CN107832926B - 规划态配变负荷计算方法和系统 - Google Patents
规划态配变负荷计算方法和系统 Download PDFInfo
- Publication number
- CN107832926B CN107832926B CN201710994511.3A CN201710994511A CN107832926B CN 107832926 B CN107832926 B CN 107832926B CN 201710994511 A CN201710994511 A CN 201710994511A CN 107832926 B CN107832926 B CN 107832926B
- Authority
- CN
- China
- Prior art keywords
- space
- load
- distribution transformer
- block
- distribution
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710994511.3A CN107832926B (zh) | 2017-10-23 | 2017-10-23 | 规划态配变负荷计算方法和系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710994511.3A CN107832926B (zh) | 2017-10-23 | 2017-10-23 | 规划态配变负荷计算方法和系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107832926A CN107832926A (zh) | 2018-03-23 |
CN107832926B true CN107832926B (zh) | 2022-02-18 |
Family
ID=61648722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710994511.3A Active CN107832926B (zh) | 2017-10-23 | 2017-10-23 | 规划态配变负荷计算方法和系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107832926B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115102174B (zh) * | 2022-06-06 | 2025-04-29 | 国网浙江省电力有限公司嘉兴供电公司 | 一种有源配网的网格间功率互济方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102053835A (zh) * | 2010-12-30 | 2011-05-11 | 广东电网公司江门供电局 | 一种配电线路供电范围的显示方法 |
CN103116812A (zh) * | 2013-02-20 | 2013-05-22 | 重庆市电力公司电力科学研究院 | 一种新型的变电站布点方法 |
US9250618B2 (en) * | 2013-01-29 | 2016-02-02 | General Electric Company | PWM based energy management with local distributed transformer constraints |
CN106446345A (zh) * | 2016-08-30 | 2017-02-22 | 国网江苏省电力公司 | 基于细分地理区域的配网运行指标处理方法 |
CN106777105A (zh) * | 2016-12-15 | 2017-05-31 | 天津市骐高数码科技发展有限公司 | 利用地理信息系统搜索覆盖区变电站的方法及设备 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130046411A1 (en) * | 2011-08-15 | 2013-02-21 | Siemens Corporation | Electric Vehicle Load Management |
-
2017
- 2017-10-23 CN CN201710994511.3A patent/CN107832926B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102053835A (zh) * | 2010-12-30 | 2011-05-11 | 广东电网公司江门供电局 | 一种配电线路供电范围的显示方法 |
US9250618B2 (en) * | 2013-01-29 | 2016-02-02 | General Electric Company | PWM based energy management with local distributed transformer constraints |
CN103116812A (zh) * | 2013-02-20 | 2013-05-22 | 重庆市电力公司电力科学研究院 | 一种新型的变电站布点方法 |
CN106446345A (zh) * | 2016-08-30 | 2017-02-22 | 国网江苏省电力公司 | 基于细分地理区域的配网运行指标处理方法 |
CN106777105A (zh) * | 2016-12-15 | 2017-05-31 | 天津市骐高数码科技发展有限公司 | 利用地理信息系统搜索覆盖区变电站的方法及设备 |
Non-Patent Citations (2)
Title |
---|
提高城市供电可靠性指标的方法与建议;陶凯;《广西电力》;20121031;第35卷(第5期);第57-61页 * |
智能配电网研究热点;董旭柱,吴争荣,刘志文,李鹏,陈立明;《南方电网技术》;20160531;第10卷(第5期);第2-9页 * |
Also Published As
Publication number | Publication date |
---|---|
CN107832926A (zh) | 2018-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bitencourt et al. | Optimal location of EV charging stations in a neighborhood considering a multi-objective approach | |
Babacan et al. | Siting and sizing of distributed energy storage to mitigate voltage impact by solar PV in distribution systems | |
Wang et al. | Stochastic DG placement for conservation voltage reduction based on multiple replications procedure | |
Wu et al. | A robust state estimator for medium voltage distribution networks | |
Domenech et al. | Hierarchical methodology to optimize the design of stand-alone electrification systems for rural communities considering technical and social criteria | |
US20140159483A1 (en) | Apparatus and method for optimal phase balancing using dynamic programming with spatial consideration | |
Shayesteh et al. | ATC-based system reduction for planning power systems with correlated wind and loads | |
Sousa et al. | Evaluation of different initial solution algorithms to be used in the heuristics optimization to solve the energy resource scheduling in smart grids | |
Heymann et al. | Orchestrating incentive designs to reduce adverse system-level effects of large-scale EV/PV adoption–The case of Portugal | |
CN110533304B (zh) | 一种电力系统负荷不确定性分析方法 | |
Wang et al. | Actuator placement for enhanced grid dynamic performance: A machine learning approach | |
Vučićević et al. | Sustainability assessment of residential buildings by non-linear normalization procedure | |
Yoon et al. | Optimal placement algorithm of multiple dgs based on model-free lyapunov exponent estimation | |
Yao et al. | Evaluation and development of sustainable urban land use plans through spatial optimization | |
Miettinen et al. | Simulating wind power forecast error distributions for spatially aggregated wind power plants | |
Abedi et al. | Sub-transmission substation expansion planning considering load center uncertainties of size and location | |
CN107832926B (zh) | 规划态配变负荷计算方法和系统 | |
CN107274054B (zh) | 基于同层设备最大可供能力的配电网运行效率评价方法 | |
Cortés-Caicedo et al. | Minimizing the annual costs in AC distribution microgrids through optimal BESS location, selection, and operation using a hybrid approach | |
Ranjith Kumar et al. | A Hybrid Technique for Optimal Placement of Fast‐Charging Stations of Electric Vehicles for the Reliability of Distribution Network | |
Huang et al. | Sizing solar panels and storage for multiple roofs | |
Alipour et al. | A risk‐averse strategy based on information gap decision theory for optimal placement of service transformers in distribution networks | |
JP7537303B2 (ja) | トランス接続相判定プログラム、装置、及び方法 | |
CN110765562B (zh) | 一种基于多源信息多约束的目标网架自动生成方法 | |
Maji et al. | A Fuzzy Decision-Based Multiobjective Planning for Microphasor Measurement Unit Placement in Power Distribution Infrastructure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210819 Address after: 510700 3rd, 4th and 5th floors of building J1 and 3rd floor of building J3, No.11 Kexiang Road, Science City, Luogang District, Guangzhou City, Guangdong Province Applicant after: China South Power Grid International Co.,Ltd. Applicant after: NR ELECTRIC Co.,Ltd. Applicant after: CHINA SOUTHERN POWER GRID Co.,Ltd. Applicant after: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF GUANGXI POWER GRID Corp. Applicant after: NANNING POWER SUPPLY BUREAU OF GUANGXI POWER GRID Co.,Ltd. Address before: 510663 1-2 / F, building J3, No.11 Kexiang Road, Science City, Luogang District, Guangzhou City, Guangdong Province Applicant before: POWER GRID TECHNOLOGY RESEARCH CENTER. CHINA SOUTHERN POWER GRID Applicant before: China South Power Grid International Co.,Ltd. Applicant before: NR ELECTRIC Co.,Ltd. Applicant before: CHINA SOUTHERN POWER GRID Co.,Ltd. Applicant before: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF GUANGXI POWER GRID Corp. Applicant before: NANNING POWER SUPPLY BUREAU OF GUANGXI POWER GRID Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |