CN107882043B - The multi-functional floating platform that links in well - Google Patents

The multi-functional floating platform that links in well Download PDF

Info

Publication number
CN107882043B
CN107882043B CN201711008080.5A CN201711008080A CN107882043B CN 107882043 B CN107882043 B CN 107882043B CN 201711008080 A CN201711008080 A CN 201711008080A CN 107882043 B CN107882043 B CN 107882043B
Authority
CN
China
Prior art keywords
floating box
well
platform
floating
steel guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711008080.5A
Other languages
Chinese (zh)
Other versions
CN107882043A (en
Inventor
张海锋
徐英武
徐杰
瞿彦忠
徐玉夏
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201711008080.5A priority Critical patent/CN107882043B/en
Publication of CN107882043A publication Critical patent/CN107882043A/en
Application granted granted Critical
Publication of CN107882043B publication Critical patent/CN107882043B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices

Abstract

The present invention relates to the floating platforms that links multi-functional in a kind of well, the first to the 5th floating box in the floating box of seven different configurations forms main floating box, main floating box two sides are respectively fixedly connected with a floating box, steel guide rail is installed on main floating box, mechanical execution slot is reserved among steel guide rail, it realizes construction machinery from walking using steel guide rail, and utilizes mechanical execution slot, the shaft bottom soil body is carried out broken to take soil;It is respectively equipped with active tourelle and fixed device between main floating box and the 6th floating box and the 7th floating box and the borehole wall, floating box is made to realize convolution waterborne in well by active tourelle, fixed device further rotates shaking to prevent to float platform.The present invention can solve open caisson during non-drainage subsidence, it is difficult under conditions of not by SEA LEVEL VARIATION in well, the problem of being abolished using mechanical equipment to the shaft bottom soil body.It using the floating platform that links in well, is needed in conjunction with site operation, carries all kinds of construction machineries, operated by platform, the shaft bottom total space soil body is abolished in realization.

Description

The multi-functional floating platform that links in well
Technical field
It is especially a kind of to carry all kinds of construction machineries, spin the present invention relates to the floating platform that links multi-functional in a kind of well Turn the operating platform waterborne of construction space in covering well.
Background technique
Open caisson is to make pit shaft on a kind of ground, is tied by the underground for taking soil to be allowed to sink down into underground predetermined depth in well Structure.During non-drainage subsidence method is well sinking, controls water level in well and water and soil in well is kept to stablize, carry out taking soil under water Method for sinking.After well sinking depth down, the outer Water And Earth Pressures of well are gradually increased, for guarantee open caisson surrounding enviroment it is impacted compared with It is small, it is necessary to use non-drainage subsidence method, stablize Water And Earth Pressures inside and outside open caisson, reduce the outer soil body of well and pour in.
When using non-drainage subsidence, suction dredger equipment can not construct on the water surface, flat according to Jing Ding is set up The support bracket fastened form of platform, cost is larger, and fixed bracket is larger by well sinking bias effect, it is difficult to be all kinds of constructions Mechanical equipment provides a basis firm level, the workbench not influenced by SEA LEVEL VARIATION in well.
Summary of the invention
The present invention is to provide for the multi-functional floating platform that links in a kind of well, does not arrange for solving all kinds of mechanical equipments in open caisson It is underwater heavy when abolishing the shaft bottom soil body, equipment firm horizontal base on the water and whole spaces in the revolving coverage method well of well center Demand.
To solve the above problems, the technical scheme is that multi-functional link floats platform in a kind of well, by seven differences The floating box of construction, two sections of steel guide rails, four sleeve fixture mechanisms, four sets of tourelle compositions, the buoyancy tank of seven different configurations The first to the 5th floating box in body forms main floating box, and main floating box two sides are respectively fixedly connected with the 6th floating box and the 7th and float Cabinet is equipped with steel guide rail on the main floating box, reserves mechanical execution slot among steel guide rail, construction machinery is made to utilize steel guide rail It realizes on platform from walking, and using intermediate reserved mechanical execution slot, the shaft bottom soil body is carried out broken to take soil;The main buoyancy tank It is respectively equipped with tourelle and fixed device between body and the 6th floating box and the 7th floating box and the borehole wall, floating box is made to pass through rolling Dynamic device realizes convolution waterborne in well, and prevents floating platform to further rotate using fixed device after rotating to designated position It shakes.
It is fixedly connected between the floating box of seven different configurations by bolt.
Four sets of tourelle synchronous rollings, rotate floating box around well center, and mechanical execution slot revolving coverage method is entire Native space is taken inside well.
The beneficial effects of the present invention are: open caisson is constructed using non-drainage subsidence, when all kinds of mechanical equipments of needs are to shaft bottom soil When body carries out effectively broken remove, the multi-functional floating platform that links is capable of providing well firm carrying operation platform in well, guarantees Mechanical equipment all-the-time stable, and can be rotated according to the needs of mechanical equipment, platform around well center, realize that mechanical equipment is complete to shaft bottom Space covering operation;Simultaneously because platform can be realized equipment to shaft bottom space equipped with tourelle and fixed device, platform Accurate positioning;Since platform is made of muti-piece cabinet, platform construction influenced by water level height difference variation in well it is smaller, and can root According to the difference of different caisson structures, reasonable combination variation is carried out, changes planform shape to match construction needs.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the multi-functional floating platform that links in well of the invention.
Specific embodiment
The present invention is further illustrated with embodiment with reference to the accompanying drawing.
As shown in Figure 1, the multi-functional floating platform that links in a kind of well, by the floating box of 7 different configurations, 2 sections of steel guide rails 8,4 9,4 sets of tourelles 10 of sleeve fixture mechanism form, and are connected between the floating box of different configuration using latch, wherein first to the Five floating box 1,2,3,4,5 form main floating box, and main floating box two sides are respectively fixedly connected with the 6th floating box 6 and the 7th floating box 7, steel guide rail 8 is installed on main floating box, reserves mechanical execution slot among steel guide rail 8, construction machinery on floating box using disposing Steel guide rail 8 realize on platform from walking, and using mechanical execution slot reserved among floating platform, the shaft bottom soil body is crushed Take soil.Floating platform realizes convolution waterborne in well by tourelle 10, and utilizes fixed device 9 really after rotating to designated position No longer with the borehole wall positional shift occurs for platform cabinet of keeping tie.
Floating platform is made of the floating box of multiple and different constructions, and planform shape construction can be adjusted according to well body structure, Platform construction can not influenced by the variation of well sinking absolute altitude substantially.
Tourelle 10 answers synchronous rolling, rotates floating platform around well center, in the entire well of mechanical execution slot revolving coverage method Portion takes native space.
First to the 7th floating box 1,2,3,4,5,6,7 is responsible for providing platform floating force-summing device carrying platform basis, is real Existing equipment over-water construction and rotational positioning it is basic.It breaks ground and inhales mud equipment by, from walking, rolling dress on the realization platform of steel guide rail 8 It sets 10 realization platforms to rotate around well center, fixed device 9 ensures the relative positional relationship of platform Yu well inner wall, so that it is guaranteed that mechanical Equipment can realize any one of shaft bottom inside position and be accurately positioned, and not arrange to smoothly solve all kinds of mechanical equipments in open caisson It is underwater heavy when abolishing the shaft bottom soil body, equipment firm horizontal base on the water and whole spaces in the revolving coverage method well of well center Demand.
Application implementation example of the present invention:
Engineering is Zhengjiang City huge port water factory one phase water intake engineering, and water-fetching head engineering east, west line open caisson are round reinforced concrete Structure, two caisson structures are identical, open caisson outer diameter 17.6m, blade foot bottom absolute altitude -33.0m, submergence depth 41.2m, sink eventually The heavy stage meets with 5. silty clay, characteristic load bearing capacity and reaches 260KPa, and 2m below blade foot absolute altitude is horizon d.Due to Gao Shui The presence of head pressure makes this engineering open caisson native difficulty of construction must be taken larger using non-drainage subsidence construction technology, shaft bottom, needs Corresponding mechanical equipment is wanted effectively to abolish the soil body under blade foot and bottom beam.By using the present invention, effectively set for all kinds of machinery It is standby to provide integrated construction platform waterborne in well, it realizes to soil body space all standing in well, and be always ensured that various kinds of equipment is in In stable, safe and reliable working environment, the construction of open caisson non-drainage subsidence is well realized.

Claims (3)

1. the multi-functional floating platform that links in a kind of well, by the floating box of seven different configurations, two sections of steel guide rails (8), four sets of fixations Device (9), four sets of tourelles (10) composition, it is characterised in that: first to the in the floating box of seven different configurations Five floating box (1,2,3,4,5) form main floating box, and main floating box two sides are respectively fixedly connected with the 6th floating box (6) and the 7th and float Cabinet (7) is equipped with steel guide rail (8) on the main floating box, and reserved mechanical execution slot, makes construction machinery among steel guide rail (8) It is realized using steel guide rail (8) from the mechanical execution slot walked, and utilize centre reserved on platform, broken take is carried out to the shaft bottom soil body Soil;Be respectively equipped between the main floating box and the 6th floating box (6) and the 7th floating box (7) and the borehole wall tourelle (10) and Fixed device (9) make floating box realize convolution waterborne in well by tourelle (10), and utilize after rotating to designated position Fixed device (9) further rotate shaking to prevent to float platform.
2. the multi-functional floating platform that links in well according to claim 1, it is characterised in that: seven different configurations are floated It is fixedly connected between cabinet by bolt.
3. the multi-functional floating platform that links in well according to claim 1, it is characterised in that: four sets of tourelles (10) Synchronous rolling rotates floating box around well center, takes native space inside the entire well of mechanical execution slot revolving coverage method.
CN201711008080.5A 2017-10-25 2017-10-25 The multi-functional floating platform that links in well Active CN107882043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711008080.5A CN107882043B (en) 2017-10-25 2017-10-25 The multi-functional floating platform that links in well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711008080.5A CN107882043B (en) 2017-10-25 2017-10-25 The multi-functional floating platform that links in well

Publications (2)

Publication Number Publication Date
CN107882043A CN107882043A (en) 2018-04-06
CN107882043B true CN107882043B (en) 2019-09-10

Family

ID=61782209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711008080.5A Active CN107882043B (en) 2017-10-25 2017-10-25 The multi-functional floating platform that links in well

Country Status (1)

Country Link
CN (1) CN107882043B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100254703B1 (en) * 1995-02-17 2000-05-01 마키 에이지 A soft settling structure and method for setting the same
CN101994319A (en) * 2010-05-06 2011-03-30 中交第二公路工程局有限公司 Land oversized open caisson subsidence construction method
CN103967029B (en) * 2014-05-13 2015-11-18 河海大学 Breast wall type well sinking device and construction method thereof
CN106480895A (en) * 2015-08-31 2017-03-08 陈飞 A kind of large-scale well-sinking non-drainage subsidence construction technology
CN105887907B (en) * 2016-05-03 2019-03-05 上海市基础工程集团有限公司 Native machine is taken for Soft Soil well sinking

Also Published As

Publication number Publication date
CN107882043A (en) 2018-04-06

Similar Documents

Publication Publication Date Title
US9567720B2 (en) Offshore platform for a marine environment
KR101044753B1 (en) Apparatus for correcting inclination of offshore wind power generation facility using internal compartment
RU2422614C2 (en) Mobile arctic drilling system of year-round operation
KR101459649B1 (en) Double layered floating-gravity structure for installing offshore substructure, and method for constructing offshore substructure using the same
CN105569064B (en) A kind of setting formula construction of Open Caisson Foundation method suitable for deep water drift net
CN102587401B (en) Sinking construction method for open caisson in geological sludge layer under saturated water condition
CN103228909A (en) Process for installing an offshore tower
CN102803616A (en) Method and device for creating an underwater foundation of a building
CN102635113A (en) Construction method for hydraulic vibrating sinking pipe cast-in-place piles
KR102185234B1 (en) Pre-piling template using spudcan and installation method of offshore structure using thereof
CN202519694U (en) Open caisson foundation structure under saturated water condition when geology is sludge layer
CN105155602A (en) Multi-support foundation strengthening comprehensive controlling method
CN102296629B (en) Tower-drum structure suitable for ocean engineering and installation method thereof
TW202240052A (en) Subsea foundations
GB2256889A (en) Offshore structure and installation method
KR102521885B1 (en) Offshore wind farm structure installed by jacking method and its construction method
KR101597705B1 (en) Verticality control testing device for suction base of offshore wind power
CN107882043B (en) The multi-functional floating platform that links in well
RU2386755C1 (en) Method for arrangement of shallow subway at water area bottom
CN104120699B (en) Steel sheet pile bucket base man-made island dado structure
CN102720211B (en) Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system
JP2020128672A (en) Installation method of mono-pile foundation for offshore wind power generation and mono-pile foundation for offshore wind power generation
CN206873478U (en) A kind of underground shaft robot
US3115013A (en) Artificial island and method of constructing the same
RU2536726C1 (en) Self-lifting drilling rig

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20180406

Assignee: SHANGHAI KANGYI MARINE ENGINEERING Co.,Ltd.

Assignor: SHANGHAI FOUNDATION ENGINEERING GROUP Co.,Ltd.

Contract record no.: X2024990000014

Denomination of invention: Multi functional linkage floating platform inside the well

Granted publication date: 20190910

License type: Common License

Record date: 20240103