CN107837989A - The vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint equipment and technique - Google Patents
The vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint equipment and technique Download PDFInfo
- Publication number
- CN107837989A CN107837989A CN201711312392.5A CN201711312392A CN107837989A CN 107837989 A CN107837989 A CN 107837989A CN 201711312392 A CN201711312392 A CN 201711312392A CN 107837989 A CN107837989 A CN 107837989A
- Authority
- CN
- China
- Prior art keywords
- paint
- vacuum
- workpiece
- valve
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C—APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C7/00—Apparatus specially designed for applying liquid or other fluent material to the inside of hollow work
- B05C7/04—Apparatus specially designed for applying liquid or other fluent material to the inside of hollow work the liquid or other fluent material flowing or being moved through the work; the work being filled with liquid or other fluent material and emptied
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C—APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C11/00—Component parts, details or accessories not specifically provided for in groups B05C1/00 - B05C9/00
- B05C11/10—Storage, supply or control of liquid or other fluent material; Recovery of excess liquid or other fluent material
- B05C11/1002—Means for controlling supply, i.e. flow or pressure, of liquid or other fluent material to the applying apparatus, e.g. valves
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C—APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C9/00—Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important
- B05C9/08—Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important for applying liquid or other fluent material and performing an auxiliary operation
- B05C9/12—Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important for applying liquid or other fluent material and performing an auxiliary operation the auxiliary operation being performed after the application
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D1/00—Processes for applying liquids or other fluent materials
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/04—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
- B05D3/0406—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases the gas being air
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
The vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint Processes and apparatus, it is characterised in that equipment is along transmission line arrangement order:Vacuum pump set, paint equipment, exhausting unit, then the vacuum pump set that continues, the equipment of rapid-curing cutback lacquer craftwork are drawn, there is air channel to connect tail gas recycle processing system;Vacuum method draws paint, exhausting unit draws wind and vacuum method quick drying paint is online connecting operation:Program is run according to CNC controlling transmissions chain in work ID code, and processing duration beat is separated by 5~8 minutes, 8~12m/min of transmission speed;Vacuum-pumping valve is opened, and closes other valves, the order for opening vacuum pump set and two vavuum pump automatically controls;Meet that drawing paint after vacuum automatically controls related functionality, carries out drawing paint to workpiece;After drawing paint completely, close after drawing paint valve and open compressed air valve, 0.1~0.2MPa, pressurization is completed, and unlatching connects open to atmosphere valve and back paint valve, and the paint in workpiece is flowed back into storage paint can, turns sequence.
Description
Technical field
The present invention relates to manufacture field, extra-high voltage transformer manufacturing, specifically manufactures the radiating of extra-high voltage transformer
Draw paint and quick drying paint vacuum method and equipment in device inner chamber.
Background technology
Currently manufactured high voltage extra-high voltage radiator for transformer purpose inner chamber handling process, using non-online
Step-by-step processing technology mode.
Gilled radiator is internal in process of production to retain welding slag, debris etc., after being coupled due to radiator with transformer,
Transformer oil and lumen of radiator intercommunication in transformer, so lumen of radiator inclusion particles may be to high voltage transformer
Safety adversely affects, therefore high to the purity requirements of lumen of radiator, because lumen of radiator is complex-shaped, is not easy
Remove clean.Inner chamber needs to prevent inner chamber from getting rusty inner chamber filling painting after the completion of rinsing cleaning, may if producing corrosion
There is rust staining, the regulus that rust staining peels off comes off in inner chamber, can produce harm safely to high voltage transformer.Therefore to radiator
Complicated inner cavity whether can paint completely in place and ensure product quality critical process, and paint front interior cavity substrate surface will
Meet that japanning needs adhesive force requirement is precondition.And current process is:When irrigation lumen oily substance, need
A number of radiator, stacking is pushed into hot drying kiln again on flatcar, and this technical process, which can only use, divides
The mode of production is walked, more than 150 DEG C is heated to using drying chamber, is kept for more than 60 minutes, promote inner chamber to remain oils in high temperature
Inner chamber is evaporated, then flatcar is released to kiln again makes japanning front interior cavity substrate of steel plate surface meet japanning adhesive force technological requirement.
Paint is filled using pressurization to lumen of radiator again, i.e., mouth connection storage paint can under the oil collecting pipe of radiator, connection suitable for reading is contained paint bath, used
By paint in paint can, the mouth under radiator is pressed into and then makes to paint liquid level jacking in inner chamber air pressure, suitable for reading from inner chamber after filling
Untill adapter mouth is flowed into Sheng paint bath, several minutes of stopping pressure then being stood, the paint of pressure of leaking rear interior cavity flows back to storage from Xia Kou and painted
In tank, the paint remained in radiator is trickled vertically using product, blowing suitable for reading accelerates surface paint to distribute, and treats down intraoral nothing
Paint is considered as standing process when trickling out and terminated.The defects of this way is:Because lumen of radiator area is big, passage and narrow slit
More, standing blow-time is longer, and inner chamber paint also wants 100 DEG C or so of specially for carrying out drying, several hours, and the dilution in inner chamber
Though agent is gasified through high temperature, but still is contained in inner space, still suffered from after condensation in inner chamber, hidden danger be present.Therefore paint link is filled
It is power consumption, exhaust emissions pollution sources, time-consuming production bottleneck.Further disadvantage is that:May remaining to the chamber gap away from inlet and outlet
Micro-bubble, this to bear down on one from lower implication into the method for paint, the measure to air bubble problem simply fills repeatedly, it is difficult to disappears
Remove micro-bubble.Inner chamber quality is not guaranteed, is the bottleneck problem of current production.
The content of the invention
It is an object of the invention to provide a kind of vacuum of radiator for transformer inner chamber draw paint and vacuum quick drying paint equipment and
Technique, solve the problems, such as the inner chamber japanning production bottleneck of radiator, realize lumen of radiator painting process beat 5~10 minutes
Line speed of production.
The vacuum of this radiator for transformer inner chamber draw paint and vacuum quick drying paint equipment, including storage paint can, vacuum system,
Process control system, tail gas recycle processing system, workshop top set track, chain and its group of motors, air channel, workpiece carrier vehicle
And the electric hoist of control lifting, it is characterised in that equipment is along transmission line arrangement order:Vacuum draws paint equipment, exhausting unit, then connects
The equipment of continuous vacuum quick drying paint technique, has air channel to connect tail gas recycle processing system;The vacuum pump set and storage for drawing paint equipment paint
Tank is connected with workpiece pipeline, and accesses compressed air line between paint valve and vacuum valve drawing drawing for paint pipe, it is ensured that workpiece
Inner chamber paint is filled;It is provided with the vacuum pump set being connected with workpiece and holds agent gas recovery condenser, metal bellows, vacuum valve,
Store up paint can and configure scalable metal bellows volume compensator, workpiece setting deflation valve suitable for reading;Exhausting unit is arranged on control paint
Draw in wind process, the equipment for the vacuum method rapid-curing cutback lacquer craftwork that continues:Provided with agent gas recovery condenser, metal bellows is held, with work
Upper and lower vacuum valve is set before the vacuum tube of the upper and lower mouth connection of part oil collecting pipe.
Process:The technique that paint and vacuum quick drying paint equipment processing heat radiator inner chamber are drawn using the vacuum of the present invention, bag
Include online processing routine control system, it is characterised in that vacuum method draws paint, exhausting unit draws wind and vacuum method quick drying paint be
Line connecting operation:Workpiece adds ID codes, and online processing routine is run according to each technique duration rhythm control chain, has and completely transports
Row control is combined with station lift electrical control, and station signal priority;Each work pieces process time beat is separated by 5~8 points
Clock, production line transmission speed of service control is at 8~12 ms/min;Process:Workpiece is delivered to station by the electric hoist on transmission line and erected
Directly to reach the standard grade, automatic hydraulic clamp device is quickly connected vacuum tube head with the upper and lower mouth flange of workpiece, opens vacuum-pumping valve, and
Other valves are closed, the order for opening vacuum pump set and two vavuum pump automatically controls;The automatic control of paint is drawn after meeting vacuum
Correlation function valve processed, workpiece is carried out to draw paint;After drawing paint completely, closing opens compressed air valve after drawing paint valve, to inside workpiece
Malleation is applied in inflation, 0.1~0.2MPa, the slit of workpiece lumen is completely filled with paint solution, pressurization completion, the open to atmosphere valve of the company of unlatching
Door and back paint valve, flow back to storage paint can by the paint in workpiece, turn sequence;
Quick drying paint technological process:Continue and above-mentioned draw lacquerer's sequence, it is characterised in that transmission line by above-mentioned draws lacquerer's sequence in advancing
Paint the multigroup collection of the workpiece flow to end and be bonded to air channel, extension connects paint can below each workpiece, and exhausting unit is drawn against the upper and lower mouth of workpiece
Wind, 3~5 minutes, enter containing diluent gas and reclaim cold poly- device;The online horizontal of workpiece is to vacuum quick drying paint station, by certainly
Hydrodynamic pressure clamping device is quickly connected vacuum tube head with the upper and lower mouth flange of workpiece, vacuum system automatic running, by setting technique
Condition and technique beat, upper and lower mouth vacuum valve automatically control, online no worker monitor, abnormal alarm;Make dilute in the paint of inner chamber
Transfer process of the agent experience by liquid-vapor-liquid is released, after meeting requirements for automatic control, closes vacuum system, realizes that technique is imitated
Fruit.
This technique substitutes existing inner chamber processing mode, and energy-conserving and environment-protective simultaneously improve efficiency and product quality, and are achieved
Online production.Lumen of radiator sinks paint under vacuum conditions, inner chamber is fully obtained protection by paints and lacquers, although product cavity is answered
It is miscellaneous, but because intracavitary is without air barrier, narrow angle, slit can all have paint to enter, compared at present directly from bottom injection inner chamber
Technique, quality will be significantly increased.This technology also makes inner chamber paint quickly drain with vacuum method again, makes what inner chamber was painted
Macrodilution agent by narrow and small flange port is able to quickly separate out and extract out out of complexity major lumen, is previous methods so
The effect that can not be realized in the short time.Because inner chamber paint has been done before baking, therefore the inventive method instead of special use and add
The temperature drying practice, in company with drying in the lump when can be dried with spreader surface paint, saves the energy, emission-free environment protecting and life
Production efficiency is increased substantially, and inner chamber paint is quickly separated out and drained, and is achieved On-line Product mass production, while also saves product life
Production process transfer sequence, which is stacked, takes factory site.The industrialization for the being embodied as industry upgrading of this technology provides new way.With production
Line parallel arrangement tail gas recycle air channel, the paint volatilization gas on each station can be taken in collection centre's timely processing, no
Only plant working environment free from extraneous odour, ensure that workers ' health is not encroached on, also reclaimed diluent, it is cost-effective.
Brief description of the drawings
Fig. 1 is that the vacuum method of the present invention draws paint equipment arrangement schematic diagram;
Fig. 2 is the quick drying paint equipment arrangement schematic diagram after blower fan group;
Fig. 3 is to draw lacquer craftwork flow chart using the vacuum method of present device;
Fig. 4 is vacuum method quick drying paint process chart;
Fig. 5 is tail gas recycle processing equipment schematic diagram.
Embodiment
The equipment arrangement order of the present invention:Including storage paint can, vacuum system, process control system, tail gas recycle processing system
System, workshop top set track, chain and its group of motors, air channel, hang workpiece carrier vehicle 9 on the transmission line and control lifting
Electric hoist 8, it is characterised in that equipment is along transmission line arrangement order:Vacuum draws paint equipment 2, exhausting unit 10, then the true air speed that continues
The equipment of dried lacquer technique, there is air channel to connect tail gas recycle processing system;Vacuum method draws paint equipment, adds exhausting unit, then continue
The equipment of rapid-curing cutback lacquer craftwork;And there is air channel to connect tail gas recycle processing system.
Vacuum method draws paint equipment:See Fig. 1, vacuum is drawn paint equipment 2 and is connected with compression of metals ripple tank 1, compression of metals ripple
Line tank 1 has bleeder valve F7;Vacuum pump set 4 connects solvent gas recovery condenser 5, metal tube 3 to vacuum-pumping valve F1.Work
The upper and lower mouth of part 7 is connected by the respective one end of clamping device 6 respectively with vent valve F6, vacuum-pumping valve F1.Vacuum pump set by
Two sets of pump groups into, have opening sequence automatic control program and vacuum monitoring and warning device.
Suitable for reading connect is that deflation valve F6a, lower mouth connection vacuum pump set straight tube are vacuum pumping valves with workpiece oil collecting pipe
Door F1, what three-way pipe was connected with storage paint can be draw paint valve F2, that be connected compressed air line is charging valve F3.Vacuum method is drawn
After painting equipment, exhausting unit 10 is set.
The equipment of rapid-curing cutback lacquer craftwork is set:See Fig. 2, including workpiece transmission line, the vacuum line of upper and lower mouth, its feature exists
The solvent gas for having diluent in the vacuum line for the vacuum pump set 4 for having two sets of pumps reclaim cold knockouts 5, scalable metal wave
Line pipe 3, mouth valve F5, vacuum under vacuum dried lacquer are set before the vacuum tube connected with the upper and lower mouth of the oil collecting pipe of workpiece 7 by clamping device 6
Dried lacquer deflation valve F6 suitable for reading.
Tail gas recycle processing equipment, is shown in Fig. 5, if two active carbon adsorber V1011A/B, two dry filters
G1011A/B is main equipment, and storage is received with processing alternately, if pipeline and the japanning of suction fan UNICOM, control paint, touch-up paint station, and
In dipping lacquer room, preheating chamber, hothouse increase suction fan;Workshop VOCs waste gas enters activity by dry filter G1011A/B
Enter catalytic burner C1011, processing system through spark arrester Z1011, desorption blower fan F2011 after charcoal absorber V1011A/B, discharge
Also set up in system and mend air-cooler F3011, the produced gas for not meeting discharge standard enters back into active carbon adsorber, acceptable gas
Discharge main air blower F1011 is discharged in air.
Application method:See Fig. 3, paint equipment is drawn using the vacuum method of the present invention, in online production line, movable type to connect
Pipe-line system adapts to the connection of products of different specifications, it is characterised in that workpiece 7 is reached the standard grade by the quick handle of automatic hydraulic clamp device 6
Vacuum tube head is connected with the upper and lower mouth flange of workpiece, opens vacuum-pumping valve F1, opens the suitable of vacuum pump set and two vavuum pump
Sequence automatically controls, and closes other valves automatically:Draw paint valve F2, charging valve F3 and deflation valve F4;Vacuum meets will
It is automatic after asking to close vacuum pump set 4 and vacuum-pumping valve F1, open and draw paint valve F2;Draw paint it is full after, close in vacuum pump set 4,
Draw under paint valve F2 and deflation valve F4 closed modes, open charging valve F3 and apply malleation to filling compressed air inside workpiece 7, make
The slit of workpiece lumen is completely filled with liquid;Draw paint to complete, open deflation valve F4, draw paint valve F2, close vacuum-pumping valve
F1, charging valve F3, release paint and be back to storage paint can, workpiece turns sequence.
Workpiece is turned in line process by transmission line, mounts paint can under each workpiece at mouth, and enters Xian Shangjifang areas, inner chamber paint stream
The multi-group workpiece of hanging is put to collecting on line with blower fan again after to the greatest extent while draws wind, i.e. blower fan exhausting/air draught outward, sets air channel herein
Communicated with tail gas recycle processing system.
Quick drying paint technological process:See Fig. 4, it is characterised in that the horizontal of workpiece 7, workpiece, which is reached the standard grade, passes through automatic hydraulic clamp device
6 are quickly connected vacuum tube head with the upper and lower mouth flange of workpiece, and Moveable pipeline system adapts to the connection of products of different specifications.Open
Open vacuum pump set 4 and vavuum pump order automatically controls, exception, which occurs, in vacuum alarm, and solvent gas reclaim cold knockouts 5, made
Diluent completes the transfer process by liquid-vapor-liquid;Equipment automatic running, by setting process conditions and technique beat, with
Vacuum dried lacquer valve F5, the connection workpiece deflation valve F6 suitable for reading that vacuum pump set 4 connects are automatically controlled, online unmanned prison
Control, abnormal alarm;After meeting requirements for automatic control, vacuum pump set 4 is closed, completion turns sequence.
Claims (4)
1. a kind of vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint equipment, including storage paint can, vacuum system, work
Skill control system, tail gas recycle processing system, set at the top of workshop track, chain and its group of motors, air channel, workpiece carrier vehicle and
Control the electric hoist of lifting, it is characterised in that equipment is along transmission line arrangement order:Vacuum draws paint equipment, exhausting unit, then continues
The equipment of vacuum quick drying paint technique, there is air channel to connect tail gas recycle processing system;Draw the vacuum pump set and storage paint can of paint equipment
It is connected with workpiece pipeline, and compressed air line is accessed between paint valve and vacuum valve drawing drawing for paint pipe, it is ensured that in workpiece
Chamber paint is filled;It is provided with the vacuum pump set being connected with workpiece and holds agent gas recovery condenser, metal bellows, vacuum valve, storage
Paint can configures scalable metal bellows volume compensator, workpiece setting deflation valve suitable for reading;Exhausting unit is arranged on control paint and drawn
In wind process, the equipment for the vacuum method rapid-curing cutback lacquer craftwork that continues:Provided with agent gas recovery condenser, metal bellows is held, with workpiece
Upper and lower vacuum valve is set before the vacuum tube of the upper and lower mouth connection of oil collecting pipe.
2. the vacuum of radiator for transformer inner chamber according to claim 1 draws paint and vacuum quick drying paint equipment, its feature
It is and production line parallel arrangement tail gas recycle air channel, tail gas recycle processing equipment:If two active carbon adsorber (V1011A/
B), two dry filters (G1011A/B) are main equipment, and storage is received with processing alternately, if pipeline and suction fan UNICOM apply
Paint, control paint, touch-up paint station, and in dipping lacquer room, preheating chamber, hothouse increase suction fan;Workshop VOCs waste gas passes through dry type mistake
Filter (G1011A/B) enters after active carbon adsorber (V1011A/B), discharge through spark arrester (Z1011), desorption blower fan
(F2011) enter catalytic burner (C1011), also set up in processing system and mend air-cooler (F3011), it is produced not meet discharge
The gas of standard enters back into active carbon adsorber, and acceptable gas discharge main air blower (F1011) is discharged in air.
3. usage right requires that 1 vacuum draws the technique of paint and vacuum quick drying paint equipment processing heat radiator inner chamber, including online
Processing routine control system, it is characterised in that vacuum method draws paint, exhausting unit draws wind and vacuum method quick drying paint is to continue online
Operation:Workpiece adds ID codes, and online processing routine is run according to each technique duration rhythm control chain, there is completely operation control
Combined with station lift electrical control, and station signal priority;Each work pieces process time beat is separated by 5~8 minutes, produces
Line transmission speed of service control is in 8~12m/min;Process:Workpiece is delivered to station by the electric hoist on transmission line and reached the standard grade vertically, from
Hydrodynamic pressure clamping device is quickly connected vacuum tube head with the upper and lower mouth flange of workpiece, opens vacuum-pumping valve, and close other valves
Door, the order for opening vacuum pump set and two vavuum pump automatically control;Meet that drawing paint after vacuum automatically controls correlation function
Valve, workpiece is carried out to draw paint;After drawing paint completely, closing opens compressed air valve after drawing paint valve, and malleation is applied to inside workpiece inflation,
0.1~0.2MPa, the slit of workpiece lumen is set to be completely filled with paint solution, pressurization completion, the open to atmosphere valve of the company of unlatching and back paint valve
Door, flows back to storage paint can by the paint in workpiece, turns sequence.
4. the technique that vacuum described in claim 3 draws paint and vacuum quick drying paint equipment processing heat radiator inner chamber, it is characterised in that speed
Dried lacquer technological process:Continue it is above-mentioned draw lacquerer's sequence, transmission line advance in by the above-mentioned multigroup set of workpiece drawn lacquerer's sequence paint and flow to end
To air channel, extension connects paint can below each workpiece, and exhausting unit draws wind against the upper and lower mouth of workpiece, 3~5 minutes, contains diluent
Gas, which enters, reclaims cold poly- device;The online horizontal of workpiece is to vacuum quick drying paint station, by automatic hydraulic clamp device quickly true
Blank pipe head is connected with the upper and lower mouth flange of workpiece, vacuum system automatic running, by setting process conditions and technique beat, upper and lower mouth
Vacuum valve automatically controls, online no worker monitor, abnormal alarm;The diluent in the paint of inner chamber is set to undergo by liquid-vapor-liquid
The transfer process of state, after meeting requirements for automatic control, vacuum system is closed, realizes technological effect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711312392.5A CN107837989B (en) | 2017-12-08 | 2017-12-08 | Vacuum paint sucking and vacuum quick-drying equipment and process for radiator inner cavity of transformer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711312392.5A CN107837989B (en) | 2017-12-08 | 2017-12-08 | Vacuum paint sucking and vacuum quick-drying equipment and process for radiator inner cavity of transformer |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107837989A true CN107837989A (en) | 2018-03-27 |
CN107837989B CN107837989B (en) | 2023-03-10 |
Family
ID=61664760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711312392.5A Active CN107837989B (en) | 2017-12-08 | 2017-12-08 | Vacuum paint sucking and vacuum quick-drying equipment and process for radiator inner cavity of transformer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107837989B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110681521A (en) * | 2018-07-05 | 2020-01-14 | 艾森曼欧洲公司 | Processing apparatus and method for processing workpieces |
CN111744728A (en) * | 2020-07-07 | 2020-10-09 | 山东交通学院 | Anti-corrosion treatment device for transformer shell |
CN114054263A (en) * | 2020-08-03 | 2022-02-18 | 龚海涛 | Oil applying device for inner wall of welded pipe |
CN114121424A (en) * | 2021-11-26 | 2022-03-01 | 保定新胜冷却设备有限公司 | Method and device for filling paint into inner wall of finned radiator for transformer |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000001770A (en) * | 1998-06-18 | 2000-01-07 | Ulvac Corp | Vapor deposition apparatus for generating trigger discharge by using transformer |
CN1927473A (en) * | 2006-09-20 | 2007-03-14 | 潍坊市阿波罗散热器制造有限公司 | Vacuum coating technique for anticorrosive coating in heat sink and dedicated device thereof |
CN201030352Y (en) * | 2007-03-22 | 2008-03-05 | 刘效堂 | Conservation device inside heating radiator |
CN205146609U (en) * | 2015-11-30 | 2016-04-13 | 衡阳金化高压容器股份有限公司 | Transformer fin inner wall painting device |
CN205673140U (en) * | 2016-06-12 | 2016-11-09 | 乐清市精创机械制造有限公司 | A kind of vacuum pressure impregnated with varnish |
CN205886514U (en) * | 2016-08-11 | 2017-01-18 | 杭州佳德环保科技有限公司 | Paint spraying waste gas treatment device |
CN106881237A (en) * | 2015-12-16 | 2017-06-23 | 株洲时代新材料科技股份有限公司 | Vacuum hydraulic immersion system and dipping method |
CN207628684U (en) * | 2017-12-08 | 2018-07-20 | 沈阳天通电气有限公司 | The vacuum of radiator for transformer inner cavity draws paint and vacuum quick drying paint equipment |
-
2017
- 2017-12-08 CN CN201711312392.5A patent/CN107837989B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000001770A (en) * | 1998-06-18 | 2000-01-07 | Ulvac Corp | Vapor deposition apparatus for generating trigger discharge by using transformer |
CN1927473A (en) * | 2006-09-20 | 2007-03-14 | 潍坊市阿波罗散热器制造有限公司 | Vacuum coating technique for anticorrosive coating in heat sink and dedicated device thereof |
CN201030352Y (en) * | 2007-03-22 | 2008-03-05 | 刘效堂 | Conservation device inside heating radiator |
CN205146609U (en) * | 2015-11-30 | 2016-04-13 | 衡阳金化高压容器股份有限公司 | Transformer fin inner wall painting device |
CN106881237A (en) * | 2015-12-16 | 2017-06-23 | 株洲时代新材料科技股份有限公司 | Vacuum hydraulic immersion system and dipping method |
CN205673140U (en) * | 2016-06-12 | 2016-11-09 | 乐清市精创机械制造有限公司 | A kind of vacuum pressure impregnated with varnish |
CN205886514U (en) * | 2016-08-11 | 2017-01-18 | 杭州佳德环保科技有限公司 | Paint spraying waste gas treatment device |
CN207628684U (en) * | 2017-12-08 | 2018-07-20 | 沈阳天通电气有限公司 | The vacuum of radiator for transformer inner cavity draws paint and vacuum quick drying paint equipment |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110681521A (en) * | 2018-07-05 | 2020-01-14 | 艾森曼欧洲公司 | Processing apparatus and method for processing workpieces |
CN110681521B (en) * | 2018-07-05 | 2023-09-01 | 艾森曼有限公司 | Processing apparatus and method for processing a workpiece |
CN111744728A (en) * | 2020-07-07 | 2020-10-09 | 山东交通学院 | Anti-corrosion treatment device for transformer shell |
CN114054263A (en) * | 2020-08-03 | 2022-02-18 | 龚海涛 | Oil applying device for inner wall of welded pipe |
CN114054263B (en) * | 2020-08-03 | 2023-04-07 | 龚海涛 | Oil applying device for inner wall of welded pipe |
CN114121424A (en) * | 2021-11-26 | 2022-03-01 | 保定新胜冷却设备有限公司 | Method and device for filling paint into inner wall of finned radiator for transformer |
CN114121424B (en) * | 2021-11-26 | 2024-09-20 | 保定新胜冷却设备有限公司 | Paint filling method and device for inner wall of finned radiator for transformer |
Also Published As
Publication number | Publication date |
---|---|
CN107837989B (en) | 2023-03-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107837989A (en) | The vacuum of radiator for transformer inner chamber draws paint and vacuum quick drying paint equipment and technique | |
CN206215437U (en) | A kind of compact intelligent painting line | |
CN205074282U (en) | High pressure cleaning machine | |
CN102327719A (en) | System and method for treating exhaust gas generated during varnish baking by using water for industrial cycle | |
CN104084356A (en) | Environment-friendly paint painting production line | |
CN206199588U (en) | Aluminium section bar Horizontal type automatic shower coat production line | |
CN105457820A (en) | Intelligent production line with segmental speed change and flexible butt-joint spraying | |
CN108079738B (en) | Energy-saving environment-friendly circulating type waste gas treatment method applied to paint spraying and baking process | |
CN104014458A (en) | Automatic paint-spraying assembly line device | |
CN108273701B (en) | Process of automatic production line equipment for processing paint on outer surface of radiator | |
CN207628684U (en) | The vacuum of radiator for transformer inner cavity draws paint and vacuum quick drying paint equipment | |
CN108063041B (en) | A kind of on-line processing method and equipment manufacturing high-tension transformer lumen of radiator | |
CN108686873A (en) | A kind of electric automatization spray-painting plant | |
CN203935975U (en) | A kind of auto spray painting flow-line equipment | |
CN117797994A (en) | Paint spraying circulation loop production system and production method thereof | |
CN204034929U (en) | Warming plate automatic spraying machine | |
CN204035134U (en) | Vacuum drying oven cleaning device | |
CN112076931A (en) | Track traffic integral wheel coating production line and use method thereof | |
CN210815833U (en) | Quick spraying device that sprays paint of car panel beating | |
CN218223001U (en) | Large-scale facade automatic paint spraying system | |
CN218653429U (en) | Waste gas collecting and treating device | |
CN106733348A (en) | A kind of automobile door handle automatic application product line | |
CN114558423B (en) | Asphalt flue gas coke powder injection adsorption purification device | |
CN114984678A (en) | Waste gas collecting and treating device | |
CN201493220U (en) | Spraying and baking dual-use device with air supply system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |