CN107883369A - Adapt to the boiler feedwater step heating system and adjusting method of the wide load denitration of unit - Google Patents

Adapt to the boiler feedwater step heating system and adjusting method of the wide load denitration of unit Download PDF

Info

Publication number
CN107883369A
CN107883369A CN201711241985.7A CN201711241985A CN107883369A CN 107883369 A CN107883369 A CN 107883369A CN 201711241985 A CN201711241985 A CN 201711241985A CN 107883369 A CN107883369 A CN 107883369A
Authority
CN
China
Prior art keywords
steam
valve
pipe
heat exchanger
pressure heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711241985.7A
Other languages
Chinese (zh)
Other versions
CN107883369B (en
Inventor
高新勇
陈菁
孙士恩
俞聪
郑立军
费盼峰
何晓红
王伟
王宏石
李开创
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Electric Power Research Institute Co Ltd
Original Assignee
Huadian Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Electric Power Research Institute Co Ltd filed Critical Huadian Electric Power Research Institute Co Ltd
Priority to CN201711241985.7A priority Critical patent/CN107883369B/en
Publication of CN107883369A publication Critical patent/CN107883369A/en
Application granted granted Critical
Publication of CN107883369B publication Critical patent/CN107883369B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/32Feed-water heaters, i.e. economisers or like preheaters arranged to be heated by steam, e.g. bled from turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/50Feed-water heaters, i.e. economisers or like preheaters incorporating thermal de-aeration of feed-water

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The invention discloses a kind of boiler feedwater step heating system for adapting to the wide load denitration of unit,Including steam turbine high-pressure cylinder,Steam Turbine Through IP Admission,Reheater,Three-level high-pressure heater,Two level high-pressure heater,One-level high-pressure heater,First steam condenser,Second steam condenser,Industrial steam heat exchanger,3rd steam condenser,Reheated steam heat exchanger,Economizer,Denitrification apparatus,Steam turbine high-pressure cylinder,Reheater is sequentially connected with Steam Turbine Through IP Admission,Deaerated feedwater pipe is sequentially connected three-level high-pressure heater,Two level high-pressure heater,One-level high-pressure heater,First steam condenser,Second steam condenser,Industrial steam heat exchanger,3rd steam condenser,Reheated steam heat exchanger and economizer,Steam Turbine Through IP Admission adds extraction steam pipe with three-level height respectively,Extraction steam for factories pipe connects,Extraction steam for factories pipe is connected with industrial steam heat exchanger,The reheating extraction steam pipe venthole with reheater respectively,Reheated steam heat exchanger air intake connects.

Description

Adapt to the boiler feedwater step heating system and adjusting method of the wide load denitration of unit
Technical field
The invention belongs to thermoelectricity flexibility technical field, and in particular to a kind of boiler feedwater for adapting to the wide load denitration of unit Step heating system and adjusting method, the thermal power plant for the unit load peak regulation that is particularly suitable for use in.
Background technology
At present, China's policy gradually payes attention to the popularization of new energy, reduces the ratio of fired power generating unit.Ended for the end of the year 2012, I The existing 44.8GW of state installed capacity of wind-driven power.But wind-powered electricity generation has very strong randomness, intermittence, uncontrollability and demodulates peak spy Property, this carries out the difficulty of peak load regulation network with regard to gradually increasing fired power generating unit.In order to effectively dissolve new forms of energy resource, country by The policy requirement of fired power generating unit peak regulation is gradually increased, if northeast Supervision Bureau of National Energy Board is on printing and distributing《Tohoku Electric Power peak regulation Assisted hatching supervisory method (tentative)》And its supplementary provisions requirement will lift clean energy resource consumption space, define simultaneously " staged " compensation mechanism.As can be seen here, national policy is just progressively increasing the compensation dynamics to fired power generating unit peak modulation capacity, for Fired power generating unit, its peak regulation potentiality is given full play to, be beneficial to be lifted the adaptability in its market.But national environmental protection is to fired power generating unit The limitation of discharged nitrous oxides is very strict, it is desirable to:The flue gas of power plant emission needs to realize discharged nitrous oxides under full load It is below 100mg/Nm3.Existing SCR denitration device boiler load less than 50% or so and it is following when reaction efficiency it is serious under Drop, it is impossible to meet the requirement of pollution discharging thing discharge standard, limit the performance of fired power generating unit peak modulation capacity.
At present, mainly solves the problem by transforming the technological means of economizer, such as patent 1:Economizer is segmented pot The low NO of stove full loadXDevice and remodeling method (patent No. 201510701175.X), by the way that economizer is divided into high temperature section, medium temperature Section, low-temperature zone, while denitrification apparatus reaction zone is arranged on the higher high temperature section and low-temperature zone of temperature, so as to solve the problem, But the technology drawback is that the reconstruction scope is larger, and the original characteristics of compact layout of boiler tail, it is unsuitable for being transformed on a large scale, separately Outside, when unit load is higher, flue-gas temperature is too high so that the flue-gas temperature of denitrification apparatus reaction zone drastically raises, so as to drop The low reaction efficiency of denitration;Patent 2:The efficient SCR denitration structures and methods (patent No. that a kind of achievable full load puts into operation 201710168504.8) first layer, the second layer, third layer, are distinguished into by the reaction to denitrification apparatus, respectively in correspondence position First order economizer, second level economizer are set, so as to solve the problem, but the maximum drawback of the technology is that transformation is complicated, The reconstruction scope is big, and the boiler tail being not easy in characteristics of compact layout deploys to implement.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of boiler feedwater step heating for adapting to the wide load denitration of unit System and adjusting method, have it is reasonable in design, transform simple, low-cost, dependable performance, adjust the advantages of simple.
In order to solve the above technical problems, the boiler feedwater step heating system of the adaptation wide load denitration of unit of the present invention, The heating system includes steam turbine high-pressure cylinder, Steam Turbine Through IP Admission, reheater, three-level high-pressure heater, two level hyperbaric heating Device, one-level high-pressure heater, the first steam condenser, the second steam condenser, industrial steam heat exchanger, the cooling of the 3rd steam Device, reheated steam heat exchanger, economizer, denitrification apparatus, the steam drain of steam turbine high-pressure cylinder and the air intake of reheater connect, then The venthole of hot device and the air intake of Steam Turbine Through IP Admission connect, and deaerated feedwater pipe is sequentially connected three-level high-pressure heater, two Level high-pressure heater, one-level high-pressure heater, the first steam condenser, the second steam condenser, industrial steam heat exchanger, the 3rd Steam condenser, reheated steam heat exchanger and economizer, are heated to deaerated feedwater, steam turbine high-pressure cylinder respectively with one-level height Add extraction steam pipe, two level high plus extraction steam pipe connects, one-level is high plus extraction steam pipe is sequentially connected the second steam condenser, one-level high pressure adds Hot device, two level is high plus extraction steam pipe is sequentially connected the first steam condenser, two level high-pressure heater, Steam Turbine Through IP Admission respectively with Three-level is high plus extraction steam pipe, the connection of extraction steam for factories pipe, three-level height plus extraction steam pipe are sequentially connected the 3rd steam condenser, three-level high pressure Heater, extraction steam for factories pipe are connected with industrial steam heat exchanger, reheating the extraction steam pipe venthole with reheater, reheated steam respectively The air intake connection of heat exchanger, flue are sequentially connected economizer, denitrification apparatus.
Preferably, the deaerated feedwater pipe of first steam condenser is provided with the first feed water by-pass, and steamed first The first valve, the second valve, the 3rd are respectively provided with the deaerated feedwater water inlet pipe of vapour cooler, outlet pipe and the first feed water by-pass Valve.
Preferably, the deaerated feedwater pipe of second steam condenser is provided with the second feed water by-pass, and steamed second The 4th valve, the 5th valve, the 6th are respectively provided with the deaerated feedwater water inlet pipe of vapour cooler, outlet pipe and the second feed water by-pass Valve.
Preferably, the deaerated feedwater pipe of the industrial steam heat exchanger is provided with the 3rd feed water by-pass, and steamed in industry The 7th valve, the 8th valve, the 9th are respectively provided with the deaerated feedwater water inlet pipe of vapour heat exchanger, outlet pipe and the 3rd feed water by-pass Valve.
Preferably, the deaerated feedwater pipe of the 3rd steam condenser is provided with the 4th feed water by-pass, and steamed the 3rd The tenth valve, the 11st valve, are respectively provided with the deaerated feedwater water inlet pipe of vapour cooler, outlet pipe and the 4th feed water by-pass 12 valves.
Preferably, the deaerated feedwater pipe of the reheated steam heat exchanger is provided with the 5th feed water by-pass, and steamed in reheating Be respectively provided with the deaerated feedwater water inlet pipe of vapour heat exchanger, outlet pipe and the 5th feed water by-pass the 13rd valve, the 14th valve, 15th valve.
Preferably, being equipped with the 16th valve on the extraction steam for factories pipe, the 17th valve is housed on the reheating extraction steam pipe Door.
Preferably, the three-level high-pressure heater, two level high-pressure heater, one-level high-pressure heater, industrial steam change Hot device, reheated steam heat exchanger use wall-type heat exchange equipment or direct contact heat transfer equipment.
In order to solve the above technical problems, the boiler feedwater step heating system of the adaptation wide load denitration of unit of the present invention Adjusting method, payload situation when whether the adjusting method participates in peak load regulation network and operation according to Steam Turbine, according to Following steps are adjusted:
(1) when Steam Turbine is not involved in peak load regulation network and unit load is larger, the 16th valve (46), the 7th valve are closed Door (37), the 8th valve (38), opening the 9th valve (39) makes deaerated feedwater be changed by the 3rd feed water by-pass (23), industrial steam Hot device (9) is not put into operation, closes the 17th valve (47), the 13rd valve (43), the 14th valve (44), opens the 15th Valve (45) makes deaerated feedwater not put into operation by the 5th feed water by-pass (25), reheated steam heat exchanger (11), passes through opening And adjust the first valve (31), the second valve (32), the 3rd valve (33), the 4th valve (34), the 5th valve (35), the 6th valve Door (36), the tenth valve (40), the 11st valve (41), the switch degree of the 12nd valve (42), make to change through economizer (12) Exit gas temperature after heat reaches the process requirements of denitrification apparatus (13);
(2) when Steam Turbine participate in peak load regulation network, unit load it is larger and through economizer (12) heat exchange after exiting flue gas When temperature does not reach the process requirements of denitrification apparatus (13), on the basis of above-mentioned steps (1), the 16th valve (46) is opened, Industrial steam heat exchanger (9) puts into operation, by opening and adjusting the 7th valve (37), the 8th valve (38), the 9th valve (39) switch degree, the exit gas temperature after economizer (12) exchanges heat is made to reach the process requirements of denitrification apparatus (13);
(3) when Steam Turbine participate in peak load regulation network, unit load it is smaller and through economizer (12) heat exchange after exiting flue gas When temperature does not reach the process requirements of denitrification apparatus (13), on the basis of above-mentioned steps (2), the 17th valve (47) is opened, Reheated steam heat exchanger (11) puts into operation, by opening and adjusting the 13rd valve (43), the 14th valve (44), the 15th The switch degree of valve (45), the exit gas temperature after economizer (12) exchanges heat is reached the technique of denitrification apparatus (13) needs Ask.
The present invention compared with prior art, has advantages below and effect:(1) fully recycle at different levels high plus draw gas The degree of superheat, then draw gas acting capacity loss it is minimum in the case of, improve the temperature of boiler feedwater, improve the comprehensive of fired power generating unit Close efficiency of energy utilization;(2) drawn gas using extraction steam for factories, reheating to heat deaerated feedwater, by increasing giving into economizer Coolant-temperature gage improves the exit gas temperature of economizer, so as to improve the flue-gas temperature into denitrification apparatus, is giving full play to fire While group of motors peak modulation capacity, the reaction efficiency of denitration has been effectively ensured;(3) in addition, using extraction steam for factories, reheating draw gas come Deaerated feedwater is heated, reduces the acting steam flow of Steam Turbine flow passage component, so as to further improve the peak regulation of unit Ability.
Brief description of the drawings
Fig. 1 is the boiler feedwater step heating system schematic diagram that the present invention adapts to the wide load denitration of unit.
Embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
As shown in figure 1, adapting to the boiler feedwater step heating system of the wide load denitration of unit, the heating system includes vapour Turbine high pressure cylinder 1, Steam Turbine Through IP Admission 2, reheater 3, three-level high-pressure heater 4, two level high-pressure heater 5, one-level high pressure add Hot device 6, the first steam condenser 7, the second steam condenser 8, industrial steam heat exchanger 9, the 3rd steam condenser 10, reheating are steamed Vapour heat exchanger 11, economizer 12 and denitrification apparatus 13, the high steam from utility boiler enter steam turbine high-pressure cylinder 1, The steam drain of steam turbine high-pressure cylinder 1 is connected with the air intake of reheater 3, the venthole of reheater 3 and entering for Steam Turbine Through IP Admission 2 Steam ports connects, and the steam discharge of Steam Turbine Through IP Admission 2 continues to do work into turbine low pressure cylinder, and deaerated feedwater pipe 19 is sequentially connected three Level high-pressure heater 4, two level high-pressure heater 5, one-level high-pressure heater 6, the first steam condenser 7, the second steam condenser 8th, industrial steam heat exchanger 9, the 3rd steam condenser 10, reheated steam heat exchanger 11 and economizer 12, deaerated feedwater is carried out Heating, steam turbine high-pressure cylinder 1 are connected with one-level height plus extraction steam pipe 14, two level height plus extraction steam pipe 15 respectively, and one-level is high to add extraction steam pipe 14 are sequentially connected the second steam condenser 8, one-level high-pressure heater 6, and one-level is high plus draws gas by the He of the second steam condenser 8 One-level high-pressure heater 6 heats to deaerated feedwater, two level is high plus extraction steam pipe 15 be sequentially connected the first steam condenser 7, Two level high-pressure heater 5, two level is high plus draws gas to enter deaerated feedwater by the first steam condenser 7 and two level high-pressure heater 5 Row heating, Steam Turbine Through IP Admission 2 are connected with three-level height plus extraction steam pipe 16, extraction steam for factories pipe 17 respectively, three-level height plus extraction steam pipe 16 The 3rd steam condenser 10, three-level high-pressure heater 4 are sequentially connected, three-level is high plus draws gas by the He of the 3rd steam condenser 10 Three-level high-pressure heater 4 is heated to deaerated feedwater, and extraction steam for factories pipe 17 is connected with industrial steam heat exchanger 9, and deoxygenation is given Water is heated, and the venthole with reheater 3, the air intake of reheated steam heat exchanger 11 are connected reheating extraction steam pipe 18 respectively, then Heat is drawn gas to be heated by reheated steam heat exchanger 11 to deaerated feedwater, and flue 20 is sequentially connected economizer 12, taken off Nitre device 13, deaerated feedwater and flue gas are exchanged heat in economizer 12, and deaerated feedwater temperature, which improves, enters utility boiler, Flue-gas temperature, which reduces, reaches denitration temperature.
Preferably, the deaerated feedwater pipe 19 of first steam condenser 7 is provided with the first feed water by-pass 21, and The first valve 31, second is respectively provided with the deaerated feedwater water inlet pipe of one steam condenser 7, outlet pipe and the first feed water by-pass 21 Valve 32, the 3rd valve 33.
Preferably, the deaerated feedwater pipe 19 of second steam condenser 8 is provided with the second feed water by-pass 22, and The 4th valve the 34, the 5th is respectively provided with the deaerated feedwater water inlet pipes of two steam condensers 8, outlet pipe and the second feed water by-pass 22 Valve 35, the 6th valve 36.
Preferably, the deaerated feedwater pipe 19 of the industrial steam heat exchanger 9 is provided with the 3rd feed water by-pass 23, and in work The 7th valve the 37, the 8th is respectively provided with the deaerated feedwater water inlet pipe of industry vapor heat exchanger 9, outlet pipe and the 3rd feed water by-pass 23 Valve 38, the 9th valve 39.
Preferably, the deaerated feedwater pipe 19 of the 3rd steam condenser 10 is provided with the 4th feed water by-pass 24, and Be respectively provided with the deaerated feedwater water inlet pipe of 3rd steam condenser 10, outlet pipe and the 4th feed water by-pass 24 the tenth valve 40, 11st valve 41, the 12nd valve 42.
Preferably, the deaerated feedwater pipe 19 of the reheated steam heat exchanger 11 is provided with the 5th feed water by-pass 25, and The 13rd valve is respectively provided with the deaerated feedwater water inlet pipe of reheated steam heat exchanger 11, outlet pipe and the 5th feed water by-pass 25 43rd, the 14th valve 44, the 15th valve 45.
Preferably, be equipped with the 16th valve 46 on the extraction steam for factories pipe 17, equipped with the on the reheating extraction steam pipe 18 17 valves 47.
Preferably, the three-level high-pressure heater 4, two level high-pressure heater 5, one-level high-pressure heater 6, industrial steam Heat exchanger 9, the heat exchanger types of reheated steam heat exchanger 11 determine according to the heat regenerative system of specific steam power plant, can be partitions Formula heat transmission equipment or direct contact heat transfer equipment.
A kind of adjusting method of boiler feedwater step heating system according to the wide load denitration of above-mentioned adaptation unit, the tune Payload situation when whether section method participates in peak load regulation network and operation according to Steam Turbine, is adjusted in accordance with the following steps Section:
(1) when Steam Turbine is not involved in peak load regulation network and unit load is larger, the 16th valve 46, the 7th valve are closed 37th, the 8th valve 38, opening the 9th valve 39 makes deaerated feedwater not thrown by the 3rd feed water by-pass 23, industrial steam heat exchanger 9 Enter operation, close the 17th valve 47, the 13rd valve 43, the 14th valve 44, opening the 15th valve 45 makes deaerated feedwater By the 5th feed water by-pass 25, reheated steam heat exchanger 11 does not put into operation, by opening and adjusting the first valve 31, the second valve The 32, the 3rd valve 33 of door, the 4th valve 34, the 5th valve 35, the 6th valve 36, the tenth valve 40, the 11st valve the 41, the tenth The switch degree of two valves 42, the exit gas temperature after economizer 12 exchanges heat is set to reach the process requirements of denitrification apparatus 13; Using at different levels high plus draw gas deaerated feedwater is preheated, the degree of superheat that is at different levels high plus drawing gas fully is reclaimed, it is high to reduce three-level The heat transfer temperature difference in heater 4, two level high-pressure heater 5, one-level high-pressure heater 6 is pressed, reduces irreversible loss;
(2) when Steam Turbine participate in peak load regulation network, unit load it is larger and through economizer 12 heat exchange after exiting flue gas temperature When degree does not reach the process requirements of denitrification apparatus 13, on the basis of above-mentioned steps (1), the 16th valve 46 is opened, industry is steamed Vapour heat exchanger 9 puts into operation, by opening and adjusting the switch degree of the 7th valve 37, the 8th valve 38, the 9th valve 39, makes Exit gas temperature after the heat exchange of economizer 12 reaches the process requirements of denitrification apparatus 13;
When Steam Turbine participates in peak load regulation network, unit load gradually reduces, and amount of flue gas emission gradually reduces with initial temperature, Exit gas temperature after the heat exchange of economizer 12 is gradually lowered, the process requirements until being unable to reach denitrification apparatus 13, On the basis of aforesaid operations step (1), the 16th valve 46 is opened, industrial steam heat exchanger 9 puts into operation, now, opens simultaneously The 7th valve 37, the 8th valve 38, the 9th valve 39 are adjusted, deaerated feedwater is heated using extraction steam for factories, to improve into province's coal The deaerated feedwater temperature of device 12, so as to improve the exit gas temperature of economizer 12, make the outlet cigarette after economizer 12 exchanges heat Temperature degree reaches the process requirements of denitrification apparatus 13;
(3) when Steam Turbine participate in peak load regulation network, unit load it is smaller and through economizer 12 heat exchange after exiting flue gas temperature When degree does not reach the process requirements of denitrification apparatus 13, on the basis of above-mentioned steps (2), the 17th valve 47 is opened, reheating is steamed Vapour heat exchanger 11 puts into operation, by the switch for opening and adjusting the 13rd valve 43, the 14th valve 44, the 15th valve 45 Degree, the exit gas temperature after economizer 12 exchanges heat is set to reach the process requirements of denitrification apparatus 13.
When Steam Turbine participates in peak load regulation network, unit load is more reduced, and amount of flue gas emission is more reduced with initial temperature, (exit gas temperature i.e. after the heat exchange of economizer 12 does not reach de- when being still unable to meet demand using industrial steam heat exchanger 9 The process requirements of nitre device 13), now, the 17th valve 47 is opened, reheated steam heat exchanger 11 puts into operation, now, opens And the 13rd valve 43, the 14th valve 44, the 15th valve 45 are adjusted, deaerated feedwater is heated using reheated steam, to enter one Step improves the deaerated feedwater temperature into economizer 12, so as to further improve the exit gas temperature of economizer 12, makes through saving Exit gas temperature after the heat exchange of coal device 12 reaches the process requirements of denitrification apparatus 13.
Furthermore, it is necessary to illustrate, the specific embodiment described in this specification, the shape of its parts and components, it is named Title etc. can be different, and the above content described in this specification is only to structure example explanation of the present invention.It is all according to The equivalence changes or simple change done according to the construction described in inventional idea of the present invention, feature and principle, are included in this hair In the protection domain of bright patent.Those skilled in the art can do various to described specific embodiment The modification of various kinds or supplement are substituted using similar mode, without departing from structure of the invention or surmount present claims Scope defined in book, protection scope of the present invention all should be belonged to.

Claims (9)

  1. A kind of 1. boiler feedwater step heating system for adapting to the wide load denitration of unit, it is characterised in that the heating system bag Include steam turbine high-pressure cylinder (1), Steam Turbine Through IP Admission (2), reheater (3), three-level high-pressure heater (4), two level high-pressure heater (5), one-level high-pressure heater (6), the first steam condenser (7), the second steam condenser (8), industrial steam heat exchanger (9), 3rd steam condenser (10), reheated steam heat exchanger (11), economizer (12), denitrification apparatus (13), steam turbine high-pressure cylinder (1) Steam drain be connected with the air intake of reheater (3), the venthole of reheater (3) and the air intake of Steam Turbine Through IP Admission (2) connect Connect, deaerated feedwater pipe (19) is sequentially connected three-level high-pressure heater (4), two level high-pressure heater (5), one-level high-pressure heater (6), the first steam condenser (7), the second steam condenser (8), industrial steam heat exchanger (9), the 3rd steam condenser (10), Reheated steam heat exchanger (11) and economizer (12), are heated to deaerated feedwater, steam turbine high-pressure cylinder (1) respectively with one-level height Add extraction steam pipe (14), two level high plus extraction steam pipe (15) connection, one-level height plus extraction steam pipe (14) are sequentially connected the cooling of the second steam Device (8), one-level high-pressure heater (6), two level is high plus extraction steam pipe (15) is sequentially connected the first steam condenser (7), two level height Heater (5) is pressed, Steam Turbine Through IP Admission (2) is connected with three-level height plus extraction steam pipe (16), extraction steam for factories pipe (17) respectively, and three-level is high Extraction steam pipe (16) is added to be sequentially connected the 3rd steam condenser (10), three-level high-pressure heater (4), extraction steam for factories pipe (17) and work Industry vapor heat exchanger (9) connects, reheating extraction steam pipe (18) venthole with reheater (3), reheated steam heat exchanger (11) respectively Air intake connection, flue (20) is sequentially connected economizer (12), denitrification apparatus (13).
  2. 2. the boiler feedwater step heating system according to claim 1 for adapting to the wide load denitration of unit, it is characterised in that The deaerated feedwater pipe (19) of first steam condenser (7) is provided with the first feed water by-pass (21), and is cooled down in the first steam The first valve (31), the second valve are respectively provided with the deaerated feedwater water inlet pipe of device (7), outlet pipe and the first feed water by-pass (21) (32), the 3rd valve (33).
  3. 3. the boiler feedwater step heating system according to claim 2 for adapting to the wide load denitration of unit, it is characterised in that The deaerated feedwater pipe (19) of second steam condenser (8) is provided with the second feed water by-pass (22), and is cooled down in the second steam The 4th valve (34), the 5th valve are respectively provided with the deaerated feedwater water inlet pipe of device (8), outlet pipe and the second feed water by-pass (22) (35), the 6th valve (36).
  4. 4. the boiler feedwater step heating system according to claim 3 for adapting to the wide load denitration of unit, it is characterised in that The deaerated feedwater pipe (19) of the industrial steam heat exchanger (9) is provided with the 3rd feed water by-pass (23), and is exchanged heat in industrial steam The 7th valve (37), the 8th valve are respectively provided with the deaerated feedwater water inlet pipe of device (9), outlet pipe and the 3rd feed water by-pass (23) (38), the 9th valve (39).
  5. 5. the boiler feedwater step heating system according to claim 4 for adapting to the wide load denitration of unit, it is characterised in that The deaerated feedwater pipe (19) of 3rd steam condenser (10) is provided with the 4th feed water by-pass (24), and is cooled down in the 3rd steam The tenth valve (40), the 11st are respectively provided with the deaerated feedwater water inlet pipe of device (10), outlet pipe and the 4th feed water by-pass (24) Valve (41), the 12nd valve (42).
  6. 6. the boiler feedwater step heating system according to claim 5 for adapting to the wide load denitration of unit, it is characterised in that The deaerated feedwater pipe (19) of the reheated steam heat exchanger (11) is provided with the 5th feed water by-pass (25), and is exchanged heat in reheated steam The 13rd valve (43), the tenth are respectively provided with the deaerated feedwater water inlet pipe of device (11), outlet pipe and the 5th feed water by-pass (25) Four valves (44), the 15th valve (45).
  7. 7. the boiler feedwater step heating system according to claim 6 for adapting to the wide load denitration of unit, it is characterised in that 16th valve (46) is housed on the extraction steam for factories pipe (17), the 17th valve is housed on the reheating extraction steam pipe (18) (47)。
  8. 8. the boiler feedwater step heating system according to claim 7 for adapting to the wide load denitration of unit, it is characterised in that The three-level high-pressure heater (4), two level high-pressure heater (5), one-level high-pressure heater (6), industrial steam heat exchanger (9), Reheated steam heat exchanger (11) uses wall-type heat exchange equipment or direct contact heat transfer equipment.
  9. A kind of 9. regulation side of the boiler feedwater step heating system according to claim 8 for adapting to the wide load denitration of unit Method, it is characterised in that payload situation when whether the adjusting method participates in peak load regulation network and operation according to Steam Turbine, It is adjusted in accordance with the following steps:
    (1) when Steam Turbine is not involved in peak load regulation network and unit load is larger, the 16th valve (46), the 7th valve are closed (37), the 8th valve (38), opening the 9th valve (39) makes deaerated feedwater pass through the 3rd feed water by-pass (23), industrial steam heat exchange Device (9) does not put into operation, closes the 17th valve (47), the 13rd valve (43), the 14th valve (44), opens the 15th valve Door (45) makes deaerated feedwater not put into operation by the 5th feed water by-pass (25), reheated steam heat exchanger (11), by opening simultaneously Adjust the first valve (31), the second valve (32), the 3rd valve (33), the 4th valve (34), the 5th valve (35), the 6th valve (36), the tenth valve (40), the 11st valve (41), the switch degree of the 12nd valve (42), make to exchange heat through economizer (12) Exit gas temperature afterwards reaches the process requirements of denitrification apparatus (13);
    (2) when Steam Turbine participate in peak load regulation network, unit load it is larger and through economizer (12) heat exchange after exit gas temperature When not reaching the process requirements of denitrification apparatus (13), on the basis of above-mentioned steps (1), the 16th valve (46), industry are opened Vapor heat exchanger (9) puts into operation, by opening and adjusting the 7th valve (37), the 8th valve (38), the 9th valve (39) Switch degree, the exit gas temperature after economizer (12) exchanges heat is set to reach the process requirements of denitrification apparatus (13);
    (3) when Steam Turbine participate in peak load regulation network, unit load it is smaller and through economizer (12) heat exchange after exit gas temperature When not reaching the process requirements of denitrification apparatus (13), on the basis of above-mentioned steps (2), the 17th valve (47), reheating are opened Vapor heat exchanger (11) puts into operation, by opening and adjusting the 13rd valve (43), the 14th valve (44), the 15th valve (45) switch degree, the exit gas temperature after economizer (12) exchanges heat is made to reach the process requirements of denitrification apparatus (13).
CN201711241985.7A 2017-11-30 2017-11-30 Boiler water supply cascade heating system suitable for wide-load denitration of unit and adjusting method Active CN107883369B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711241985.7A CN107883369B (en) 2017-11-30 2017-11-30 Boiler water supply cascade heating system suitable for wide-load denitration of unit and adjusting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711241985.7A CN107883369B (en) 2017-11-30 2017-11-30 Boiler water supply cascade heating system suitable for wide-load denitration of unit and adjusting method

Publications (2)

Publication Number Publication Date
CN107883369A true CN107883369A (en) 2018-04-06
CN107883369B CN107883369B (en) 2024-01-09

Family

ID=61776375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711241985.7A Active CN107883369B (en) 2017-11-30 2017-11-30 Boiler water supply cascade heating system suitable for wide-load denitration of unit and adjusting method

Country Status (1)

Country Link
CN (1) CN107883369B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108954291A (en) * 2018-07-18 2018-12-07 深能合和电力(河源)有限公司 A kind of power station unit pipe-line system
CN110686405A (en) * 2019-08-09 2020-01-14 上海外高桥第三发电有限责任公司 Device and method for using air for regenerative heating denitration pyrolysis furnace

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011127786A (en) * 2009-12-15 2011-06-30 Toshiba Corp Combined cycle power generation facility and feed-water heating method thereof
US20120048215A1 (en) * 2010-09-01 2012-03-01 Hicks Timothy E Steam cycle efficiency improvement with pre-economizer
CN103644004A (en) * 2013-12-20 2014-03-19 上海电气电站设备有限公司 Double-turbine and combined cycle heat and power combined supply system
CN104456519A (en) * 2014-11-03 2015-03-25 章礼道 Novel efficient water supply heat recovery system for secondary reheating unit
CN104482530A (en) * 2014-11-13 2015-04-01 徐进峰 Novel circulating fluidized bed combined cycle
CN106247312A (en) * 2016-08-30 2016-12-21 山东电力工程咨询院有限公司 A kind of extra-supercritical unit double reheat two-shipper backheat thermodynamic system without deaerator
CN205939097U (en) * 2016-08-16 2017-02-08 宁夏清远顺合环保科技有限公司 SCR inlet smoke temperature double - circuit dynamic control system of boiler
CN107270274A (en) * 2017-07-10 2017-10-20 江苏大唐国际吕四港发电有限责任公司 The new Starting mode of ultra-supercritical coal-fired units realizes that the denitration of unit full load is put into
JP6224858B1 (en) * 2017-03-17 2017-11-01 三菱日立パワーシステムズ株式会社 Power plant and operation method thereof
CN207716403U (en) * 2017-11-30 2018-08-10 华电电力科学研究院 Adapt to the boiler feedwater step heating system of the wide load denitration of unit

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011127786A (en) * 2009-12-15 2011-06-30 Toshiba Corp Combined cycle power generation facility and feed-water heating method thereof
US20120048215A1 (en) * 2010-09-01 2012-03-01 Hicks Timothy E Steam cycle efficiency improvement with pre-economizer
CN103644004A (en) * 2013-12-20 2014-03-19 上海电气电站设备有限公司 Double-turbine and combined cycle heat and power combined supply system
CN104456519A (en) * 2014-11-03 2015-03-25 章礼道 Novel efficient water supply heat recovery system for secondary reheating unit
CN104482530A (en) * 2014-11-13 2015-04-01 徐进峰 Novel circulating fluidized bed combined cycle
CN205939097U (en) * 2016-08-16 2017-02-08 宁夏清远顺合环保科技有限公司 SCR inlet smoke temperature double - circuit dynamic control system of boiler
CN106247312A (en) * 2016-08-30 2016-12-21 山东电力工程咨询院有限公司 A kind of extra-supercritical unit double reheat two-shipper backheat thermodynamic system without deaerator
JP6224858B1 (en) * 2017-03-17 2017-11-01 三菱日立パワーシステムズ株式会社 Power plant and operation method thereof
CN107270274A (en) * 2017-07-10 2017-10-20 江苏大唐国际吕四港发电有限责任公司 The new Starting mode of ultra-supercritical coal-fired units realizes that the denitration of unit full load is put into
CN207716403U (en) * 2017-11-30 2018-08-10 华电电力科学研究院 Adapt to the boiler feedwater step heating system of the wide load denitration of unit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108954291A (en) * 2018-07-18 2018-12-07 深能合和电力(河源)有限公司 A kind of power station unit pipe-line system
CN110686405A (en) * 2019-08-09 2020-01-14 上海外高桥第三发电有限责任公司 Device and method for using air for regenerative heating denitration pyrolysis furnace

Also Published As

Publication number Publication date
CN107883369B (en) 2024-01-09

Similar Documents

Publication Publication Date Title
CN105737129B (en) The synthesis afterheat utilizing system of First air warm depth optimization
CN108035777A (en) A kind of fired power generating unit mesolow cylinder combines zero output heating system and method
CN207813667U (en) Low pressure cylinder cooling system based on different steam ports
EP3848562A1 (en) Method for improving rankine cycle efficiency
CN106761982A (en) A kind of new part backheating gas turbine combined cycle system
CN101639211A (en) Float glass melting furnace parallel connection waste heat power generation system
CN203249228U (en) Air pre-heating system extracting steam through steam turbine
CN111271702A (en) Parallel steam extraction energy level lifting system of steam turbine
CN107883369A (en) Adapt to the boiler feedwater step heating system and adjusting method of the wide load denitration of unit
CN105698161A (en) Coal-fired power plant energy level matching heat integration system based on primary air
CN105371267B (en) The Double reheat steam turbine backheat energy utility system of heating boiler primary and secondary air
CN105443243A (en) Gas-steam combined circulation system
CN207813676U (en) It is a kind of to improve the solidifying back of the body of taking out for thermally safe co-generation unit
CN207716403U (en) Adapt to the boiler feedwater step heating system of the wide load denitration of unit
CN206694081U (en) A kind of heat regenerative system for thermal power plant
CN210662813U (en) Parallel steam extraction energy level lifting system of steam turbine
CN110864274B (en) Hot water recycling system for flue gas waste heat recovery
CN202813417U (en) Energy-saving system for preheating air by utilizing exhaust steam of small steam turbine in power plant
CN205261526U (en) Steam power plant's heat supply steam superheating degree of heating boiler overgrate air utilizes system
CN205206962U (en) Gas and steam combined cycle system
CN217082504U (en) Wide-load denitration system with stable combustion performance of boiler
CN206330114U (en) Boiler tail heat exchange device
CN110145754A (en) It can prevent the boiler flue gas treatment system and method for back-end surfaces low-temperature corrosion
CN205535746U (en) Coal -fired power plant waste heat utilization system based on low -grade heat source center
CN105298566A (en) Single reheat condensation type turbo generator unit transformation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 310030 No.10, Xiyuan 1st Road, Sandun Town, Xihu District, Hangzhou City, Zhejiang Province

Applicant after: HUADIAN ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Address before: 310030 No.10, Xiyuan 1st Road, Sandun Town, Xihu District, Hangzhou City, Zhejiang Province

Applicant before: Huadian Electric Power Research Institute

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant