有限公司 | Prefabricated block for backfill and backfill method |
CN103496927A (en) * | 2013-09-03 | 2014-01-08 | 北京四方如钢混凝土制品有限公司 | Method for manufacturing solid block by using engineering waste, solid block, and backfilling method |
CN103864371A (en) * | 2014-03-17 | 2014-06-18 | 乌海市公路工程有限公司 | Backfill for checking peripheral settlement of wells and pipelines and preparation method of backfill |
CN106699069A (en) * | 2017-01-18 | 2017-05-24 | 北京工业大学 | Low-intensity groove concrete produced by using red brick construction wastes and construction technology of low-intensity groove concrete |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854248A (en) * | 2021-03-12 | 2021-05-28 | 河南绿岩工程科技有限公司 | Foundation pit backfill structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Estabragh et al. | Treatment of an expansive soil by mechanical and chemical techniques | |
US11319676B2 (en) | Construction method for using phosphogypsum in embankment improvement | |
CN101602567B (en) | Waste mud solidification processing method based on polypropylene acetamide | |
CN103253899B (en) | Silt solidification method | |
CN106337347A (en) | Construction method of ardealite improved roadbed | |
CN101812888A (en) | Concrete brick containing sludge burning ash residue | |
CN103739242A (en) | Method used for preparing solid blocks with sludge and waste material, solid blocks, and backfilling method | |
KR100900779B1 (en) | A manufacturing method of artifical soil using coal dust | |
CN105969367B (en) | A kind of premixing high strength cement soil | |
CN113652915B (en) | Road construction process | |
CN111499280A (en) | Method for preparing controllable low-strength material by utilizing waterworks sludge and material | |
CN108409215B (en) | Ductile sludge geopolymer and preparation method thereof | |
CN107117903A (en) | A kind of concrete road pavement brick with water penetration and preparation method thereof | |
CN107902974A (en) | A kind of high intensity compresses prefabricated section backfilling process | |
CN104402380B (en) | A kind of curing materials with viscosity spoir as primary raw material and preparation method thereof | |
CN105970903B (en) | It is a kind of to strengthen the plastic concrete mattress layer of the native synergy of compound foundation pile | |
CN116639946A (en) | Sludge curing agent and sludge in-situ curing method | |
KR20140098416A (en) | Solidified soil forming method for improving ground using | |
DE102013016425A1 (en) | Method for filling cavities with a filling compound | |
CN103496890B (en) | Utilize the method for mud manufacture solid block, solid block and earth-filling method | |
KR102106528B1 (en) | Folwable landfill cover soil composition | |
CN111424486A (en) | Construction method for loess embankment settlement deformation control by adopting phosphogypsum | |
CN104310932A (en) | C20 curing product based on viscous spoil and sand spoil, and preparation method of C20 curing product based on viscous spoil and sand spoil | |
CN104310933A (en) | Sandy-spoil-based C30 slope-protection brick mixture ratio and preparation method of slope-protection brick | |
CN204875831U (en) | Top layer soil solidifies on spot and closes foundation structure that bears with pile cluster |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180413 |
|