CN107869838A - A kind of electric heater for being capable of Fast transforms water flow - Google Patents
A kind of electric heater for being capable of Fast transforms water flow Download PDFInfo
- Publication number
- CN107869838A CN107869838A CN201711290924.XA CN201711290924A CN107869838A CN 107869838 A CN107869838 A CN 107869838A CN 201711290924 A CN201711290924 A CN 201711290924A CN 107869838 A CN107869838 A CN 107869838A
- Authority
- CN
- China
- Prior art keywords
- water
- flow
- water flow
- inner bag
- straightener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 239
- 238000005485 electric heating Methods 0.000 claims abstract description 16
- 230000033228 biological regulation Effects 0.000 claims description 13
- 238000010438 heat treatment Methods 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 7
- 238000001816 cooling Methods 0.000 claims description 6
- 210000003739 neck Anatomy 0.000 claims description 4
- 102000010637 Aquaporins Human genes 0.000 claims 2
- 108010063290 Aquaporins Proteins 0.000 claims 2
- 230000037431 insertion Effects 0.000 claims 1
- 238000003780 insertion Methods 0.000 claims 1
- 230000005611 electricity Effects 0.000 description 3
- 238000003825 pressing Methods 0.000 description 3
- 230000006641 stabilisation Effects 0.000 description 3
- 238000011105 stabilization Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005338 heat storage Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H1/00—Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
- F24H1/18—Water-storage heaters
- F24H1/185—Water-storage heaters using electric energy supply
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H9/00—Details
- F24H9/0005—Details for water heaters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H9/00—Details
- F24H9/20—Arrangement or mounting of control or safety devices
- F24H9/2007—Arrangement or mounting of control or safety devices for water heaters
- F24H9/2014—Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
- F24H9/2021—Storage heaters
Abstract
The present invention discloses a kind of electric heater for being capable of Fast transforms water flow, including inner bag, electric heating tube, water inlet pipe, outlet pipe and control panel, the delivery port connection outlet pipe of inner bag, water inlet pipe connects inner bag water inlet by control unit of intaking, water inlet control unit includes housing, housing is provided with intake tunnel and exhalant canal, intake tunnel passes through the first of parallel connection, second water route connects exhalant canal, first electromagnetic valve and the first flow straightener are housed on the first water route, second electromagnetic valve and the second flow straightener are housed on the second water route, 3rd flow straightener is housed on exhalant canal;The water flow of 3rd flow straightener is more than the water flow of the second flow straightener, the water flow of second flow straightener is more than the water flow of the first flow straightener, and the water flow addition of the water flow of the first flow straightener and the second flow straightener is more than the water flow of the 3rd flow straightener.The water flow of energy Fast transforms outlet pipe of the invention, and each water flow is all relatively stable, convenient use.
Description
Technical field
The present invention relates to electric heater manufacturing technology field, especially a kind of electric hot water for being capable of Fast transforms water flow
Device.
Background technology
Traditional fast heating type or heat storage electric water heater, to change water flow, it usually needs come by the water mixing valve of outside
Complete, but by water mixing valve adjusting water outlet flow, first, regulation trouble, two leaving water temperatures can be sent out with the change of water flow
It is raw to change, use more troublesome.Have at present on some high-end quick-heating electric water heaters and stepping is coordinated using flow valve
Motor and control panel carry out the regulation of water flow, this quick-heating electric water heater although use it is more convenient, but its
Manufacturing cost is higher, and maintenance difficulties are larger, it is difficult to popularizes.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of electric heater for being capable of Fast transforms water flow, it can be fast
The water flow of speed conversion outlet pipe, and each water flow is all relatively stable, convenient use.
To reach above-mentioned purpose, the technical scheme is that:A kind of electric heater for being capable of Fast transforms water flow,
Including inner bag, electric heating tube, water inlet pipe, outlet pipe and control panel, inner bag is provided with water inlet and delivery port, and control panel control electricity adds
Heat pipe works, and electric heating tube gives the water heating entered in inner bag, and the delivery port connection outlet pipe of inner bag, the water inlet pipe is by entering
Water management members inner bag water inlet, the water inlet control unit include housing, and housing is provided with intake tunnel and water outlet is led to
Road, intake tunnel connect exhalant canal with the second water route by the first water route of parallel connection, the first electromagnetic brake are housed on the first water route
Valve and the first flow straightener, the second electromagnetic valve and the second flow straightener are housed on the second water route, the 3rd current stabilization is housed on exhalant canal
Device;The water flow of 3rd flow straightener is more than the water flow of the second flow straightener, and the water flow of the second flow straightener is more than first
The water flow of the water flow of flow straightener, the water flow of the first flow straightener and the second flow straightener, which is added, is more than the 3rd flow straightener
Water flow;The intake tunnel connects water inlet pipe, and the exhalant canal connects inner bag water inlet by connecting pipe, described
Control panel controls the first electromagnetic valve and the work of the second electromagnetic valve.
Further improve, flow of inlet water sensing is also equipped with the connecting pipe between exhalant canal and the inner bag water inlet
Device and inflow temperature sensor, the data that the control panel is sent according to flow of inlet water sensor and inflow temperature sensor are adjusted
The heating power of electric heating tube, with the leaving water temperature of adjusting water outlet pipe.Adjusting water outlet problem can so be facilitated, moreover it is possible in difference
Output flow in the case of so that leaving water temperature keep it is constant.
Further improve, the connecting pipe outer surface is provided with the installation end face of flow of inlet water sensor and is installed into water temperature
Spend the stairstepping through hole of sensor.To facilitate the installation of flow of inlet water sensor and inflow temperature sensor.
Further improve, leaving water temperature sensors are housed on the outlet pipe, leaving water temperature sensors electrically connect the control
Making sheet.The data detected by leaving water temperature sensors, the control panel can further adjust the power of electric heating tube, to meet
Leaving water temperature requirement.
Further improve, multiple branch's water inlet pipes being distributed along different directions are also connected on the water inlet pipe.To facilitate peace
Dress.
Further to improve, the water inlet end of the housing intake tunnel and the water side of exhalant canal are in the same side, and first
The installation end of electromagnetic valve and the second electromagnetic valve is in the same side.Compact-sized to cause, layout is more reasonable.
Further improve, the housing sets two hangers in exhalant canal water side, and card is respectively equipped with two hangers
Groove, connecting pipe connection described exhalant canal one end outer surface are provided with two clamping projections, and two clampings are raised and two
Neck is engaged.With convenient for assembly, prevent connecting pipe from departing from the exhalant canal.
It is preferred that the connecting pipe is L-shaped, the water side of the housing exhalant canal, another is inserted in one end of connecting pipe
The water inlet of the inner bag is inserted at end.
Further improve, the inner bag and water inlet control unit are fixed in a rear shell, the also connected face-piece of rear shell, face
Shell covers inner bag and the water inlet control unit, and the electric heating tube is mounted in inner bag, and the control panel is on face-piece, face-piece
It is upper to be pressed equipped with power on button, the first water flow control button, the second water flow control button and the control of the 3rd water flow
Button, power on button, the first water flow control button, the second water flow control button and the 3rd water flow control button electricity
Connect control panel.With convenient use.
Further ,+heat button and cooling button ,+heat button and cooling button electrical connection are also equipped with the face-piece
The control panel.To facilitate adjusting water outlet temperature.
Of the invention to connect inner bag water inlet by control unit of intaking due to water inlet pipe, the water inlet control unit includes shell
Body, housing are provided with intake tunnel and exhalant canal, and intake tunnel connects water outlet by the first water route of parallel connection with the second water route
Passage, the first electromagnetic valve and the first flow straightener are housed on the first water route, the second electromagnetic valve and second are housed on the second water route
Flow straightener, the 3rd flow straightener is housed on exhalant canal;The water flow of 3rd flow straightener is more than the water flow of the second flow straightener,
The water flow of second flow straightener is more than the water flow of the first flow straightener, the water flow of the first flow straightener and the second flow straightener
Water flow be added more than the 3rd flow straightener water flow;The intake tunnel connects water inlet pipe, and the exhalant canal leads to
Connecting pipe connection inner bag water inlet is crossed, the control panel controls the first electromagnetic valve and the work of the second electromagnetic valve.
So when the first electromagnetic valve is opened, the second electromagnetic valve is closed, the water that water inlet pipe enters is through the first flow straightener
Stable input inner bag and exported after regulation from outlet pipe, now because the water flow of the 3rd flow straightener is more than the first flow straightener
Water flow, the 3rd flow straightener do not work, and outlet pipe output flow is stable by the output flow after the regulation of the first flow straightener
Output;
When the first electromagnetic valve is closed, the second electromagnetic valve is opened, the water that water inlet pipe enters is adjusted through the second flow straightener
Stable input inner bag and exported afterwards from outlet pipe, now because the water flow of the 3rd flow straightener is more than going out for the second flow straightener
Water-carrying capacity, the 3rd flow straightener do not work, and the output flow stabilization after outlet pipe output flow is adjusted with the second flow straightener exports;
When the first electromagnetic valve and the second electromagnetic valve are opened simultaneously, the water that water inlet pipe enters is through the first flow straightener and second
Enter the exhalant canal after flow straightener regulation, now because the water flow of the first flow straightener and the second flow straightener go out current
Amount is added the water flow more than the 3rd flow straightener, and the 3rd flow straightener functions to, and outlet pipe output flow is with the 3rd current stabilization
The stable output of output flow after device regulation.
Therefore, just can Fast transforms outlet pipe as long as changing the working condition of the first electromagnetic valve and the second electromagnetic valve
Water flow, and each water flow is all relatively stable, convenient use.
Further, the present invention can also realize that leaving water temperature is basically unchanged after different water flows are converted, and preferably meet people
Required with water.
Brief description of the drawings
Fig. 1 is front perspective view of the present invention;
Fig. 2 is the rear perspective view of the hiding rear shell of the present invention;
Fig. 3 is the front perspective view of the hiding rear shell of the present invention, face-piece, control panel and each button;
Fig. 4 is that present invention water inlet control unit is connected with each other stereogram with connecting pipe;
Fig. 5 is the stereogram into water control unit housing;
Fig. 6 is into water control unit principle assumption diagram;
Fig. 7 is connecting pipe stereogram.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Shown in Fig. 1 to Fig. 7, a kind of electric heater for being capable of Fast transforms water flow, including inner bag 1, electric heating tube 2,
Water inlet pipe 3, outlet pipe 4 and control panel 5, inner bag 1 are provided with water inlet and delivery port, and control panel 5 controls electric heating tube 2 to work, electricity
Heating tube 2 is mounted in inner bag 1, and electric heating tube 2 gives the water heating entered in inner bag 1, the delivery port connection outlet pipe 4 of inner bag 1, institute
State water inlet pipe 3 and the water inlet of inner bag 1 is connected by control unit 6 of intaking.
The water inlet control unit 6 includes housing 61, and housing 61 is provided with intake tunnel 611 and exhalant canal 612, water inlet
Passage 611 connect exhalant canal 612 with the second water route 614 by the first water route 613 of parallel connection, and the is equipped with the first water route 613
One electromagnetic valve 62 and the first flow straightener 63, the second electromagnetic valve 64 and the second flow straightener 65, water outlet are housed on the second water route 614
3rd flow straightener 66 is housed on passage 612;The water flow of 3rd flow straightener 66 is more than the water flow of the second flow straightener 65, the
The water flow of two flow straighteners 65 is more than the water flow of the first flow straightener 63, the water flow of the first flow straightener 63 and second steady
The water flow for flowing device 65 is added the water flow for being more than the 3rd flow straightener 66;The intake tunnel 611 connects water inlet pipe 3, institute
State exhalant canal 612 and the water inlet of inner bag 1 is connected by connecting pipe 7, the control panel 5 controls the first electromagnetic valve 62 and second
Electromagnetic valve 64 works.
Be also equipped with connecting pipe 7 between exhalant canal 612 and inner bag 1 water inlet flow of inlet water sensor 71 and
Inflow temperature sensor 72, the data that the control panel 5 is sent according to flow of inlet water sensor 71 and inflow temperature sensor 72
The heating power of electric heating tube 2 is adjusted, with the leaving water temperature of adjusting water outlet pipe 4.
The connecting pipe 7 is L-shaped, and one end outer surface of connecting pipe 7 is provided with the installation end face of flow of inlet water sensor 71
711st, other end outer surface is provided with the stairstepping through hole 721 of installation inflow temperature sensor 72.
Leaving water temperature sensors 41 are housed, leaving water temperature sensors 41 electrically connect the control panel 5 on the outlet pipe 4.
Multiple branch's water inlet pipes 31 being distributed along different directions are also connected on the water inlet pipe 3.
The water inlet end of the intake tunnel 611 of housing 61 and the water side of exhalant canal 612 are in the same side, the first electromagnetism
The installation end of the electromagnetic valve 64 of gate valve 62 and second is in the same side.
The housing 61 sets two hangers 615 in the water side of exhalant canal 612, and card is respectively equipped with two hangers 615
Groove 616, the connecting pipe 7 connect one end outer surface of exhalant canal 612 and are provided with two clamping projections 73, and two clampings are convex
73 are played to be engaged with two necks 616.The water side, another of the exhalant canal 612 of housing 61 is inserted in one end of connecting pipe 7
The water inlet of the inner bag 1 is inserted at end.The inner surface of exhalant canal 612 is additionally provided with the stepped groove of the 3rd flow straightener 66 of positioning
617。
The inner bag 1 and water inlet control unit 6 are fixed in a rear shell 8, and the also connected face-piece 9 of rear shell 8, face-piece 9 covers
Lid inner bag 1 and the water inlet control unit 6, the control panel 5 are equipped with power on button 91, first on face-piece 9 on face-piece 9
Water flow control button 92, the second water flow control button 93, the 3rd water flow control button 94, the and of+heat button 95
Cool button 96, power on button 91, the first water flow control button 92, the second water flow control button 93, the 3rd water outlet
Flow control button 94 ,+heat button 95 and cooling button 96 electrically connect control panel 5.
The present embodiment in use, first open power on button 91, then can optionally press the first water flow control button
92 or second water flow control button 93 or the 3rd water flow control button 94.
When pressing the first water flow control button 92, the first electromagnetic valve 62 is opened, the second electromagnetic valve 64 is closed, and is entered
The water that water pipe 3 enters input inner bag 1 stable after the regulation of the first flow straightener 63 simultaneously exports from outlet pipe 4, now due to the 3rd
The water flow of flow straightener 66 is more than the water flow of the first flow straightener 63, and the 3rd flow straightener 66 does not work, and outlet pipe 4 exports
Output flow of the flow after the regulation of the first flow straightener 63 is defined.
When pressing the second water flow control button 93, the first electromagnetic valve 62 is closed, the second electromagnetic valve 64 is opened, and is entered
The water that water pipe 3 enters input inner bag 1 stable after the regulation of the second flow straightener 65 simultaneously exports from outlet pipe 4, now due to the 3rd
The water flow of flow straightener 66 is more than the water flow of the second flow straightener 65, and the 3rd flow straightener 66 does not work, and outlet pipe 4 exports
Output flow of the flow after the regulation of the second flow straightener 65 is defined.
When pressing the 3rd water flow control button 94, the first electromagnetic valve 62 and the second electromagnetic valve 64 are opened simultaneously,
The water that water inlet pipe 3 enters inputs exhalant canal 612 after the first flow straightener 63 and the regulation of the second flow straightener 65, now due to first
The water flow of the water flow of flow straightener 63 and the second flow straightener 65 be added more than the 3rd flow straightener 66 water flow, the 3rd
Flow straightener 66 functions to, and output flow of the output flow of outlet pipe 4 after the regulation of the 3rd flow straightener 66 is defined.
In the case of different flow output, the control panel 5 can be set according to by+heat button 95 or cooling button 96
Fixed leaving water temperature, the data sent further according to flow of inlet water sensor 71 and inflow temperature sensor 72 adjust electric heating tube 2
Heating power, with the leaving water temperature of adjusting water outlet pipe 4.
It the above is only a preferred embodiment of the invention, those skilled in the art is made equivalent change by claim
Both fall within the protection domain of this case.
Claims (10)
1. a kind of electric heater for being capable of Fast transforms water flow, including inner bag, electric heating tube, water inlet pipe, outlet pipe and control
Making sheet, inner bag are provided with water inlet and delivery port, control panel control electric heating tube work, and electric heating tube gives the water entered in inner bag to add
Heat, the delivery port connection outlet pipe of inner bag, it is characterised in that:The water inlet pipe connects inner bag by control unit of intaking and intake
Mouthful, the water inlet control unit includes housing, and housing is provided with intake tunnel and exhalant canal, and intake tunnel passes through in parallel the
One water route connects exhalant canal with the second water route, and the first electromagnetic valve and the first flow straightener, the second water route are housed on the first water route
It is upper that second electromagnetic valve and the second flow straightener are housed, the 3rd flow straightener is housed on exhalant canal;The water flow of 3rd flow straightener
More than the water flow of the second flow straightener, the water flow of the second flow straightener is more than the water flow of the first flow straightener, and first is steady
The water flow of the water flow and the second flow straightener that flow device is added the water flow more than the 3rd flow straightener;The intake tunnel
Water inlet pipe is connected, the exhalant canal connects inner bag water inlet by connecting pipe, and the control panel controls the first electromagnetic valve
Worked with the second electromagnetic valve.
A kind of 2. electric heater for being capable of Fast transforms water flow according to claim 1, it is characterised in that:It is described go out
Flow of inlet water sensor and inflow temperature sensor, the control are also equipped with connecting pipe between aquaporin and inner bag water inlet
The data that making sheet is sent according to flow of inlet water sensor and inflow temperature sensor adjust the heating power of electric heating tube, with regulation
The leaving water temperature of outlet pipe.
A kind of 3. electric heater for being capable of Fast transforms water flow according to claim 2, it is characterised in that:The company
Thread a pipe outer surface provided with flow of inlet water sensor installation end face and install inflow temperature sensor stairstepping through hole.
A kind of 4. electric heater for being capable of Fast transforms water flow according to claim 1, it is characterised in that:It is described go out
Leaving water temperature sensors are housed, leaving water temperature sensors electrically connect the control panel on water pipe.
A kind of 5. electric heater for being capable of Fast transforms water flow according to claim 1, it is characterised in that:It is described enter
Multiple branch's water inlet pipes being distributed along different directions are also connected on water pipe.
A kind of 6. electric heater for being capable of Fast transforms water flow according to claim 1, it is characterised in that:The shell
The water inlet end of body intake tunnel and the water side of exhalant canal are in the peace of the same side, the first electromagnetic valve and the second electromagnetic valve
Dress end is in the same side.
A kind of 7. electric heater for being capable of Fast transforms water flow according to claim 1, it is characterised in that:The shell
Body sets two hangers in exhalant canal water side, and neck is respectively equipped with two hangers, is gone out described in the connecting pipe connection
Aquaporin one end outer surface is provided with two clamping projections, and two clampings are raised to be engaged with two necks.
A kind of 8. electric heater for being capable of Fast transforms water flow according to claim 1, it is characterised in that:The company
Thread a pipe and insert entering for the inner bag for L-shaped, the water side of one end insertion housing exhalant canal of connecting pipe, the other end
The mouth of a river.
9. a kind of electric heater for being capable of Fast transforms water flow according to any one of claim 1 to 8, its feature exist
In:The inner bag and water inlet control unit are fixed in a rear shell, and rear shell is also connected a face-piece, face-piece covering inner bag and described
Intake control unit, the electric heating tube is mounted in inner bag, the control panel on the face-piece, on face-piece equipped with power on button,
First water flow control button, the second water flow control button and the 3rd water flow control button, power on button, first
Water flow control button, the second water flow control button and the 3rd water flow control button electrical connection control panel.
A kind of 10. electric heater for being capable of Fast transforms water flow according to claim 9, it is characterised in that:It is described
+ heat button and cooling button are also equipped with face-piece ,+heat button and cooling button electrically connect the control panel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711290924.XA CN107869838A (en) | 2017-12-08 | 2017-12-08 | A kind of electric heater for being capable of Fast transforms water flow |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711290924.XA CN107869838A (en) | 2017-12-08 | 2017-12-08 | A kind of electric heater for being capable of Fast transforms water flow |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107869838A true CN107869838A (en) | 2018-04-03 |
Family
ID=61755204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711290924.XA Pending CN107869838A (en) | 2017-12-08 | 2017-12-08 | A kind of electric heater for being capable of Fast transforms water flow |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107869838A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111365855A (en) * | 2020-03-16 | 2020-07-03 | 华帝股份有限公司 | Gas water heater capable of realizing multistage current limiting and temperature control and control method thereof |
CN111426052A (en) * | 2020-03-25 | 2020-07-17 | 华帝股份有限公司 | Constant-temperature gas water heater and control method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201181101Y (en) * | 2008-03-14 | 2009-01-14 | 保音股份有限公司 | Water heater using multi-section switch to regulate firepower |
CN202792559U (en) * | 2011-09-20 | 2013-03-13 | 李明秀 | Instant electric water heater |
JP2013113052A (en) * | 2011-11-30 | 2013-06-10 | Kvk Corp | Automatic faucet |
JP2014077558A (en) * | 2012-10-09 | 2014-05-01 | Panasonic Corp | Water heater |
CN106196565A (en) * | 2016-08-30 | 2016-12-07 | 江苏苏美达机电有限公司 | A kind of thermostatic instant heating formula water heater and control method thereof |
CN106969489A (en) * | 2017-03-29 | 2017-07-21 | 厦门佳普乐电子科技有限公司 | A kind of instantaneously heated type heater |
CN207599973U (en) * | 2017-12-08 | 2018-07-10 | 厦门阿玛苏电子卫浴有限公司 | A kind of electric heater for being capable of Fast transforms water flow |
-
2017
- 2017-12-08 CN CN201711290924.XA patent/CN107869838A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201181101Y (en) * | 2008-03-14 | 2009-01-14 | 保音股份有限公司 | Water heater using multi-section switch to regulate firepower |
CN202792559U (en) * | 2011-09-20 | 2013-03-13 | 李明秀 | Instant electric water heater |
JP2013113052A (en) * | 2011-11-30 | 2013-06-10 | Kvk Corp | Automatic faucet |
JP2014077558A (en) * | 2012-10-09 | 2014-05-01 | Panasonic Corp | Water heater |
CN106196565A (en) * | 2016-08-30 | 2016-12-07 | 江苏苏美达机电有限公司 | A kind of thermostatic instant heating formula water heater and control method thereof |
CN106969489A (en) * | 2017-03-29 | 2017-07-21 | 厦门佳普乐电子科技有限公司 | A kind of instantaneously heated type heater |
CN207599973U (en) * | 2017-12-08 | 2018-07-10 | 厦门阿玛苏电子卫浴有限公司 | A kind of electric heater for being capable of Fast transforms water flow |
Non-Patent Citations (1)
Title |
---|
黄守孝: "《小康林业建设研究》", 31 December 2005, 山西经济出版社, pages: 298 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111365855A (en) * | 2020-03-16 | 2020-07-03 | 华帝股份有限公司 | Gas water heater capable of realizing multistage current limiting and temperature control and control method thereof |
CN111426052A (en) * | 2020-03-25 | 2020-07-17 | 华帝股份有限公司 | Constant-temperature gas water heater and control method thereof |
CN111426052B (en) * | 2020-03-25 | 2024-01-23 | 华帝股份有限公司 | Constant-temperature type gas water heater and control method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107869838A (en) | A kind of electric heater for being capable of Fast transforms water flow | |
CN204786682U (en) | Constant temperature constant current hot -water heating system | |
CN201852266U (en) | Water storage type electric water heater | |
CN207599973U (en) | A kind of electric heater for being capable of Fast transforms water flow | |
CN207378199U (en) | A kind of security protection water mixing valve | |
CN101090590B (en) | Electric heating plate | |
CN208687968U (en) | A kind of heating hot water furnace apparatus having mixed water function | |
CN201438037U (en) | Quick electric water heater | |
CN208121883U (en) | A kind of water heater shower system of intelligent temperature control | |
CN205878568U (en) | External circulation of heater is preheated and constant temperature electric water heater | |
CN205717493U (en) | Warm bath system | |
CN205372708U (en) | Bathroom hot -water heating formula electric fan heater | |
CN203857672U (en) | Full-automatic instantaneous electric water heater | |
CN108953731A (en) | A kind of intelligent temperature control tap | |
CN204987183U (en) | Water and electricity allies oneself with heating gas | |
CN205332566U (en) | High -efficient solar water heating system of safe type | |
CN208349574U (en) | Phase-change thermal storage type water heater | |
CN207299491U (en) | A kind of dual circuit heater and multi-functional water heater | |
CN206905098U (en) | Duct type water-warming heater | |
CN205505362U (en) | System for heating device and use this heating device | |
CN206113308U (en) | Water heater water path device | |
CN206973782U (en) | A kind of electrical heating energy storage air conditioner system | |
CN109869899A (en) | A kind of water heater | |
CN105476522B (en) | The shower and its application method of piano type control | |
CN206822392U (en) | Indoor temperature regulating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |