CN107837989A - The vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint equipment and technique - Google Patents

The vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint equipment and technique Download PDF

Info

Publication number
CN107837989A
CN107837989A CN201711312392.5A CN201711312392A CN107837989A CN 107837989 A CN107837989 A CN 107837989A CN 201711312392 A CN201711312392 A CN 201711312392A CN 107837989 A CN107837989 A CN 107837989A
Authority
CN
China
Prior art keywords
paint
vacuum
workpiece
valve
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711312392.5A
Other languages
Chinese (zh)
Other versions
CN107837989B (en
Inventor
王天林
王冬冬
姜洪强
宫兴海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG TIANTONG ELECTRIC CO Ltd
Original Assignee
SHENYANG TIANTONG ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG TIANTONG ELECTRIC CO Ltd filed Critical SHENYANG TIANTONG ELECTRIC CO Ltd
Priority to CN201711312392.5A priority Critical patent/CN107837989B/en
Publication of CN107837989A publication Critical patent/CN107837989A/en
Application granted granted Critical
Publication of CN107837989B publication Critical patent/CN107837989B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C7/00Apparatus specially designed for applying liquid or other fluent material to the inside of hollow work
    • B05C7/04Apparatus specially designed for applying liquid or other fluent material to the inside of hollow work the liquid or other fluent material flowing or being moved through the work; the work being filled with liquid or other fluent material and emptied
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C11/00Component parts, details or accessories not specifically provided for in groups B05C1/00 - B05C9/00
    • B05C11/10Storage, supply or control of liquid or other fluent material; Recovery of excess liquid or other fluent material
    • B05C11/1002Means for controlling supply, i.e. flow or pressure, of liquid or other fluent material to the applying apparatus, e.g. valves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C9/00Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important
    • B05C9/08Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important for applying liquid or other fluent material and performing an auxiliary operation
    • B05C9/12Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important for applying liquid or other fluent material and performing an auxiliary operation the auxiliary operation being performed after the application
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D1/00Processes for applying liquids or other fluent materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/04Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
    • B05D3/0406Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases the gas being air
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint Processes and apparatus, it is characterised in that equipment is along transmission line arrangement order:Vacuum pump set, paint equipment, exhausting unit, then the vacuum pump set that continues, the equipment of rapid-curing cutback lacquer craftwork are drawn, there is air channel to connect tail gas recycle processing system;Vacuum method draws paint, exhausting unit draws wind and vacuum method quick drying paint is online connecting operation:Program is run according to CNC controlling transmissions chain in work ID code, and processing duration beat is separated by 5~8 minutes, 8~12m/min of transmission speed;Vacuum-pumping valve is opened, and closes other valves, the order for opening vacuum pump set and two vavuum pump automatically controls;Meet that drawing paint after vacuum automatically controls related functionality, carries out drawing paint to workpiece;After drawing paint completely, close after drawing paint valve and open compressed air valve, 0.1~0.2MPa, pressurization is completed, and unlatching connects open to atmosphere valve and back paint valve, and the paint in workpiece is flowed back into storage paint can, turns sequence.

Description

The vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint equipment and technique
Technical field
The present invention relates to manufacture field, extra-high voltage transformer manufacturing, specifically manufactures the radiating of extra-high voltage transformer Draw paint and quick drying paint vacuum method and equipment in device inner chamber.
Background technology
Currently manufactured high voltage extra-high voltage radiator for transformer purpose inner chamber handling process, using non-online Step-by-step processing technology mode.
Gilled radiator is internal in process of production to retain welding slag, debris etc., after being coupled due to radiator with transformer, Transformer oil and lumen of radiator intercommunication in transformer, so lumen of radiator inclusion particles may be to high voltage transformer Safety adversely affects, therefore high to the purity requirements of lumen of radiator, because lumen of radiator is complex-shaped, is not easy Remove clean.Inner chamber needs to prevent inner chamber from getting rusty inner chamber filling painting after the completion of rinsing cleaning, may if producing corrosion There is rust staining, the regulus that rust staining peels off comes off in inner chamber, can produce harm safely to high voltage transformer.Therefore to radiator Complicated inner cavity whether can paint completely in place and ensure product quality critical process, and paint front interior cavity substrate surface will Meet that japanning needs adhesive force requirement is precondition.And current process is:When irrigation lumen oily substance, need A number of radiator, stacking is pushed into hot drying kiln again on flatcar, and this technical process, which can only use, divides The mode of production is walked, more than 150 DEG C is heated to using drying chamber, is kept for more than 60 minutes, promote inner chamber to remain oils in high temperature Inner chamber is evaporated, then flatcar is released to kiln again makes japanning front interior cavity substrate of steel plate surface meet japanning adhesive force technological requirement. Paint is filled using pressurization to lumen of radiator again, i.e., mouth connection storage paint can under the oil collecting pipe of radiator, connection suitable for reading is contained paint bath, used By paint in paint can, the mouth under radiator is pressed into and then makes to paint liquid level jacking in inner chamber air pressure, suitable for reading from inner chamber after filling Untill adapter mouth is flowed into Sheng paint bath, several minutes of stopping pressure then being stood, the paint of pressure of leaking rear interior cavity flows back to storage from Xia Kou and painted In tank, the paint remained in radiator is trickled vertically using product, blowing suitable for reading accelerates surface paint to distribute, and treats down intraoral nothing Paint is considered as standing process when trickling out and terminated.The defects of this way is:Because lumen of radiator area is big, passage and narrow slit More, standing blow-time is longer, and inner chamber paint also wants 100 DEG C or so of specially for carrying out drying, several hours, and the dilution in inner chamber Though agent is gasified through high temperature, but still is contained in inner space, still suffered from after condensation in inner chamber, hidden danger be present.Therefore paint link is filled It is power consumption, exhaust emissions pollution sources, time-consuming production bottleneck.Further disadvantage is that:May remaining to the chamber gap away from inlet and outlet Micro-bubble, this to bear down on one from lower implication into the method for paint, the measure to air bubble problem simply fills repeatedly, it is difficult to disappears Remove micro-bubble.Inner chamber quality is not guaranteed, is the bottleneck problem of current production.
The content of the invention
It is an object of the invention to provide a kind of vacuum of radiator for transformer inner chamber draw paint and vacuum quick drying paint equipment and Technique, solve the problems, such as the inner chamber japanning production bottleneck of radiator, realize lumen of radiator painting process beat 5~10 minutes Line speed of production.
The vacuum of this radiator for transformer inner chamber draw paint and vacuum quick drying paint equipment, including storage paint can, vacuum system, Process control system, tail gas recycle processing system, workshop top set track, chain and its group of motors, air channel, workpiece carrier vehicle And the electric hoist of control lifting, it is characterised in that equipment is along transmission line arrangement order:Vacuum draws paint equipment, exhausting unit, then connects The equipment of continuous vacuum quick drying paint technique, has air channel to connect tail gas recycle processing system;The vacuum pump set and storage for drawing paint equipment paint Tank is connected with workpiece pipeline, and accesses compressed air line between paint valve and vacuum valve drawing drawing for paint pipe, it is ensured that workpiece Inner chamber paint is filled;It is provided with the vacuum pump set being connected with workpiece and holds agent gas recovery condenser, metal bellows, vacuum valve, Store up paint can and configure scalable metal bellows volume compensator, workpiece setting deflation valve suitable for reading;Exhausting unit is arranged on control paint Draw in wind process, the equipment for the vacuum method rapid-curing cutback lacquer craftwork that continues:Provided with agent gas recovery condenser, metal bellows is held, with work Upper and lower vacuum valve is set before the vacuum tube of the upper and lower mouth connection of part oil collecting pipe.
Process:The technique that paint and vacuum quick drying paint equipment processing heat radiator inner chamber are drawn using the vacuum of the present invention, bag Include online processing routine control system, it is characterised in that vacuum method draws paint, exhausting unit draws wind and vacuum method quick drying paint be Line connecting operation:Workpiece adds ID codes, and online processing routine is run according to each technique duration rhythm control chain, has and completely transports Row control is combined with station lift electrical control, and station signal priority;Each work pieces process time beat is separated by 5~8 points Clock, production line transmission speed of service control is at 8~12 ms/min;Process:Workpiece is delivered to station by the electric hoist on transmission line and erected Directly to reach the standard grade, automatic hydraulic clamp device is quickly connected vacuum tube head with the upper and lower mouth flange of workpiece, opens vacuum-pumping valve, and Other valves are closed, the order for opening vacuum pump set and two vavuum pump automatically controls;The automatic control of paint is drawn after meeting vacuum Correlation function valve processed, workpiece is carried out to draw paint;After drawing paint completely, closing opens compressed air valve after drawing paint valve, to inside workpiece Malleation is applied in inflation, 0.1~0.2MPa, the slit of workpiece lumen is completely filled with paint solution, pressurization completion, the open to atmosphere valve of the company of unlatching Door and back paint valve, flow back to storage paint can by the paint in workpiece, turn sequence;
Quick drying paint technological process:Continue and above-mentioned draw lacquerer's sequence, it is characterised in that transmission line by above-mentioned draws lacquerer's sequence in advancing Paint the multigroup collection of the workpiece flow to end and be bonded to air channel, extension connects paint can below each workpiece, and exhausting unit is drawn against the upper and lower mouth of workpiece Wind, 3~5 minutes, enter containing diluent gas and reclaim cold poly- device;The online horizontal of workpiece is to vacuum quick drying paint station, by certainly Hydrodynamic pressure clamping device is quickly connected vacuum tube head with the upper and lower mouth flange of workpiece, vacuum system automatic running, by setting technique Condition and technique beat, upper and lower mouth vacuum valve automatically control, online no worker monitor, abnormal alarm;Make dilute in the paint of inner chamber Transfer process of the agent experience by liquid-vapor-liquid is released, after meeting requirements for automatic control, closes vacuum system, realizes that technique is imitated Fruit.
This technique substitutes existing inner chamber processing mode, and energy-conserving and environment-protective simultaneously improve efficiency and product quality, and are achieved Online production.Lumen of radiator sinks paint under vacuum conditions, inner chamber is fully obtained protection by paints and lacquers, although product cavity is answered It is miscellaneous, but because intracavitary is without air barrier, narrow angle, slit can all have paint to enter, compared at present directly from bottom injection inner chamber Technique, quality will be significantly increased.This technology also makes inner chamber paint quickly drain with vacuum method again, makes what inner chamber was painted Macrodilution agent by narrow and small flange port is able to quickly separate out and extract out out of complexity major lumen, is previous methods so The effect that can not be realized in the short time.Because inner chamber paint has been done before baking, therefore the inventive method instead of special use and add The temperature drying practice, in company with drying in the lump when can be dried with spreader surface paint, saves the energy, emission-free environment protecting and life Production efficiency is increased substantially, and inner chamber paint is quickly separated out and drained, and is achieved On-line Product mass production, while also saves product life Production process transfer sequence, which is stacked, takes factory site.The industrialization for the being embodied as industry upgrading of this technology provides new way.With production Line parallel arrangement tail gas recycle air channel, the paint volatilization gas on each station can be taken in collection centre's timely processing, no Only plant working environment free from extraneous odour, ensure that workers ' health is not encroached on, also reclaimed diluent, it is cost-effective.
Brief description of the drawings
Fig. 1 is that the vacuum method of the present invention draws paint equipment arrangement schematic diagram;
Fig. 2 is the quick drying paint equipment arrangement schematic diagram after blower fan group;
Fig. 3 is to draw lacquer craftwork flow chart using the vacuum method of present device;
Fig. 4 is vacuum method quick drying paint process chart;
Fig. 5 is tail gas recycle processing equipment schematic diagram.
Embodiment
The equipment arrangement order of the present invention:Including storage paint can, vacuum system, process control system, tail gas recycle processing system System, workshop top set track, chain and its group of motors, air channel, hang workpiece carrier vehicle 9 on the transmission line and control lifting Electric hoist 8, it is characterised in that equipment is along transmission line arrangement order:Vacuum draws paint equipment 2, exhausting unit 10, then the true air speed that continues The equipment of dried lacquer technique, there is air channel to connect tail gas recycle processing system;Vacuum method draws paint equipment, adds exhausting unit, then continue The equipment of rapid-curing cutback lacquer craftwork;And there is air channel to connect tail gas recycle processing system.
Vacuum method draws paint equipment:See Fig. 1, vacuum is drawn paint equipment 2 and is connected with compression of metals ripple tank 1, compression of metals ripple Line tank 1 has bleeder valve F7;Vacuum pump set 4 connects solvent gas recovery condenser 5, metal tube 3 to vacuum-pumping valve F1.Work The upper and lower mouth of part 7 is connected by the respective one end of clamping device 6 respectively with vent valve F6, vacuum-pumping valve F1.Vacuum pump set by Two sets of pump groups into, have opening sequence automatic control program and vacuum monitoring and warning device.
Suitable for reading connect is that deflation valve F6a, lower mouth connection vacuum pump set straight tube are vacuum pumping valves with workpiece oil collecting pipe Door F1, what three-way pipe was connected with storage paint can be draw paint valve F2, that be connected compressed air line is charging valve F3.Vacuum method is drawn After painting equipment, exhausting unit 10 is set.
The equipment of rapid-curing cutback lacquer craftwork is set:See Fig. 2, including workpiece transmission line, the vacuum line of upper and lower mouth, its feature exists The solvent gas for having diluent in the vacuum line for the vacuum pump set 4 for having two sets of pumps reclaim cold knockouts 5, scalable metal wave Line pipe 3, mouth valve F5, vacuum under vacuum dried lacquer are set before the vacuum tube connected with the upper and lower mouth of the oil collecting pipe of workpiece 7 by clamping device 6 Dried lacquer deflation valve F6 suitable for reading.
Tail gas recycle processing equipment, is shown in Fig. 5, if two active carbon adsorber V1011A/B, two dry filters G1011A/B is main equipment, and storage is received with processing alternately, if pipeline and the japanning of suction fan UNICOM, control paint, touch-up paint station, and In dipping lacquer room, preheating chamber, hothouse increase suction fan;Workshop VOCs waste gas enters activity by dry filter G1011A/B Enter catalytic burner C1011, processing system through spark arrester Z1011, desorption blower fan F2011 after charcoal absorber V1011A/B, discharge Also set up in system and mend air-cooler F3011, the produced gas for not meeting discharge standard enters back into active carbon adsorber, acceptable gas Discharge main air blower F1011 is discharged in air.
Application method:See Fig. 3, paint equipment is drawn using the vacuum method of the present invention, in online production line, movable type to connect Pipe-line system adapts to the connection of products of different specifications, it is characterised in that workpiece 7 is reached the standard grade by the quick handle of automatic hydraulic clamp device 6 Vacuum tube head is connected with the upper and lower mouth flange of workpiece, opens vacuum-pumping valve F1, opens the suitable of vacuum pump set and two vavuum pump Sequence automatically controls, and closes other valves automatically:Draw paint valve F2, charging valve F3 and deflation valve F4;Vacuum meets will It is automatic after asking to close vacuum pump set 4 and vacuum-pumping valve F1, open and draw paint valve F2;Draw paint it is full after, close in vacuum pump set 4, Draw under paint valve F2 and deflation valve F4 closed modes, open charging valve F3 and apply malleation to filling compressed air inside workpiece 7, make The slit of workpiece lumen is completely filled with liquid;Draw paint to complete, open deflation valve F4, draw paint valve F2, close vacuum-pumping valve F1, charging valve F3, release paint and be back to storage paint can, workpiece turns sequence.
Workpiece is turned in line process by transmission line, mounts paint can under each workpiece at mouth, and enters Xian Shangjifang areas, inner chamber paint stream The multi-group workpiece of hanging is put to collecting on line with blower fan again after to the greatest extent while draws wind, i.e. blower fan exhausting/air draught outward, sets air channel herein Communicated with tail gas recycle processing system.
Quick drying paint technological process:See Fig. 4, it is characterised in that the horizontal of workpiece 7, workpiece, which is reached the standard grade, passes through automatic hydraulic clamp device 6 are quickly connected vacuum tube head with the upper and lower mouth flange of workpiece, and Moveable pipeline system adapts to the connection of products of different specifications.Open Open vacuum pump set 4 and vavuum pump order automatically controls, exception, which occurs, in vacuum alarm, and solvent gas reclaim cold knockouts 5, made Diluent completes the transfer process by liquid-vapor-liquid;Equipment automatic running, by setting process conditions and technique beat, with Vacuum dried lacquer valve F5, the connection workpiece deflation valve F6 suitable for reading that vacuum pump set 4 connects are automatically controlled, online unmanned prison Control, abnormal alarm;After meeting requirements for automatic control, vacuum pump set 4 is closed, completion turns sequence.

Claims (4)

1. a kind of vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint equipment, including storage paint can, vacuum system, work Skill control system, tail gas recycle processing system, set at the top of workshop track, chain and its group of motors, air channel, workpiece carrier vehicle and Control the electric hoist of lifting, it is characterised in that equipment is along transmission line arrangement order:Vacuum draws paint equipment, exhausting unit, then continues The equipment of vacuum quick drying paint technique, there is air channel to connect tail gas recycle processing system;Draw the vacuum pump set and storage paint can of paint equipment It is connected with workpiece pipeline, and compressed air line is accessed between paint valve and vacuum valve drawing drawing for paint pipe, it is ensured that in workpiece Chamber paint is filled;It is provided with the vacuum pump set being connected with workpiece and holds agent gas recovery condenser, metal bellows, vacuum valve, storage Paint can configures scalable metal bellows volume compensator, workpiece setting deflation valve suitable for reading;Exhausting unit is arranged on control paint and drawn In wind process, the equipment for the vacuum method rapid-curing cutback lacquer craftwork that continues:Provided with agent gas recovery condenser, metal bellows is held, with workpiece Upper and lower vacuum valve is set before the vacuum tube of the upper and lower mouth connection of oil collecting pipe.
2. the vacuum of radiator for transformer inner chamber according to claim 1 draws paint and vacuum quick drying paint equipment, its feature It is and production line parallel arrangement tail gas recycle air channel, tail gas recycle processing equipment:If two active carbon adsorber (V1011A/ B), two dry filters (G1011A/B) are main equipment, and storage is received with processing alternately, if pipeline and suction fan UNICOM apply Paint, control paint, touch-up paint station, and in dipping lacquer room, preheating chamber, hothouse increase suction fan;Workshop VOCs waste gas passes through dry type mistake Filter (G1011A/B) enters after active carbon adsorber (V1011A/B), discharge through spark arrester (Z1011), desorption blower fan (F2011) enter catalytic burner (C1011), also set up in processing system and mend air-cooler (F3011), it is produced not meet discharge The gas of standard enters back into active carbon adsorber, and acceptable gas discharge main air blower (F1011) is discharged in air.
3. usage right requires that 1 vacuum draws the technique of paint and vacuum quick drying paint equipment processing heat radiator inner chamber, including online Processing routine control system, it is characterised in that vacuum method draws paint, exhausting unit draws wind and vacuum method quick drying paint is to continue online Operation:Workpiece adds ID codes, and online processing routine is run according to each technique duration rhythm control chain, there is completely operation control Combined with station lift electrical control, and station signal priority;Each work pieces process time beat is separated by 5~8 minutes, produces Line transmission speed of service control is in 8~12m/min;Process:Workpiece is delivered to station by the electric hoist on transmission line and reached the standard grade vertically, from Hydrodynamic pressure clamping device is quickly connected vacuum tube head with the upper and lower mouth flange of workpiece, opens vacuum-pumping valve, and close other valves Door, the order for opening vacuum pump set and two vavuum pump automatically control;Meet that drawing paint after vacuum automatically controls correlation function Valve, workpiece is carried out to draw paint;After drawing paint completely, closing opens compressed air valve after drawing paint valve, and malleation is applied to inside workpiece inflation, 0.1~0.2MPa, the slit of workpiece lumen is set to be completely filled with paint solution, pressurization completion, the open to atmosphere valve of the company of unlatching and back paint valve Door, flows back to storage paint can by the paint in workpiece, turns sequence.
4. the technique that vacuum described in claim 3 draws paint and vacuum quick drying paint equipment processing heat radiator inner chamber, it is characterised in that speed Dried lacquer technological process:Continue it is above-mentioned draw lacquerer's sequence, transmission line advance in by the above-mentioned multigroup set of workpiece drawn lacquerer's sequence paint and flow to end To air channel, extension connects paint can below each workpiece, and exhausting unit draws wind against the upper and lower mouth of workpiece, 3~5 minutes, contains diluent Gas, which enters, reclaims cold poly- device;The online horizontal of workpiece is to vacuum quick drying paint station, by automatic hydraulic clamp device quickly true Blank pipe head is connected with the upper and lower mouth flange of workpiece, vacuum system automatic running, by setting process conditions and technique beat, upper and lower mouth Vacuum valve automatically controls, online no worker monitor, abnormal alarm;The diluent in the paint of inner chamber is set to undergo by liquid-vapor-liquid The transfer process of state, after meeting requirements for automatic control, vacuum system is closed, realizes technological effect.
CN201711312392.5A 2017-12-08 2017-12-08 Vacuum paint sucking and vacuum quick-drying equipment and process for radiator inner cavity of transformer Active CN107837989B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711312392.5A CN107837989B (en) 2017-12-08 2017-12-08 Vacuum paint sucking and vacuum quick-drying equipment and process for radiator inner cavity of transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711312392.5A CN107837989B (en) 2017-12-08 2017-12-08 Vacuum paint sucking and vacuum quick-drying equipment and process for radiator inner cavity of transformer

Publications (2)

Publication Number Publication Date
CN107837989A true CN107837989A (en) 2018-03-27
CN107837989B CN107837989B (en) 2023-03-10

Family

ID=61664760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711312392.5A Active CN107837989B (en) 2017-12-08 2017-12-08 Vacuum paint sucking and vacuum quick-drying equipment and process for radiator inner cavity of transformer

Country Status (1)

Country Link
CN (1) CN107837989B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110681521A (en) * 2018-07-05 2020-01-14 艾森曼欧洲公司 Processing apparatus and method for processing workpieces
CN111744728A (en) * 2020-07-07 2020-10-09 山东交通学院 Anti-corrosion treatment device for transformer shell
CN114054263A (en) * 2020-08-03 2022-02-18 龚海涛 Oil applying device for inner wall of welded pipe
CN114121424A (en) * 2021-11-26 2022-03-01 保定新胜冷却设备有限公司 Method and device for filling paint into inner wall of finned radiator for transformer

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000001770A (en) * 1998-06-18 2000-01-07 Ulvac Corp Vapor deposition apparatus for generating trigger discharge by using transformer
CN1927473A (en) * 2006-09-20 2007-03-14 潍坊市阿波罗散热器制造有限公司 Vacuum coating technique for anticorrosive coating in heat sink and dedicated device thereof
CN201030352Y (en) * 2007-03-22 2008-03-05 刘效堂 Conservation device inside heating radiator
CN205146609U (en) * 2015-11-30 2016-04-13 衡阳金化高压容器股份有限公司 Transformer fin inner wall painting device
CN205673140U (en) * 2016-06-12 2016-11-09 乐清市精创机械制造有限公司 A kind of vacuum pressure impregnated with varnish
CN205886514U (en) * 2016-08-11 2017-01-18 杭州佳德环保科技有限公司 Paint spraying waste gas treatment device
CN106881237A (en) * 2015-12-16 2017-06-23 株洲时代新材料科技股份有限公司 Vacuum hydraulic immersion system and dipping method
CN207628684U (en) * 2017-12-08 2018-07-20 沈阳天通电气有限公司 The vacuum of radiator for transformer inner cavity draws paint and vacuum quick drying paint equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000001770A (en) * 1998-06-18 2000-01-07 Ulvac Corp Vapor deposition apparatus for generating trigger discharge by using transformer
CN1927473A (en) * 2006-09-20 2007-03-14 潍坊市阿波罗散热器制造有限公司 Vacuum coating technique for anticorrosive coating in heat sink and dedicated device thereof
CN201030352Y (en) * 2007-03-22 2008-03-05 刘效堂 Conservation device inside heating radiator
CN205146609U (en) * 2015-11-30 2016-04-13 衡阳金化高压容器股份有限公司 Transformer fin inner wall painting device
CN106881237A (en) * 2015-12-16 2017-06-23 株洲时代新材料科技股份有限公司 Vacuum hydraulic immersion system and dipping method
CN205673140U (en) * 2016-06-12 2016-11-09 乐清市精创机械制造有限公司 A kind of vacuum pressure impregnated with varnish
CN205886514U (en) * 2016-08-11 2017-01-18 杭州佳德环保科技有限公司 Paint spraying waste gas treatment device
CN207628684U (en) * 2017-12-08 2018-07-20 沈阳天通电气有限公司 The vacuum of radiator for transformer inner cavity draws paint and vacuum quick drying paint equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110681521A (en) * 2018-07-05 2020-01-14 艾森曼欧洲公司 Processing apparatus and method for processing workpieces
CN110681521B (en) * 2018-07-05 2023-09-01 艾森曼有限公司 Processing apparatus and method for processing a workpiece
CN111744728A (en) * 2020-07-07 2020-10-09 山东交通学院 Anti-corrosion treatment device for transformer shell
CN114054263A (en) * 2020-08-03 2022-02-18 龚海涛 Oil applying device for inner wall of welded pipe
CN114054263B (en) * 2020-08-03 2023-04-07 龚海涛 Oil applying device for inner wall of welded pipe
CN114121424A (en) * 2021-11-26 2022-03-01 保定新胜冷却设备有限公司 Method and device for filling paint into inner wall of finned radiator for transformer
CN114121424B (en) * 2021-11-26 2024-09-20 保定新胜冷却设备有限公司 Paint filling method and device for inner wall of finned radiator for transformer

Also Published As

Publication number Publication date
CN107837989B (en) 2023-03-10

Similar Documents

Publication Publication Date Title
CN107837989A (en) The vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint equipment and technique
CN206215437U (en) A kind of compact intelligent painting line
CN205074282U (en) High pressure cleaning machine
CN102327719A (en) System and method for treating exhaust gas generated during varnish baking by using water for industrial cycle
CN104084356A (en) Environment-friendly paint painting production line
CN206199588U (en) Aluminium section bar Horizontal type automatic shower coat production line
CN105457820A (en) Intelligent production line with segmental speed change and flexible butt-joint spraying
CN108079738B (en) Energy-saving environment-friendly circulating type waste gas treatment method applied to paint spraying and baking process
CN104014458A (en) Automatic paint-spraying assembly line device
CN108273701B (en) Process of automatic production line equipment for processing paint on outer surface of radiator
CN207628684U (en) The vacuum of radiator for transformer inner cavity draws paint and vacuum quick drying paint equipment
CN108063041B (en) A kind of on-line processing method and equipment manufacturing high-tension transformer lumen of radiator
CN108686873A (en) A kind of electric automatization spray-painting plant
CN203935975U (en) A kind of auto spray painting flow-line equipment
CN117797994A (en) Paint spraying circulation loop production system and production method thereof
CN204034929U (en) Warming plate automatic spraying machine
CN204035134U (en) Vacuum drying oven cleaning device
CN112076931A (en) Track traffic integral wheel coating production line and use method thereof
CN210815833U (en) Quick spraying device that sprays paint of car panel beating
CN218223001U (en) Large-scale facade automatic paint spraying system
CN218653429U (en) Waste gas collecting and treating device
CN106733348A (en) A kind of automobile door handle automatic application product line
CN114558423B (en) Asphalt flue gas coke powder injection adsorption purification device
CN114984678A (en) Waste gas collecting and treating device
CN201493220U (en) Spraying and baking dual-use device with air supply system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant