CN107882573A - Multifunction working platform and bow member installation chassis - Google Patents

Multifunction working platform and bow member installation chassis Download PDF

Info

Publication number
CN107882573A
CN107882573A CN201711185593.3A CN201711185593A CN107882573A CN 107882573 A CN107882573 A CN 107882573A CN 201711185593 A CN201711185593 A CN 201711185593A CN 107882573 A CN107882573 A CN 107882573A
Authority
CN
China
Prior art keywords
impactor
working platform
multifunction
interface
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711185593.3A
Other languages
Chinese (zh)
Inventor
周秀静
江乃东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING XIN NENG ZHENG YUAN ENVIRONMENT TECHNOLOGY Co Ltd
Original Assignee
BEIJING XIN NENG ZHENG YUAN ENVIRONMENT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING XIN NENG ZHENG YUAN ENVIRONMENT TECHNOLOGY Co Ltd filed Critical BEIJING XIN NENG ZHENG YUAN ENVIRONMENT TECHNOLOGY Co Ltd
Priority to CN201711185593.3A priority Critical patent/CN107882573A/en
Publication of CN107882573A publication Critical patent/CN107882573A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • E21D9/122Working or loading platforms
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

This disclosure relates to a kind of Multifunction working platform (2) and bow member installation chassis, the Multifunction working platform (2) includes floor (201) and the fence (202) around the floor (201), working space is in the space that the fence (202) limits with floor (201), the operating desk (21) for controlling operation unit to work is provided with the working space, wherein, pneumatic impact spanner (22) and interface unit (23) are provided with the working space, the interface unit (23) includes gas source interface (231), the pneumatic impact spanner (22) can be removably attachable to the gas source interface (231) to obtain power.The Multifunction working platform that the disclosure provides can improve convenience for construction.

Description

Multifunction working platform and bow member installation chassis
Technical field
This disclosure relates to technical field of engineering machinery, in particular it relates to a kind of Multifunction working platform and bow member erecting bed Car.
Background technology
Tunnel is the engineering works being embedded in stratum, is a kind of form of human use's underground space.Tunnel can divide For traffic tunnel, Hydraulic Tunnel, municipal tunnel, mining tunnel.
Bow member is set up in constructing tunnel operation, it is necessary in tunnel, beats the means such as anchor pole, linked network piece, whitewashing to country rock Reinforced, ensure construction safety.
In existing bow member installation chassis, job platform is generally provided with the distal end of telescopic arm, is set in job platform There is operating desk, closely to operate bow member clamping device and telescopic arm, work is set up to carry out bow member.
The content of the invention
The purpose of the disclosure is to provide a kind of Multifunction working platform, to improve convenience for construction.
To achieve these goals, the disclosure provides a kind of Multifunction working platform, including floor and around the floor Fence, the space that the fence limits with floor are provided with for controlling operation unit as working space in the working space The operating desk of work, wherein, pneumatic impact spanner and interface unit are provided with the working space, the interface unit connects including source of the gas Mouthful, the pneumatic impact spanner can be removably attachable to the gas source interface to obtain power.
Selectively, the pneumatic impact spanner and the neighbouring setting of the interface unit, and close to the gas source interface.
Selectively, liquid explosives configuration space and liquid explosives sealing machine are provided with the working space.
Selectively, the lacing wire basket for depositing lacing wire is provided with the working space, the lacing wire basket is connected to described Fence.
Selectively, it is provided with tool box in the working space.
Selectively, the interface unit also includes water source interface and slurry interface, be provided with the outside of the fence anchor pole/ Mesh sheet storage configuration.
Selectively, the interface unit also includes hydraulic interface, and impactor, the gas are fixed with the outside of the fence Source interface or the hydraulic interface can provide power for the impactor.
Selectively, impactor slewing equipment is provided between the impactor and the fence, the impactor passes through Connector is connected with the impactor slewing equipment, and the impactor slewing equipment limits the gyroaxis perpendicular to the floor Line, and drive the impactor and the connecting plate to be rotated around the axis of rotation.
Selectively, the impactor is fixed on a mounting board, and one end of the installing plate is articulated with described by pivotal axis A Connector, the other end are hinged by pivotal axis B and one end of impactor drive device, and the other end of the impactor drive device leads to Cross pivotal axis C and be articulated with the connector, described pivotal axis A, B, C are each parallel to the plane where the floor, and the peace Loading board, the connecting plate and the impactor drive device it is mutual pin joint it is coplanar, the plane is perpendicular to the floor The plane at place, the impactor drive device drive the impactor to swing in the vertical direction.
On the basis of above-mentioned technical proposal, the disclosure also provides a kind of bow member installation chassis, including chassis, telescopic arm group And operation unit, the telescopic arm group include multiple telescopic arms, the proximal hinge of each telescopic arm is in the chassis, the operation Unit includes bow member clamping device, and the bow member clamping device is arranged at the distal end of the telescopic arm, wherein, the multi-function operation Chassis also includes the Multifunction working platform that the disclosure provides, and the Multifunction working platform is arranged on the distal end of the telescopic arm simultaneously And close to the bow member clamping device.
Pass through above-mentioned technical proposal, the disclosure provide Multifunction working platform in not only provide operating desk to control operation Cell operation, but also pneumatic impact spanner and interface unit are provided, the gas source interface in pneumatic impact spanner and interface unit is removably Connection, power is obtained, torque spanner Quick fastening bolt can be replaced, convenience for construction and efficiency of construction can either be improved, again It can ensure that each fastening torque of bolt is consistent.The bow member installation chassis that the disclosure provides includes above-mentioned Multifunction working platform, Therefore equally there is above-mentioned advantage, in order to avoid repeating, will not be repeated here.
Other feature and advantage of the disclosure will be described in detail in subsequent specific embodiment part.
Brief description of the drawings
Accompanying drawing is for providing further understanding of the disclosure, and a part for constitution instruction, with following tool Body embodiment is used to explain the disclosure together, but does not form the limitation to the disclosure.In the accompanying drawings:
Fig. 1 is the simplified block diagram for the Multifunction working platform that the embodiment of the present disclosure provides;
Fig. 2 is the top view of a part for the bow member installation chassis that the embodiment of the present disclosure provides, illustrated therein is the disclosure The Multifunction working platform that embodiment provides;
Fig. 3 is the front view of a part for the bow member installation chassis that the embodiment of the present disclosure provides, illustrated therein is the disclosure Embodiment provides Multifunction working platform.
Description of reference numerals
1 telescopic arm, 11 distal ends, 12 operation unit slewing equipments, 13 connecting plates, 14 operation unit drive devices, 2 is multi-functional Job platform, 21 operating desks, 201 floors, 202 fences, 22 pneumatic impact spanneres, 23 interface units, 231 gas source interfaces, 232 water sources connect Mouthful, 233 slurry interfaces, 234 hydraulic interfaces, 241 liquid explosives configuration spaces, 242 liquid explosives sealing machines, 25 lacing wire baskets, 26 Tool box, 27 anchor poles/mesh sheet storage configuration, 28 impactors, 281 connectors, 282 installing plates, 283 impactor drive devices, 29 Impactor slewing equipment, 3 bow member clamping devices.
Embodiment
The embodiment of the disclosure is described in detail below in conjunction with accompanying drawing.It should be appreciated that this place is retouched The embodiment stated is merely to illustrate and explained the disclosure, is not limited to the disclosure.
In the disclosure, in the case where not making opposite explanation, it is front to define the direction that telescopic arm stretches out, the side of retraction Distal end is defined as to the forefront for rear, telescopic arm, rearmost is defined as near-end;" inside and outside " refers to relative to part in itself It is inside and outside for profile.But the above-mentioned noun of locality is only used for the explanation and illustration disclosure, is not limited to.
According to the embodiment of the disclosure, there is provided a kind of Multifunction working platform 2, including floor 201 and around this The fence 202 on floor 201, the space that the fence 202 limits with floor 201 are set as working space in the working space There is the operating desk 21 for controlling operation unit to work, wherein, pneumatic impact spanner 22 and interface list are provided with the working space Member 23, the interface unit 23 includes gas source interface 231, hydraulic interface 232, water source interface 233 and slurry interface 234, the gas Wrench 22 can be removably attachable to the gas source interface 231 to obtain power.
Pass through above-mentioned technical proposal, the disclosure provide Multifunction working platform 2 in not only provide operating desk 21 with control Operation unit works, but also provides pneumatic impact spanner 22 and interface unit 23, pneumatic impact spanner 22 and the source of the gas in interface unit 23 Interface 231 is detachably connected, obtains power, can replace torque spanner Quick fastening bolt, can either improve convenient construction Property and efficiency of construction, and can enough ensure that each fastening torque of bolt is consistent.
Wherein, in order to improve convenience, the pneumatic impact spanner 22 and the neighbouring setting of the interface unit 23, and close to institute State gas source interface 231.
In constructing tunnel operation, liquid explosives can be used to carry out tunnel local explosion.There is provided in the disclosure specific In embodiment, in order to improve security, the raw material of liquid explosives can be transported in Multifunction working platform 2 and be showed Field configuration, therefore, can be provided with liquid explosives configuration space 241 and liquid explosives sealing machine 242 in the working space, join Examine shown in Fig. 1 and Fig. 2.
In constructing tunnel operation, it will usually use lacing wire, lacing wire can catch on cage bar and stirrup simultaneously, improve reinforcing bar The globality of frame and play drawknot.In the embodiment that the disclosure provides, constructed for the ease of the lacing wire of eminence, institute The lacing wire basket 25 that can be provided with working space for depositing lacing wire is stated, the lacing wire basket 25 is connected to the fence 202.
In addition, using for convenience and management service, tool box 26 is additionally provided with the working space, it is each to deposit Instrument of the kind with difference in functionality and effect, can also deposit some findings such as bolt.
In the embodiment that the disclosure provides, hung for the ease of installation/protection screen sheet of anchor pole, it is described to enclose The outside on column 202 can be provided with anchor pole/mesh sheet storage configuration 27.The anchor pole/mesh sheet storage configuration 27 is it is so structured that hook Structure, in a row or arow is arranged.The interface unit 23 also includes water source interface 232 and slurry interface 233, to beat anchor pole The service life for extending jumbolter is not only facilitated, but also can reduce sky as auxiliary construction medium using water during hole The content of dust in gas, the environment at Optimizing construction scene.After rockbolt installation, slurries can be provided by slurry interface 233, To carry out spraying mixed supporting operation to anchor pole.
In addition, in the embodiment that the disclosure provides, the outside of the fence 202 is fixed with impactor 28, with It is easy to that addi-tional crusher operation can be carried out when tunnel tunnel face meets special circumstances, suitably the drilling holes on rock.Wherein, rush It can be air hammer to hit device 28, in which case it is possible to use the gas source interface 231 in interface unit 23 provides for it Power;Impactor 28 can also be hydraulic impacter, and in this case, the interface unit 23 can include hydraulic interface 234, to provide power for hydraulic impacter.
Wherein, for the ease of adjusting the posture of impactor 28 with Drilling lateral aperture, the impactor 28 and the fence 202 Between be provided with impactor slewing equipment 29, the impactor 28 is connected by connector 281 and the impactor slewing equipment 29 Connect, the impactor slewing equipment 29 limits the axis of rotation perpendicular to the floor 201, and drives the He of impactor 28 The connecting plate is rotated around the axis of rotation, and thus, impactor 28 can be swung in the horizontal plane, so as to realize to lateral aperture Drilling.
In addition, installing plate is fixed on Drilling lateral aperture, the impactor 28 for the ease of adjusting the posture of impactor 28 On 282, one end of the installing plate 282 is articulated with the connector 281 by pivotal axis A, and the other end passes through pivotal axis B and impact One end of device drive device 283 is hinged, and the other end of the impactor drive device 283 is articulated with the connection by pivotal axis C Part 281, described pivotal axis A, B, C are each parallel to the plane where the floor 201, and the installing plate 282, the connecting plate Mutual pin joint is coplanar with the impactor drive device 283, and the plane is perpendicular to flat where the floor 201 Face, the impactor drive device 283 drive the impactor 28 to swing in the vertical direction, so as to realize the brill to angling hole Chisel.
On the basis of above-mentioned technical proposal, the disclosure also provides a kind of bow member installation chassis, including chassis, telescopic arm 1 Group and operation unit, 1 group of the telescopic arm include multiple telescopic arms 1, and the proximal hinge of each telescopic arm 1 is in the chassis, institute Stating operation unit includes bow member clamping device 3, and the bow member clamping device 3 is arranged at the distal end 11 of the telescopic arm 1, more work( Energy Mobile workbench also includes the Multifunction working platform 2 that the disclosure provides, and the Multifunction working platform 2 is arranged on the telescopic arm 1 distal end 11 and the close bow member clamping device 3.With reference to shown in figure 3, in the distal end 11 of telescopic arm 1, multi-function operation Platform 2 and bow member clamping device 3 are connected to distal end 11 by operation unit slewing equipment 12, and operation unit slewing equipment, which limits, to hang down Directly in the axis of rotation on floor 201, and Multifunction working platform 2 and bow member clamping device 3 can be driven to turn around axis of rotation It is dynamic, to carry out corresponding operation.Wherein, (Multifunction working platform 2 and bow member clamping device 3 connect for the lower end of slewing equipment 12 In the upper end of slewing equipment 12) connecting plate 13 is fixed with, the distal end 11 of telescopic arm 1 is be hinged by pivotal axis D and connecting plate 13, makees One end of industry cell driving device 14 is articulated with connecting plate 13 by pivotal axis E, and the other end is articulated with telescopic arm by pivotal axis F 1 distal end 11, pass through the driving of operation unit drive device 14, operation unit slewing equipment 12, Multifunction working platform 2 and arch Frame clamping device 3 can rotate around pivotal axis D, and pivotal axis D, E, F are parallel to each other and parallel to horizontal planes, therefore, multi-functional work Industry platform 2 and bow member clamping device 3 can swung up and down.
Wherein, in the embodiment that the disclosure provides, bow member clamping device 3 can match somebody with somebody in any suitable manner Put, for example, the applicant submitted and authorized, notification number be CN205805588U Chinese patent application in manipulator, The either clamp mechanism in Publication No. CN106761853A Chinese patent application or Publication No. CN106586817A Handgrip mechanism disclosed in Chinese patent application.In the embodiment that the disclosure provides, this is not specifically limited, only Bow member use can be selectively clamped in the construction operation that bow member is installed.
The preferred embodiment of the disclosure is described in detail above in association with accompanying drawing, still, the disclosure is not limited to above-mentioned reality The detail in mode is applied, in the range of the technology design of the disclosure, a variety of letters can be carried out to the technical scheme of the disclosure Monotropic type, these simple variants belong to the protection domain of the disclosure.
It is further to note that each particular technique feature described in above-mentioned embodiment, in not lance In the case of shield, it can be combined by any suitable means.In order to avoid unnecessary repetition, the disclosure to it is various can The combination of energy no longer separately illustrates.
In addition, it can also be combined between a variety of embodiments of the disclosure, as long as it is without prejudice to originally Disclosed thought, it should equally be considered as disclosure disclosure of that.

Claims (10)

1. a kind of Multifunction working platform (2), including floor (201) and the fence (202) around the floor (201), described to enclose The space that column (202) limits with floor (201) is provided with for controlling operation unit work as working space in the working space The operating desk (21) of work, it is characterised in that pneumatic impact spanner (22) and interface unit (23) are provided with the working space, this connects Mouth unit (23) includes gas source interface (231), and the pneumatic impact spanner (22) can be removably attachable to the gas source interface (231) to obtain power.
2. Multifunction working platform (2) according to claim 1, it is characterised in that the pneumatic impact spanner (22) with it is described Interface unit (23) is neighbouring to be set, and close to the gas source interface (231).
3. Multifunction working platform (2) according to claim 1, it is characterised in that be provided with liquid in the working space Body explosive configuration space (241) and liquid explosives sealing machine (242).
4. Multifunction working platform (2) according to claim 1, it is characterised in that be provided with use in the working space In the lacing wire basket (25) of storage lacing wire, the lacing wire basket (25) is connected to the fence (202).
5. Multifunction working platform (2) according to claim 1, it is characterised in that be provided with work in the working space Has case (26).
6. Multifunction working platform (2) according to claim 1, it is characterised in that the interface unit (23) also includes Water source interface (232) and slurry interface (233), fence (202) outside are provided with anchor pole/mesh sheet storage configuration (27).
7. Multifunction working platform (2) according to claim 1, it is characterised in that the interface unit (23) also includes Hydraulic interface (234), impactor (28), the gas source interface (231) or the hydraulic pressure are fixed with the outside of the fence (202) Interface (234) can be that the impactor (28) provides power.
8. Multifunction working platform (2) according to claim 7, it is characterised in that the impactor (28) is enclosed with described Impactor slewing equipment (29) is provided between column (202), the impactor (28) passes through connector (281) and the impactor Slewing equipment (29) connects, and the impactor slewing equipment (29) limits the axis of rotation perpendicular to the floor (201), and The impactor (28) and the connecting plate is driven to be rotated around the axis of rotation.
9. Multifunction working platform (2) according to claim 8, it is characterised in that the impactor (28) is fixed on peace In loading board (282), one end of the installing plate (282) is articulated with the connector (281) by pivotal axis A, and the other end passes through pivot Rotating shaft B and the one end of impactor drive device (283) are hinged, and the other end of the impactor drive device (283) passes through pivotal axis C It is articulated with the connector (281), described pivotal axis A, B, C are each parallel to the plane where the floor (201), and the peace Loading board (282), the connecting plate and the impactor drive device (283) it is mutual pin joint it is coplanar, the plane is vertical Plane where the floor (201), the impactor drive device (283) drive the impactor (28) in above-below direction Upper swing.
10. a kind of bow member installs chassis, including chassis, telescopic arm (1) group and operation unit, telescopic arm (1) group includes more Individual telescopic arm (1), the proximal hinge of each telescopic arm (1) include bow member clamping device in the chassis, the operation unit (3), the bow member clamping device (3) is arranged at the distal end (11) of the telescopic arm (1), it is characterised in that the multi-function operation Chassis also includes the Multifunction working platform (2) according to any one in claim 1-9, the Multifunction working platform (2) it is arranged on the distal end (11) of the telescopic arm (1) and close to the bow member clamping device (3).
CN201711185593.3A 2017-11-23 2017-11-23 Multifunction working platform and bow member installation chassis Pending CN107882573A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711185593.3A CN107882573A (en) 2017-11-23 2017-11-23 Multifunction working platform and bow member installation chassis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711185593.3A CN107882573A (en) 2017-11-23 2017-11-23 Multifunction working platform and bow member installation chassis

Publications (1)

Publication Number Publication Date
CN107882573A true CN107882573A (en) 2018-04-06

Family

ID=61774842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711185593.3A Pending CN107882573A (en) 2017-11-23 2017-11-23 Multifunction working platform and bow member installation chassis

Country Status (1)

Country Link
CN (1) CN107882573A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113441858A (en) * 2021-07-09 2021-09-28 中国铁建重工集团股份有限公司 Automatic sealing and mounting operation device and operation method for TBM steel arch frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2958637A1 (en) * 2010-04-13 2011-10-14 Razel Plates installation device for installation of e.g. fire protection plates on walls of tunnel, has manipulator arm whose compensating unit adapted to balance weight of gripping tool and plate according to vertical direction
CN103643959A (en) * 2013-12-23 2014-03-19 中铁工程装备集团有限公司 Novel tunneling device
CN205503141U (en) * 2015-12-31 2016-08-24 中国神华能源股份有限公司 A work platform for tunnel disease management
CN105881436A (en) * 2014-09-26 2016-08-24 李书益 Pneumatic nut wrench
CN205977245U (en) * 2016-06-06 2017-02-22 蒲长晏 Road multifunctional machinery ization tunnel supporting platform truck
CN206468362U (en) * 2017-01-09 2017-09-05 北京新能正源环境科技有限公司 Handgrip mechanism and bow member chassis for bow member chassis
CN207420581U (en) * 2017-11-23 2018-05-29 北京新能正源环境科技有限公司 Multifunction working platform and bow member installation trolley

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2958637A1 (en) * 2010-04-13 2011-10-14 Razel Plates installation device for installation of e.g. fire protection plates on walls of tunnel, has manipulator arm whose compensating unit adapted to balance weight of gripping tool and plate according to vertical direction
CN103643959A (en) * 2013-12-23 2014-03-19 中铁工程装备集团有限公司 Novel tunneling device
CN105881436A (en) * 2014-09-26 2016-08-24 李书益 Pneumatic nut wrench
CN205503141U (en) * 2015-12-31 2016-08-24 中国神华能源股份有限公司 A work platform for tunnel disease management
CN205977245U (en) * 2016-06-06 2017-02-22 蒲长晏 Road multifunctional machinery ization tunnel supporting platform truck
CN206468362U (en) * 2017-01-09 2017-09-05 北京新能正源环境科技有限公司 Handgrip mechanism and bow member chassis for bow member chassis
CN207420581U (en) * 2017-11-23 2018-05-29 北京新能正源环境科技有限公司 Multifunction working platform and bow member installation trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113441858A (en) * 2021-07-09 2021-09-28 中国铁建重工集团股份有限公司 Automatic sealing and mounting operation device and operation method for TBM steel arch frame

Similar Documents

Publication Publication Date Title
CN100559013C (en) Tunneling, anchoring and drilling composite machine
CN104564090B (en) Repair all-in-one in multi-functional lane
CN105822225A (en) One-arm two-drill rock drilling boom structure
CN106437783B (en) A kind of multifunctional tunnel construction mechanical arm group and its construction method
US10508542B2 (en) Excavation assembly for use in excavator
CN201802409U (en) Multi-arm rock drill
CN109098710A (en) A kind of impact grinding device of rock tunnelling bolting combined machine
CN108775161A (en) A kind of support system for assembled architecture and bridge construction
CN107514236A (en) A kind of arm support and drill jumbo
CN207420581U (en) Multifunction working platform and bow member installation trolley
CN107882573A (en) Multifunction working platform and bow member installation chassis
KR102195905B1 (en) Rock splitting system having multi-directional plasma-oil pressure rock splitter, and continuous rock splitting method using the same
CN108729689A (en) A kind of improved support system for assembled architecture and bridge construction
KR100978532B1 (en) Rock drill for excavator
CN102785243A (en) Multi-directional regulating mechanical hand
CN102536117B (en) Machine-mounted type multipurpose anchor rod drilling machine
WO2018230877A1 (en) Excavator
JP2008133630A (en) Device and method for attaching/detaching front for work
CN202510030U (en) Vehicle multipurpose roofbolter
CN108868600B (en) Tunnel drilling trolley carrying multiple drilling mechanisms
KR20120094318A (en) A small pro-apparatus for mine
CN207879335U (en) A kind of laneway repair machine of anti-explosion diesel engine driving
CN207846504U (en) A kind of scraper bowl of forklift
KR101848381B1 (en) Auxiliary arm for crusher attached to excavator mounting
CN216260956U (en) Ramming equipment matched with breaking hammer for use

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 10, color Xiang Dong Road, South color Town, Beijing, Shunyi District, Beijing

Applicant after: BEIJING XINNENG ZHENGYUAN INTELLIGENT EQUIPMENT Co.,Ltd.

Address before: 101300 No. 8 Choi Yuan Industrial Park, 10 Choi Cheung Road, Shunyi District, Beijing.

Applicant before: BEIJING XIN NENG ZHENG YUAN ENVIRONMENT TECHNOLOGY Co.,Ltd.

RJ01 Rejection of invention patent application after publication

Application publication date: 20180406