CN107832141A - Application program progress control method and equipment - Google Patents

Application program progress control method and equipment Download PDF

Info

Publication number
CN107832141A
CN107832141A CN201710941844.XA CN201710941844A CN107832141A CN 107832141 A CN107832141 A CN 107832141A CN 201710941844 A CN201710941844 A CN 201710941844A CN 107832141 A CN107832141 A CN 107832141A
Authority
CN
China
Prior art keywords
computing resource
mobile terminal
application program
cpu
resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710941844.XA
Other languages
Chinese (zh)
Inventor
林志泳
刘美
莫瑞宏
张俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Oppo Mobile Telecommunications Corp Ltd
Original Assignee
Guangdong Oppo Mobile Telecommunications Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Oppo Mobile Telecommunications Corp Ltd filed Critical Guangdong Oppo Mobile Telecommunications Corp Ltd
Priority to CN201710941844.XA priority Critical patent/CN107832141A/en
Publication of CN107832141A publication Critical patent/CN107832141A/en
Priority to PCT/CN2018/109830 priority patent/WO2019072208A1/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • G06F9/5038Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration

Abstract

The embodiment of the present application discloses a kind of application program progress control method and equipment.Method includes:Determine that the destination application of mobile terminal front stage operation is in default internal operation scene;The first computing resource of default internal operation scene is obtained, and obtains the second computing resource of at least one application program of mobile terminal running background;According to the first computing resource and the second computing resource, the configuration strategy of multiple central processing unit CPUs of mobile terminal is determined;Internal operation scene is preset using computing resource operation corresponding at least one CPU of destination application is distributed in configuration strategy.The embodiment of the present application is advantageous to the reliability and fluency of running of mobile terminal destination application.

Description

Application program progress control method and equipment
Technical field
The application is related to technical field of mobile terminals, and in particular to application program progress control method and equipment.
Background technology
With the fast development of smart mobile phone correlation technique, increasing application is installed in user mobile phone, is such as read Read class application, pay class application, game class application, the application of music class etc., the clothing, food, lodging and transportion -- basic necessities of life of people are inseparable with mobile phone.
The content of the invention
The embodiment of the present application provides application program progress control method and equipment, can improve running of mobile terminal target The reliability and fluency of application program.
In a first aspect, the embodiment of the present application provides a kind of application program progress control method, including:
Determine that the destination application of mobile terminal front stage operation is in default internal operation scene, obtain described default interior First computing resource of portion's Run-time scenario, and the second of at least one application program of the acquisition mobile terminal running background Computing resource;
According to first computing resource and second computing resource, multiple central processings of the mobile terminal are determined Unit CPU configuration strategy;
Transported using computing resource corresponding at least one CPU of the destination application is distributed in the configuration strategy The row default internal operation scene.
Second aspect, the embodiment of the present application provide a kind of application program operating control device, including determining unit, acquisition list Member and enable unit, wherein,
The determining unit, the destination application for determining mobile terminal front stage operation are in default internal operation field Scape;
The acquiring unit, for obtaining the first computing resource of the default internal operation scene, and described in acquisition Second computing resource of at least one application program of mobile terminal running background;
The determining unit, it is additionally operable to, according to first computing resource and second computing resource, determine the shifting The configuration strategy of multiple central processing unit CPUs of dynamic terminal;
It is described to enable unit, for using distributing at least one of the destination application in the configuration strategy Computing resource corresponding to CPU runs the default internal operation scene.
The third aspect, the embodiment of the present application provide a kind of mobile terminal, including processor, memory, communication interface and One or more programs, wherein, one or more of programs are stored in the memory, and are configured by described Manage device to perform, described program includes being used for the instruction for performing the step in the embodiment of the present application first aspect either method.
Fourth aspect, the embodiment of the present application provide a kind of computer-readable recording medium, wherein, it is described computer-readable Storage medium stores the computer program for electronic data interchange, wherein, the computer program causes computer to perform such as Part or all of step described in the embodiment of the present application first aspect either method, the computer include mobile terminal.
5th aspect, the embodiment of the present application provide a kind of computer program product, wherein, the computer program product Non-transient computer-readable recording medium including storing computer program, the computer program are operable to make calculating Machine is performed such as the part or all of step described in the embodiment of the present application first aspect either method.The computer program product Can be a software installation bag, the computer includes mobile terminal.
As can be seen that in the embodiment of the present application, mobile terminal determines the intended application journey of mobile terminal front stage operation first Sequence is in default internal operation scene, next, the first computing resource of default internal operation scene is obtained, and obtain mobile whole The second computing resource of at least one application program of running background is held, again, is calculated and provided according to the first computing resource and second Source, the configuration strategy of multiple central processing unit CPUs of mobile terminal is determined, finally, using distributing to target in configuration strategy The default internal operation scene of computing resource operation corresponding at least one CPU of application program.Because mobile terminal can be directed to The internal operation scene combination current system occupation condition of destination application carries out accurate resource allocation, avoids other Application program takes excessive computing resource and influences the running status of current internal Run-time scenario, is advantageous to improve intended application journey The default internal operation scene reliability of operation and fluency of sequence.
Brief description of the drawings
The accompanying drawing involved by the embodiment of the present application will be briefly described below.
Figure 1A is a kind of schematic diagram of the program running space of smart mobile phone;
Figure 1B is a kind of system architecture diagram of Android system;
Fig. 2 is a kind of schematic flow sheet for application program progress control method that the embodiment of the present application provides;
Fig. 3 is a kind of schematic flow sheet of application program progress control method disclosed in the embodiment of the present application;
Fig. 4 is a kind of schematic flow sheet of application program progress control method disclosed in the embodiment of the present application;
Fig. 5 is a kind of structural representation of mobile terminal disclosed in the embodiment of the present application;
Fig. 6 is a kind of functional unit composition block diagram of mobile terminal disclosed in the embodiment of the present application;
Fig. 7 is a kind of structural representation of smart mobile phone disclosed in the embodiment of the present application.
Embodiment
In order that those skilled in the art more fully understand application scheme, below in conjunction with the embodiment of the present application Accompanying drawing, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described embodiment is only Some embodiments of the present application, rather than whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belong to the scope of the application protection.
Term " first ", " second " in the description and claims of this application and the accompanying drawing etc. are to be used to distinguish Different objects, rather than for describing particular order.In addition, term " comprising " and " having " and their any deformations, it is intended that It is to cover non-exclusive include.Such as process, method, system, product or the equipment for containing series of steps or unit do not have The step of being defined in the step of having listed or unit, but alternatively also including not listing or unit, or alternatively also wrap Include for other intrinsic steps of these processes, method, product or equipment or unit.
Referenced herein " embodiment " is it is meant that the special characteristic, structure or the characteristic that describe can wrap in conjunction with the embodiments It is contained at least one embodiment of the application.Each position in the description occur the phrase might not each mean it is identical Embodiment, nor the independent or alternative embodiment with other embodiments mutual exclusion.Those skilled in the art explicitly and Implicitly understand, embodiment described herein can be combined with other embodiments.
Mobile terminal involved by the embodiment of the present application can include the various handheld devices with radio communication function, Mobile unit, wearable device, computing device or other processing equipments for being connected to radio modem, and various forms User equipment (User Equipment, UE), mobile station (Mobile Station, MS), terminal device (terminal Device) etc..For convenience of description, apparatus mentioned above is referred to as mobile terminal.Behaviour involved by the embodiment of the present application It is that hardware resource is managed collectively as system, and provides a user the software systems of business interface.The embodiment of the present application institute The computing resource of description sets the operation computing resource of mobile terminal, is also deposited as fortune.
As shown in Figure 1A, the mobile terminal such as smart mobile phone is typically provided with program running space at present, and program operation is empty Between include user's space and operating system space, wherein, user's space operation have one or more application programs, this or more Individual application program is the destination application of mobile terminal installation, and operating system space motion has the operating system of mobile terminal. The mobile terminal can specifically run Android android system, Mobile operating system iOS that Apple Inc. develops etc., herein not Do unique restriction.As shown in Figure 1B, so that the running of mobile terminal has android system as an example, corresponding user's space includes Application layer (Applications) in the android system, operating system space can include answering in the android system With process block rack-layer (Application Framework), system operation storehouse layer (including system operation storehouse layer Libraries and Android Runtime when Android is run), Linux inner core (Linux Kernel).Wherein, include in application layer all kinds of With the application program of user's direct interaction, or the service routine for running on backstage write by Java language.For example, smart mobile phone The program of the common basic function of upper realization, such as short message service (Short Messaging Service, SMS) short message, electricity The programs such as words dialing, Photo Browser, calendar, game, map, WWW (World Wide Web, Web) browser, and The other applications of developer's exploitation.Application framework layer provides a series of needed for exploitation Android application programs It class libraries, can be used in reusing component, personalized extension can also be realized by inheriting.System operation storehouse layer is application program frame The support of frame, service is provided for each component in android system.System operation storehouse layer is transported by system class libraries and Android Formed during row.Android includes core library and Dalvik virtual machine two parts when running.Linux inner core is used to realize hardware The Core Features such as device drives, process and memory management, network protocol stack, power management, radio communication.
In conventional design, destination application operates in user's space, sends data when it will perform network, reads magnetic When disk resource etc. acts, it is necessary to completed by the standard interface function for calling write, send etc. to be provided by operating system, i.e., Operated by the code of CPU call operation system spaces to complete the request of user.The operating system of mobile terminal is usually overall Property raising system resource configuration such as raising CPU frequency accelerate the runnability of destination application.
For the situation, the embodiment of the present application proposes a kind of application program of destination application for mobile terminal Progress control method, in this method, mobile terminal determines that the destination application of mobile terminal front stage operation is in default first Internal operation scene, secondly, the first computing resource of default internal operation scene is obtained, and obtain mobile terminal running background At least one application program the second computing resource, again, according to the first computing resource and the second computing resource, it is determined that mobile The configuration strategy of multiple central processing unit CPUs of terminal, finally, using distributing to destination application in configuration strategy extremely The default internal operation scene of computing resource operation corresponding to a few CPU.Because mobile terminal can be directed to destination application Internal operation scene combination current system occupation condition carry out accurate resource allocation, avoid other applications from taking Excessive computing resource and influence the running status of current internal Run-time scenario, be advantageous to improve the default inside of destination application Run-time scenario reliability of operation and fluency.
The embodiment of the present application is introduced below in conjunction with the accompanying drawings.
Referring to Fig. 2, Fig. 2 is the embodiment of the present application provide a kind of application program progress control method flow signal Figure, being run applied to mobile terminal, on mobile terminal has operating system and one or more application programs, as illustrated, should Included with program operation control method:
S201, the mobile terminal determine that the destination application of mobile terminal front stage operation is in default internal operation field Scape.
Wherein, the destination application for example can be game application, instant messaging application program, camera applications Program, shopping application program, video class application program etc., do not do unique restriction herein.
Wherein, the default internal operation scene of different application is usually different, by taking game application as an example, trip Default internal operation scene in play application program is not done herein such as can be a battlefield scape, store scene, start scene It is unique to limit.
S202, the first computing resource of default internal operation scene described in the acquisition for mobile terminal, and described in acquisition Second computing resource of at least one application program of mobile terminal running background.
Wherein, the computing resource can be default empirical value, and first computing resource can be supported in current preset Portion's Run-time scenario operates in reliable, smooth and image quality and reaches necessarily required state, as frame per second 60, image quality grade are Middle Standard, first computing resource do not do unique limit herein such as can be 300MHZ, 400MHZ, 500MHZ, 1GHZ It is fixed.
Wherein, second computing resource is the computing resource occupancy of at least one application program of running background With as at least one application program of running background includes the first application program and the second application program, and the first application program Computing resource occupancy be 50MHZ, the occupancy of the computing resource of the second application program is 75MHZ, then the second computing resource For 125MHZ.
S203, the mobile terminal determine the movement according to first computing resource and second computing resource The configuration strategy of multiple central processing unit CPUs of terminal.
Wherein, the mobile terminal is multi-core CPU, can be specifically double-core, four cores, eight cores, 16 cores etc., not do herein It is unique to limit.
S204, the mobile terminal in the configuration strategy using distributing at least one of the destination application Computing resource corresponding to CPU runs the default internal operation scene.
Wherein, due to the computing resource required for the default internal operation scene of destination application be likely larger than it is single The computing resource that CPU can be provided, so it is default with smoothness operation to provide enough computing resources to may require that multiple CPU Internal operation scene, as group's battlefield scape of game application may need 800MHZ computing resources, and the first CPU may be only capable of 500MHZ computing resources are enough provided, just need the total 800MHZ computing resources that provide of the first CPU and the 2nd CPU in such cases Support the operation of this battlefield scape.
As can be seen that in the embodiment of the present application, mobile terminal determines the intended application journey of mobile terminal front stage operation first Sequence is in default internal operation scene, next, the first computing resource of default internal operation scene is obtained, and obtain mobile whole The second computing resource of at least one application program of running background is held, again, is calculated and provided according to the first computing resource and second Source, the configuration strategy of multiple central processing unit CPUs of mobile terminal is determined, finally, using distributing to target in configuration strategy The default internal operation scene of computing resource operation corresponding at least one CPU of application program.Because mobile terminal can be directed to The internal operation scene combination current system occupation condition of destination application carries out accurate resource allocation, avoids other Application program takes excessive computing resource and influences the running status of current internal Run-time scenario, is advantageous to improve intended application journey The default internal operation scene reliability of operation and fluency of sequence.
In a possible example, the configuration strategy includes needing the CPU number additionally enabled and each CPU Computational resource allocation, the computational resource allocation of each CPU include distributing to the application journey that the mobile terminal is currently run The computing resource of each application program in sequence.
Wherein, the computing resource for distributing to each application program can specifically include distributing to each application program The computing resource of at least one process, the type of the process include following at least one:Null process, background process, service into Journey, visible process and foreground process.That is, the managing computing resources of mobile terminal can become more meticulous to process-level, from And more accurately distribute computing resource.
In a possible example, the mobile terminal is calculated according to first computing resource and described second and provided Source, the configuration strategy of multiple central processing unit CPUs of the mobile terminal is determined, including:The mobile terminal is according to The application journey that the number and needs for the CPU that first computing resource and second computing resource determine to need additionally to enable are closed Sequence;According to the mapping relations between the application program that resources balance allocation strategy establishes each CPU computing resource and is not turned off.
Wherein, the computing resource that each CPU of mobile terminal can be provided can be with identical, can also be different, resources balance It should to the greatest extent may be used that strategy, which specifically refers to the allocated computing resources of each CPU and the accounting for the computing resource that itself can be provided, Can be close, as mobile terminal initially enables the first CPU, it is determined that need additionally to enable the 2nd CPU, and the first CPU can The computing resource of offer is 800MHZ, and the computing resource that the 2nd CPU can be provided is 500MHZ, current goal application program Computing resource required for default internal operation scene is 400MHZ, not pent application program at least one application program Including the first application program and the second application program, and the computing resource required for the first application program is 150MHZ, and second should It is 100MHZ with the computing resource required for program, then mobile terminal can determine that the first CPU 400MHZ calculates by calculating Resource establishes the first mapping relations with destination application, determines the 2nd CPU 150MHZ computing resources and the first application program The second mapping relations are established, and determine that the 2nd CPU 100MHZ computing resources and the second application program establish the 3rd mapping pass System, it is 50% so as to the first CPU and the 2nd CPU memory usage, reaches preferable equilibrium of stock state.
It can be seen that in this example, mobile terminal is primarily based on the first computing resource and the second computing resource accurately determines to need The application program that the CPU additionally enabled number and needs is closed, secondly, established according to resources balance allocation strategy each Mapping relations between CPU computing resource and the application program being not turned off, so that each in the CPU that mobile terminal enables CPU utilization rate is as close as being advantageous to equalizing system resource, be advantageous to maintain the stability of a system and power-consumption balance.
In a possible example, the mobile terminal is according to first computing resource and second computing resource It is determined that the application program that the CPU for needing to enable number and needs are closed, including:The mobile terminal determines described mobile whole Hold that whole CPU of the first max calculation resource that the CPU that currently enables can be provided and the mobile terminal can be provided the Two max calculation resources;
If first computing resource and second computing resource and provided less than or equal to first max calculation Source, then the mobile terminal determine without additionally enable CPU, and need not close at least one application program it is any should Use program;
If first computing resource and second computing resource and more than the first max calculation resource, it is and small In or equal to the second max calculation resource, then the mobile terminal is according to first computing resource and second calculating Resource and and the first max calculation resource determine to need at least one CPU for additionally enabling, and without described in closing Any application program at least one application program;
If first computing resource and second computing resource and more than the second max calculation resource, institute The orderly close-down one or more application program of mobile terminal according to application priorities from low to high is stated, and according to described The computing resource for the application program being not turned off in one computing resource and at least one application program determines to need additionally to enable At least one CPU.
It can be seen that in this example, mobile terminal can based on the first computing resource and second computing resource and with Relation between one max calculation resource and the second max calculation resource, flexibly determine to need the CPU and needs additionally enabled The application program of closing, to maintain the stability of a system, avoiding internal memory from overflowing causes system to be advantageous to improve to situations such as bursting The intelligent and reliability of control targe application program operation.
In a possible example, the mobile terminal determines that the destination application of mobile terminal front stage operation is in Default internal operation scene, including:The pass of the destination application of mobile terminal front stage operation described in the acquisition for mobile terminal Key performance parameter;Determine that the destination application is in default internal operation scene according to the critical performance parameters;Or The scene identity that the destination application of mobile terminal front stage operation described in the acquisition for mobile terminal is sent;Determine the scene Internal operation scene corresponding to mark is default internal operation scene.
Wherein, critical performance parameters include destination application interface identification in the process of running, user mutual record, The sorts of systems such as frame per second state parameter and/or information.
It can be seen that in this example, the scheme for determining default internal operation scene based on critical performance parameters, due to key Performance parameter can directly be gathered by destination application, and real-time delivery is analyzed to operating system, then by operating system It is quick to determine internal operation scene, be advantageous to improve the real-time that internal operation scene confirms.For being determined based on scene identity The scheme of default internal operation scene is, it is necessary to which destination application possesses scene Recognition ability, and is identifying current internal fortune The scene identity is transmitted to operating system in the case of row scene, it is accurately true to enable operating system to be based on the scene identity Surely default internal operation scene, improves the degree of accuracy that internal operation scene confirms.
It is consistent with the embodiment shown in described Fig. 2, referring to Fig. 3, a kind of application that Fig. 3, which is the embodiment of the present application, to be provided The schematic flow sheet of program operation control method, being run applied to mobile terminal, on the mobile terminal has mobile terminal and one Individual multiple application programs.As illustrated, application progress control method includes:
S301, the key performance ginseng of the destination application of mobile terminal front stage operation described in the acquisition for mobile terminal Number.
S302, the mobile terminal determine that the destination application is in default internal according to the critical performance parameters Run-time scenario.
S303, the first computing resource of default internal operation scene described in the acquisition for mobile terminal, and described in acquisition Second computing resource of at least one application program of mobile terminal running background.
S304, the mobile terminal determine to need additionally to open according to first computing resource and second computing resource The application program that CPU number and needs is closed.
S305, the mobile terminal are established each CPU computing resource according to resources balance allocation strategy and are not turned off Mapping relations between application program.
S306, the mobile terminal in the configuration strategy using distributing at least one of the destination application Computing resource corresponding to CPU runs the default internal operation scene.
As can be seen that in the embodiment of the present application, mobile terminal determines the intended application journey of mobile terminal front stage operation first Sequence is in default internal operation scene, next, the first computing resource of default internal operation scene is obtained, and obtain mobile whole The second computing resource of at least one application program of running background is held, again, is calculated and provided according to the first computing resource and second Source, the configuration strategy of multiple central processing unit CPUs of mobile terminal is determined, finally, using distributing to target in configuration strategy The default internal operation scene of computing resource operation corresponding at least one CPU of application program.Because mobile terminal can be directed to The internal operation scene combination current system occupation condition of destination application carries out accurate resource allocation, avoids other Application program takes excessive computing resource and influences the running status of current internal Run-time scenario, is advantageous to improve intended application journey The default internal operation scene reliability of operation and fluency of sequence.
In addition, the scheme for determining default internal operation scene based on critical performance parameters, due to critical performance parameters It can directly be gathered by destination application, and real-time delivery is to operating system, then carried out by operating system analyzing quick determination Internal operation scene, be advantageous to improve the real-time that internal operation scene confirms.
It is consistent with the embodiment shown in described Fig. 2, referring to Fig. 4, a kind of application that Fig. 4, which is the embodiment of the present application, to be provided The schematic flow sheet of program operation control method, being run applied to mobile terminal, on the mobile terminal has mobile terminal and one Individual or multiple application programs.As illustrated, application progress control method includes:
S401, the key performance ginseng of the destination application of mobile terminal front stage operation described in the acquisition for mobile terminal Number.
S402, the mobile terminal determine that the destination application is in default internal according to the critical performance parameters Run-time scenario.
S403, the first computing resource of default internal operation scene described in the acquisition for mobile terminal, and described in acquisition Second computing resource of at least one application program of mobile terminal running background.
S404, the mobile terminal determine the first max calculation that the CPU that the mobile terminal currently enables can be provided The second max calculation resource that whole CPU of resource and the mobile terminal can be provided.
S405, if first computing resource and second computing resource and less than or equal to the described first most matter of fundamental importance Calculate resource, it is determined that without additionally enabling CPU, and any application program that need not be closed at least one application program.
S406, if first computing resource and second computing resource and provided more than first max calculation Source, and be less than or equal to the second max calculation resource, then according to first computing resource and second computing resource And and the first max calculation resource determine to need at least one CPU for additionally enabling, and without described in closing at least Any application program in one application program.
S407, if first computing resource and second computing resource and provided more than second max calculation Source, then the orderly close-down one or more application program according to application priorities from low to high, and according to the described first meter Calculate the application program being not turned off in resource and at least one application program computing resource determine to need additionally to enable to A few CPU.
S408, the mobile terminal are established each CPU computing resource according to resources balance allocation strategy and are not turned off Mapping relations between application program.
S409, the mobile terminal in the configuration strategy using distributing at least one of the destination application Computing resource corresponding to CPU runs the default internal operation scene.
As can be seen that in the embodiment of the present application, mobile terminal determines the intended application journey of mobile terminal front stage operation first Sequence is in default internal operation scene, next, the first computing resource of default internal operation scene is obtained, and obtain mobile whole The second computing resource of at least one application program of running background is held, again, is calculated and provided according to the first computing resource and second Source, the configuration strategy of multiple central processing unit CPUs of mobile terminal is determined, finally, using distributing to target in configuration strategy The default internal operation scene of computing resource operation corresponding at least one CPU of application program.Because mobile terminal can be directed to The internal operation scene combination current system occupation condition of destination application carries out accurate resource allocation, avoids other Application program takes excessive computing resource and influences the running status of current internal Run-time scenario, is advantageous to improve intended application journey The default internal operation scene reliability of operation and fluency of sequence.
In addition, the scheme for determining default internal operation scene based on critical performance parameters, due to critical performance parameters It can directly be gathered by destination application, and real-time delivery is to operating system, then carried out by operating system analyzing quick determination Internal operation scene, be advantageous to improve the real-time that internal operation scene confirms.
In addition, mobile terminal can based on the first computing resource and second computing resource and with the first max calculation Relation between resource and the second max calculation resource, flexibly determination need the application that the CPU additionally enabled and needs are closed Program, to maintain the stability of a system, avoiding internal memory from overflowing causes system to be answered to raising control targe situations such as bursting, is advantageous to The intelligent and reliability run with program.
It is consistent with the embodiment shown in described Fig. 2, Fig. 3, Fig. 4, provided referring to Fig. 5, Fig. 5 is the embodiment of the present application A kind of structural representation of mobile terminal, the running of mobile terminal have one or more application programs and operating system, as schemed institute Showing, the mobile terminal includes processor, memory, communication interface and one or more programs, wherein, it is one or more of Program is different from one or more of application programs, and one or more of programs are stored in the memory, and And be configured by the computing device, described program includes being used for the instruction for performing following steps;
Determine that the destination application of mobile terminal front stage operation is in default internal operation scene;
The first computing resource of the default internal operation scene is obtained, and obtains the mobile terminal running background Second computing resource of at least one application program;
According to first computing resource and second computing resource, multiple central processings of the mobile terminal are determined Unit CPU configuration strategy;
Transported using computing resource corresponding at least one CPU of the destination application is distributed in the configuration strategy The row default internal operation scene.
As can be seen that in the embodiment of the present application, mobile terminal determines the intended application journey of mobile terminal front stage operation first Sequence is in default internal operation scene, next, the first computing resource of default internal operation scene is obtained, and obtain mobile whole The second computing resource of at least one application program of running background is held, again, is calculated and provided according to the first computing resource and second Source, the configuration strategy of multiple central processing unit CPUs of mobile terminal is determined, finally, using distributing to target in configuration strategy The default internal operation scene of computing resource operation corresponding at least one CPU of application program.Because mobile terminal can be directed to The internal operation scene combination current system occupation condition of destination application carries out accurate resource allocation, avoids other Application program takes excessive computing resource and influences the running status of current internal Run-time scenario, is advantageous to improve intended application journey The default internal operation scene reliability of operation and fluency of sequence.
In a possible example, the configuration strategy includes needing the CPU number additionally enabled and each CPU Computational resource allocation, the computational resource allocation of each CPU include distributing to the application journey that the mobile terminal is currently run The computing resource of each application program in sequence.
In a possible example, described according to first computing resource and second computing resource, it is determined that In terms of the configuration strategy of multiple central processing unit CPUs of the mobile terminal, the instruction in described program is specifically used for performing Operate below:Determined to need according to first computing resource and second computing resource CPU number that additionally enables with And need the application program closed;And establish each CPU computing resource according to resources balance allocation strategy and be not turned off Mapping relations between application program.
In a possible example, need are determined according to first computing resource and second computing resource described In terms of the application program that the number and needs for the CPU to be enabled are closed, it is following that the instruction in described program is specifically used for execution Operation:Determine the first max calculation resource that the CPU that the mobile terminal currently enables can be provided and the mobile terminal The second max calculation resource that whole CPU can be provided;
If first computing resource and second computing resource and provided less than or equal to first max calculation Source, it is determined that without additionally enabling CPU, and any application program that need not be closed at least one application program;
If first computing resource and second computing resource and more than the first max calculation resource, it is and small In or equal to the second max calculation resource, then according to first computing resource and second computing resource and and The first max calculation resource determines to need at least one CPU additionally enabled, and need not close at least one application Any application program in program;
If first computing resource and second computing resource and more than the second max calculation resource, press According to the orderly close-down one or more application program of application priorities from low to high, and according to first computing resource and The computing resource of the application program being not turned off at least one application program determines to need additionally to enable at least one CPU。
In a possible example, in the destination application of the determination mobile terminal front stage operation is in default In terms of portion's Run-time scenario, the instruction in described program is specifically used for performing following operate:Obtain the mobile terminal front stage operation Destination application critical performance parameters;Determine that the destination application is in default according to the critical performance parameters Internal operation scene;Or obtain the scene identity that the destination application of the mobile terminal front stage operation is sent;Determine institute It is default internal operation scene to state internal operation scene corresponding to scene identity.
Fig. 6 shows a kind of possible functional unit of application program operating control device involved in the embodiment Composition frame chart.Application program operating control device 600 is applied to mobile terminal, on the mobile terminal operation have operating system and One or more application programs, application program operating control device 600 include determining unit 601, acquiring unit 602 and enable list Member 603, wherein,
The determining unit 601, the destination application for determining mobile terminal front stage operation are in default internal fortune Row scene;
The acquiring unit 602, for obtaining the first computing resource of the default internal operation scene, and obtain institute State the second computing resource of at least one application program of mobile terminal running background;
The determining unit 601, it is additionally operable to according to first computing resource and second computing resource, it is determined that described The configuration strategy of multiple central processing unit CPUs of mobile terminal;
It is described to enable unit 603, for using distributing at least the one of the destination application in the configuration strategy Computing resource corresponding to individual CPU runs the default internal operation scene.
As can be seen that in the embodiment of the present application, mobile terminal determines the intended application journey of mobile terminal front stage operation first Sequence is in default internal operation scene, next, the first computing resource of default internal operation scene is obtained, and obtain mobile whole The second computing resource of at least one application program of running background is held, again, is calculated and provided according to the first computing resource and second Source, the configuration strategy of multiple central processing unit CPUs of mobile terminal is determined, finally, using distributing to target in configuration strategy The default internal operation scene of computing resource operation corresponding at least one CPU of application program.Because mobile terminal can be directed to The internal operation scene combination current system occupation condition of destination application carries out accurate resource allocation, avoids other Application program takes excessive computing resource and influences the running status of current internal Run-time scenario, is advantageous to improve intended application journey The default internal operation scene reliability of operation and fluency of sequence.
In a possible example, the configuration strategy includes needing the CPU number additionally enabled and each CPU Computational resource allocation, the computational resource allocation of each CPU include distributing to the application journey that the mobile terminal is currently run The computing resource of each application program in sequence.
In a possible example, described according to first computing resource and second computing resource, it is determined that In terms of the configuration strategy of multiple central processing unit CPUs of the mobile terminal, the determining unit 601 is specifically used for:According to What the number and needs for the CPU that first computing resource and second computing resource determine to need additionally to enable were closed should Use program;And each CPU computing resource is established according to resources balance allocation strategy between the application program that is not turned off Mapping relations.
In a possible example, need are determined according to first computing resource and second computing resource described In terms of the application program that the number and needs for the CPU to be enabled are closed, the determining unit 601 is specifically used for:It is it is determined that described The the first max calculation resource and whole CPU of the mobile terminal that the CPU that mobile terminal currently enables can be provided can carry The the second max calculation resource supplied;
If first computing resource and second computing resource and provided less than or equal to first max calculation Source, it is determined that without additionally enabling CPU, and any application program that need not be closed at least one application program;
If first computing resource and second computing resource and more than the first max calculation resource, it is and small In or equal to the second max calculation resource, then according to first computing resource and second computing resource and and The first max calculation resource determines to need at least one CPU additionally enabled, and need not close at least one application Any application program in program;
If first computing resource and second computing resource and more than the second max calculation resource, press According to the orderly close-down one or more application program of application priorities from low to high, and according to first computing resource and The computing resource of the application program being not turned off at least one application program determines to need additionally to enable at least one CPU。
In a possible example, in the destination application of the determination mobile terminal front stage operation is in default In terms of portion's Run-time scenario, the determining unit 601 is specifically used for:Obtain the destination application of the mobile terminal front stage operation Critical performance parameters;Determine that the destination application is in default internal operation scene according to the critical performance parameters; Or obtain the scene identity that the destination application of the mobile terminal front stage operation is sent;Determine the scene identity pair The internal operation scene answered is default internal operation scene.
It should be noted that the application program operating control device described by the application device embodiment is with functional unit Form present.Term " unit " used herein above should be understood to implication as most wide as possible, each " single for realizing The object of function for example can be integrated circuit ASIC described by member ", single circuit, for performing one or more softwares or solid The processor (shared, special or chipset) and memory of part program, combinational logic circuit, and/or offer are realized above-mentioned Other suitable components of function.
Wherein it is determined that unit 601 can be processor or controller with unit 603 is enabled, acquiring unit 602 can be place The internal communications interface between device and program running space is managed, such as processor and the communication interface in operating system space, or place Manage communication interface of device and user's space etc..
Referring to Fig. 7, Fig. 7, which is a kind of of the embodiment of the present application offer, is applied to above-mentioned application program progress control method The structural representation of smart mobile phone 700, the smart mobile phone 700 include:Housing 710, touching display screen 720, mainboard 730, electricity Pond 740 and subplate 750, front camera 731, processor 732, memory 733, power management chip are provided with mainboard 730 734 etc., oscillator 751, integral sound chamber 752, VOOC are provided with subplate and is dodged and fills interface 753 and fingerprint recognition module 754.
Wherein, smart mobile phone 700 can determine that the destination application of mobile terminal front stage operation is in default internal fortune Row scene;And the first computing resource of the default internal operation scene is obtained, and obtain the mobile terminal backstage and transport Second computing resource of capable at least one application program;And calculated and provided according to first computing resource and described second Source, determine the configuration strategy of multiple central processing unit CPUs of the mobile terminal;And using being distributed in the configuration strategy The default internal operation scene is run to computing resource corresponding at least one CPU of the destination application.
The processor 732 is the control centre of smart mobile phone, utilizes various interfaces and the whole smart mobile phone of connection Various pieces, by running or performing the software program and/or module that are stored in memory 733, and call and be stored in Data in memory 733, the various functions and processing data of smart mobile phone are performed, so as to carry out overall prison to smart mobile phone Control.Optionally, processor 732 may include one or more processing units;Preferably, processor 732 can integrate application processor And modem processor, wherein, application processor mainly handles operating system, user interface and application program etc., modulatedemodulate Processor is adjusted mainly to handle radio communication.It is understood that the modem processor can not also be integrated into processor In 732.The processor 732 for example can be central processing unit (Central Processing Unit, CPU), general procedure Device, digital signal processor (Digital Signal Processor, DSP), application specific integrated circuit (Application- Specific Integrated Circuit, ASIC), field programmable gate array (Field Programmable Gate Array, FPGA) either other PLDs, transistor logic, hardware component or its any combination.It can To realize or perform the various exemplary logic blocks with reference to described by present disclosure, module and circuit.The place It can also be the combination for realizing computing function to manage device, such as is combined comprising one or more microprocessors, DSP and microprocessor Combination etc..
The memory 733 can be used for storage software program and module, and processor 732 is stored in memory by operation 733 software program and module, so as to perform the various function application of smart mobile phone and data processing.Memory 733 can Mainly include storing program area and storage data field, wherein, storing program area can storage program area, needed at least one function Application program etc.;Storage data field can store uses created data etc. according to smart mobile phone.In addition, memory 733 High-speed random access memory can be included, can also include nonvolatile memory, a for example, at least disk memory, Flush memory device or other volatile solid-state parts.The memory 733 for example can be random access memory (Random Access Memory, RAM), flash memory, read-only storage (Read Only Memory, ROM), the read-only storage of erasable programmable Device (Erasable Programmable ROM, EPROM), EEPROM (Electrically EPROM, EEPROM), register, hard disk, mobile hard disk, read-only optical disc (CD-ROM) or any other shape well known in the art The storage medium of formula.
The embodiment of the present application also provides a kind of computer-readable storage medium, wherein, the computer-readable storage medium is stored for electricity The computer program that subdata exchanges, the computer program cause computer to perform any as described in methods described embodiment The part or all of step of method, the computer include mobile terminal.
The embodiment of the present application also provides a kind of computer program product, and the computer program product includes storing calculating The non-transient computer-readable recording medium of machine program, the computer program are operable to make computer perform such as the side The part or all of step of either method described in method embodiment.The computer program product can be a software installation Bag, the computer include mobile terminal.
It should be noted that for foregoing each method embodiment, in order to be briefly described, therefore it is all expressed as a series of Combination of actions, but those skilled in the art should know, the application is not limited by described sequence of movement because According to the application, some steps can use other orders or carry out simultaneously.Secondly, those skilled in the art should also know Know, embodiment described in this description belongs to preferred embodiment, involved action and module not necessarily the application It is necessary.
In the described embodiment, the description to each embodiment all emphasizes particularly on different fields, and does not have the portion being described in detail in some embodiment Point, it may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed device, can be by another way Realize.For example, device embodiment described above is only schematical, such as the division of the unit, it is only one kind Division of logic function, can there is an other dividing mode when actually realizing, such as multiple units or component can combine or can To be integrated into another system, or some features can be ignored, or not perform.Another, shown or discussed is mutual Coupling direct-coupling or communication connection can be by some interfaces, the INDIRECT COUPLING or communication connection of device or unit, Can be electrical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
In addition, each functional unit in each embodiment of the application can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.The integrated list Member can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and is used as independent production marketing or use When, it can be stored in a computer-readable access to memory.Based on such understanding, the technical scheme of the application substantially or Person say the part to be contributed to prior art or the technical scheme all or part can in the form of software product body Reveal and, the computer software product is stored in a memory, including some instructions are causing a computer equipment (can be personal computer, server or network equipment etc.) performs all or part of each embodiment methods described of the application Step.And foregoing memory includes:USB flash disk, read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with the medium of store program codes.
One of ordinary skill in the art will appreciate that all or part of step in the various methods of the embodiment is can To instruct the hardware of correlation to complete by program, the program can be stored in a computer-readable memory, memory It can include:Flash disk, read-only storage (English:Read-Only Memory, referred to as:ROM), random access device (English: Random Access Memory, referred to as:RAM), disk or CD etc..
The embodiment of the present application is described in detail above, specific case used herein to the principle of the application and Embodiment is set forth, and the explanation of above example is only intended to help and understands the present processes and its core concept; Meanwhile for those of ordinary skill in the art, according to the thought of the application, can in specific embodiments and applications There is change part, in summary, this specification content should not be construed as the limitation to the application.

Claims (10)

  1. A kind of 1. application program progress control method, it is characterised in that including:
    Determine that the destination application of mobile terminal front stage operation is in default internal operation scene;
    The first computing resource of the default internal operation scene is obtained, and obtains the mobile terminal running background at least Second computing resource of one application program;
    According to first computing resource and second computing resource, multiple CPU of the mobile terminal are determined CPU configuration strategy;
    Institute is run using computing resource corresponding at least one CPU of the destination application is distributed in the configuration strategy State default internal operation scene.
  2. 2. according to the method for claim 1, it is characterised in that the configuration strategy includes the CPU's for needing additionally to enable The computational resource allocation of number and each CPU, the computational resource allocation of each CPU are worked as including distributing to the mobile terminal The computing resource of each application program in the application program of preceding operation.
  3. 3. method according to claim 1 or 2, it is characterised in that described according to first computing resource and described Two computing resources, the configuration strategy of multiple central processing unit CPUs of the mobile terminal is determined, including:
    The number and needs for the CPU for needing additionally to enable according to first computing resource and second computing resource determination The application program of closing;
    Closed according to the mapping between the application program that resources balance allocation strategy establishes each CPU computing resource and is not turned off System.
  4. 4. according to the method for claim 3, it is characterised in that described to be counted according to first computing resource with described second Calculate resource and determine the number for the CPU that needs enable and the application program that needs are closed, including:
    Determine the complete of the first max calculation resource that the CPU that the mobile terminal currently enables can be provided and the mobile terminal The second max calculation resource that portion CPU can be provided;
    If first computing resource and second computing resource and less than or equal to the first max calculation resource, It is determined that without additionally enabling CPU, and any application program that need not be closed at least one application program;
    If first computing resource and second computing resource and more than the first max calculation resource, and be less than or Equal to the second max calculation resource, then according to first computing resource and second computing resource and and described First max calculation resource determines to need at least one CPU additionally enabled, and need not close at least one application program In any application program;
    If first computing resource and second computing resource and more than the second max calculation resource, according to should With the orderly close-down one or more application program of program priority from low to high, and according to first computing resource and described The computing resource for the application program being not turned off at least one application program determines to need at least one CPU additionally enabled.
  5. 5. according to the method described in claim any one of 1-4, it is characterised in that the mesh for determining mobile terminal front stage operation Mark application program and be in default internal operation scene, including:
    Obtain the critical performance parameters of the destination application of the mobile terminal front stage operation;
    Determine that the destination application is in default internal operation scene according to the critical performance parameters;Or
    Obtain the scene identity that the destination application of the mobile terminal front stage operation is sent;
    It is default internal operation scene to determine internal operation scene corresponding to the scene identity.
  6. A kind of 6. application program operating control device, it is characterised in that including determining unit, acquiring unit and unit is enabled, its In,
    The determining unit, the destination application for determining mobile terminal front stage operation are in default internal operation scene;
    The acquiring unit, for obtaining the first computing resource of the default internal operation scene, and obtain the movement Second computing resource of at least one application program of terminal running background;
    The determining unit, it is additionally operable to according to first computing resource and second computing resource, determines described mobile whole The configuration strategy of multiple central processing unit CPUs at end;
    It is described to enable unit, for using distributing at least one CPU pairs of the destination application in the configuration strategy The computing resource answered runs the default internal operation scene.
  7. 7. device according to claim 6, it is characterised in that the configuration strategy includes the CPU's for needing additionally to enable The computational resource allocation of number and each CPU, the computational resource allocation of each CPU are worked as including distributing to the mobile terminal The computing resource of each application program in the application program of preceding operation.
  8. 8. the device according to claim 6 or 7, it is characterised in that described according to first computing resource and described Second computing resource, determine the configuration strategy aspect of multiple central processing unit CPUs of the mobile terminal, the determining unit It is specifically used for:Determined to need according to first computing resource and second computing resource CPU number that additionally enables with And need the application program closed;And establish each CPU computing resource according to resources balance allocation strategy and be not turned off Mapping relations between application program.
  9. A kind of 9. mobile terminal, it is characterised in that including processor, memory, communication interface and one or more programs, its In, one or more of programs are stored in the memory, and are configured by the computing device, described program Instruction including requiring the step in any one of 1-5 method for perform claim.
  10. 10. a kind of computer-readable recording medium, it is characterised in that the computer-readable recording medium storage is used for electron number According to the computer program of exchange, wherein, the computer program causes computer to perform as described in claim any one of 1-5 Method, the computer include mobile terminal.
CN201710941844.XA 2017-10-11 2017-10-11 Application program progress control method and equipment Pending CN107832141A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710941844.XA CN107832141A (en) 2017-10-11 2017-10-11 Application program progress control method and equipment
PCT/CN2018/109830 WO2019072208A1 (en) 2017-10-11 2018-10-11 Application running control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710941844.XA CN107832141A (en) 2017-10-11 2017-10-11 Application program progress control method and equipment

Publications (1)

Publication Number Publication Date
CN107832141A true CN107832141A (en) 2018-03-23

Family

ID=61647839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710941844.XA Pending CN107832141A (en) 2017-10-11 2017-10-11 Application program progress control method and equipment

Country Status (2)

Country Link
CN (1) CN107832141A (en)
WO (1) WO2019072208A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019072208A1 (en) * 2017-10-11 2019-04-18 Oppo广东移动通信有限公司 Application running control method and device
CN109831585A (en) * 2019-02-22 2019-05-31 维沃移动通信有限公司 A kind of operating parameter method of adjustment and mobile terminal
CN110096315A (en) * 2019-03-22 2019-08-06 华为技术有限公司 A kind of component loading method and device
CN110413417A (en) * 2019-08-02 2019-11-05 广州小鹏汽车科技有限公司 The running optimizatin methods, devices and systems of onboard system process
CN112764933A (en) * 2021-01-27 2021-05-07 惠州Tcl移动通信有限公司 CPU configuration method, device, terminal and computer readable storage medium
JP2021516395A (en) * 2018-03-13 2021-07-01 オッポ広東移動通信有限公司Guangdong Oppo Mobile Telecommunications Corp., Ltd. Resource configuration method, equipment, terminals, and storage media
CN113193975A (en) * 2020-01-29 2021-07-30 瞻博网络公司 Controller device, method and computer readable storage medium
CN113975816A (en) * 2021-12-24 2022-01-28 北京蔚领时代科技有限公司 Hook-based graphics card distribution method using graphics card through DirectX interface

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106055070A (en) * 2016-05-24 2016-10-26 青岛海信移动通信技术股份有限公司 Terminal power consumption control method and apparatus
CN106055408A (en) * 2016-05-31 2016-10-26 广东欧珀移动通信有限公司 Application control method and mobile terminal

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9229779B2 (en) * 2009-12-28 2016-01-05 Empire Technology Development Llc Parallelizing heterogeneous network communications in smart devices based on selection of task allocation strategy
CN103530185B (en) * 2012-07-02 2018-12-04 南京中兴新软件有限责任公司 Method for optimizing resources and device
WO2014005328A1 (en) * 2012-07-06 2014-01-09 华为终端有限公司 Method and device for allocating resource
CN107832141A (en) * 2017-10-11 2018-03-23 广东欧珀移动通信有限公司 Application program progress control method and equipment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106055070A (en) * 2016-05-24 2016-10-26 青岛海信移动通信技术股份有限公司 Terminal power consumption control method and apparatus
CN106055408A (en) * 2016-05-31 2016-10-26 广东欧珀移动通信有限公司 Application control method and mobile terminal

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019072208A1 (en) * 2017-10-11 2019-04-18 Oppo广东移动通信有限公司 Application running control method and device
JP6996005B2 (en) 2018-03-13 2022-01-17 オッポ広東移動通信有限公司 Resource configuration method, equipment, terminals, and storage media
US11513820B2 (en) 2018-03-13 2022-11-29 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Method for resource allocation, terminal, and computer-readable storage medium
JP2021516395A (en) * 2018-03-13 2021-07-01 オッポ広東移動通信有限公司Guangdong Oppo Mobile Telecommunications Corp., Ltd. Resource configuration method, equipment, terminals, and storage media
CN109831585A (en) * 2019-02-22 2019-05-31 维沃移动通信有限公司 A kind of operating parameter method of adjustment and mobile terminal
CN110096315A (en) * 2019-03-22 2019-08-06 华为技术有限公司 A kind of component loading method and device
CN110096315B (en) * 2019-03-22 2020-09-04 华为技术有限公司 Component loading method and device
CN110413417A (en) * 2019-08-02 2019-11-05 广州小鹏汽车科技有限公司 The running optimizatin methods, devices and systems of onboard system process
CN113193975A (en) * 2020-01-29 2021-07-30 瞻博网络公司 Controller device, method and computer readable storage medium
US11805013B2 (en) 2020-01-29 2023-10-31 Juniper Networks, Inc. Prioritizing policy intent enforcement on network devices
CN113193975B (en) * 2020-01-29 2023-11-21 瞻博网络公司 Controller device, method and computer readable storage medium
CN112764933A (en) * 2021-01-27 2021-05-07 惠州Tcl移动通信有限公司 CPU configuration method, device, terminal and computer readable storage medium
CN113975816A (en) * 2021-12-24 2022-01-28 北京蔚领时代科技有限公司 Hook-based graphics card distribution method using graphics card through DirectX interface

Also Published As

Publication number Publication date
WO2019072208A1 (en) 2019-04-18

Similar Documents

Publication Publication Date Title
CN107832141A (en) Application program progress control method and equipment
CN107577537A (en) Resource allocation method and Related product
CN107426432B (en) Resource allocation method and Related product
CN107577533A (en) Resource allocation method and Related product
CN107861816B (en) Resource allocation method and device
CN107547746B (en) Resource allocation method and related product
CN107807852A (en) Application program capacity control method and equipment
CN107589998A (en) Resource allocation method and Related product
CN107861814A (en) Resource allocation method and equipment
CN108776934B (en) Distributed data calculation method and device, computer equipment and readable storage medium
CN107515787A (en) Resource allocation method and Related product
CN107547745A (en) Resource allocation method and Related product
CN107528976B (en) Resource allocation method and related product
CN107786748A (en) Method for displaying image and equipment
CN107894920A (en) Resource allocation method and Related product
CN107995357A (en) Resource allocation method and device
CN107589977A (en) Resource allocation method and related product
CN107547744A (en) Resource allocation method and Related product
CN107450988B (en) Resource allocation method and related product
CN107479970A (en) Resource allocation method and Related product
CN107635078B (en) Game control method and device
CN107786738B (en) Network control method and equipment
CN109144658B (en) Load balancing method and device for limited resources and electronic equipment
CN107797868A (en) resource adjusting method and device
CN107832148A (en) Performance optimization method and equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180323