CN107885641A - A kind of operation management method and apparatus - Google Patents

A kind of operation management method and apparatus Download PDF

Info

Publication number
CN107885641A
CN107885641A CN201711196156.1A CN201711196156A CN107885641A CN 107885641 A CN107885641 A CN 107885641A CN 201711196156 A CN201711196156 A CN 201711196156A CN 107885641 A CN107885641 A CN 107885641A
Authority
CN
China
Prior art keywords
current
archives
state parameter
pending
abnormal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711196156.1A
Other languages
Chinese (zh)
Inventor
黄浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Inspur Cloud Service Information Technology Co Ltd
Original Assignee
Shandong Inspur Cloud Service Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Inspur Cloud Service Information Technology Co Ltd filed Critical Shandong Inspur Cloud Service Information Technology Co Ltd
Priority to CN201711196156.1A priority Critical patent/CN107885641A/en
Publication of CN107885641A publication Critical patent/CN107885641A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3051Monitoring arrangements for monitoring the configuration of the computing system or of the computing system component, e.g. monitoring the presence of processing resources, peripherals, I/O links, software programs
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/34Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
    • G06F11/3466Performance evaluation by tracing or monitoring
    • G06F11/3476Data logging

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computing Systems (AREA)
  • Computer Hardware Design (AREA)
  • Alarm Systems (AREA)

Abstract

The invention provides a kind of operation management method and apparatus, operation management method includes:At least one pending object is determined, and is each described pending Object Creation O&M archives;According to each O&M archives, at least one O&M object is determined from least one pending object;For O&M object each described, it is performed both by:Obtain the status data of current O&M object;According to the O&M archives and status data of the current O&M object, judge whether the running status of the current O&M object is abnormal, when the running status of the current O&M object is abnormal, operation management is carried out to the current O&M object.Technical scheme provided by the invention can improve the operating efficiency of maintenance work.

Description

A kind of operation management method and apparatus
Technical field
The present invention relates to technical field of information processing, more particularly to a kind of operation management method and apparatus.
Background technology
With the arrival of information age, each information system plays indispensable in daily life Effect, therefore ensure that each information system normal operation turns into focus of concern.
Usually, the part that operation maintenance personnel breaks down to information system is safeguarded, or is to informationization periodically System is safeguarded.
But information system complexity increasingly increases, singly deposit and information system safeguarded by operation maintenance personnel, The operation maintenance personnel plenty of time can be consumed, and it is error-prone, so as to reduce the operating efficiency of maintenance work.
The content of the invention
The embodiments of the invention provide a kind of operation management method and apparatus, it is possible to increase the operating efficiency of maintenance work.
In a first aspect, the embodiments of the invention provide a kind of operation management method, including:
At least one pending object is determined, and is each described pending Object Creation O&M archives;
According to each O&M archives, at least one O&M object is determined from least one pending object;
For O&M object each described, it is performed both by:
Obtain the status data of current O&M object;
According to the O&M archives and status data of the current O&M object, judge the operation shape of the currently O&M object Whether state is abnormal;
When the running status of the current O&M object is abnormal, operation management is carried out to the current O&M object.
Preferably, the O&M archives, including:The O&M timing node of the pending object;
It is described according to each O&M archives, determine at least one O&M pair from least one pending object As, including:
Obtain current time, and judge the current time whether be currently pending object O&M timing node, such as Fruit is to determine that the currently pending object is the O&M object.
Preferably, the status data, including:At least one state parameter;
The O&M archives, including:State parameter threshold value corresponding to each described state parameter;
The O&M archives and status data according to the current O&M object, judge the fortune of the current O&M object Whether row state is abnormal, including:
At least one state parameter, and at least one state parameter threshold value are obtained respectively;
Judge whether each described state parameter reaches the corresponding state parameter threshold value, if it is, determining institute State current O&M object normal operation;Otherwise, it determines the current O&M object operation exception.
Preferably, further comprise:
Prestore the trigger condition of at least one O&M method and each O&M method;
Then, it is described that operation management is carried out to the current O&M object, including:
From each state parameter of the current O&M object, determine at least one to be not reaching to corresponding state parameter The abnormality parameter of threshold value;
Judge whether at least one abnormality parameter meets at least one trigger condition, if it is, triggering At least one O&M method corresponding at least one trigger condition;Otherwise, prompt message is tieed up to outside sender's labour movement.
Preferably, further comprise:
Identify the abnormal O&M object of running status, and record the abnormal O&M object of running status quantity, each The operation management result of the status data of the O&M object and each O&M object.
Second aspect, the embodiments of the invention provide a kind of operation and maintenance device, including:Creation module, object determine mould Block and O&M module;
The creation module, for determining at least one pending object, and it is each described pending Object Creation O&M archives;
The object determining module, for each O&M archives created according to the creation module, from it is described to At least one O&M object is determined in a few pending object;
The O&M module, for each the described O&M object determined for the object determining module, it is performed both by:
Obtain the status data of current O&M object;According to the O&M archives and status data of the current O&M object, Judge whether the running status of the current O&M object is abnormal;When the running status of the current O&M object is abnormal, Operation management is carried out to the current O&M object.
Preferably, the O&M archives, including:The O&M timing node of the pending object;
The object determining module, for obtaining current time, and judge whether the current time is currently pending The O&M timing node of object, if it is, determining that the currently pending object is the O&M object.
Preferably, the creation module, further comprises:Standard setting unit;
The status data, including:At least one state parameter;
The O&M archives, including:State parameter threshold value corresponding to each described state parameter;
The O&M module, including:Acquiring unit and judging unit;
The acquiring unit, for obtaining at least one state parameter, and at least one state ginseng respectively Number threshold value;
The judging unit, for judging whether each described state parameter that the acquiring unit is got reaches The corresponding state parameter threshold value, if it is, determining the current O&M object normal operation;It is otherwise, it determines described current O&M object operation exception.
Preferably, further comprise:Memory module;
The memory module, for prestoring the triggering of at least one O&M method and each O&M method Condition;
The O&M module, further comprises:Parameter determination unit and method determining unit;
The parameter determination unit, for from each state parameter of the current O&M object, determining at least one The abnormality parameter of state parameter threshold value corresponding to being not reaching to;
Methods described determining unit, for judging that at least one abnormality that the parameter determination unit determines is joined Whether number meets at least one trigger condition, if it is, at least one corresponding to triggering at least one trigger condition O&M method;Otherwise, prompt message is tieed up to outside sender's labour movement.
Preferably, further comprise:Logging modle;
The logging modle, the O&M object abnormal for identifying running status, and record the abnormal O&M of running status The operation management result of the quantity of object, the status data of each O&M object and each O&M object.
The embodiments of the invention provide a kind of operation management method and apparatus, determine at least one pending object, and be Each pending Object Creation O&M archives, by for pending Object Creation O&M archives, recording each pending object O&M information and attribute, in order to carry out operation management to each pending object;O&M information in O&M archives, O&M object is determined from pending object;For each O&M object, it is performed both by:Obtain the status number of current O&M object According to;According to the O&M archives and status data of current O&M object, judge whether the running status of current O&M object is abnormal;When When the running status of the current O&M object is abnormal, operation management is carried out to current O&M object.Because O&M archives are remembered There are the attribute and O&M information of current O&M object in record, therefore can be believed by the attribute and O&M for comparing O&M dossier Breath, and current O&M object status data be capable of determining that current O&M object whether operation exception.As can be seen here, this hair Bright embodiment is integrated the O&M information of each pending object and attribute by creating O&M archives, to manage to each Individual pending object carries out operation management and provides data support, and is manually determined O&M pair using the replacement of O&M archives As, integrate O&M object status data;Replace manually safeguarding O&M object using O&M archives and status data, from And improve the operating efficiency of maintenance work.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are the present invention Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis These accompanying drawings obtain other accompanying drawings.
Fig. 1 is a kind of flow chart for operation management method that one embodiment of the invention provides;
Fig. 2 is the flow chart for another operation management method that one embodiment of the invention provides;
Fig. 3 is a kind of structural representation for operation and maintenance device that one embodiment of the invention provides;
Fig. 4 is the structural representation for another operation and maintenance device that one embodiment of the invention provides;
Fig. 5 is the structural representation for another operation and maintenance device that one embodiment of the invention provides;
Fig. 6 is the structural representation for another operation and maintenance device that one embodiment of the invention provides.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments, based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained on the premise of creative work is not made, belongs to the scope of protection of the invention.
As shown in figure 1, the embodiments of the invention provide a kind of operation management method, comprise the following steps:
Step 101, at least one pending object is determined, and is each described pending Object Creation O&M archives.
Step 102, according to each O&M archives, at least one fortune is determined from least one pending object Dimensional object.
Step 103, for O&M object each described, it is performed both by:Obtain the status data of current O&M object;According to The O&M archives and status data of the current O&M object, judge whether the running status of the current O&M object is abnormal; When the running status of the current O&M object is abnormal, operation management is carried out to the current O&M object.
The embodiments of the invention provide a kind of operation management method, determines at least one pending object, and is each Pending Object Creation O&M archives, by the O&M for for pending Object Creation O&M archives, recording each pending object Information and attribute are in order to each pending object progress operation management;O&M information in O&M archives, from treating Manage and O&M object is determined in object;For each O&M object, it is performed both by:Obtain the status data of current O&M object;Root According to the O&M archives and status data of the current O&M object, judge whether the running status of the current O&M object is different Often;When the running status of the current O&M object is abnormal, operation management is carried out to the current O&M object.Due to fortune There are the attribute and O&M information of current O&M object in dimension dossier, therefore can be by comparing the attribute of O&M dossier With the status data of O&M information, and current O&M object be capable of determining that current O&M object whether operation exception.Thus It can be seen that the embodiment of the present invention by creating O&M archives, the O&M information of each pending object and attribute is integrated, are Management carries out operation management to each pending object and provides data support, and replaces manually being determined using O&M archives O&M object, the status data for integrating O&M object;Replace manually carrying out O&M object using O&M archives and status data Safeguard, so as to improve the operating efficiency of maintenance work.
In order to ensure system normal operation, it is necessary to periodically be safeguarded to each system, the maintenance time of each system is not Equally, singly deposit by manual maintenance, may result in operation maintenance personnel and misremember the time, and then the operation of whole system can be influenceed.For Solve the above problems, in one embodiment of the invention, the O&M archives, including:The O&M of the pending object Timing node;
It is described according to each O&M archives, determine at least one O&M pair from least one pending object As, including:
Obtain current time, and judge the current time whether be currently pending object O&M timing node, such as Fruit is to determine that the currently pending object is the O&M object.
By setting O&M timing node in O&M archives, instead of the O&M time of each system of manual record, avoid There is the situation for misremembering time or the time of forgetting.For example, system A needs to be updated 20 days monthly, then setting O&M Timing node is " 20 days ", it is not necessary to which operation maintenance personnel removes record system A O&M timing node.Further, since pending is System enormous amount, O&M object is distinguished by O&M timing node so that operation maintenance personnel does not have to take a significant amount of time to treat numerous O&M object is determined in process object, to improve the operating efficiency of maintenance work.
After the status data of O&M object is got, operation maintenance personnel needs bonding state data and rule of thumb judges to work as O&M object whether normal operation, the degree of accuracy of the above method relies primarily on the experience of developer, the risk that erroneous judgement be present, In one embodiment of the present of invention, the status data, including:At least one state parameter;
The O&M archives, including:State parameter threshold value corresponding to each described state parameter;
The O&M archives and status data according to the current O&M object, judge the fortune of the current O&M object Whether row state is abnormal, including:
At least one state parameter, and at least one state parameter threshold value are obtained respectively;
Judge whether each described state parameter reaches the corresponding state parameter threshold value, if it is, determining institute State current O&M object normal operation;Otherwise, it determines the current O&M object operation exception.
By setting state parameter threshold value in O&M archives, after state parameter is got, each state is examined to join Whether number reaches state parameter threshold value, with replace it is artificial determine O&M object whether normal operation.For example, setting O&M object EMS memory occupation threshold value is 75% to 80%, if the memory usage of the O&M object got is 76%, illustrates O&M object Normal operation;If the memory usage of the O&M object got is 81%, illustrate O&M object operation exception.
Usually, fixed solution can all be had by triggering the problem of O&M object operation exception, in order to allow O&M people More energy are used to develop more efficiently O&M method by member, in an embodiment of the invention, it is preferable that further comprise:
Prestore the trigger condition of at least one O&M method and each O&M method;
Then, it is described that operation management is carried out to the current O&M object, including:
From each state parameter of the current O&M object, determine at least one to be not reaching to corresponding state parameter The abnormality parameter of threshold value;
Judge whether at least one abnormality parameter meets at least one trigger condition, if it is, triggering At least one O&M method corresponding at least one trigger condition;Otherwise, prompt message is tieed up to outside sender's labour movement.
Influenceed by itself and external factor, O&M object may operation exception, such as interim suspension, or itself program falls into Enter endless loop.The operation exception of O&M object can cause state parameter abnormal again, i.e., state parameter can not reach state parameter threshold Value.And difference leads to itself and external factor and different state parameters can be caused abnormal, therefore can judge to lead by anomaly parameter The reason for causing O&M object operation exception, and then determine O&M method.Anomaly parameter is arranged to the trigger condition of O&M method. If for example, there is exception simultaneously in A and B, then restarts the process C of O&M object.Because system is constantly updated, after renewal is System operationally, it is possible that it is new the problem of, need to solve by manual operation in these cases, can now send Prompt message is tieed up to outside sender's labour movement.
In order to constantly improve O&M method, to improve the efficiency of maintenance work, in an embodiment of the invention, enter One step includes:
Identify the abnormal O&M object of running status, and record the abnormal O&M object of running status quantity, each The operation management result of the status data of the O&M object and each O&M object.
The abnormal O&M object of running status is identified, and records the quantity of the abnormal O&M object of running status, Ke Yirang Operation maintenance personnel intuitively confirms O&M object produced problem, and develops O&M method, to avoid occurring the problem of identical again. The status data of each O&M object and the operation management result of each O&M object are recorded, operation maintenance personnel can be allowed to sentence Whether disconnected setting trigger condition is accurate, and whether the O&M method of setting can carry out effectively operation management to O&M object.This Outside, operation maintenance personnel is also convenient for mutually to use for reference and learn.
In order to which the embodiment of the present invention is better described, O&M is carried out to A systems in the method in examples detailed above below, such as schemed Shown in 2, the embodiments of the invention provide another operation management method, comprise the following steps:
Step 201, it is pending object to determine system A, and creates O&M archives for system A.
In embodiments of the present invention, archives include system A identification information, hardware information, software information, O&M time The threshold value of node and each state parameter.
Step 202, current time is obtained.
Step 203, judge current time whether the O&M timing node for being system A, if it is, perform step 204;It is no Then, current process is terminated.
Step 204, it is O&M object to determine system A.
Step 205, system A status data is obtained.
In embodiments of the present invention, system A status data include having current memory occupancy, it is current run simultaneously enter Number of passes amount and the process identity information being currently running.
Step 206, at least one state parameter in status data is obtained respectively, and it is at least one in O&M archives State parameter threshold value.
In embodiments of the present invention, the state parameter threshold value that system A archives include is, memory usage threshold value, can The process identity information table for running the amount threshold of process simultaneously and needing while running.It is understood that process identification (PID) is believed The identification information of each process can regard a numerical value as in breath table, and therefore, process identity information table is to need same luck The threshold value of capable process.
Step 207, judge whether each state parameter reaches corresponding state parameter threshold value, if it is, performing step Rapid 213;Otherwise, step 208 is performed.
In embodiments of the present invention, if system A internal memory usage amount or the number of processes run be not in threshold value model simultaneously In enclosing or the identification information of current while operation process with need while the process identity information table of operation is inconsistent, illustrate be System A operation exceptions.
Step 208, system A operation exceptions are determined.
Step 209, from system A each state parameter, state parameter threshold corresponding at least one be not reaching to is determined The abnormality parameter of value.
In embodiments of the present invention, it is determined that after system A operation exceptions, abnormality parameter is first determined, could basis Abnormality parameter determines trigger condition to be triggered.
Step 210, judge whether at least one abnormality parameter meets at least one default trigger condition, if It is to perform step 211;Otherwise, step 212 is performed.
In embodiments of the present invention, trigger condition is describing the logical relation of abnormality parameter and O&M method, example Such as, process B be present in system A, then " trigger condition corresponding to restarting process B " is O&M method:If system A's is current interior Deposit occupancy and be less than EMS memory occupation amount threshold value, and the number of processes of current operation simultaneously is less than the number of processes that can be run simultaneously, And process B identification information is not contained in the current process identity information of operation simultaneously, then trigger process B.
Step 211, at least one default O&M method corresponding at least one trigger condition is triggered, and performs step 213。
In embodiments of the present invention, if system A abnormality parameter is current memory occupancy, currently run simultaneously Number of processes and the process identity information that is currently running, and meet that the logic that trigger condition describes in step 210 is closed simultaneously System, then restart process B.O&M method, such as poorly efficient application journey can be preset for the performance issue of most systems Sequence, irrational application program sentence etc..
Step 212, prompt message is tieed up to outside sender's labour movement.
In embodiments of the present invention, because system update is frequent, thus system in the process of running can caused by new ask Topic, these new problems need operation maintenance personnel to develop new method to go to solve, need to outside sender's work for the above situation O&M prompt message.In addition, for many system instabilities, it is impossible to only go to solve by default method, such as hard disk Damage can cause system operation abnormal, and corresponding presetting method " obtains the hard disk information of damage, and generates the application for buying the hardware Table ", buying afterwards and installing the links such as hard disk needs to being accomplished manually.
Step 213, the abnormal O&M object of running status is identified, and records the number of the abnormal O&M object of running status The operation management result of amount, the status data of each O&M object and each O&M object.
In embodiments of the present invention, record result is stored in the form of reporting, and creates each report of database purchase, To facilitate all operation maintenance personnels to learn and use for reference.
The embodiment of the present invention is by for pending Object Creation archives and presetting O&M method, to replace manually treating Process object carries out the operations such as establishment archives, regular O&M and processing O&M problem so that operation maintenance personnel can have more essences Power goes to be engaged in the development of O&M method, so as to improve the operating efficiency of maintenance work.
As shown in figure 3, the embodiments of the invention provide a kind of operation and maintenance device, including:Creation module 301, object are true Cover half block 302 and O&M module 303;
Creation module 301, for determining at least one pending object, and it is each pending Object Creation fortune Tie up archives;
Object determining module 302, for each O&M archives created according to creation module 301, from it is described at least At least one O&M object is determined in one pending object;
O&M module 303, for each the described O&M object determined for object determining module 302, it is performed both by:
Obtain the status data of current O&M object;According to the O&M archives and status data of the current O&M object, Judge whether the running status of the current O&M object is abnormal;When the running status of the current O&M object is abnormal, Operation management is carried out to the current O&M object.
In one embodiment of the invention, the O&M archives, including:The segmentum intercalaris during O&M of the pending object Point;
Object determining module 302, for obtaining current time and judging whether the current time is currently pending right The O&M timing node of elephant, if it is, determining that the currently pending object is the O&M object.
As shown in figure 4, the embodiments of the invention provide another operation and maintenance device, the status data, including:At least One state parameter;
The O&M archives, including:State parameter threshold value corresponding to each described state parameter;
O&M module 303, including:Acquiring unit 3031 and judging unit 3032;
Acquiring unit 3031, for obtaining at least one state parameter, and at least one state ginseng respectively Number threshold value;
Judging unit 3032, for judging whether each described state parameter that acquiring unit 3031 is got reaches The corresponding state parameter threshold value, if it is, determining the current O&M object normal operation;It is otherwise, it determines described current O&M object operation exception.
As shown in figure 5, the embodiments of the invention provide another operation and maintenance device, further comprise:Memory module 501;
Memory module 501, for prestoring the triggering of at least one O&M method and each O&M method Condition;
O&M module 303, further comprises:Parameter determination unit 3033 and method determining unit 3034;
Parameter determination unit 3033, for from each state parameter of the current O&M object, determining at least one The abnormality parameter of state parameter threshold value corresponding to being not reaching to;
Method determining unit 3034, for judging that at least one abnormality that parameter determination unit 3033 determines is joined Whether number meets at least one trigger condition, if it is, at least one corresponding to triggering at least one trigger condition O&M method;Otherwise, prompt message is tieed up to outside sender's labour movement.
As shown in fig. 6, the embodiments of the invention provide another operation and maintenance device, further comprise:Logging modle 601;
Logging modle 601, the O&M object abnormal for identifying running status, and record the abnormal O&M pair of running status The operation management result of the quantity of elephant, the status data of each O&M object and each O&M object.
The contents such as the information exchange between each unit, implementation procedure in said apparatus, due to implementing with the inventive method Example is based on same design, and particular content can be found in the narration in the inventive method embodiment, and here is omitted.
The embodiments of the invention provide a kind of computer-readable recording medium, including execute instruction, when the computing device of storage control During the execute instruction, the storage control performs any described operation management method in the above embodiment of the present invention.
The embodiments of the invention provide a kind of storage control, including:Processor, memory and bus;
The processor is connected with the memory by the bus;
The memory, when the storage control is run, memory storage is described described in the computing device Execute instruction, so that the storage control performs any described operation management method in the above embodiment of the present invention.
In summary, each embodiment of the present invention at least has the advantages that:
1st, in one embodiment of the invention, at least one pending object is determined, and is each pending Object Creation fortune Archives are tieed up, by for pending Object Creation O&M archives, recording the O&M information and attribute of each pending object, in order to Operation management is carried out to each pending object;O&M information in O&M archives, O&M is determined from pending object Object;For each O&M object, it is performed both by:Obtain the status data of current O&M object;According to current O&M object O&M archives and status data, judge whether the running status of current O&M object is abnormal, if it is, entering to current O&M object Row operation management.Due to having the attribute of current O&M object and O&M information in O&M dossier, therefore comparison can be passed through The attribute and O&M information of O&M dossier, and the status data of current O&M object are capable of determining that current O&M object Whether operation exception.As can be seen here, the embodiment of the present invention is by creating O&M archives, by the O&M information of each pending object Integrated with attribute, carrying out operation management to each pending object for management provides data support, and utilizes O&M shelves Case replaces manually being determined O&M object, integrates the status data of O&M object;Replaced using O&M archives and status data Manually O&M object is safeguarded, so as to improve the operating efficiency of maintenance work.
2nd, in one embodiment of the invention, the O&M timing node of each pending object is set, and by segmentum intercalaris during O&M Point distinguishes O&M object so that and operation maintenance personnel does not have to take a significant amount of time the determination O&M object in numerous pending systems, So as to further increase the operating efficiency of maintenance work.
3rd, in one embodiment of the invention, state parameter threshold value is set in O&M archives, and utilizes state parameter threshold value, is sentenced Whether the state parameter got that breaks is correct, to judge whether the operation of O&M object is normal, avoids artificial original instead of operation maintenance personnel Slipped up caused by, so as to further increase the operating efficiency of maintenance work.
4th, in one embodiment of the invention, O&M method is preset, operation maintenance personnel pair is replaced using default O&M method O&M object carries out O&M, allows operation maintenance personnel to be used to more energy develop more efficiently O&M method, so as to further improve The operating efficiency of maintenance work.
5th, in one embodiment of the invention, the abnormal O&M object of mark running status, and record the abnormal fortune of running status The operation management result of the quantity of dimensional object, the status data of each O&M object and each O&M object so that O&M Personnel can intuitively confirm O&M object produced problem, and update the trigger condition and O&M method set, so as to enter One step improves the operating efficiency of maintenance work.
It should be noted that herein, such as first and second etc relational terms are used merely to an entity Or operation makes a distinction with another entity or operation, and not necessarily require or imply and exist between these entities or operation Any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant be intended to it is non- It is exclusive to include, so that process, method, article or equipment including a series of elements not only include those key elements, But also the other element including being not expressly set out, or also include solid by this process, method, article or equipment Some key elements.In the absence of more restrictions, the key element limited by sentence " including one ", is not arranged Except other identical factor in the process including the key element, method, article or equipment being also present.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above method embodiment can pass through Programmed instruction related hardware is completed, and foregoing program can be stored in computer-readable storage medium, the program Upon execution, the step of execution includes above method embodiment;And foregoing storage medium includes:ROM, RAM, magnetic disc or light Disk etc. is various can be with the medium of store program codes.
It is last it should be noted that:Presently preferred embodiments of the present invention is the foregoing is only, is merely to illustrate the skill of the present invention Art scheme, is not intended to limit the scope of the present invention.Any modification for being made within the spirit and principles of the invention, Equivalent substitution, improvement etc., are all contained in protection scope of the present invention.

Claims (10)

  1. A kind of 1. operation management method, it is characterised in that including:
    At least one pending object is determined, and is each described pending Object Creation O&M archives;
    According to each O&M archives, at least one O&M object is determined from least one pending object;
    For O&M object each described, it is performed both by:
    Obtain the status data of current O&M object;
    According to the O&M archives and status data of the current O&M object, judging the running status of the current O&M object is No exception;
    When the running status of the current O&M object is abnormal, operation management is carried out to the current O&M object.
  2. 2. according to the method for claim 1, it is characterised in that
    The O&M archives, including:The O&M timing node of the pending object;
    It is described to determine at least one O&M object from least one pending object according to each O&M archives, Including:
    Obtain current time, and judge the current time whether be currently pending object O&M timing node, if it is, It is the O&M object to determine the currently pending object.
  3. 3. according to the method for claim 1, it is characterised in that
    The status data, including:At least one state parameter;
    The O&M archives, including:State parameter threshold value corresponding to each described state parameter;
    The O&M archives and status data according to the current O&M object, judge the operation shape of the current O&M object Whether state is abnormal, including:
    At least one state parameter, and at least one state parameter threshold value are obtained respectively;
    Judge whether each described state parameter reaches the corresponding state parameter threshold value, if it is, determining described work as Preceding O&M object normal operation;Otherwise, it determines the current O&M object operation exception.
  4. 4. according to the method for claim 3, it is characterised in that further comprise:
    Prestore the trigger condition of at least one O&M method and each O&M method;
    Then, it is described that operation management is carried out to the current O&M object, including:
    From each state parameter of the current O&M object, state parameter threshold value corresponding at least one be not reaching to is determined Abnormality parameter;
    Judge whether at least one abnormality parameter meets at least one trigger condition, if it is, described in triggering At least one O&M method corresponding at least one trigger condition;Otherwise, prompt message is tieed up to outside sender's labour movement.
  5. 5. according to any described method in Claims 1-4, it is characterised in that further comprise:
    The abnormal O&M object of running status is identified, and records the quantity of the abnormal O&M object of running status, described in each The operation management result of the status data of O&M object and each O&M object.
  6. A kind of 6. operation and maintenance device, it is characterised in that including:Creation module, object determining module and O&M module;
    The creation module, for determining at least one pending object, and it is each described pending Object Creation O&M Archives;
    The object determining module, for each O&M archives created according to the creation module, from described at least one At least one O&M object is determined in individual pending object;
    The O&M module, for each the described O&M object determined for the object determining module, it is performed both by:
    Obtain the status data of current O&M object;According to the O&M archives and status data of the current O&M object, judge Whether the running status of the current O&M object is abnormal;When the running status of the current O&M object is abnormal, to institute State current O&M object and carry out operation management.
  7. 7. device according to claim 6, it is characterised in that
    The O&M archives, including:The O&M timing node of the pending object;
    The object determining module, for obtaining current time, and judge whether the current time is currently pending object O&M timing node, if it is, determining that the currently pending object is the O&M object.
  8. 8. device according to claim 6, it is characterised in that
    The status data, including:At least one state parameter;
    The O&M archives, including:State parameter threshold value corresponding to each described state parameter;
    The O&M module, including:Acquiring unit and judging unit;
    The acquiring unit, for obtaining at least one state parameter, and at least one state parameter threshold respectively Value;
    The judging unit, for judging whether each described state parameter that the acquiring unit is got reaches corresponding The state parameter threshold value, if it is, determining the current O&M object normal operation;Otherwise, it determines the current O&M Object operation exception.
  9. 9. device according to claim 6, it is characterised in that further comprise:Memory module;
    The memory module, for prestoring the triggering bar of at least one O&M method and each O&M method Part;
    The O&M module, further comprises:Parameter determination unit and method determining unit;
    The parameter determination unit, for from each state parameter of the current O&M object, determining at least one do not have The abnormality parameter of state parameter threshold value corresponding to reaching;
    Methods described determining unit, for judging that at least one abnormality parameter that the parameter determination unit determines is It is no to meet at least one trigger condition, if it is, at least one O&M corresponding to triggering at least one trigger condition Method;Otherwise, prompt message is tieed up to outside sender's labour movement.
  10. 10. according to any described device in claim 6 to 9, it is characterised in that
    Further comprise:Logging modle;
    The logging modle, the O&M object abnormal for identifying running status, and record the abnormal O&M object of running status Quantity, the status data of each O&M object and the operation management result of each O&M object.
CN201711196156.1A 2017-11-25 2017-11-25 A kind of operation management method and apparatus Pending CN107885641A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711196156.1A CN107885641A (en) 2017-11-25 2017-11-25 A kind of operation management method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711196156.1A CN107885641A (en) 2017-11-25 2017-11-25 A kind of operation management method and apparatus

Publications (1)

Publication Number Publication Date
CN107885641A true CN107885641A (en) 2018-04-06

Family

ID=61775162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711196156.1A Pending CN107885641A (en) 2017-11-25 2017-11-25 A kind of operation management method and apparatus

Country Status (1)

Country Link
CN (1) CN107885641A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108595625A (en) * 2018-04-23 2018-09-28 平安科技(深圳)有限公司 O&M method, apparatus, computer installation and the storage medium of BI tools

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582812A (en) * 2008-05-13 2009-11-18 新奥特(北京)视频技术有限公司 Monitoring and operation managing system
CN104407959A (en) * 2014-12-12 2015-03-11 深圳中兴网信科技有限公司 Application based monitoring method and monitoring device
CN105988886A (en) * 2015-04-21 2016-10-05 中国银联股份有限公司 Fault processing method and device in operation and maintenance process
CN106201832A (en) * 2016-06-29 2016-12-07 浪潮(北京)电子信息产业有限公司 A kind of method and device that web application running status is monitored

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582812A (en) * 2008-05-13 2009-11-18 新奥特(北京)视频技术有限公司 Monitoring and operation managing system
CN104407959A (en) * 2014-12-12 2015-03-11 深圳中兴网信科技有限公司 Application based monitoring method and monitoring device
CN105988886A (en) * 2015-04-21 2016-10-05 中国银联股份有限公司 Fault processing method and device in operation and maintenance process
CN106201832A (en) * 2016-06-29 2016-12-07 浪潮(北京)电子信息产业有限公司 A kind of method and device that web application running status is monitored

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108595625A (en) * 2018-04-23 2018-09-28 平安科技(深圳)有限公司 O&M method, apparatus, computer installation and the storage medium of BI tools

Similar Documents

Publication Publication Date Title
US10310968B2 (en) Developing software project plans based on developer sensitivity ratings detected from monitoring developer error patterns
US20120023054A1 (en) Device and Method for Creating a Process Model
CN108255620A (en) A kind of business logic processing method, apparatus, service server and system
CN105912361A (en) Method, device and system for updating configuration information of hardware device
CN106873957A (en) The processing method and equipment of a kind of operation flow
Iglesias et al. Product line engineering of monitoring functionality in industrial cyber-physical systems: a domain analysis
Bernardi et al. Using discriminative rule mining to discover declarative process models with non-atomic activities
Cupek et al. “Digital Twins” for highly customized electronic devices–Case study on a rework operation
CN111798083B (en) Production scheduling monitoring system, method and storage medium
CN110008049A (en) A kind of data correcting method based on internet platform, terminal device and medium
CN109284331A (en) Accreditation information acquisition method, terminal device and medium based on business datum resource
BR112019018281A2 (en) method of managing the life cycle of a complex engineering object and the system for its implementation
CN109242067A (en) A kind of hospital gauze monitoring method and device
CN107885641A (en) A kind of operation management method and apparatus
CN109039714A (en) The management method and device of resource in cloud computing system
CN107423035B (en) Product data management system in software development process
CN107577802A (en) A kind of data base management method and device
CN110018949B (en) Universal log management method and system based on IPMI protocol
KR101985871B1 (en) Method for diagnosing process abnormality based on internet of things by using parallel processing and Apparatus thereof
CN110083823B (en) Dictionary table establishing method and device, computer device and storage medium
JPH07253905A (en) Device and method for generating test case
CN106796501A (en) Based on single reference Inspection and maintenance multiple counter
CN107741963A (en) Across company-data merging method and device, electronic equipment, computer-readable storage medium
JP2009080759A (en) Cell production system process control method
CN112948480B (en) Data extraction method, device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180406

RJ01 Rejection of invention patent application after publication