CN107884717B - 一种动力电池系统热管理性能测试方法 - Google Patents
一种动力电池系统热管理性能测试方法 Download PDFInfo
- Publication number
- CN107884717B CN107884717B CN201710923771.1A CN201710923771A CN107884717B CN 107884717 B CN107884717 B CN 107884717B CN 201710923771 A CN201710923771 A CN 201710923771A CN 107884717 B CN107884717 B CN 107884717B
- Authority
- CN
- China
- Prior art keywords
- power battery
- temperature
- battery system
- performance
- thermal management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/385—Arrangements for measuring battery or accumulator variables
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Secondary Cells (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710923771.1A CN107884717B (zh) | 2017-09-30 | 2017-09-30 | 一种动力电池系统热管理性能测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710923771.1A CN107884717B (zh) | 2017-09-30 | 2017-09-30 | 一种动力电池系统热管理性能测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107884717A CN107884717A (zh) | 2018-04-06 |
CN107884717B true CN107884717B (zh) | 2019-12-31 |
Family
ID=61781092
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710923771.1A Active CN107884717B (zh) | 2017-09-30 | 2017-09-30 | 一种动力电池系统热管理性能测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107884717B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110687463A (zh) * | 2018-07-04 | 2020-01-14 | 中国电力科学研究院有限公司 | 一种退役动力电池的工况适应性评价方法及装置 |
CN109324296A (zh) * | 2018-09-28 | 2019-02-12 | 上汽通用五菱汽车股份有限公司 | 电动汽车的电池性能测试方法和系统 |
CN109540544A (zh) * | 2018-11-30 | 2019-03-29 | 北京新能源汽车股份有限公司 | 一种检验电池热管理系统冷却能力的测试系统及测试方法 |
CN110414818A (zh) * | 2019-07-19 | 2019-11-05 | 中国汽车技术研究中心有限公司 | 一种乘用车节能竞争力评价方法及系统 |
CN111002830B (zh) * | 2019-12-19 | 2021-06-18 | 吉林建筑大学 | 一种基于柔性热管的动力电池管理系统及方法 |
CN111198325B (zh) * | 2019-12-31 | 2022-11-22 | 湖州师范学院 | 锂电池性能检测方法、系统及计算机可读存储介质 |
CN114492019B (zh) * | 2022-01-22 | 2024-02-02 | 苏州纬方电子有限公司 | 一种电池模组的自适应温度调控的评估方法及系统 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102121973A (zh) * | 2011-01-04 | 2011-07-13 | 武汉理工大学 | 电动汽车动力电池净能量测试方法 |
CN102122735A (zh) * | 2010-12-21 | 2011-07-13 | 奇瑞汽车股份有限公司 | 电池热管理方法、系统和装置 |
US8612166B2 (en) * | 2009-12-23 | 2013-12-17 | Avl List Gmbh | Test bed for electrical energy storage systems for vehicles |
CN103502829A (zh) * | 2011-05-04 | 2014-01-08 | Ifp新能源公司 | 用于电化学存储系统热管理的优化方法 |
CN103543410A (zh) * | 2013-10-31 | 2014-01-29 | 国家电网公司 | 高寒地区能量型动力锂离子电池低温充放电性能检测系统及方法 |
CN103612570A (zh) * | 2013-09-04 | 2014-03-05 | 奇瑞汽车股份有限公司 | 一种纯电动汽车整车热管理控制系统及其控制方法 |
CN205882117U (zh) * | 2016-07-11 | 2017-01-11 | 吉林大学 | 动力电池组复合热管理系统 |
-
2017
- 2017-09-30 CN CN201710923771.1A patent/CN107884717B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8612166B2 (en) * | 2009-12-23 | 2013-12-17 | Avl List Gmbh | Test bed for electrical energy storage systems for vehicles |
CN102122735A (zh) * | 2010-12-21 | 2011-07-13 | 奇瑞汽车股份有限公司 | 电池热管理方法、系统和装置 |
CN102121973A (zh) * | 2011-01-04 | 2011-07-13 | 武汉理工大学 | 电动汽车动力电池净能量测试方法 |
CN103502829A (zh) * | 2011-05-04 | 2014-01-08 | Ifp新能源公司 | 用于电化学存储系统热管理的优化方法 |
CN103612570A (zh) * | 2013-09-04 | 2014-03-05 | 奇瑞汽车股份有限公司 | 一种纯电动汽车整车热管理控制系统及其控制方法 |
CN103543410A (zh) * | 2013-10-31 | 2014-01-29 | 国家电网公司 | 高寒地区能量型动力锂离子电池低温充放电性能检测系统及方法 |
CN205882117U (zh) * | 2016-07-11 | 2017-01-11 | 吉林大学 | 动力电池组复合热管理系统 |
Also Published As
Publication number | Publication date |
---|---|
CN107884717A (zh) | 2018-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107884717B (zh) | 一种动力电池系统热管理性能测试方法 | |
CN108172930B (zh) | 电池包冷却控制方法、装置和电池包 | |
Chen et al. | Air and PCM cooling for battery thermal management considering battery cycle life | |
Xu et al. | Modelling and control of vehicle integrated thermal management system of PEM fuel cell vehicle | |
An et al. | A review on lithium-ion power battery thermal management technologies and thermal safety | |
Yuksel et al. | Plug-in hybrid electric vehicle LiFePO4 battery life implications of thermal management, driving conditions, and regional climate | |
Chung et al. | Optimization of electric vehicle charging for battery maintenance and degradation management | |
CN113071286A (zh) | 基于热泵空调的燃料电池汽车集成热管理系统及控制方法 | |
Liang et al. | Advances and challenges of integrated thermal management technologies for pure electric vehicles | |
CN111244568A (zh) | 电动汽车动力电池液冷系统实时制冷量计算方法及其控制 | |
CN109830782A (zh) | 一种电动汽车电池行车加热控制方法 | |
Lu et al. | Optimal selection range of FCV power battery capacity considering the synergistic decay of dual power source lifespan | |
CN109585952A (zh) | 车辆动力电池包的热管理方法及装置 | |
Chen et al. | Experimental research and energy consumption analysis on the economic performance of a hybrid-power gas engine heat pump with LiFePO4 battery | |
Guo et al. | An integrated thermal management strategy for cabin and battery heating in range-extended electric vehicles under low-temperature conditions | |
CN111079316A (zh) | 低温续驶里程衰减整车热管理设计目标分解模型与分析方法 | |
Zhao et al. | A two-stage eco-cooling control strategy for electric vehicle thermal management system considering multi-source information fusion | |
Ma et al. | Experimental investigation on energy consumption of power battery integrated thermal management system | |
CN114824357B (zh) | 一种氢燃料电池电动汽车动力总成冷却系统、试验方法及评价方法 | |
Zhang et al. | An optimal thermal management system heating control strategy for electric vehicles under low-temperature fast charging conditions | |
CN115291131A (zh) | 锂离子电池的循环寿命和使用温度预测方法及系统 | |
Wu et al. | Optimal battery thermal management for electric vehicles with battery degradation minimization | |
CN110588440B (zh) | 一种基于出行规划的远程制冷管理方法 | |
CN116872795A (zh) | 电池热管理方法、装置、车辆和存储介质 | |
CN116266652A (zh) | 动力电池低温加热策略确定方法、电池管理系统及车辆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: No. 68, Xianfeng East Road, Dongli District, Tianjin 300000 Patentee after: CHINA AUTOMOTIVE TECHNOLOGY AND RESEARCH CENTER Co.,Ltd. Address before: 300300 Tianjin city Dongli District Tianshan Road intersection Cheng linzhuan (Cheng linzhuan Road) Patentee before: CHINA AUTOMOTIVE TECHNOLOGY & RESEARCH CENTER |
|
CP03 | Change of name, title or address | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200508 Address after: Room 602, 6th floor, scientific research building, No. 68, Xianfeng East Road, Dongli District, Tianjin 300000 Patentee after: CNR software evaluation (Tianjin) Co.,Ltd. Address before: No. 68, Xianfeng East Road, Dongli District, Tianjin 300000 Patentee before: CHINA AUTOMOTIVE TECHNOLOGY AND RESEARCH CENTER Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220530 Address after: 300300 68 pioneer East Road, Dongli District, Tianjin Patentee after: CHINA AUTOMOTIVE TECHNOLOGY AND RESEARCH CENTER Co.,Ltd. Patentee after: China automotive research new energy vehicle inspection center (Tianjin) Co.,Ltd. Patentee after: CNR software evaluation (Tianjin) Co.,Ltd. Address before: Room 602, 6th floor, scientific research building, 68 Xianfeng East Road, Dongli District, Tianjin Patentee before: CNR software evaluation (Tianjin) Co.,Ltd. |
|
TR01 | Transfer of patent right |