CN107900100A - A kind of cold rolling continuous machine applied to high-strength steel opens car method - Google Patents

A kind of cold rolling continuous machine applied to high-strength steel opens car method Download PDF

Info

Publication number
CN107900100A
CN107900100A CN201710998364.7A CN201710998364A CN107900100A CN 107900100 A CN107900100 A CN 107900100A CN 201710998364 A CN201710998364 A CN 201710998364A CN 107900100 A CN107900100 A CN 107900100A
Authority
CN
China
Prior art keywords
rack
value
force
roll
rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710998364.7A
Other languages
Chinese (zh)
Other versions
CN107900100B (en
Inventor
王少飞
窦爱民
王艳超
齐海峰
王飞
张良
王玉良
杨洪凯
时海涛
张树亮
张家方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Jingtang United Iron and Steel Co Ltd
Original Assignee
Shougang Jingtang United Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Jingtang United Iron and Steel Co Ltd filed Critical Shougang Jingtang United Iron and Steel Co Ltd
Priority to CN201710998364.7A priority Critical patent/CN107900100B/en
Publication of CN107900100A publication Critical patent/CN107900100A/en
Application granted granted Critical
Publication of CN107900100B publication Critical patent/CN107900100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • B21B1/24Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process
    • B21B1/28Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process by cold-rolling, e.g. Steckel cold mill
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B31/00Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames
    • B21B31/02Rolling stand frames or housings; Roll mountings ; Roll chocks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/48Tension control; Compression control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/58Roll-force control; Roll-gap control
    • B21B37/62Roll-force control; Roll-gap control by control of a hydraulic adjusting device

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)
  • Metal Rolling (AREA)

Abstract

Car method is opened the embodiment of the invention discloses a kind of cold rolling continuous machine applied to high-strength steel, this method includes:The outlet of the cold continuous rolling is built and is opened;The roll-force of first rack, second rack, the 3rd rack, the 4th rack and the 5th rack is adjusted to respective preset value respectively;The entrance of the cold continuous rolling is built and is opened, and starts the cold continuous rolling;Adjust the hydraulic cylinder tilting value between each rack;When the tension value of each rack tends towards stability, judge whether the thickness of the high-strength steel of the 5th rack outlet and the difference of target thickness are more than predetermined deviation value, if the thickness of the high-strength steel and the difference of target thickness are more than predetermined deviation value, the first rack is then adjusted to the roll-force of the 4th rack, the difference is less than predetermined deviation value;The cold continuous rolling is carried out to the production of high-strength steel according to pre-set velocity.The present invention solves has the technical problem for opening car failure since roll-force is difficult to control in the prior art.

Description

A kind of cold rolling continuous machine applied to high-strength steel opens car method
Technical field
The present invention relates to the control technology field of cold rolling continuous machine, more particularly to a kind of cold rolling continuous applied to high-strength steel of method Machine opens car method.
Background technology
Since high-strength steel has high intensity and certain formability, it is widely used in automobile manufacturing field.It is domestic each Iron and steel enterprise of family meets the needs of automaker all in Devoting Major Efforts To Developing high-intensity band steel, particularly the height of more than DP780 Qiang Gang, the steel grade yield strength is high, and the maximum unit roll-force of each rack reaches 19Kn/mm.
At present, in the production of the high-strength steel of more than DP780, since the roll-force of high-strength steel is close to limiting value, easily make Into rolling sideslip, additionally due to the plate shape thickness control difficulty of high-strength steel is big, phenomena such as broken belt easily occurs for when dynamic variable specification, When breaking down shutdown or broken belt occurring, milling train is again started up extremely difficult.
It follows that there is the technical problem for opening car failure since roll-force is difficult to control in the prior art.
The content of the invention
A kind of cold rolling continuous machine applied to high-strength steel of offer of the embodiment of the present invention opens car method, to improve the prior art In due to roll-force is difficult to control and in the presence of open car failure technical problem.
What the embodiment of the present application provided a kind of cold rolling continuous machine applied to high-strength steel opens car method, the cold rolling continuous machine bag The first rack, the second rack, the 3rd rack, the 4th rack and the 5th rack are included, the described method includes:
The outlet of the cold continuous rolling is built and is opened;
Respectively by first rack, second rack, the 3rd rack, the 4th rack and the 5th machine The roll-force of frame is adjusted to respective preset value;
The entrance of the cold continuous rolling is built and is opened, and starts the cold continuous rolling;
Adjust first rack, second rack, the 3rd rack, the 4th rack and the 5th rack Between hydraulic cylinder tilting value, tension variation between each rack is controlled within setting range;
Monitor first rack, second rack, the 3rd rack, the 4th rack and the 5th rack Respective tension value, when the tension value of each rack tends towards stability, judges the thickness of the high-strength steel of the 5th rack outlet Whether it is more than predetermined deviation value with the difference of target thickness, if the difference of the thickness of the high-strength steel and target thickness is more than in advance If deviation, then first rack, second rack, the 3rd rack, the roll-force of the 4th rack are adjusted, is made The deviation is less than predetermined deviation value;
The cold continuous rolling is carried out to the production of high-strength steel according to pre-set velocity.
Optionally, built in the outlet by the cold continuous rolling after opening, the method further includes:
Whether the state by the mandrel for monitoring the cold continuous rolling, judge that outlet is built to open and succeed.
Optionally, built in the entrance by the cold continuous rolling, and before starting the cold continuous rolling, the method Further include:
Adjust first rack, second rack, the 3rd rack, the 4th rack and the 5th rack Between hydraulic cylinder tilting value, the dip deviation of the cold continuous rolling is maintained in setting range.
Optionally, in the adjustment first rack, second rack, the 3rd rack, the 4th rack Hydraulic cylinder tilting value between the 5th rack, makes tension variation between each rack control within setting range it Afterwards, the method further includes:
The tilting value of the hydraulic cylinder is adjusted within the scope of ± 0.3mm;
Judge whether the actual rolling force deviation value of each rack is less than 500kn, wherein, the actual rolling force deviation value The difference of roll-force between the fore side and driving side of the cold continuous rolling;
If actual rolling force deviation value is not less than 500kn, hydraulic cylinder is retracted, and readjusts rolling for each rack Power processed.
Optionally, in the monitoring first rack, second rack, the 3rd rack, the 4th rack Before the respective tension value of the 5th rack, the method further includes:
Adjust the bending roller force of each rack.
Optionally, the monitoring first rack, second rack, the 3rd rack, the 4th rack and The respective tension value of 5th rack, including:
Make first rack, second rack, the 3rd rack, the 4th rack and the 5th rack each From tension force actual value and setting value between deviation be no more than 10%.
Optionally, if the difference of the thickness of the high-strength steel and target thickness is more than predetermined deviation value, adjust First rack, second rack, the 3rd rack, the roll-force of the 4th rack, are less than the difference pre- If deviation, including:
According to the 3rd rack, the second rack, the first rack, the order of the 4th rack, roll-force is adjusted.
Optionally, the adjustment amount of the adjustment roll-force rolls the difference of force value for roll-force upper limit value with reality, wherein, institute It is 30000kn to state roll-force upper limit value.
Optionally, the pre-set velocity is 45mpm.
Optionally, after the production according to pre-set velocity progress high-strength steel by the cold continuous rolling, the method Further include:
The speed of the cold continuous rolling is monitored, when the speed of the cold continuous rolling is more than 60mpm, enables each rack Automatic thickness control function.
The one or more technical solutions provided in the embodiment of the present application, have at least the following technical effects or advantages:
Cold rolling continuous machine provided by the embodiments of the present application applied to high-strength steel opens car method, first respectively by the first machine Frame, the second rack, the 3rd rack, the roll-force of the 4th rack and the 5th rack are adjusted to respective preset value, restart cold company Milling train, and tilted by adjusting the hydraulic cylinder between the first rack, the second rack, the 3rd rack, the 4th rack and the 5th rack Value, makes the tension variation between each rack control within setting range, then by monitoring the tension value of each rack, when When the tension value of each rack tends towards stability, pass through the thickness of the high-strength steel that judges the 5th rack outlet and target thickness Whether difference is more than predetermined deviation value, so as to adjust the first rack, the second rack, the 3rd rack, the roll-force of the 4th rack, makes The difference is less than predetermined deviation value.Since the method for the present invention is by the additional roll-force for adjusting first to fourth rack, and And by the control of the difference of the exit thickness of the 5th rack and target thickness within the scope of predetermined deviation value, due to just starting When, the AGC (automatic thickness control) of the 5th rack does not come into operation, so the exit thickness of the 5th rack does not reach target thickness Degree, and after interstand tension is stablized, first to fourth rack can automatically switch to AGC control models, and the 5th rack at this time Exit thickness and target thickness difference already less than predetermined deviation value, automatic thickness controls the rolling for being assigned to the 4th rack Power can reduce, thus for high-strength steel, roll-force has obtained preferable control, is not in roll-force overrun condition, and The thickness of the high-strength steel of 5th rack outlet can be rapidly achieved desired value, so as to save the production time, improve and open car Success rate.Improve and there is the technical problem for opening car failure since roll-force is difficult to control in the prior art.
Brief description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only the embodiment of the present invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to the attached drawing of offer other Attached drawing.
The flow for opening car method of a kind of cold rolling continuous machine applied to high-strength steel in a kind of preferred embodiment of Fig. 1 present invention Figure.
Embodiment
A kind of cold rolling continuous machine applied to high-strength steel of offer of the embodiment of the present invention opens car method, to improve the prior art In due to roll-force is difficult to control and in the presence of open car failure technical problem.
In order to solve above-mentioned technical problem existing in the prior art, the overall think of of technical solution provided by the embodiments of the present application Road is as follows:
The roll-force of each rack is adjusted to setting value first, then adjusts rolling for first to fourth rack by additional Power processed, and by the control of the difference of the exit thickness of the 5th rack and target thickness within the scope of predetermined deviation value, due to firm During startup, the AGC (automatic thickness control) of the 5th rack does not come into operation, so the exit thickness of the 5th rack does not reach target Thickness, and after interstand tension is stablized, first to fourth rack can automatically switch to AGC control models, and the 5th machine at this time The exit thickness of frame and the difference of target thickness are assigned to rolling for the 4th rack already less than predetermined deviation value, automatic thickness control Power processed can reduce, thus for high-strength steel, roll-force has obtained preferable control, is not in roll-force overrun condition, And the 5th the thickness of high-strength steel of rack outlet can be rapidly achieved desired value, so as to save the production time, improve and open car Success rate.Improve and there is the technical problem for opening car failure since roll-force is difficult to control in the prior art.
In order to better understand the above technical scheme, in conjunction with appended figures and specific embodiments to upper State technical solution to be described in detail, it should be understood that the specific features in the embodiment of the present invention and embodiment are to the present invention The detailed description of technical solution, rather than the restriction to technical solution of the present invention, in the case where there is no conflict, the present invention are implemented Technical characteristic in example and embodiment can be mutually combined.
In the present embodiment, there is provided a kind of cold rolling continuous machine applied to high-strength steel opens car method, refers to Fig. 1, should Method includes:
Step S101:The outlet of the cold continuous rolling is built and is opened.
Step S102:Respectively by first rack, second rack, the 3rd rack, the 4th rack and The roll-force of 5th rack is adjusted to respective preset value.
Specifically, the roll-force of each rack can be adjusted to by preset value by programming, wherein preset value can To be configured according to actual conditions.
Step S103:The entrance of the cold continuous rolling is built and is opened, and starts the cold continuous rolling.
Specifically, after the roll-force of each rack is tentatively set, tension force is established in the entrance of the cold continuous rolling, and Car pattern, which is opened, according to raw material plate starts the cold continuous rolling.
Step S104:Adjust first rack, second rack, the 3rd rack, the 4th rack and institute The hydraulic cylinder tilting value between the 5th rack is stated, the tension variation between each rack is controlled within setting range.
In specific implementation process, the deviation of the tension value of each rack is controlled by adjusting the tilting value of hydraulic cylinder Control is in setting range, such as can be 3Mpa, 2Mpa etc..
Step S105:Monitor first rack, second rack, the 3rd rack, the 4th rack and institute The 5th respective tension value of rack is stated, when the tension value of each rack tends towards stability, judges the height of the 5th rack outlet Whether the strong thickness of steel and the difference of target thickness are more than predetermined deviation value, if the thickness of the high-strength steel and target thickness Difference is more than predetermined deviation value, then adjusts first rack, second rack, the 3rd rack, the 4th rack Roll-force, the deviation is less than predetermined deviation value.
Specifically, above-mentioned predetermined deviation value can be adjusted according to actual requirement, such as can be 300 μm, 200 μm Or 100 μm.
Step S106:The cold continuous rolling is carried out to the production of high-strength steel according to pre-set velocity.
In order to avoid mandrel dallies, built in the outlet by the cold continuous rolling after opening, the method further includes:
Whether the state by the mandrel for monitoring the cold continuous rolling, judge that outlet is built to open and succeed.
In specific implementation process, high strength band steel is rolled onto on mandrel, is then established outlet tension force, can be passed through after building Whether observation outlet mandrel state succeeds to judge that outlet is built to open, such as mandrel then shows that outlet does not have also in idling conditions Build and be turned into work(, need strap rolling-assisting device to be crimped again after rising at this time.
In order to ensure the stability of each rack of cold rolling continuous machine, build and open in the entrance by the cold continuous rolling, and open Before moving the cold continuous rolling, the method further includes:
Adjust first rack, second rack, the 3rd rack, the 4th rack and the 5th rack Between hydraulic cylinder tilting value, the dip deviation of the cold continuous rolling is maintained in setting range.
In order to ensure stability that cold rolling continuous machine starts, in the adjustment first rack, second rack, described Hydraulic cylinder tilting value between 3rd rack, the 4th rack and the 5th rack, makes the tension force between each rack inclined After difference is controlled within setting range, the method further includes:
The tilting value of the hydraulic cylinder is adjusted within the scope of ± 0.3mm;
Judge whether the actual rolling force deviation value of each rack is less than 500kn, wherein, the actual rolling force deviation value The difference of roll-force between the fore side and driving side of the cold continuous rolling;
If actual rolling force deviation value is not less than 500kn, hydraulic cylinder is retracted, and readjusts rolling for each rack Power processed.
In specific implementation process, by judging the difference of the roll-force between fore side and driving side, so as to adjust again The roll-force of whole each rack, due to this application involves high-strength steel yield strength it is high, such as DP780, DP980 etc., respectively The maximum unit roll-force of rack reaches 19Kn/mm, thus roll-force can be close to limiting value during production, it is therefore desirable to rationally control The roll-force of each rack.
In order to improve the flatness of high-strength steel, in the monitoring first rack, second rack, the 3rd machine Before frame, the 4th rack and the respective tension value of the 5th rack, the method further includes:
Adjust the bending roller force of each rack.
In the method that the application provides, first rack, second rack, the 3rd rack, described is monitored 4th rack and the respective tension value of the 5th rack, including:
Make first rack, second rack, the 3rd rack, the 4th rack and the 5th rack each From tension force actual value and setting value between deviation be no more than 10%.
In specific implementation process, the tension value of each rack often changes, in order to ensure to produce high-strength steel Stability, it is necessary to monitor the actual tension value of each rack, and need to protect the deviation of actual tension value and setting value in real time Hold in smaller range.
In the method that the application provides, if the difference of the thickness of the high-strength steel and target thickness is more than predetermined deviation Value, then adjust first rack, second rack, the 3rd rack, the roll-force of the 4th rack, makes described inclined Difference is less than predetermined deviation value, including:
According to the 3rd rack, the second rack, the first rack, the order of the 4th rack, roll-force is adjusted.
In specific implementation process, when the thickness of milling train outlet high-strength steel does not reach target thickness, then produce High-strength steel is unqualified, it is therefore desirable to the roll-force of each rack is adjusted again, and according to the 3rd rack, the second rack, the first machine The order of frame, the 4th rack, adjusts roll-force, so that adjustment space is reserved to the 4th rack, easy to automatic quick adjustment, so that Preferably exit thickness can be adjusted, and cause the difference of thickness to be less than predetermined deviation value.
In the method that the application provides, the adjustment amount of the adjustment roll-force is roll-force upper limit value and actual roll-force The difference of value, wherein, the roll-force upper limit value is 30000kn, so as to quickly eliminate between actual (real) thickness and target thickness Thickness difference.
In the method that the application provides, the pre-set velocity is 45mpm.
In specific implementation process, the speed setting value of main transmission makes speed and addition speed two by main in the operation of rolling Part forms, and wherein addition speed is provided respectively by two modules of AGC and tension force, but second to the in steel start-up course The AGC of four racks has not been put to, thus AGC output addition speed it is constant be zero.Pre-set velocity is set as 45mpm, that is, is opened Vehicle speed, so as to be conducive to low speed tension adjustment.The control mode of tension force is changed into speed control mode.Preferably, Tension force can be put into chain condition threshold speed and be revised as 12mpm, and existing speed adjusts the critical value of tension force For 50mpm.Since raw material plate plays the problem of vehicle speed is set as 45mpm, be able to can not so be triggered there are speed control tension force, this Application is conducive to tension force closed loop and puts into and realize that as early as possible raw material plate plays car by the way that critical speed is revised as 12mpm Tension force function.
In the method that the application provides, in the production that the cold continuous rolling is carried out to high-strength steel according to pre-set velocity Afterwards, the method further includes:
The speed of the cold continuous rolling is monitored, when the speed of the cold continuous rolling is more than 60mpm, enables each rack Automatic thickness control function.
In specific implementation process, as rolling mill speed > 60mpm, the AGC functions of each rack are all put into.It is and firm Start milling train under 45mpm speed operating statuses, the AGC of the 5th rack of milling train does not come into operation, so the actual (real) thickness of outlet Target thickness is not reached.After interstand tension is stablized, Increased Speed of Rolling Mill to 60mpm, other racks (first to fourth rack) are certainly It is dynamic to be switched to AGC control models, and the thickness of outlet of the 5th rack and the difference of target thickness are inclined already less than default at this time Difference, so automatic thickness control is assigned to the roll-force of the 4th rack and can reduce, because without roll-force overrun condition, And the 5th the thickness of rack outlet can be rapidly achieved desired value.
The one or more technical solutions provided in the embodiment of the present application, have at least the following technical effects or advantages:
Cold rolling continuous machine provided by the embodiments of the present application applied to high-strength steel opens car method, first respectively by the first machine Frame, the second rack, the 3rd rack, the roll-force of the 4th rack and the 5th rack are adjusted to respective preset value, restart cold company Milling train, and tilted by adjusting the hydraulic cylinder between the first rack, the second rack, the 3rd rack, the 4th rack and the 5th rack Value, makes the tension variation between each rack control within setting range, then by monitoring the tension value of each rack, when When the tension value of each rack tends towards stability, pass through the thickness of the high-strength steel that judges the 5th rack outlet and target thickness Whether difference is more than predetermined deviation value, so as to adjust the first rack, the second rack, the 3rd rack, the roll-force of the 4th rack, makes The difference is less than predetermined deviation value.Since the method for the present invention is by the additional roll-force for adjusting first to fourth rack, and And by the difference of the exit thickness of the 5th rack and target thickness control within the scope of predetermined deviation value, due to just start when, The AGC (automatic thickness control) of 5th rack does not come into operation, so the exit thickness of the 5th rack does not reach target thickness, and After interstand tension is stablized, first to fourth rack can automatically switch to AGC control models, and the outlet of the 5th rack at this time Already less than predetermined deviation value, the roll-force that automatic thickness control is assigned to the 4th rack can drop the difference of thickness and target thickness It is low, thus for high-strength steel, roll-force has obtained preferable control, is not in roll-force overrun condition, and the 5th machine The thickness of the high-strength steel of frame outlet can be rapidly achieved desired value, so as to save the production time, improve the success rate for opening car. Improve and there is the technical problem for opening car failure since roll-force is difficult to control in the prior art.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know basic creation Property concept, then can make these embodiments other change and modification.So appended claims be intended to be construed to include it is excellent Select embodiment and fall into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art God and scope.In this way, if these modifications and changes of the present invention belongs to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these modification and variations.

Claims (10)

1. a kind of cold rolling continuous machine applied to high-strength steel opens car method, the cold rolling continuous machine include the first rack, the second rack, 3rd rack, the 4th rack and the 5th rack, the described method includes:
The outlet of the cold continuous rolling is built and is opened;
Respectively by first rack, second rack, the 3rd rack, the 4th rack and the 5th rack Roll-force is adjusted to respective preset value;
The entrance of the cold continuous rolling is built and is opened, and starts the cold continuous rolling;
Adjust between first rack, second rack, the 3rd rack, the 4th rack and the 5th rack Hydraulic cylinder tilting value, tension variation between each rack is controlled within setting range;
Monitor first rack, second rack, the 3rd rack, the 4th rack and the 5th rack each Tension value, when the tension value of each rack tends towards stability, judge the thickness and mesh of the high-strength steel of the 5th rack outlet Whether the difference of mark thickness is more than predetermined deviation value, if the difference of the thickness of the high-strength steel and target thickness is more than described pre- If deviation, then first rack, second rack, the 3rd rack, the roll-force of the 4th rack are adjusted, is made The difference is less than the predetermined deviation value;
The cold continuous rolling is carried out to the production of high-strength steel according to pre-set velocity.
2. the method as described in claim 1, it is characterised in that built in the outlet by the cold continuous rolling after opening, institute The method of stating further includes:
Whether the state by the mandrel for monitoring the cold continuous rolling, judge that outlet is built to open and succeed.
3. the method as described in claim 1, it is characterised in that build and open in the entrance by the cold continuous rolling, and start Before the cold continuous rolling, the method further includes:
Adjust between first rack, second rack, the 3rd rack, the 4th rack and the 5th rack Hydraulic cylinder tilting value, the dip deviation of the cold continuous rolling is maintained in setting range.
4. the method as described in claim 1, it is characterised in that in the adjustment first rack, second rack, institute The hydraulic cylinder tilting value between the 3rd rack, the 4th rack and the 5th rack is stated, makes the tension force between each rack After deviation is controlled within setting range, the method further includes:
The tilting value of the hydraulic cylinder is adjusted within the scope of ± 0.3mm;
Judge whether the actual rolling force deviation value of each rack is less than 500kn, wherein, the actual rolling force deviation value is institute State the difference of the roll-force between the fore side of cold continuous rolling and driving side;
If actual rolling force deviation value is not less than 500kn, hydraulic cylinder is retracted, and readjusts the rolling of each rack Power.
5. the method as described in claim 1, it is characterised in that in the monitoring first rack, second rack, institute Before stating the 3rd rack, the 4th rack and the respective tension value of the 5th rack, the method further includes:
Adjust the bending roller force of each rack.
6. the method as described in claim 1, it is characterised in that the monitoring first rack, second rack, described 3rd rack, the 4th rack and the respective tension value of the 5th rack, including:
Make first rack, second rack, the 3rd rack, the 4th rack and the 5th rack respective Deviation between the actual value and setting value of tension force is no more than 10%.
7. the method as described in claim 1, it is characterised in that if the difference of the thickness of the high-strength steel and target thickness Value is more than predetermined deviation value, then adjusts first rack, second rack, the 3rd rack, the 4th rack Roll-force, makes the difference be less than the predetermined deviation value, including:
According to the 3rd rack, the second rack, the first rack, the order of the 4th rack, roll-force is adjusted.
8. the method for claim 7, it is characterised in that it is described adjustment roll-force adjustment amount for roll-force upper limit value with The difference of actual rolling force value, wherein, the roll-force upper limit value is 30000kn.
9. the method as described in claim 1, it is characterised in that the pre-set velocity is 45mpm.
10. the method as described in claim 1, it is characterised in that carry out the cold continuous rolling according to pre-set velocity described After the production of high-strength steel, the method further includes:
The speed of the cold continuous rolling is monitored, when the speed of the cold continuous rolling is more than 60mpm, enables the automatic of each rack Thickness control function.
CN201710998364.7A 2017-10-24 2017-10-24 A kind of cold continuous rolling applied to high-strength steel opens Che Fangfa Active CN107900100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710998364.7A CN107900100B (en) 2017-10-24 2017-10-24 A kind of cold continuous rolling applied to high-strength steel opens Che Fangfa

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710998364.7A CN107900100B (en) 2017-10-24 2017-10-24 A kind of cold continuous rolling applied to high-strength steel opens Che Fangfa

Publications (2)

Publication Number Publication Date
CN107900100A true CN107900100A (en) 2018-04-13
CN107900100B CN107900100B (en) 2019-04-12

Family

ID=61841617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710998364.7A Active CN107900100B (en) 2017-10-24 2017-10-24 A kind of cold continuous rolling applied to high-strength steel opens Che Fangfa

Country Status (1)

Country Link
CN (1) CN107900100B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109894482A (en) * 2019-02-28 2019-06-18 首钢智新迁安电磁材料有限公司 A kind of cold continuous rolling Starting control optimization method and device
CN110202009A (en) * 2019-06-11 2019-09-06 首钢京唐钢铁联合有限责任公司 A kind of milling train vehicle method for controlling thickness and device
CN111085543A (en) * 2018-10-23 2020-05-01 宝山钢铁股份有限公司 Vibration monitoring and adjusting method for cold continuous rolling mill
CN112718858A (en) * 2020-12-15 2021-04-30 首钢智新迁安电磁材料有限公司 Starting control method, device and system for raw material plate
CN113680827A (en) * 2021-08-17 2021-11-23 北京首钢冷轧薄板有限公司 Method for lifting cold-rolled thin high-reduction-rate high-strength steel after strip breakage
CN114682631A (en) * 2022-03-29 2022-07-01 北京首钢冷轧薄板有限公司 Method for adjusting current load of cold continuous rolling mill frame
CN114700373A (en) * 2022-03-10 2022-07-05 首钢京唐钢铁联合有限责任公司 Starting tension control method for raw material plate and related equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1177132A (en) * 1997-09-04 1999-03-23 Toshiba Corp Reduction control device for rolling mill
CN101797588A (en) * 2010-04-01 2010-08-11 中色科技股份有限公司 Secondary control rolling force forecasting method of hot mill
CN101934290A (en) * 2009-06-30 2011-01-05 上海宝信软件股份有限公司 Load allocation adjusting method for stainless steel tandem cold rolling mill
JP2013111615A (en) * 2011-11-29 2013-06-10 Jfe Steel Corp Method of conveying rolled stock and rolling apparatus
CN103785694A (en) * 2013-11-22 2014-05-14 首钢总公司 Method for preventing strip breakage on startup
CN105344712A (en) * 2015-11-26 2016-02-24 首钢京唐钢铁联合有限责任公司 Raw material plate starting method for cold rolling mill

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1177132A (en) * 1997-09-04 1999-03-23 Toshiba Corp Reduction control device for rolling mill
CN101934290A (en) * 2009-06-30 2011-01-05 上海宝信软件股份有限公司 Load allocation adjusting method for stainless steel tandem cold rolling mill
CN101797588A (en) * 2010-04-01 2010-08-11 中色科技股份有限公司 Secondary control rolling force forecasting method of hot mill
JP2013111615A (en) * 2011-11-29 2013-06-10 Jfe Steel Corp Method of conveying rolled stock and rolling apparatus
CN103785694A (en) * 2013-11-22 2014-05-14 首钢总公司 Method for preventing strip breakage on startup
CN105344712A (en) * 2015-11-26 2016-02-24 首钢京唐钢铁联合有限责任公司 Raw material plate starting method for cold rolling mill

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111085543A (en) * 2018-10-23 2020-05-01 宝山钢铁股份有限公司 Vibration monitoring and adjusting method for cold continuous rolling mill
CN111085543B (en) * 2018-10-23 2021-08-17 宝山钢铁股份有限公司 Vibration monitoring and adjusting method for cold continuous rolling mill
CN109894482A (en) * 2019-02-28 2019-06-18 首钢智新迁安电磁材料有限公司 A kind of cold continuous rolling Starting control optimization method and device
CN110202009A (en) * 2019-06-11 2019-09-06 首钢京唐钢铁联合有限责任公司 A kind of milling train vehicle method for controlling thickness and device
CN110202009B (en) * 2019-06-11 2020-12-11 首钢京唐钢铁联合有限责任公司 Rolling mill start thickness control method and device
CN112718858A (en) * 2020-12-15 2021-04-30 首钢智新迁安电磁材料有限公司 Starting control method, device and system for raw material plate
CN112718858B (en) * 2020-12-15 2022-05-17 首钢智新迁安电磁材料有限公司 Starting control method, device and system for raw material plate
CN113680827A (en) * 2021-08-17 2021-11-23 北京首钢冷轧薄板有限公司 Method for lifting cold-rolled thin high-reduction-rate high-strength steel after strip breakage
CN114700373A (en) * 2022-03-10 2022-07-05 首钢京唐钢铁联合有限责任公司 Starting tension control method for raw material plate and related equipment
CN114682631A (en) * 2022-03-29 2022-07-01 北京首钢冷轧薄板有限公司 Method for adjusting current load of cold continuous rolling mill frame
CN114682631B (en) * 2022-03-29 2023-11-28 北京首钢冷轧薄板有限公司 Method for adjusting current load of cold tandem mill frame

Also Published As

Publication number Publication date
CN107900100B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN107900100A (en) A kind of cold rolling continuous machine applied to high-strength steel opens car method
EP2176010B1 (en) Method for the production of a strip made of steel
CN105344712B (en) A kind of raw material plate of cold continuous rolling opens car method
EP1960131B1 (en) Method and device for producing a metal strip by continuous casting and rolling
CN107617647B (en) Method for producing hot-rolled strip steel with thickness less than or equal to 1.2mm by continuous casting and rolling of sheet billet
EP3000539B1 (en) Method for casting and rolling an endless strand
EP2441538A1 (en) Strand casting device with dynamic strand thickness reduction
CN110722000B (en) Rolling method and device for high-strength steel
WO2012049107A1 (en) Energy- and yield-optimized method and plant for producing hot steel strip
EP2623223A1 (en) Cleaning device and method for removing a lubricant from the rollers of a roller framework
DE102005031461A1 (en) Method for producing micro alloyed cold rolled strip with varying thickness by two rolling and tempering processes
EP3305437A1 (en) Continuous casting and rolling apparatus and continuous casting and rolling method
KR20110071024A (en) Method for adjusting a drive load for a plurality of drives of a mill train for rolling rolling stock, control and/or regulation device, storage medium, program code and rolling mill
RU2713666C2 (en) Continuous steel casting method
US8807201B2 (en) Device and method for horizontal casting of a metal band
CN113102504B (en) Method and apparatus for producing flat metal products
JP6461357B2 (en) Continuous casting method for slabs
EP1536900A1 (en) Method and device for commencing a casting process
EP3089832B1 (en) Method and device for producing a metal strip in a continuous casting and rolling process
KR20150065862A (en) Width-altering system for strip-shaped rolled material
CN102605162A (en) Emergency state control system of continuous annealing furnace on continuous assembly line
JP7397193B2 (en) Methods for operating equipment in the steel industry
EP2849898B1 (en) Method for operating a steckel mill
JP6881670B2 (en) Rolling method of steel sheet and manufacturing method of steel sheet
DE102012224531A1 (en) Method for manufacturing hot-rolled strip of casting product e.g. thin slab made of silicon-alloyed steels, involves subjecting casting product to rolling process in hot-rolling roads, before heating casting product

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant