CN107834406A - The construction method of preassembled transformer station - Google Patents

The construction method of preassembled transformer station Download PDF

Info

Publication number
CN107834406A
CN107834406A CN201710957690.3A CN201710957690A CN107834406A CN 107834406 A CN107834406 A CN 107834406A CN 201710957690 A CN201710957690 A CN 201710957690A CN 107834406 A CN107834406 A CN 107834406A
Authority
CN
China
Prior art keywords
plate
snap
connecting member
fit
structural steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710957690.3A
Other languages
Chinese (zh)
Other versions
CN107834406B (en
Inventor
郑书强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Liangshi Mechanical and Electrical Engineering Co., Ltd.
Original Assignee
郑书强
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郑书强 filed Critical 郑书强
Priority to CN201710957690.3A priority Critical patent/CN107834406B/en
Publication of CN107834406A publication Critical patent/CN107834406A/en
Application granted granted Critical
Publication of CN107834406B publication Critical patent/CN107834406B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a kind of construction method of preassembled transformer station, the second plate(2)Bottom set a roof beam in place with bottom frame(5)Top pass through the 3rd structural steel connecting member(4‑1)With the 4th structural steel connecting member(4‑2)Link together;Set a roof beam in place in bottom frame(5)With the 4th structural steel connecting member(4‑2)Inner side shaped steel between formed it is fluted(4‑3), the 3rd plate(3)Sidepiece be provided with and groove(4‑3)The interpolating unit to match(3‑1);First plate(1)It is provided with U-shaped card slot and the first jack;The plate body of second plate is inserted into U-shaped card slot, the first plug(2‑1)It is inserted into the first jack(1‑2)It is interior.Using the construction method of the preassembled transformer station of the present invention, it is possible to increase the security and aesthetic property of prefabricated transformer station;The antidumping intensity of wall;Convenient dismounting transformer station.

Description

The construction method of preassembled transformer station
Technical field
Patent of the present invention is related to electrical equipment technical field, more particularly to a kind of construction method of preassembled transformer station.
Background technology
A kind of pre-mounted box type transformer substation of the disclosure of the invention of Application No. 201610072143.2, propose a kind of structure letter The single, pre-mounted box type transformer substation that stability is good, easy to assembly.If the pre-mounted box type transformer substation is by bottom plate, top plate and dry plate If side plate, dry plate supporting plate are formed, key is that the edge of the bottom plate is provided with slot, and the both sides of slot are provided with bottom fastening bolt hole; The bottom of the side plate is inserted into slot, and the bottom of side plate is provided with side bolt hole, and the supporting plate is provided with bottom flange and side Portion's flange, the bottom flange are fixedly connected by screwing in the bolt in bottom fastening bolt hole with bottom plate, and sidepiece flange is by screwing in side spiral shell The bolt of keyhole is fixedly connected with side plate;The bottom of the top plate is provided with downward projection of neck, the top insertion of the side plate To neck, the top of the side plate utilizes the bolt through neck and side plate to be fixedly connected with top plate.The prepackage type of the present invention Box-type substation facilitates transport by the Split type structure of pin-connected panel, and it is easy for installation, fixed it is reliable, function is more, have very Good practicality.
The invention of Application No. 201510048189.6 provides a kind of pre-mounted box type transformer substation, including:Base, bottom Plate, column, coaming plate, door body and top cover, base are spliced using channel-section steel, and bottom plate is located on base, and the bottom plate, column pass through Connecting method is fixedly connected with the channel-section steel of base, and coaming plate and door body are connected by connecting method with column, and top cover is by coloured glaze tile And bent plate is spliced, top cover is connected by connecting method with the coaming plate.For the present invention using being spliced, technique is simple, even Connect, be convenient to mount and dismount, do not have requirement to direct labor, production efficiency is high, convenient transportation, and assembly can also circulate profit With being advantageous to environmental protection.
Above-mentioned document, main design are:To the connected mode of top cover-framed side wallboard, framed side wallboard-bottom plate (Vierendeel girder) Improved.The technological development direction of the connected mode of framed side wallboard-bottom plate (Vierendeel girder) of transformer station is now:Improve side The resistance to capsizing of wallboard;And the technological development direction of top cover-framed side wallboard is:The connection improved between top cover and framed side wallboard is strong Degree and the security of connection.
The content of the invention
It is an object of the invention to provide a kind of construction method of preassembled transformer station, so as to improve framed side wallboard and Vierendeel girder it Between antidumping intensity;Improve the security that top plate is connected with framed side wallboard.
Preassembled transformer station, including:First plate (1), the second plate (2), the 3rd plate (3), bottom frame are set a roof beam in place (5), the first plate For top cover, the second plate is framed side wallboard, and the 3rd plate is bottom plate;
The bottom of second plate (2) sets the 3rd structural steel connecting member (4-1), and the 3rd structural steel connecting member (4-1) includes:Inside and outside two In step-like shaped steel, opening formed with centre between the inner side shaped steel and outside shaped steel of the 3rd structural steel connecting member (4-1) Mouthful;
Bottom frame is set a roof beam in place and is provided with the 4th structural steel connecting member (4-2) at the top of (5), and the 4th structural steel connecting member (4-2) includes:Interior, Outer two are in step-like shaped steel, between the inner side shaped steel and outside shaped steel of the 4th structural steel connecting member (4-2) formed with Between opening;
Set a roof beam in place with the bottom frame top of (5) of the bottom of second plate (2) is connected by the 3rd structural steel connecting member (4-1) and the 4th shaped steel Part (4-2) links together;3rd structural steel connecting member (4-1) with the 4th structural steel connecting member (4-2) when being connected, by the 3rd shaped steel The shaped steel of the inner side of connector (4-1) is inserted into the opening of the 4th structural steel connecting member (4-2), is then connected by the 3rd shaped steel Part (4-1) moves inward, and realizes the 3rd structural steel connecting member (4-1) engaging with the 4th structural steel connecting member (4-2);
Set a roof beam in place (5) in bottom frame and formed fluted (4-3) between the shaped steel of the inner side of the 4th structural steel connecting member (4-2), the 3rd The sidepiece of plate (3) is provided with the interpolating unit (3-1) to match with groove (4-3);Set a roof beam in place (5) and the 4th structural steel connecting member in bottom frame Groove is also formed between the shaped steel in the outside of (4-2);
The bottom of first plate (1) is provided with U-shaped card slot (1-2), is additionally provided with the first jack (1-2) on the first panel;Second plate (2) include plate body, the first plug (2-1) is provided with the top of the plate body of the second plate, the plate body of the second plate is inserted into U-shaped card In groove, the first plug (2-1) is inserted into the first jack (1-2);
The first snap-fit passage (1-3-1), the second snap-fit passage (1-3-5), the first card are also preset with the plate body of first plate Enter part passage (1-3-1) and be separately positioned on the first jack (1-2) both sides with the second snap-fit passage (1-3-5);
It is preset with the first snap-fit passage (1-3-1) and goes to component (1-3-6) and snap-fit, snap-fit comprise at least Following two parts:Snap-fit promote-side (1-3-2), snap-fit insertion end (1-3-4);The longitudinal direction of snap-fit promote-side (1-3-2) Direction is hollow-core construction, and a side of its longitudinal direction is provided with promotion tooth;
Revolving member (1-3-6) is ring-shaped, and its outer surface and inner surface are respectively provided with teeth, the outside of revolving member (1-3-6) Tooth has to be intermeshed with the promotion tooth of snap-fit promote-side (1-3-2);
Handle hole (1-5) is also preset with the plate body of first plate.
Further, changeover portion (1-3- is set between snap-fit promote-side (1-3-2) and snap-fit insertion end (1-3-4) 3)。
Further, going to component (1-3-6) can rotate around the central shaft of itself, and its bottom sets some balls, ball In the center of circle track of its underpart.
Further, it is provided with spacing-type in the space of the formation between the 3rd structural steel connecting member and the 4th structural steel connecting member Material;Bottom frame set a roof beam in place (5) be fixed in foundation structure for end to end form.
Further, fixing tooth is arranged on another side of snap-fit promote-side (1-3-2), goes to component (1-3- 6) fixing tooth of outside tooth and the arrangement of snap-fit promote-side (1-3-2) not in contact with;Snap-fit is being inserted by operating parts Enter after end is advanced to the second snap-fit passage, take out operating parts, then will prevent component (1-6) from handle hole (1-5) be placed in On revolving member (1-3-6);Component (1-6) is prevented to include:Prevent component insertion end (1-6-1), prevent tooth connection end (1-6-2) And prevent tooth (1-6-3);Prevent to be provided with the outside of component insertion end (1-6-1) with mutually nibbling on the inside of revolving member (1-3-6) The tooth of conjunction, tooth (1-6-3) and the fixing tooth of snap-fit promote-side (1-3-2) is prevented to be intermeshed.
Further, rubber layer, and are arranged above the engaging position of the both sides shaped steel of the 4th structural steel connecting member (4-2) The bottom of the both sides shaped steel of three structural steel connecting members (4-1) is arranged with the horizontal section steel towards outside.
Further, the 4th structural steel connecting member (4-2) sets a roof beam in place (5) by being welded to connect with bottom frame;3rd structural steel connecting member The medial and lateral shaped steel of (4-1) is anchored in the second plate (2) and connected in the side being anchored in the second plate (2) using horizontal section steel Meet both.
The construction method of preassembled transformer station, comprises the following steps:First, installation bottom frame is set a roof beam in place (5) and the 3rd plate; Second, the second plate is installed on bottom frame is set a roof beam in place;Lift the second plate so that by the type of the inner side of the 3rd structural steel connecting member (4-1) Steel is inserted into the opening of the 4th structural steel connecting member (4-2), then the second plate and the 3rd structural steel connecting member (4-1) is inside Side is moved, and realizes the 3rd structural steel connecting member (4-1) engaging with the 4th structural steel connecting member (4-2);Finally connected in the 3rd shaped steel Spacing section bar is inserted between part and the 4th structural steel connecting member, and/or, the 3rd shaped steel is connected again by some bolt and nut components Part (4-1) and the 4th structural steel connecting member (4-2) are fixed;
3rd, the first plate is installed on the second plate:First, the first plate is lifted, the U-shaped card slot of the first plate is caught in the upper of the second plate End, the first plug (2-1) of the upper end of the second plate are inserted into the first jack (1-2);Then, by using the insertion end of operating parts (1-4-2) is inserted into the handle hole (1-5) of the first plate, the end outside of the insertion end (1-4-2) of operating parts and turning for ring-type The inner surface of dynamic component (1-3-6) is provided with the tooth being adapted, and passes through the rotation process end (1-4-1) of rotary operating member, rotation Turning operating side and rotate the insertion end rotation for driving operating parts, the insertion end and then drive revolving member (1-3-6) of operating parts rotate, The promotion tooth that the outside cingulum of revolving member (1-3-6) moves snap-fit promote-side (1-3-2) is for linear motion so that snap-fit is inserted The perforation for entering end (1-3-4) through the first plug (2-1) enters the second snap-fit passage (1-3-5) of the first plate;Install Cheng Hou, draw out operation part, cover plate is set in the top of handle hole (1-5)..
Further, during dismounting, the cover plate above opening operation hole, the operating side of operating parts is then inserted into revolving member Inner surface, then rotate so that snap-fit insertion end (1-3-4) is from the first plug (2-1) and the second snap-fit passage (1-3- 5) exit.
Further, during installation, after snap-fit insertion end is advanced into the second snap-fit passage by operating parts, behaviour is taken out Workpiece, then component (1-6) will be prevented to be placed in from handle hole (1-5) onto revolving member (1-3-6);Prevent component (1-6) bag Include:Component insertion end (1-6-1) is prevented, prevent tooth connection end (1-6-2) and prevents tooth (1-6-3);Prevent component insertion end The tooth with being meshed on the inside of revolving member (1-3-6) is provided with the outside of (1-6-1), prevents tooth (1-6-3) from being promoted with snap-fit Hold the fixing tooth intermeshing of (1-3-2).
Further, during dismounting, cover plate is opened, component (1-6) will be prevented to be extracted out from revolving member (1-3-6), then will The operating side of operating parts is inserted into the inner surface of revolving member, then rotates so that snap-fit insertion end (1-3-4) is inserted from first Head (2-1) and the second snap-fit passage (1-3-5) exit.
Using above-mentioned technical proposal, compared with prior art, advantage include it is following some.
First, the connected mode of the first plate and the second plate, usually sets in U-shaped card slot and the second plate in the prior art Through hole is put, is then connected by bolt;And in the present invention, the snap-fit with " bolt " function is hidden in the first plate body The security and aesthetic property that improve prefabricated transformer station interior, that maximum limits.
The second, the second plate and bottom frame set a roof beam in place between connected mode, be compared to for the mode of comparative example one, two, Main advantage is:The antidumping intensity of wall greatly improves.
3rd, component is prevented by setting, is able to ensure that " snap-fit " between the first plate and the second plate plays stabilization " shearing resistance " acts on.
Brief description of the drawings:
Fig. 1:The preassembled transformer station design drawing of comparative example 1.
Fig. 2:The preassembled transformer station design drawing of comparative example 2.
Fig. 3:First structural steel connecting member of comparative example 2 and the connection design drawing of the second structural steel connecting member.
Fig. 4:The preassembled transformer station design drawing of embodiment 1.
Fig. 5:First snap-fit passage of the first plate of embodiment 1 and the design drawing of the second snap-fit passage.
Fig. 6:The snap-fit promote-side of embodiment 1 and the connection design drawing of revolving member.
Fig. 7:Snap-fit promote-side, revolving member and the connection design drawing for preventing component of embodiment 2.
Fig. 8 a-8b:The top view and elevation of the prevention component of embodiment 2.
Fig. 9:The scheme of installation that the bottom frame of embodiment 3 is set a roof beam in place with the 3rd plate.
Figure 10:3rd structural steel connecting member of embodiment 4 and the connection diagram of the 4th structural steel connecting member.
Embodiment
As shown in figure 1, the scheme of comparative example 1:Preassembled transformer station, including:First plate (1), the second plate (2), the 3rd plate (3), the first plate is top cover, and the second plate is framed side wallboard, and the 3rd plate is bottom plate;
The bottom of first plate (1) is provided with U-shaped card slot (1-2), is additionally provided with the first jack (1-2) on the first panel;
Second plate (2) includes plate body, and the first plug (2-1) is provided with the top of plate body, the bottom of plate body is provided with type Steel fastener;Plate body is inserted into U-shaped card slot, and the first plug (2-1) is inserted into the first jack (1-2);
The top of 3rd plate (3) set structural steel connecting member, the second plate and the 3rd plate by the structural steel connecting member of the second plate bottom with Structural steel connecting member at the top of 3rd plate is fixed together, the structural steel connecting member of the second plate and the 3rd plate be it is step-like, and second The structural steel connecting member of plate is enclosed on the structural steel connecting member of the 3rd plate, the second plate and the 3rd plate to be fixed.
As Figure 2-3, it is the scheme of comparative example 2:It is with the difference of comparative example 1, comparative example 2 is in comparative example 1 On the basis of improved for the connected mode of the second plate (2) and the 3rd plate (3):
The bottom of the plate body of second plate (2) is provided with the first structural steel connecting member (2-2);
The top of 3rd plate (3) sets the second structural steel connecting member (3-1), passes through the first structural steel connecting member (2-2) and the second shaped steel The connection of connector (3-1) so that the second plate and the 3rd plate are fixed together;
First structural steel connecting member (2-2) and the second structural steel connecting member (3-1) are stage portion shape and are left and right two types Steel, the shape of middle opening, in connection, first, the inner side shaped steel of the first structural steel connecting member (2-2) is inserted into the second shaped steel company Among the opening of fitting (3-1), the position of the second plate is then reduced to predetermined altitude, then moves the second plate so that the first type Steel fastener (2-2) matches with the step of the both sides shaped steel of the second structural steel connecting member (3-1).
The advantages of comparative example 2, is:The outside shaped steel of the structural steel connecting member of second plate fits in the 3rd template steel fastener Outside shaped steel outside, and the inner side shaped steel of the structural steel connecting member of the second plate fits in the medial type of the 3rd template steel fastener The inner side of steel;This inner side with the structural steel connecting member of the second plate in comparative example 1, outside shaped steel is bonded and the 3rd template steel connects The difference for being designed with matter in the outside of fitting.The shortcomings that comparative example 2, is:1) it is bonding strength between the first plate and the second plate It is relatively low;2) it is that the second structural steel connecting member (3-1) is directly fixed on bottom plate, it is inconvenient during bottom plate to make.
Embodiment one is on the basis of comparative example 2, and further the connected mode to the second plate and the 3rd plate optimizes, be right The connected mode of first plate and the second plate optimizes:
Preassembled transformer station, including:First plate (1), the second plate (2), the 3rd plate (3), bottom frame are set a roof beam in place (5), and the first plate is top Lid, the second plate is framed side wallboard, and the 3rd plate is bottom plate;
The bottom of second plate (2) sets the 3rd structural steel connecting member (4-1), and the 3rd structural steel connecting member (4-1) includes:Inside and outside two In step-like shaped steel and the opening of centre;
Bottom frame is set a roof beam in place and is provided with the 4th structural steel connecting member (4-2) at the top of (5), and the 4th structural steel connecting member (4-2) includes:Interior, Outer two in step-like shaped steel and the opening of centre;
Set a roof beam in place with the bottom frame top of (5) of the bottom of second plate (2) is connected by the 3rd structural steel connecting member (4-1) and the 4th shaped steel Part (4-2) links together;
3rd structural steel connecting member (4-1) with the 4th structural steel connecting member (4-2) when being connected, by the 3rd structural steel connecting member (4-1) The shaped steel of inner side is inserted into the opening of the 4th structural steel connecting member (4-2), then by the 3rd structural steel connecting member (4-1) to inner side It is mobile, realize the 3rd structural steel connecting member (4-1) engaging with the 4th structural steel connecting member (4-2);
Set a roof beam in place (5) in bottom frame and formed fluted (4-3) between the shaped steel of the inner side of the 4th structural steel connecting member (4-2), the 3rd The sidepiece of plate (3) is provided with the interpolating unit (3-1) to match with groove (4-3);
Set a roof beam in place (5) in bottom frame and be also formed with groove between the shaped steel in the outside of the 4th structural steel connecting member (4-2);
The bottom of first plate (1) is provided with U-shaped card slot (1-2), is additionally provided with the first jack (1-2) on the first panel;
Second plate (2) includes plate body, and the first plug (2-1) is provided with the top of plate body, the bottom of plate body is provided with type Steel fastener;Plate body is inserted into U-shaped card slot, and the first plug (2-1) is inserted into the first jack (1-2);
The first snap-fit passage (1-3-1), the second snap-fit passage (1-3-5), the first card are also preset with the plate body of first plate Enter part passage (1-3-1) and be separately positioned on the first jack (1-2) both sides with the second snap-fit passage (1-3-5);
It is preset with the first snap-fit passage (1-3-1) and goes to component (1-3-6) and snap-fit, snap-fit comprise at least Following two parts:Snap-fit promote-side (1-3-2), snap-fit insertion end (1-3-4);The longitudinal direction of snap-fit promote-side (1-3-2) Direction is hollow-core construction, and a side of its longitudinal direction is provided with promotion tooth;
In the plate body of first plate also it is pre- it is intrinsic go to component (1-3-6), revolving member (1-3-6) is ring-shaped, its outer surface with Inner surface is respectively provided with teeth, and the outside tooth of revolving member (1-3-6) has the promotion tooth with snap-fit promote-side (1-3-2) mutually to nibble Close;
Handle hole (1-5) is also preset with the plate body of first plate;
In snap-fit promote-side (1-3-2) and snap-fit insertion end (1-3-4), changeover portion (1-3-3), changeover portion can also be set (1-3-3) is used for;
Going to component (1-3-6) can rotate around the central shaft of itself, and its bottom sets some balls, and ball is located at its underpart In the track of the center of circle.
The installation method of above-mentioned preassembled transformer station is as follows:
First, installation bottom frame is set a roof beam in place (5) and the 3rd plate;
Second, the second plate is installed on bottom frame is set a roof beam in place;Lift the second plate so that by the inner side of the 3rd structural steel connecting member (4-1) Shaped steel be inserted into the opening of the 4th structural steel connecting member (4-2), then by the second plate and the 3rd structural steel connecting member (4-1) Move inward, realize the 3rd structural steel connecting member (4-1) engaging with the 4th structural steel connecting member (4-2);Finally by some spiral shells Bolt nut assembly is fixed by the 3rd structural steel connecting member (4-1) and the 4th structural steel connecting member (4-2) again.
3rd, the first plate is installed on the second plate:First, the first plate is lifted, the U-shaped card slot of the first plate is caught in the upper of the second plate End, the first plug (2-1) of the upper end of the second plate are inserted into the first jack (1-2);Then, by using the insertion end of operating parts (1-4-2) is inserted into the handle hole (1-5) of the first plate, the end outside of the insertion end (1-4-2) of operating parts and turning for ring-type The inner surface of dynamic component (1-3-6) is provided with the tooth being adapted, and passes through the rotation process end (1-4-1) of rotary operating member, rotation Turning operating side and rotate the insertion end rotation for driving operating parts, the insertion end and then drive revolving member (1-3-6) of operating parts rotate, The promotion tooth that the outside cingulum of revolving member (1-3-6) moves snap-fit promote-side (1-3-2) is for linear motion so that snap-fit is inserted The perforation for entering end (1-3-4) through the first plug (2-1) enters the second snap-fit passage (1-3-5) of the first plate;Install Cheng Hou, draw out operation part, cover plate is set in the top of handle hole (1-5).
During dismounting, cover plate is opened, then the operating side of operating parts is inserted into the inner surface of revolving member, then rotated so that Snap-fit insertion end (1-3-4) exits from the first plug (2-1) and the second snap-fit passage (1-3-5).
Operating parts is shaped as L-shaped.
The advantages of embodiment one, is:
1) connected mode of the first plate and the second plate in the prior art, usually sets through hole in U-shaped card slot and the second plate, Then connected by bolt;And in the present invention, the snap-fit with " bolt " function is hidden in the first plate body, it is maximum The security for improving prefabricated transformer station limited;
2) connected mode between the second plate and bottom frame are set a roof beam in place, it is compared to for the mode of comparative example one, two, main is excellent Gesture is:The antidumping intensity of wall greatly improves.
The shortcomings that embodiment one, is that snap-fit lacks fixation after the second snap-fit passage (1-3-5) is entered. The resistance that snap-fit skids off from the second snap-fit passage is only in that snap-fit and revolving member (1-3-6) and the first snap-fit Frictional force between passage, its fixing intensity do not reach the intensity of " bolt-nut " also.
Embodiment two:In order to which fixed snap part is after the second snap-fit passage is entered, at snap-fit promote-side (1-3-2) Fixing tooth is arranged on another side, goes to the outside tooth of component (1-3-6) and the arrangement of snap-fit promote-side (1-3-2) Fixing tooth not in contact with;
After snap-fit insertion end is advanced into the second snap-fit passage by operating parts, operating parts is taken out, then will prevent structure Part (1-6) is placed in onto revolving member (1-3-6) from handle hole (1-5);Component (1-6) is prevented to include:Prevent component insertion end (1-6-1), prevent tooth connection end (1-6-2) and prevent tooth (1-6-3);The outside of component insertion end (1-6-1) is prevented to set There is the tooth with being meshed on the inside of revolving member (1-3-6), prevent tooth (1-6-3) and the fixing tooth of snap-fit promote-side (1-3-2) Intermeshing;
As shown in Figure 7, it is assumed that revolving member (1-3-6) rotates clockwise so that snap-fit promote-side (1-3-2) moves right; Meanwhile the prevention component (1-6) that revolving member drives is also in rotating clockwise so that snap-fit promote-side (1-3-2) is to moving to left It is dynamic, therefore, prevent component (1-6) from causing snap-fit promote-side that there is the action trend of different directions with revolving member (1-3-6); And then limit the position of snap-fit promote-side.
The design of embodiment two, the bolt-nut component in U-shaped card slot can be substituted, not reduce the base of bonding strength Under plinth, security is improved.
During installation, after snap-fit insertion end is advanced into the second snap-fit passage by operating parts, operating parts is taken out, so Component (1-6) will be prevented to be placed in from handle hole (1-5) onto revolving member (1-3-6) afterwards;
During dismounting, cover plate is opened, component (1-6) will be prevented to be extracted out from revolving member (1-3-6), then by the operation of operating parts End is inserted into the inner surface of revolving member, then rotates so that snap-fit insertion end (1-3-4) is from the first plug (2-1) and the Two snap-fit passages (1-3-5) exit.
Embodiment three:From insertion with being somebody's turn to do in the space of formation between the 3rd structural steel connecting member and the 4th structural steel connecting member The spacing section bar that space matches, bolt hole is provided with spacing section bar, is connected in the 3rd structural steel connecting member with the 4th shaped steel When part connects, bolt passes through the 3rd structural steel connecting member, spacing section bar, the 4th structural steel connecting member;Bottom frame set a roof beam in place (5) be head and the tail phase The form connect is fixed in foundation structure.During installations, three bottom frames are installed first and set a roof beam in place (5), the 3rd plate (3) is then installed, The interpolating unit (3-1) of 3rd plate is inserted along in groove (4-3), and the 3rd plate is using splicing or overall structure;Then in installation last 1 Individual bottom frame is set a roof beam in place.Bottom frame is set a roof beam in place by the way of end to end, and bottom frame of the guarantee per side is set a roof beam in place and have 1 insertion Face, spacing section bar can be inserted between the 3rd structural steel connecting member and the 4th structural steel connecting member.
When the 3rd plate is overall structure, interpolating unit (3-1) is provided with four sides of the 3rd plate.
Example IV, the weight of the second plate (2) and the 3rd plate (3) in embodiment one pass through the 3rd structural steel connecting member (4- 1) it is delivered to the 4th structural steel connecting member (4-2) and bottom frame is set a roof beam in place on (5), because smaller and side plate and top plate is taken up an area in transformer station Typically it is made of light material, the connected mode of the second plate (2) and the 3rd plate (3) in embodiment one is only applicable to transformer station This class formation.In order to further avoid the occurrence of stress concentration, at the engaging position of the both sides shaped steel of the 4th structural steel connecting member (4-2) On arrange rubber layer, and the bottom of the both sides shaped steel of the 3rd structural steel connecting member (4-1) is arranged with the horizontal type towards outside Steel, the horizontal section steel can further increase the contact area set a roof beam in place with bottom frame.
The preferred embodiment of present aspect is described in detail above, it is understood that being said having read the above-mentioned of the present invention After awarding content, those skilled in the art can make various changes or modifications to the present invention.These equivalent form of values equally fall into this Shen Please be in the protection domain of appended claims.

Claims (4)

1. the construction method of preassembled transformer station, it is characterised in that comprise the following steps:
First, installation bottom frame is set a roof beam in place(5)And the 3rd plate;
Second, the second plate is installed on bottom frame is set a roof beam in place;Lift the second plate so that by the 3rd structural steel connecting member(4-1)Inner side Shaped steel be inserted into the 4th structural steel connecting member(4-2)Opening in, then by the second plate and the 3rd structural steel connecting member(4-1) Move inward, realize the 3rd structural steel connecting member(4-1)With the 4th structural steel connecting member(4-2)Engaging;Finally in the 3rd shaped steel Spacing section bar is inserted between connector and the 4th structural steel connecting member, and/or, by some bolt and nut components again by the 3rd shaped steel Connector(4-1)With the 4th structural steel connecting member(4-2)It is fixed;
3rd, the first plate is installed on the second plate:First, the first plate is lifted, the U-shaped card slot of the first plate is caught in the upper of the second plate End, the first plug of the upper end of the second plate(2-1)It is inserted into the first jack(1-2);Then, by using the insertion end of operating parts (1-4-2)It is inserted into the handle hole of the first plate(1-5)It is interior, the insertion end of operating parts(1-4-2)End on the outside of with ring-type turn Dynamic component(1-3-6)Inner surface be provided with the tooth being adapted, pass through the rotation process end of rotary operating member(1-4-1), rotation Turn operating side and rotate the insertion end rotation for driving operating parts, the insertion end and then drive revolving member of operating parts(1-3-6)Rotate, Revolving member(1-3-6)Outside cingulum move snap-fit promote-side(1-3-2)Promotion tooth it is for linear motion so that snap-fit is inserted Enter end(1-3-4)Through the first plug(2-1)Perforation enter the second snap-fit passage of the first plate(1-3-5);Install Cheng Hou, draw out operation part, in handle hole(1-5)Top set cover plate.
2. the construction method of preassembled transformer station as claimed in claim 1, it is characterised in that during dismounting, on opening operation hole The operating side of operating parts, is then inserted into the inner surface of revolving member, then rotates so that snap-fit insertion end by the cover plate of side (1-3-4)From the first plug(2-1)With the second snap-fit passage(1-3-5)Exit.
3. the construction method of preassembled transformer station as claimed in claim 1, it is characterised in that during installation, passing through operating parts After snap-fit insertion end is advanced into the second snap-fit passage, operating parts is taken out, then will prevent component(1-6)From handle hole (1-5)It is placed in revolving member(1-3-6)On;Prevent component(1-6)Including:Prevent component insertion end(1-6-1), prevent tooth connect Connect end(1-6-2)And prevent tooth(1-6-3);Prevent component insertion end(1-6-1)Outside be provided with and revolving member(1-3- 6)The tooth that inner side is meshed, prevent tooth(1-6-3)With snap-fit promote-side(1-3-2)Fixing tooth intermeshing.
4. the construction method of preassembled transformer station as claimed in claim 3, it is characterised in that during dismounting, open cover plate, will hinder Only component(1-6)From revolving member(1-3-6)Middle extraction, then the operating side of operating parts is inserted into the interior table of revolving member Face, then rotate so that snap-fit insertion end(1-3-4)From the first plug(2-1)With the second snap-fit passage(1-3-5)Move back Go out.
CN201710957690.3A 2017-10-14 2017-10-14 The construction method of preassembled transformer station Active CN107834406B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710957690.3A CN107834406B (en) 2017-10-14 2017-10-14 The construction method of preassembled transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710957690.3A CN107834406B (en) 2017-10-14 2017-10-14 The construction method of preassembled transformer station

Publications (2)

Publication Number Publication Date
CN107834406A true CN107834406A (en) 2018-03-23
CN107834406B CN107834406B (en) 2019-04-23

Family

ID=61648174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710957690.3A Active CN107834406B (en) 2017-10-14 2017-10-14 The construction method of preassembled transformer station

Country Status (1)

Country Link
CN (1) CN107834406B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201095443Y (en) * 2007-11-01 2008-08-06 孔石磊 Box type assembling frame
EP2355275A2 (en) * 2010-02-01 2011-08-10 Almatec AG Attachment device and slide-in profile
CN202373865U (en) * 2011-12-27 2012-08-08 广东正超电气有限公司 Frame connecting structure for low-voltage switch cabinet
CN103220892A (en) * 2013-02-07 2013-07-24 北京长城电子装备有限责任公司 Electrical control machine cabinet based on aluminum profiles
CN204165207U (en) * 2014-08-21 2015-02-18 浙江盾安机电科技有限公司 A kind of section bar splicing structure and panel and casing
CN205583382U (en) * 2016-04-19 2016-09-14 宁波仁栋电气有限公司 Aluminizing zinc wood decorations shell prepackage type transformer substation
CN107018646A (en) * 2017-05-19 2017-08-04 深圳市佳晨科技有限公司 A kind of shielded box
CN107125956A (en) * 2017-06-15 2017-09-05 深圳市小强家居有限公司 Using the cupboard and its assemble method of hidden screw formula mounting structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201095443Y (en) * 2007-11-01 2008-08-06 孔石磊 Box type assembling frame
EP2355275A2 (en) * 2010-02-01 2011-08-10 Almatec AG Attachment device and slide-in profile
CN202373865U (en) * 2011-12-27 2012-08-08 广东正超电气有限公司 Frame connecting structure for low-voltage switch cabinet
CN103220892A (en) * 2013-02-07 2013-07-24 北京长城电子装备有限责任公司 Electrical control machine cabinet based on aluminum profiles
CN204165207U (en) * 2014-08-21 2015-02-18 浙江盾安机电科技有限公司 A kind of section bar splicing structure and panel and casing
CN205583382U (en) * 2016-04-19 2016-09-14 宁波仁栋电气有限公司 Aluminizing zinc wood decorations shell prepackage type transformer substation
CN107018646A (en) * 2017-05-19 2017-08-04 深圳市佳晨科技有限公司 A kind of shielded box
CN107125956A (en) * 2017-06-15 2017-09-05 深圳市小强家居有限公司 Using the cupboard and its assemble method of hidden screw formula mounting structure

Also Published As

Publication number Publication date
CN107834406B (en) 2019-04-23

Similar Documents

Publication Publication Date Title
US8371820B2 (en) Paneling of a nacelle of a wind energy installation
WO2007148192A3 (en) Rotatable building structure
CN106801473A (en) Aluminium alloy structure house
WO2015155131A1 (en) Nacelle of a wind turbine
CN107634451A (en) Preassembled transformer station
CN208415316U (en) A kind of intelligent well cover
CN104612550B (en) Heavy folding type automatic partition door
CN107834406A (en) The construction method of preassembled transformer station
CN206318658U (en) A kind of architectural engineering material lift equipment
CN206901173U (en) A kind of Vertical Circulating storage warehouse case
CN206956778U (en) A kind of prefabricated bolt arrangement cable shaft component
CN103924861A (en) Method For Mounting A Drive Unit Onto A Cover Element Of A Revolving Door
CN203637832U (en) Skirt board structure of passenger train
CN106801557B (en) A kind of movable type ladder top skylight and its door leaf mechanism
CN201709059U (en) Waterproof machine cabinet
CN205901115U (en) Assembled temporary power block terminal of bolted connection module
CN205187576U (en) Villa elevator car
CN205478095U (en) Aerogenerator rotating vane
CN206941992U (en) Automatic slide rail awning
CN203939368U (en) A kind of folded flat is opened the door
CN201763148U (en) Upper folding door
CN211997593U (en) Automatic wire feeding device for KITTING material box
CN205314499U (en) Full -automatic safe type apron
CN205259835U (en) Multiple al -alloy door & window who opens mode
CN204858909U (en) Automatic winding device of electric motor rotor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190329

Address after: 528400 Room 1017, Yihe Villa Yihe Center, Shiqi District, Zhongshan City, Guangdong Province

Applicant after: Guangdong Liangshi Mechanical and Electrical Engineering Co., Ltd.

Address before: 234101 No. 101 Tongyou Road, Fuli Town, Longqiao District, Suzhou City, Anhui Province