CN107843838A - 一种风电机组低电压穿越能力的检测方法 - Google Patents
一种风电机组低电压穿越能力的检测方法 Download PDFInfo
- Publication number
- CN107843838A CN107843838A CN201711003609.4A CN201711003609A CN107843838A CN 107843838 A CN107843838 A CN 107843838A CN 201711003609 A CN201711003609 A CN 201711003609A CN 107843838 A CN107843838 A CN 107843838A
- Authority
- CN
- China
- Prior art keywords
- breaker
- low
- reactance
- series
- impedance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/34—Testing dynamo-electric machines
- G01R31/343—Testing dynamo-electric machines in operation
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Wind Motors (AREA)
Abstract
本发明公开了一种风电机组低电压穿越能力的检测方法,解决了对风电场的风电机组进行低电压穿越能力现场实时检测的问题。检测装置串接在风力发电机箱式变压器低压侧690伏与被测风力发点机组690伏的并网开关之间,并联阻抗Xsc与被测风电机组的连接点为测试点,配置数据采集录波装置,形成一套完整的检测系统。通过调节串联电抗XS与并联阻抗Xsc,改变阻抗分压比,断开旁路断路器QBP 8和闭合短路断路器QSC 12,分别将串联阻抗和并联阻抗投入,在测试点实现期望的电压跌落深度;设定电压跌落持续时间,检测被测风电机组低电压穿越能力是否满足相关标准要求。本发明基于阻抗分压原理,接线简单,安全可靠,可操作性强。
Description
技术领域
本发明涉及一种电力检测方法,特别涉及一种对风电机组低电压穿越能力进行检测的系统。
背景技术
随着风电、光伏等新能源的快速发展,新能源场站不断投运并网,给电网安全稳定运行带来了新的问题。有些地方发生大面积风电脱网事故,与并网的风电机组低电压穿越能力直接相关,部分风电机组不具备低电压穿越能力或者穿越能力不能满足并网要求,当电网电压发生暂降事件时,风电机组不能抵抗电压扰动,而导致大面积脱网事故的发生。所以,现场急需一种对风电机组低电压穿越能力进行检测的系统,对未开展低穿试验的风机进行现场检测和评价,以保证电网安全稳定运行。
发明内容
本发明提供了一种风电机组低电压穿越能力的检测方法,解决了对风电场的风电机组进行低电压穿越能力现场实时检测的技术问题。
本发明是通过以下技术方案解决以上技术问题的:
一种风电机组低电压穿越能力的检测方法,在高压侧母线与低压侧母线之间设置有变压器,在低压侧母线上连接有箱式变压器;其特征在于以下步骤:
第一步、将低电压穿越能力检测装置串接在风机箱式变压器的低压侧与被测风电机组的并网开关之间,即,在箱式变压器的低压侧的输入断路器与被测风电机组的输出断路器之间串联接入电抗切换开关和串联电抗,并在箱式变压器的低压侧的输入断路器与被测风电机组的输出断路器之间并联接入旁路断路器,在串联电抗与输出断路器的连接点与地之间依次串联接入并联电抗、并联电抗切换开关和短路断路器;在串联电抗与输出断路器的连接点上接入数据采集录波器;
第二步、进行跌落方式、跌落深度和持续时间参数配置;
第三步、将与输出断路器连接的被测风电机组停机,将箱式变压器的低压侧的输入断路器、旁路断路器和被测风电机组的输出断路器合闸,将短路断路器分闸,然后,再将旁路断路器分闸,同时将短路断路器合闸;完成空载实验;
第四步:空载试验完成后,采集在串联电抗与输出断路器的连接点上接入的数据采集录波器的数据,实现空载试验电压设计跌落深度;
第五步、调整串联电抗、并联电抗,改变阻抗分压比,再将旁路断路器分闸,同时将短路断路器合闸;分别将调整后的串联阻抗和并联阻抗投入,采集在串联电抗与输出断路器的连接点上接入的数据采集录波器的数据,实现希望空载试验电压跌落的深度;
第六步、根据实现的空载试验电压跌落的深度来判断出被测风电机组的低电压穿越能力。
空载试验完成后,采集测试点数据,依据空载试验电压跌落深度,计算出系统阻抗。
本发明基于阻抗分压原理,接线简单,安全可靠,可操作性强。
附图说明
图1是本发明的结构示意图。
具体实施方式
下面结合附图对本发明进行详细说明:
一种风电机组低电压穿越能力的检测方法,在高压侧母线1与低压侧母线3之间设置有变压器2,在低压侧母线3上连接有箱式变压器4;其特征在于以下步骤:
第一步、将低电压穿越能力检测装置串接在风机箱式变压器的低压侧与被测风电机组的并网开关之间,即,在箱式变压器4的低压侧的输入断路器QI与被测风电机组的输出断路器Qo之间串联接入电抗切换开关K1 和串联电抗XS,并在箱式变压器4的低压侧的输入断路器QI与被测风电机组的输出断路器Qo之间并联接入旁路断路器QBP,在串联电抗XS与输出断路器Qo的连接点与地之间依次串联接入并联电抗XSC、并联电抗切换开关K2和短路断路器QSC;在串联电抗XS与输出断路器Qo的连接点上接入数据采集录波器;
第二步、进行跌落方式、跌落深度和持续时间参数配置;
第三步、将与输出断路器Qo连接的被测风电机组停机,将箱式变压器4的低压侧的输入断路器QI、旁路断路器QBP和被测风电机组的输出断路器Qo合闸,将短路断路器QSC分闸,然后,再将旁路断路器QBP分闸,同时将短路断路器QSC合闸;完成空载实验;
第四步:空载试验完成后,采集在串联电抗XS与输出断路器Qo的连接点上接入的数据采集录波器的数据,实现空载试验电压设计跌落深度;
第五步、调整串联电抗XS、并联电抗XSC,改变阻抗分压比,再将旁路断路器QBP分闸,同时将短路断路器QSC合闸;分别将调整后的串联阻抗XS和并联阻抗XSC投入,采集在串联电抗XS与输出断路器Qo的连接点上接入的数据采集录波器的数据,实现希望空载试验电压跌落的深度;
第六步、根据实现的空载试验电压跌落的深度来判断出被测风电机组的低电压穿越能力。
本发明的检测装置串接在风力发电机箱式变压器低压侧690伏与被测风力发点机组690伏的并网开关之间,并联阻抗Xsc 与被测风电机组的连接点为测试点,配置数据采集录波装置,形成一套完整的检测系统。通过调节串联电抗XS与并联阻抗Xsc,改变阻抗分压比,断开旁路断路器QBP 8和闭合短路断路器QSC 12,分别将串联阻抗和并联阻抗投入,在测试点实现期望的电压跌落深度;设定电压跌落持续时间,检测被测风电机组低电压穿越能力是否满足相关标准要求。
Claims (1)
1.一种风电机组低电压穿越能力的检测方法,在高压侧母线(1)与低压侧母线(3)之间设置有变压器(2),在低压侧母线(3)上连接有箱式变压器(4);其特征在于以下步骤:
第一步、将低电压穿越能力检测装置串接在风机箱式变压器的低压侧与被测风电机组的并网开关之间,即,在箱式变压器(4)的低压侧的输入断路器(QI)与被测风电机组的输出断路器(Qo)之间串联接入电抗切换开关(K1 )和串联电抗(XS),并在箱式变压器(4)的低压侧的输入断路器(QI)与被测风电机组的输出断路器(Qo)之间并联接入旁路断路器(QBP),在串联电抗(XS)与输出断路器(Qo)的连接点与地之间依次串联接入并联电抗(XSC)、并联电抗切换开关(K2)和短路断路器(QSC);在串联电抗(XS)与输出断路器(Qo)的连接点上接入数据采集录波器;
第二步、进行跌落方式、跌落深度和持续时间参数配置;
第三步、将与输出断路器(Qo)连接的被测风电机组停机,将箱式变压器(4)的低压侧的输入断路器(QI)、旁路断路器(QBP)和被测风电机组的输出断路器(Qo)合闸,将短路断路器(QSC)分闸,然后,再将旁路断路器(QBP)分闸,同时将短路断路器(QSC)合闸;完成空载实验;
第四步:空载试验完成后,采集在串联电抗(XS)与输出断路器(Qo)的连接点上接入的数据采集录波器的数据,实现空载试验电压设计跌落深度;
第五步、调整串联电抗(XS)、并联电抗(XSC),改变阻抗分压比,再将旁路断路器(QBP)分闸,同时将短路断路器(QSC)合闸;分别将调整后的串联阻抗(XS)和并联阻抗(XSC)投入,采集在串联电抗(XS)与输出断路器(Qo)的连接点上接入的数据采集录波器的数据,实现希望空载试验电压跌落的深度;
第六步、根据实现的空载试验电压跌落的深度来判断出被测风电机组的低电压穿越能力。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711003609.4A CN107843838A (zh) | 2017-10-24 | 2017-10-24 | 一种风电机组低电压穿越能力的检测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711003609.4A CN107843838A (zh) | 2017-10-24 | 2017-10-24 | 一种风电机组低电压穿越能力的检测方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107843838A true CN107843838A (zh) | 2018-03-27 |
Family
ID=61662829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711003609.4A Withdrawn CN107843838A (zh) | 2017-10-24 | 2017-10-24 | 一种风电机组低电压穿越能力的检测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107843838A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109061473A (zh) * | 2018-09-26 | 2018-12-21 | 云南电网有限责任公司电力科学研究院 | 一种风电机组主控制系统电网适应性现场检测系统和方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102684225A (zh) * | 2012-05-25 | 2012-09-19 | 武汉大学 | 一种基于可控电抗器的低电压穿越系统及其测试方法 |
CN203732686U (zh) * | 2013-09-26 | 2014-07-23 | 上海市质量监督检验技术研究院 | 一种用于测量风力发电机的电压跌落模拟发生器 |
CN204154872U (zh) * | 2014-06-13 | 2015-02-11 | 云南电力试验研究院(集团)有限公司电力研究院 | 一种检测火电机组辅机系统低电压穿越能力的装置 |
CN105004951A (zh) * | 2015-07-08 | 2015-10-28 | 上海南自科技股份有限公司 | 电压跌落发生装置 |
CN106532765A (zh) * | 2016-10-20 | 2017-03-22 | 国网福建省电力有限公司 | 考虑相位跳变的风力发电机组低电压穿越能力测试方法 |
-
2017
- 2017-10-24 CN CN201711003609.4A patent/CN107843838A/zh not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102684225A (zh) * | 2012-05-25 | 2012-09-19 | 武汉大学 | 一种基于可控电抗器的低电压穿越系统及其测试方法 |
CN203732686U (zh) * | 2013-09-26 | 2014-07-23 | 上海市质量监督检验技术研究院 | 一种用于测量风力发电机的电压跌落模拟发生器 |
CN204154872U (zh) * | 2014-06-13 | 2015-02-11 | 云南电力试验研究院(集团)有限公司电力研究院 | 一种检测火电机组辅机系统低电压穿越能力的装置 |
CN105004951A (zh) * | 2015-07-08 | 2015-10-28 | 上海南自科技股份有限公司 | 电压跌落发生装置 |
CN106532765A (zh) * | 2016-10-20 | 2017-03-22 | 国网福建省电力有限公司 | 考虑相位跳变的风力发电机组低电压穿越能力测试方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109061473A (zh) * | 2018-09-26 | 2018-12-21 | 云南电网有限责任公司电力科学研究院 | 一种风电机组主控制系统电网适应性现场检测系统和方法 |
CN109061473B (zh) * | 2018-09-26 | 2020-11-03 | 云南电网有限责任公司电力科学研究院 | 一种风电机组主控制系统电网适应性现场检测系统和方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102799722B (zh) | 一种风电场低电压穿越能力仿真验证方法 | |
CN104362667B (zh) | 一种双馈风电机组的高低电压穿越协同控制方法 | |
CN104502795B (zh) | 一种适用于微电网的智能故障诊断方法 | |
CN103412207B (zh) | 基于负序电流注入的光伏并网逆变器孤岛检测方法 | |
CN103576089B (zh) | 一种基于串联动态电压恢复装置的高低电压穿越测试系统 | |
CN104078999B (zh) | 一种双馈风电机组超速脱网临界时间的计算方法 | |
CN102709890A (zh) | 一种考虑光伏电站随机性的配电网保护方法 | |
Lien et al. | A novel fault protection system using communication-assisted digital relays for AC microgrids having a multiple grounding system | |
CN104779644B (zh) | 一种风电场并网稳定性评估方法 | |
Al-Bayati et al. | Aggregated models of wind farms: Current methods and future trends | |
CN103050933A (zh) | 基于单端电流突变量的大型电池储能电站接口保护方法 | |
CN103138289B (zh) | 一种高渗透率风电场的实时数字仿真建模的方法 | |
CN110311415A (zh) | 一种适用于可再生能源发电基地在低电压穿越期间的暂态稳定裕度评估方法 | |
CN103412260A (zh) | 电压跌落发生装置 | |
CN107843838A (zh) | 一种风电机组低电压穿越能力的检测方法 | |
CN103532520B (zh) | 一种防御大规模风电机组连锁脱网的无功补偿装置控制方法 | |
CN205958659U (zh) | 一种高电压穿越测试装置 | |
Kulshrestha et al. | A discrete wavelet transform and rule based decision tree based technique for identification of fault in utility grid network with wind energy | |
Gogula et al. | Fault detection in a distribution network using a combination of a discrete wavelet transform and a neural Network’s radial basis function algorithm to detect high-impedance faults | |
CN206331053U (zh) | 一种多功能电压跌落发生装置 | |
CN108092262B (zh) | 一种计及风电机组脱网时序的故障电流双层迭代算法 | |
Lu et al. | Evaluation of the maximum allowable generation capacity after offshore wind farms are integrated into the existing taipower system-A case study in Taiwan | |
Zhou et al. | Research of Impact of the Direct Drive Wind Farm on Power System Relay Protection | |
Shi et al. | Study on short circuit characteristics of DFIG and its impact on current protection of collector lines in wind farms | |
Prabhu et al. | An intelligent protection scheme for series-compensated transmission lines connecting large-scale wind farms |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180327 |