CN107827172A - The attachment structure and water treatment facilities of integrating water route plate and pipeline - Google Patents
The attachment structure and water treatment facilities of integrating water route plate and pipeline Download PDFInfo
- Publication number
- CN107827172A CN107827172A CN201711120125.8A CN201711120125A CN107827172A CN 107827172 A CN107827172 A CN 107827172A CN 201711120125 A CN201711120125 A CN 201711120125A CN 107827172 A CN107827172 A CN 107827172A
- Authority
- CN
- China
- Prior art keywords
- water route
- plate
- pipeline
- attachment structure
- clamp piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 98
- 238000003780 insertion Methods 0.000 claims description 21
- 230000037431 insertion Effects 0.000 claims description 21
- 238000009434 installation Methods 0.000 claims description 17
- 210000000078 claw Anatomy 0.000 claims description 16
- 210000004907 gland Anatomy 0.000 claims description 12
- 238000010276 construction Methods 0.000 abstract description 3
- 238000007789 sealing Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000001746 injection moulding Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000035622 drinking Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000008399 tap water Substances 0.000 description 1
- 235000020679 tap water Nutrition 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Water Supply & Treatment (AREA)
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Water Treatment By Sorption (AREA)
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
The invention discloses the attachment structure and water treatment facilities of a kind of integrating water route plate and pipeline, wherein, the integrating water route plate includes plate of water route body and the conduit connection being arranged on the plate of water route body, the inner chamber of the conduit connection is connected with the water route on the integrating water route plate, the pipeline is connected on the conduit connection by dismountable ready-packaged joint, and the ready-packaged joint diametrically compresses the end of the pipeline.The attachment structure of integrating water route plate and pipeline provided by the invention is simple in construction, easy to connect, while enables to the connection of pipeline more firm, improves the reliability that pipeline is connected on integrating water route plate, reduces leak risk.
Description
Technical field
The present invention relates to purifier technical field, the attachment structure of particularly a kind of integrating water route plate and pipeline and including
Its water treatment facilities.
Background technology
At present, the system connected mode of most of water purifier still uses what more connecting tube was directly connected on the market,
Perhaps the system that partially purifying water machine has employed integrating water route plate, but be directly connected to using inserted link with integrating water route plate.Pin
With inserted link and integrating water route plate at the intake-outlet being connected to water purifier with running water, the inserted link of intake-outlet is inserted directly into and connect
In head bore.This joint installation is more convenient, but the difference of the tap water pressure of different places is very big, and running water is logical
It is disconnected to form water hammer to being impacted at intake-outlet.After a period of time, inserted link can have the risk exited, cause net
The connection of inserted link is unreliable at water dispenser intake-outlet, connecting tube is exited water purifier intake-outlet and causes user's family by bubble
Risk, economic loss is brought, influence user's use.
The content of the invention
In view of this, an object of the present invention is to provide a kind of attachment structure of integrating water route plate and pipeline, can have
Effect improves the reliability that the joint design at water purifier intake-outlet is connected with pipeline, ensures the performance of water purifier, reduces
Leak risk;Snap joint quantity can be reduced simultaneously, reduce leakage point.
To reach above-mentioned purpose, on the one hand, the present invention adopts the following technical scheme that:
A kind of attachment structure of integrating water route plate and pipeline, the integrating water route plate include plate of water route body and are arranged on institute
The conduit connection on plate of water route body is stated, the inner chamber of the conduit connection is connected with the water route on the integrating water route plate
Logical, the pipeline is connected on the conduit connection by dismountable ready-packaged joint, and the ready-packaged joint is diametrically pressed
The end of the tight pipeline.
Preferably, the conduit connection includes connecting tube, and the ready-packaged joint includes flexible clamp piece, the flexible clamp piece
It is caught in the connecting tube, the end of the pipeline is caught in the flexible clamp piece, so as to which pipeline is connected into the connecting tube
On.
Preferably, the flexible clamp piece is tube-like piece, including connection ring and the Access Division that is arranged in the connection ring, institute
Stating Access Division includes multiple claws, and multiple claws are distributed in the circumference of the connection ring, and axially extend, multiple claws it
Between formed with gap.
Preferably, the Access Division includes path section and big footpath section, and the path section is identical with the internal diameter of big footpath section, described
The external diameter of path section is less than the external diameter of the big footpath section, wherein, one end of the path section is connected with the connection ring, another
End is connected with one end of the big footpath section, and the other end of the big footpath section is free end.
Preferably, it is provided with clamping rib on the inwall of the flexible clamp piece, the clamping rib is along the elastic card
Part it is axially extending.
Preferably, the width of the clamping rib in the circumferential is from the connection ring to subtracting on the direction of the Access Division
It is small;And/or
The height of the clamping rib diametrically is increased up from the connection ring to the side of the Access Division.
Preferably, in addition to gland, the gland are arranged on the outer wall of the flexible clamp piece and the inwall of the connecting tube
Between.
Preferably, the conduit connection and the plate of water route body are separately formed, and the conduit connection passes through fastening
Part is fixed on the plate of water route body.
Preferably, the conduit connection includes the installation portion being connected with the connecting tube, and the installation portion includes inserting
Enter the intracavity inter-connection in portion, the insertion section and connecting tube, wherein, the insertion section is inserted in the plate of water route body, described
Flexible clamp piece is inserted in the connecting tube.
Preferably, the installation portion also includes installing plate, and the installing plate is arranged on the connecting tube and the insertion section
Between, the size of the installing plate diametrically is more than the external diameter of the insertion section, in the connection of the insertion section and installing plate
Formed with step surface, the step surface is resisted against on the end of the plate of water route body at place.
Preferably, position limiting structure is provided with the inwall of the flexible clamp piece, the end for limiting the pipeline is inserted
Enter the position in the flexible clamp piece.
On the other hand, the present invention adopts the following technical scheme that:
A kind of water treatment facilities, include the pipeline and integrating water route plate of conveying water, and pipeline and the integrating water route plate passes through
Above-mentioned attachment structure is attached.
The attachment structure of integrating water route plate and pipeline provided by the invention, the pipeline are connected by dismountable ready-packaged joint
It is connected on the conduit connection, the ready-packaged joint diametrically compresses the end of the pipeline, simple in construction, component number
Amount is few, can reduce leakage point, meanwhile, ready-packaged joint diametrically compresses the end of pipeline, enables to the connection of pipeline more
It is firm to add, and improves the reliability that pipeline is connected on integrating water route plate, reduces water treatment facilities, such as the leak of water purifier
Risk, it ensure that the performance of water purifier.
Brief description of the drawings
By the description to the embodiment of the present invention referring to the drawings, above-mentioned and other purpose of the invention, feature and
Advantage will be apparent from, in the accompanying drawings:
Fig. 1 shows the structural representation of attachment structure provided by the invention;
Fig. 2 shows Fig. 1 sectional view;
Fig. 3 shows the exploded view of another embodiment of attachment structure provided by the invention;
Fig. 4 shows the structural representation of flexible clamp piece provided by the invention;
Fig. 5 shows sectional view when embodiment illustrated in fig. 3 is in confined state;
Fig. 6 shows that the present invention provides the exploded view of the another embodiment of attachment structure;
Fig. 7 shows embodiment illustrated in fig. 3 assembly state diagram.
In figure,
1st, plate of water route body;12nd, sealing ring;
2nd, conduit connection;21st, connecting tube;22nd, installation portion;221st, installing plate;222nd, insertion section;223rd, step surface;
3rd, ready-packaged joint;31st, flexible clamp piece;311st, connection ring;312nd, Access Division;3121st, claw;3122nd, gap;
3123rd, path section;3124th, big footpath section;313rd, clamping rib;314th, position limiting structure;315th, ring is compressed;33rd, gland;331st, radially
Extension;332nd, axially-extending portion;
4th, fastener.
Embodiment
Below based on embodiment, present invention is described, but the present invention is not restricted to these embodiments.Under
It is detailed to describe some specific detail sections in the literary detailed description to the present invention.Do not have for a person skilled in the art
The description of these detail sections can also understand the present invention completely.In order to avoid obscuring the essence of the present invention, known method, mistake
The not narration in detail of journey, flow, element.
In addition, it should be understood by one skilled in the art that provided herein accompanying drawing be provided to explanation purpose, and
What accompanying drawing was not necessarily drawn to scale.
Unless the context clearly requires otherwise, otherwise entire disclosure is similar with the " comprising " in claims, "comprising" etc.
Word should be construed to the implication included rather than exclusive or exhaustive implication;That is, it is containing for " including but is not limited to "
Justice.
In the description of the invention, it is to be understood that term " first ", " second " etc. are only used for describing purpose, without
It is understood that to indicate or implying relative importance.In addition, in the description of the invention, unless otherwise indicated, the implication of " multiple "
It is two or more.
It is integrated for the water in pipeline to be input to this application provides the attachment structure of a kind of pipeline and integrating water route plate
In plate of water route, the integrating water route plate is applied to the water treatment facilities that water purifier, purifying drinking appliance etc. need to handle water.
As shown in Figure 1-2, the integrating water route plate includes plate of water route body 1 and is arranged on 1 on the plate of water route body
Conduit connection 2, is provided with the water route 11 for conveying water on the plate of water route body 1, the inner chamber of the conduit connection 2 with
Water route on the integrating water route plate 1 is connected, and pipeline (not shown) is connected to described by dismountable ready-packaged joint 3
On conduit connection 2.Preferably, the conduit connection 2 is arranged on the edge of plate of water route body 1, the convenient company to pipeline
Connect.The conduit connection 2 can be integrally formed with the plate of water route body 1, such as by injection moulding integrated molding, can also be divided
It is body formed.
As shown in Figure 4, it is preferable that the ready-packaged joint 3 includes flexible clamp piece 31.In a more preferred embodiment
In, the flexible clamp piece 31 is caught in the connecting tube 21, and the end of the pipeline is caught in the flexible clamp piece 31, so that will
Pipeline is connected in the connecting tube 21.This structural elements are few, simple in construction, the convenient peace to pipeline and integrating water route plate
Dress.Also, while connecting tube 21 diametrically compresses flexible clamp piece 31, flexible clamp piece 31 diametrically compresses the end of pipeline
Portion, the firm connection of pipeline can be realized.
As shown in Figure 4, it is preferable that the flexible clamp piece 31 is tube-like piece, including connection ring 311 and is arranged on the connection
Access Division 312 on ring 311, wherein, the connection ring 311 is preferably annular shape;The Access Division 312 includes multiple claws
3121, multiple claws 3121 form substantially annular shape, are uniformly distributed in the circumference of the connection ring 311, and axially extend,
Formed with gap 3122 between multiple claws 3121.Specifically, one end of the claw 3121 is connected to the connection ring 311
One axial end portion, and along the axially extending of the connection ring 311.Gap 3122 is provided between multiple claws 3121,
Gap 3122 has certain width in the circumferential, so may be such that Access Division 312 has certain elasticity in the circumferential so that bullet
Property fastener 31 insert and can produce enough frictional force when in the connecting tube 21 between the inwall of the connecting tube 21, so as to
Pipeline can be fixed in the connecting tube 21.
Preferably, the Access Division 312 includes path section 3123 and big footpath section 3124, the path section 3123 and big footpath section
3124 internal diameter is identical, and the external diameter of the path section 3123 is less than the external diameter of the big footpath section 3124, wherein, the path section
3123 one end is connected with the connection ring 311, and the other end is connected with one end of the big footpath section 3124, the big footpath section
3124 other end is free end.So, the Access Division 312 is smaller in the external diameter of path section 3123, claw herein
3121 thickness is smaller, and elasticity is bigger, and the external diameter of big footpath section 3124 is bigger, the thickness ratio of claw 3121 herein compared with
Greatly, big footpath section 3124 is located remotely from the side of connection ring 311, may be such that the outer wall of big footpath section 3124 and the inwall of connecting tube 21
Between clamping force it is bigger so that the clamping force, frictional force between flexible clamp piece 31 and connecting tube 21 are bigger so that pipeline and pipe
Connection between road connecting portion 2 is more firm.
Preferably, the flexible clamp piece 31 also includes compressing ring 315, and the ring 315 that compresses is arranged on the path section
Side where 3123.The ring 315 that compresses is annular disk, and it extends to the radial outside of the flexible clamp piece 31.Setting
Have in the embodiment for compressing ring 315, the connection ring 311 can be provided with, now compress ring 315 and the phase of connection ring 311
Connection, and it is arranged on the side opposite with the claw 3121;Connection ring 311 can also be not provided with, multiple claws 3121 are direct
Compress on ring 315 described in being connected to, can also serve the same role.During assembling, this compresses ring 315 and is pressed on the connecting tube
On 21 end, position can be caught in the axial direction of flexible clamp piece 31 and positioned.
As shown in Figure 2, Figure 4 shows, the connection to pipeline for convenience, clamping is provided with the inwall of the flexible clamp piece 31
Rib 313, the clamping rib 313 are axially extending along the flexible clamp piece 31.When pipeline is inserted into the flexible clamp piece 31
When interior, the clamping rib 313 can diametrically pipeline described in clamping outer wall, realize the firm connection to pipeline.Preferably,
The width of the clamping rib 313 in the circumferential is from the connection ring 311 to gradually subtracting on the direction of the Access Division 312
It is small;The height of the clamping rib 313 diametrically is from the connection ring 311 to gradual on the direction of the Access Division 312
Increase, can so facilitate the insertion to the end of pipeline, reduce the resistance of the end insertion of pipeline, while can also realize to pipe
The firm clamping of the end on road, firm fixation is realized while convenient install.
As shown in Fig. 3, Fig. 5, Fig. 7, in a preferred embodiment, the conduit connection 2 and the plate of water route body 1
Separately formed, the conduit connection 2 is fixed on the plate of water route body 1 by fastener 4.The conduit connection 2 wraps
Connecting tube 21 and installation portion 22 are included, the connecting tube 21 is fixedly installed on installation portion 22, preferably connecting tube 21 and installation portion 22
Integrated injection molding.The installation portion 22 includes installing plate 221 and insertion section 222, and the installing plate 221 is tabular, described
Sealing ring 12 is provided between installation portion 22 and plate of water route body 1, for realizing the sealing of water route junction.Preferably, it is described
Insertion section 222 is the intracavity inter-connection of tubulose, the connecting tube 21 and insertion section 222, wherein, institute is inserted in the insertion section 222
State in plate of water route body, the flexible clamp piece 31 is caught in the connecting tube 21, so as to by the flexible clamp piece 31 and connecting tube
21 are connected, and then pipeline is connected on the conduit connection 2.
Preferably, the size of the installing plate 221 diametrically is more than the external diameter of the insertion section 222, in the installation
The junction of plate 221 and insertion section 222 is formed with step surface 223, and during assembling, the step surface 223 is resisted against the plate of water route
On the end of body 1, the positioning to the conduit connection 2, the convenient installation to conduit connection 2 can be achieved.
As shown in fig. 6, in a preferred embodiment, the ready-packaged joint 3 also includes gland 33, the gland 33 is set
Between the outer wall of the flexible clamp piece 31 and the inwall of the connecting tube 21.The gland 33 is generally tubular including mutual
The radial extension 331 and axially-extending portion 332 of connection, the radial extension 331 are annular disk, its path side and the axle
It is connected to one end of extension 332.The axially-extending portion 332 is inserted in the connecting tube 2, the radial extension 331
It is arranged between the end for compressing ring 315 and connecting tube 21 of the flexible clamp piece 31.Preferably, the gland 33 and connecting tube
It is interference fit between 21 inwall, by setting the gland 33, after flexible clamp piece 31 is inserted into gland 33, bullet can be prevented
Property fastener 31 is deviate from, and when being caught in pipeline in flexible clamp piece 31, can prevent that hydraulic pressure crosses ambassador during water flowing because of pipeline
Obtain the effect of pipeline abjection.In other preferred embodiments, gland 33 can only include circumferential extensions 332 without including footpath
To extension 331, as shown in Figure 3.
As shown in Fig. 2 the installation to pipeline for convenience, position limiting structure is provided with the inwall of the flexible clamp piece 31
314, the position that the end for limiting the pipeline is inserted in the flexible clamp piece 31.Specifically, the position limiting structure 314 is
The projection on the inwall of the flexible clamp piece 31 is formed, the projection is radially extending flexible clamp piece 31, with to pipeline
The insertion of end is stopped, spacing so as to be carried out to the insertion position of pipe ends.
The application also provides a kind of water treatment facilities, such as water purifier etc., including the pipeline of conveying water and the integrated water
Road plate, pipeline and the integrating water route plate are attached by the attachment structure in the application.
In the application, pipeline is connected to by dismountable ready-packaged joint on the conduit connection of integrating water route plate, structure
Simply, very convenient connection and dismounting to pipeline, also, amount of parts is few, can reduce leakage point.Meanwhile pass through institute
The end that ready-packaged joint diametrically compresses the pipeline is stated, enables to the connection of pipeline more firm, improves pipeline company
The reliability being connected on integrating water route plate, water treatment facilities, such as the leak risk of water purifier are reduced, ensure that water purifier
Performance.
For those skilled in the art it is easily understood that on the premise of not conflicting, above-mentioned each preferred scheme can be free
Ground combination, superposition.
It should be appreciated that above-mentioned embodiment is only illustrative, and not restrictive, without departing from the basic of the present invention
In the case of principle, those skilled in the art can be directed to the various obvious or equivalent modification made of above-mentioned details or replace
Change, be all included in scope of the presently claimed invention.
Claims (12)
1. the attachment structure of a kind of integrating water route plate and pipeline, it is characterised in that the integrating water route plate includes plate of water route body
With the conduit connection being arranged on the plate of water route body, on the inner chamber of the conduit connection and the integrating water route plate
Water route is connected, and the pipeline is connected on the conduit connection by dismountable ready-packaged joint, and the ready-packaged joint exists
Radially compress the end of the pipeline.
2. attachment structure according to claim 1, it is characterised in that the conduit connection includes connecting tube, described fast
Joint includes flexible clamp piece, and the flexible clamp piece is inserted in the connecting tube, and the elastic card is inserted in the end of the pipeline
In part, so as to which pipeline is connected in the connecting tube.
3. attachment structure according to claim 2, it is characterised in that the flexible clamp piece is tube-like piece, including connection ring
With the Access Division being arranged in the connection ring, the Access Division includes multiple claws, week of multiple claws in the connection ring
Distribution upwards, and axially extend, formed with gap between multiple claws.
4. attachment structure according to claim 3, it is characterised in that the Access Division includes path section and big footpath section, institute
State that path section is identical with the internal diameter of big footpath section, the external diameter of the path section is less than the external diameter of the big footpath section, wherein, the path
One end of section is connected with the connection ring, and the other end is connected with one end of the big footpath section, and other the one of the big footpath section
Hold as free end.
5. attachment structure according to claim 3, it is characterised in that be provided with clamping on the inwall of the flexible clamp piece
Rib, the clamping rib is along the axially extending of the flexible clamp piece.
6. attachment structure according to claim 5, it is characterised in that
The width of the clamping rib in the circumferential is from the connection ring to reducing on the direction of the Access Division;And/or
The height of the clamping rib diametrically is increased up from the connection ring to the side of the Access Division.
7. according to the attachment structure described in one of claim 2-6, it is characterised in that be also arranged on including gland, the gland
Between the outer wall of the flexible clamp piece and the inwall of the connecting tube.
8. according to the attachment structure described in one of claim 2-6, it is characterised in that the conduit connection and the plate of water route
Body is separately formed, and the conduit connection is fixed on the plate of water route body by fastener.
9. attachment structure according to claim 8, it is characterised in that the conduit connection includes and the connecting tube phase
The installation portion of connection, the installation portion include the intracavity inter-connection of insertion section, the insertion section and connecting tube, wherein, it is described to insert
Enter portion to insert in the plate of water route body, the flexible clamp piece is inserted in the connecting tube.
10. attachment structure according to claim 9, it is characterised in that the installation portion also includes installing plate, the installation
Plate is arranged between the connecting tube and the insertion section, and the size of the installing plate diametrically is more than the outer of the insertion section
Footpath, in the insertion section and the junction of installing plate formed with step surface, the step surface is resisted against the plate of water route body
On end.
11. according to the attachment structure described in one of claim 2-6, it is characterised in that set on the inwall of the flexible clamp piece
Position limiting structure is equipped with, the position that the end for limiting the pipeline is inserted in the flexible clamp piece.
12. a kind of water treatment facilities, include the pipeline and integrating water route plate of conveying water, it is characterised in that the pipeline and integrated
Plate of water route is attached by the attachment structure described in one of claim 1-11.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711120125.8A CN107827172B (en) | 2017-11-14 | 2017-11-14 | Connection structure of integrated water route board and pipeline and water treatment facilities |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711120125.8A CN107827172B (en) | 2017-11-14 | 2017-11-14 | Connection structure of integrated water route board and pipeline and water treatment facilities |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107827172A true CN107827172A (en) | 2018-03-23 |
CN107827172B CN107827172B (en) | 2023-10-24 |
Family
ID=61655391
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711120125.8A Active CN107827172B (en) | 2017-11-14 | 2017-11-14 | Connection structure of integrated water route board and pipeline and water treatment facilities |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107827172B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108744691A (en) * | 2018-07-31 | 2018-11-06 | 珠海格力电器股份有限公司 | The connection structure and water treatment facilities of integrating water route plate and pipeline |
CN113374966A (en) * | 2021-06-21 | 2021-09-10 | 杭州富阳中荷电子有限公司 | Fast-assembly type multi-channel faucet joint and assembly method thereof |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB761960A (en) * | 1954-12-20 | 1956-11-21 | Gen Descaling Co Ltd | Improvements in and relating to pipe fittings |
JPH081151A (en) * | 1994-06-20 | 1996-01-09 | Sodeken:Kk | Purification equipment |
JP2001304469A (en) * | 2000-04-25 | 2001-10-31 | Tokai Rubber Ind Ltd | Quick-disconnect pipe fitting structure |
CN2876504Y (en) * | 2006-03-31 | 2007-03-07 | 方建民 | Fast clamp type fire extinguishing water hose joint |
CN101813221A (en) * | 2010-05-19 | 2010-08-25 | 威海博扬电子有限公司 | Movable flange pipe section |
WO2013105287A1 (en) * | 2012-01-10 | 2013-07-18 | 東尾メック株式会社 | Pipe joint |
CN103624732A (en) * | 2013-09-27 | 2014-03-12 | 浙江吉利控股集团有限公司 | Forcible entry tool for broken connector |
CN203809813U (en) * | 2014-03-20 | 2014-09-03 | 开平欧标水暖器材有限公司 | Pull-out faucet |
CN104696651A (en) * | 2014-12-03 | 2015-06-10 | 浙江超润润滑元件有限公司 | Fast pipe joint insertion structure |
CN204901162U (en) * | 2015-08-11 | 2015-12-23 | 十堰市倍力汽车管业有限公司 | Pipeline meets plug device soon |
US20170043296A1 (en) * | 2015-08-12 | 2017-02-16 | Xiamen Runner Industrial Corporation | Integrated welded waterway structure of a reverse osmosis water filtration device |
CN106629877A (en) * | 2016-10-13 | 2017-05-10 | 海南立昇净水科技实业有限公司 | Free-combination type water circuit plate unit and water purifier |
CN206206865U (en) * | 2016-11-19 | 2017-05-31 | 胡华贵 | Pipe fitting fast joint |
CN207659123U (en) * | 2017-11-14 | 2018-07-27 | 珠海格力电器股份有限公司 | The connection structure and water treatment facilities of integrating water route plate and pipeline |
-
2017
- 2017-11-14 CN CN201711120125.8A patent/CN107827172B/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB761960A (en) * | 1954-12-20 | 1956-11-21 | Gen Descaling Co Ltd | Improvements in and relating to pipe fittings |
JPH081151A (en) * | 1994-06-20 | 1996-01-09 | Sodeken:Kk | Purification equipment |
JP2001304469A (en) * | 2000-04-25 | 2001-10-31 | Tokai Rubber Ind Ltd | Quick-disconnect pipe fitting structure |
CN2876504Y (en) * | 2006-03-31 | 2007-03-07 | 方建民 | Fast clamp type fire extinguishing water hose joint |
CN101813221A (en) * | 2010-05-19 | 2010-08-25 | 威海博扬电子有限公司 | Movable flange pipe section |
WO2013105287A1 (en) * | 2012-01-10 | 2013-07-18 | 東尾メック株式会社 | Pipe joint |
CN103624732A (en) * | 2013-09-27 | 2014-03-12 | 浙江吉利控股集团有限公司 | Forcible entry tool for broken connector |
CN203809813U (en) * | 2014-03-20 | 2014-09-03 | 开平欧标水暖器材有限公司 | Pull-out faucet |
CN104696651A (en) * | 2014-12-03 | 2015-06-10 | 浙江超润润滑元件有限公司 | Fast pipe joint insertion structure |
CN204901162U (en) * | 2015-08-11 | 2015-12-23 | 十堰市倍力汽车管业有限公司 | Pipeline meets plug device soon |
US20170043296A1 (en) * | 2015-08-12 | 2017-02-16 | Xiamen Runner Industrial Corporation | Integrated welded waterway structure of a reverse osmosis water filtration device |
CN106629877A (en) * | 2016-10-13 | 2017-05-10 | 海南立昇净水科技实业有限公司 | Free-combination type water circuit plate unit and water purifier |
CN206206865U (en) * | 2016-11-19 | 2017-05-31 | 胡华贵 | Pipe fitting fast joint |
CN207659123U (en) * | 2017-11-14 | 2018-07-27 | 珠海格力电器股份有限公司 | The connection structure and water treatment facilities of integrating water route plate and pipeline |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108744691A (en) * | 2018-07-31 | 2018-11-06 | 珠海格力电器股份有限公司 | The connection structure and water treatment facilities of integrating water route plate and pipeline |
CN113374966A (en) * | 2021-06-21 | 2021-09-10 | 杭州富阳中荷电子有限公司 | Fast-assembly type multi-channel faucet joint and assembly method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN107827172B (en) | 2023-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7150478B2 (en) | Integrated seal for tube to hose connection | |
US7819437B2 (en) | Flexible captive flange hose connection and method | |
US20140062078A1 (en) | Pipe connector apparatus | |
US6428055B1 (en) | Releasable quick coupling for metal pipes | |
CA2157429C (en) | Quick connector with tube activated check valve | |
BRPI0516403B1 (en) | COUPLING DEVICE | |
US7314209B2 (en) | Stub out fluid quick connector with shut off valve interface | |
EP1677042A1 (en) | Fluid quick connector with wire retainer | |
US9651177B2 (en) | Coupling connection for corrugated pipes | |
US5735555A (en) | Fuel rail to fuel tube end compact connector | |
CN107827172A (en) | The attachment structure and water treatment facilities of integrating water route plate and pipeline | |
RU2536461C2 (en) | Coupling with activated seal | |
US7850210B2 (en) | Plug-in coupling for fluid systems | |
WO2019205770A1 (en) | Connecting pipe fitting, pipe assembly and pipe connecting method | |
CN106122634B (en) | Self-closing lock quick connector and anti-dropout Quick insertion connector | |
US20070046026A1 (en) | Tube-to-tube connection | |
CN207659123U (en) | The connection structure and water treatment facilities of integrating water route plate and pipeline | |
SK12602003A3 (en) | Pipe coupling | |
CN106362251A (en) | Rapid sleeve connection joint and injection device | |
KR100881351B1 (en) | Expanding pipe with separation prevention structure | |
US20110133447A1 (en) | Plug-in hose coupling | |
CN208605785U (en) | A kind of pipe fitting quick connection structure | |
US6896297B2 (en) | Gas service riser assembly and ductile pipe to plastic pipe transition connection | |
JPH1047571A (en) | Hose joint | |
JP3176509U (en) | Check valve and packing mounting structure at the joint between water meter and shimoku |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |