CN107825133B - The nail belt assembly equipment of mechanization installation - Google Patents

The nail belt assembly equipment of mechanization installation Download PDF

Info

Publication number
CN107825133B
CN107825133B CN201711049324.4A CN201711049324A CN107825133B CN 107825133 B CN107825133 B CN 107825133B CN 201711049324 A CN201711049324 A CN 201711049324A CN 107825133 B CN107825133 B CN 107825133B
Authority
CN
China
Prior art keywords
mounting hole
exciting
flute profile
pair
string item
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711049324.4A
Other languages
Chinese (zh)
Other versions
CN107825133A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jingjiang Industrial Equipment Co.,Ltd.
Original Assignee
Yueqing Fengjie Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yueqing Fengjie Electronic Technology Co Ltd filed Critical Yueqing Fengjie Electronic Technology Co Ltd
Priority to CN201711049324.4A priority Critical patent/CN107825133B/en
Publication of CN107825133A publication Critical patent/CN107825133A/en
Application granted granted Critical
Publication of CN107825133B publication Critical patent/CN107825133B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/002Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units stationary whilst being composed

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Electric Cable Installation (AREA)
  • Toys (AREA)
  • Electroplating Methods And Accessories (AREA)
  • Devices For Conveying Motion By Means Of Endless Flexible Members (AREA)

Abstract

The invention belongs to First Tape Feeder manufacturing technology fields, it is related to a kind of nail belt assembly equipment of mechanization installation, including mounting platform, corrugated plating and propulsion assembly, propulsion assembly include propulsion electric machine, shock electric machine, fixed frame, flute profile wheel, promote gear mesh, exciting gear mesh, eccentric wheel to, promote transmission shaft to and exciting transmission shaft pair;The race of a pair of of flute profile wheel is clipped in the middle string item, and the eccentric wheel of a pair of of synchronous backward rotation evokes vibration, and flute profile wheel turning handle string item promotes preceding mounting hole and rear mounting hole.It is of the invention easy to use, it can reduce labor intensity, improve working efficiency, too big tensile force is not needed in the case where there is vibration can be such that string item penetrates in hole, effectively avoid breaking string item or make string item folder crackle, string item is avoided to waste.

Description

The nail belt assembly equipment of mechanization installation
Technical field
The invention belongs to First Tape Feeder manufacturing technology field, it is related to a kind of method for assembling nail belt and uses work Tool, and in particular to a kind of nail belt assembly method and equipment.
Background technique
Popular a kind of first apron feeder on the market in recent years, the feeding device as each plant feed bin, structure feature are as follows: The bottom of deflector chute sets a closed nail belt under feed bin, and nail belt sets bend pulley by driving drum driven, the other end at one end, Centre sets several groups idler pulley bearing nail belt;To obtain better service performance, a closed adhesive tape can be set in nail belt.This skill Art has the advantage that 1. operation power are small compared with prior art, consuming little energy, and performance driving economy is good;2. lightweight construction is made Valence is low, convenient transportation;3. feeding coal is big, stablizes, and easy to adjust;4. running smoothly, noise is small, protects environment;5. abrasion is small, A little repair, long service life;6. component universality is strong, installation, maintenance is easy;7. replaceable existing batcher, so It is vigorously promoted the use in feed bin feed industry.
Above-described nail belt is key fitment in first apron feeder running part, including multiple first pieces and more strings Item, first piece are formed using 16Mn or highly wear-resisting alloy steel hot investment casting, have good wearability, toughness, go here and there item by nylon 1010 are made, and string item has good wearability and self-lubrication, the impact resistance of nail belt are substantially increased, when nail belt is by object When expecting severe impact, its own structure type is just spread impact force by shock point around first, secondly, the adhesive tape under it is certainly Body deformation also absorbs certain shock loading, and simultaneously by remaining shock loading be conducted to impact idler and buffering support roller seat into Row buffering absorbs, and thus improves the impact resistance of first apron feeder well.
Most representative first piece please refers to entitled " a kind of Novel shield and the nail belt comprising the first piece ", application number First piece by retouching art in the Chinese utility model patent of 200720131242.X, including preceding connecting pin and rear connector, preceding company The preceding mounting hole for having the string item for connection front first piece to pass through at end is connect, has the string item for connecting rear first piece to wear at rear connector The rear mounting hole crossed, first piece front and positioned at preceding connecting pin and rear connector between equipped with the transition part of concave shape, transition part by In outward in extension shape.
The installation process of nail belt is more time-consuming, and current mounting means is first that first piece is mutually embedding on mounting platform Conjunction, Kong Yukong alignment arrangement are neat, and there are about 2 millimeters of gaps then to make in favor of mutually rotating between the end face of adjacent holes It clamps string item with pliers to be worn with strength by the position of proximal end into the hole of first piece, the resistance encountered is just tapped using hammer when too big Pliers, when jaw is close to first piece, mobile pliers makes jaw leave a little distance of first piece, taps pliers after clamping again, constantly weight The multiple above movement, until whole string item penetrates in transversely arranged all first pieces.
The installation labor intensity of this mode is very big, and efficiency is very low, and pliers is easy string item to press from both sides crackle, is also easy to do Disconnected string item, if string item is disconnected inside, it is also necessary to string item be pulled out and wear new string item again, working efficiency is lower, breaks string Item causes to waste, but up to the present there are no the equipment that people develops a kind of mechanization installation nail belt.
Summary of the invention
In place of improving the deficiencies in the prior art, a kind of nail belt dress of mechanization installation nail belt is provided With device.
The present invention is achieved through the following technical solutions:
A kind of method of nail belt assembly, comprising the following steps:
1) first piece is mutually chimeric on mounting platform, Kong Yukong alignment arrangement is neatly;
2) make go here and there item one end insertion first piece preceding mounting hole or rear mounting hole a distance;If this one end thing of string item Chamfering is first made, then can be easier when being inserted into preceding mounting hole or rear mounting hole;
3) it arranges a pair of of flute profile wheel, is race at the wheel rim of flute profile wheel, the axis parallel of flute profile wheel, a pair of of flute profile wheel String item, is placed on adjacent, is clipped among two races by race alignment;
4) a pair of of eccentric wheel is arranged, the axial line of this pair of of eccentric wheel is parallel to each other and vertical with the string axial line of item, together Step rotates backward, and generates the exciting force for being parallel to string direction of axis line, and be transmitted on string item by flute profile wheel, rotates flute profile Wheel makes string item be inserted into preceding mounting hole and rear mounting hole under motive force and the collective effect of exciting force, until being inserted into the last one Until the last one end face of the preceding mounting hole of the last one of first piece or rear mounting hole;
5) step 1) is repeated several times to 4), is all installed until all string items;
6) excision string item is exposed at the extra part outside first piece.
The preceding mounting hole of the above-described one end insertion first piece for making string item or rear mounting hole a distance refer to 1 to 5 milli The distance of rice.
Above-described a pair of eccentric wheel synchronous backward rotation, velocity of rotation refer to 600 to 3000 revs/min.
According to the method that above-described nail belt assembles, a kind of nail belt assembly equipment of mechanization installation is also provided, including Mounting platform, corrugated plating and propulsion assembly;
Propulsion assembly include propulsion electric machine, shock electric machine, fixed frame, flute profile wheel, promote gear mesh, exciting gear mesh, partially Heart wheel to, promote transmission shaft to and exciting transmission shaft pair;
Promote gear mesh, a pair of of flute profile wheel respectively with promote transmission shaft to being fixedly connected, the mounting flange of propulsion electric machine and Fixed frame is fixedly connected, and the output shaft of propulsion electric machine is fixedly connected with a propulsion transmission shaft of propulsion transmission shaft assignment, is promoted Transmission shaft is race at the wheel rim of flute profile wheel to being connected respectively with fixed frame by revolute, the race alignment of a pair of of flute profile wheel, If string item is placed on adjacent, string item can be clamped, string item can be driven when a pair of of flute profile wheel rotates simultaneously by frictional force Movement;Promote gear mesh intermeshing;When propulsion electric machine be powered its output shaft rotation when, by promote transmission shaft to promote tooth Wheel drives the string item movement being clipped in the middle to a pair of of flute profile wheel rotation of drive;
Exciting gear mesh, a pair of of eccentric wheel respectively with exciting transmission shaft to being fixedly connected, the mounting flange of shock electric machine and Fixed frame is fixedly connected, and the output shaft of shock electric machine is fixedly connected with an exciting transmission shaft of exciting transmission shaft assignment, exciting For transmission shaft to being connected respectively with fixed frame by revolute, exciting gear mesh intermeshing, a pair of of eccentric wheel is in mirror image always Symmetry status, symmetrical plane were the meshing points of exciting gear mesh and tangent simultaneously flat with two pitch circles of exciting gear mesh Face;When shock electric machine is powered the rotation of its output shaft, by exciting transmission shaft to and exciting gear mesh drive a pair of of eccentric wheel same Step reversely rotates, and centrifugal force caused by this pair of of eccentric wheel, the component on the direction of axis line perpendicular to string item mutually offsets Disappear, the mutual superposition of component on the direction of axis line for being parallel to string item, to generate the vibration in one direction, vibration is by swashing Vibration transmission shaft to, fixed frame, promote transmission shaft to pass to string item to a pair of of flute profile wheel;
Mounting hole is with after before string item is easy for being pushed under the propulsive force of a pair of of flute profile wheel and the collective effect of vibration Mounting hole, as soon as so that an installation for string item is completed, above step, which is repeated several times, quickly to be installed more string items;In order to just In installation, go here and there item original length it is often bigger than the width dimensions of nail belt, in this way, string item through the last one first piece most When the last one end face of the preceding mounting hole of the latter or rear mounting hole, flute profile wheel is allowed to clamp there are also enough length, extra string Item finally prescinds again;
Multiple corrugated platings are fixedly connected with mounting platform, there is wave crest and trough above corrugated plating, first piece go forward connecting pin and The transition part for the concave shape being arranged between rear connector is mutually chimeric with wave crest, in the horizontal plane, perpendicular on preceding mounting hole direction Play positioning action;Preceding mounting hole is mutually fitted into the two sides at trough respectively with the end face of rear mounting hole, in the horizontal plane, is put down Row is in playing positioning action on preceding mounting hole direction of axis line;The thickness of corrugated plating is 2 millimeters, between the end face of adjacent holes across The wave trough position of corrugated plating, at a distance of about 2 millimeters;First piece stabilization at this time is placed on corrugated plating;There is positioning table on mounting platform, String item is clamped between two pairs of flute profile wheels on propulsion assembly, the alignment of string one end after the preceding mounting hole of armour-piercing piece or after install Hole, the fixed frame on propulsion assembly are close to positioning table, and such propulsion assembly exerts a force by means of power, could generate propulsive force to string item, have Effect is inserted into preceding mounting hole or rear mounting hole.
Above-described pitch circle refers to the pitch circle being previously mentioned in GB/T1356-1987, GB/T1357-1987.
Above-described race frictionally pushes string item, in order to increase race to the frictional force of string item, in wheel rooved face It is provided with decorative pattern, can thus generate bigger frictional force, prevents from skidding.
Above-described race is arc-shaped race V-shaped race or straight line-circular arc-linear wheel Slot.Arc-shaped race, refers to its bus, i.e., the plane cutting flute profile wheel of flute profile wheel axial line when obtain in wheel rooved face Cutting contour line is arc-shaped;Similarly, the bus of V-shaped race is V-shaped, and straight line-circular arc-linear race bus is Two sides are straight lines, and centre is the shape of circular arc.
Above-described a pair of eccentric wheel synchronous backward rotation, velocity of rotation refer to 600 to 3000 revs/min.
The course of work of the present embodiment is such that
1) first piece on mounting platform, mutually chimeric, Kong Yukong alignment is arranged neatly, the transition of the concave shape of first on piece Portion is mutually chimeric with wave crest, and preceding mounting hole is mutually fitted into the two sides of trough respectively with the end face of rear mounting hole;
2) make go here and there item be clamped among the race of two pairs of flute profile wheels, make go here and there item one end insertion first piece preceding mounting hole or after Mounting hole a distance, makes fixed frame be close to positioning table;If chamfering is made in this one end of string item in advance, mounting hole before being inserted into Or it can be easier when rear mounting hole;
3) start shock electric machine, then a pair of of eccentric wheel synchronous backward rotation, generates and be parallel to swashing for string direction of axis line Vibration power;
4) start propulsion electric machine, then flute profile wheel synchronous rotary pushes string item, common work of the string item in motive force and exciting force The last one preceding mounting hole or rear mounting hole with the preceding mounting hole of lower insertion and rear mounting hole, until being inserted into the last one first piece Until the last one end face;
5) step 1) is repeated several times to 4), is all installed until all string items;
6) excision string item is exposed at the extra part outside first piece.
Beneficial effects of the present invention: it is easy to use, it reduces labor intensity, working efficiency is improved, in the case where there is vibration Not needing too big tensile force can be such that string item penetrates in hole, effectively avoid breaking string item or make string item folder crackle, avoid string item Waste.
Detailed description of the invention
Fig. 1 is the three dimensional structure diagram of first piece 100;
Fig. 2 is the three dimensional structure diagram at the first visual angle of the embodiment of the present invention;
Fig. 3 is the three dimensional structure diagram at the second visual angle of the embodiment of the present invention;
Fig. 4 is the top view of the embodiment of the present invention;
Fig. 5 is the cross-sectional view in Fig. 4 along line A-A;
Fig. 6 is the partial enlarged view in Fig. 5 at I;
Fig. 7 is the cross-sectional view in Fig. 4 along line B-B;
Fig. 8 is the top view of propulsion assembly 7;
Fig. 9 is C direction view in Fig. 8;
Figure 10 is D direction view in Fig. 9;
Figure 11 is in Fig. 8 along the cross-sectional view of E-E line;
Figure 12 is in Fig. 8 along the cross-sectional view of F-F line;
Figure 13 is the three dimensional structure diagram of the flute profile wheel 74 with arc-shaped race 741;
Figure 14 is the three dimensional structure diagram of eccentric wheel 77;
Figure 15 is the three dimensional structure diagram of the flute profile wheel 74 with V-shaped race 744;
Figure 16 is the positive cross-sectional view with straight line-circular arc-linear race 745 flute profile wheel 74;
It is as shown in the figure: 100. first pieces;10. preceding connecting pin;Mounting hole before 11.;20. rear connector;Mounting hole after 21.;30. Transition part;4. mounting platform;41. positioning table;5. corrugated plating;51. wave crest;52. trough;The 521. trough profiles being blocked Line;6. string item;7. propulsion assembly;71. propulsion electric machine;72. shock electric machine;73. fixed frame;74. flute profile wheel;741. arc-shaped wheels Slot;742. decorative pattern;743. sheave holes;744.V font race;745. straight lines-circular arc-linear race;75. promoting gear mesh; 76. exciting gear mesh;77. eccentric wheel;771. eccentric wheel hole;78. promoting transmission shaft pair;79. exciting transmission shaft pair;8. symmetrical flat Face.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples:
Embodiment: referring to Fig. 1 to Figure 16.
A kind of method of nail belt assembly, comprising the following steps:
1) first piece 100 is mutually chimeric on mounting platform 4, Kong Yukong alignment arrangement is neatly;
2) make in the preceding mounting hole 11 or rear mounting hole 21 of one end insertion first piece 100 of string item 6 about 2 millimeters;If going here and there item 6 This one end make chamfering in advance, then mounting hole 11 or when rear mounting hole 21, can be easier before being inserted into;
3) it arranges a pair of of flute profile wheel 74, is arc-shaped race 741 at the wheel rim of flute profile wheel 74, the axial line of flute profile wheel 74 is flat The arc-shaped race 741 of row, a pair of of flute profile wheel 74 is aligned, and string item 6 is placed on adjacent, is clipped in two arc-shaped races 741 Between;
4) a pair of of eccentric wheel 77 is arranged, the axial line of this pair of of eccentric wheel 77 is parallel to each other and hangs down with the axial line of string item 6 Directly, it is rotated with 2000 revs/min of revolving speed synchronous backward, generates the exciting force for being parallel to string 6 direction of axis line of item, and pass through slot Shape wheel 74 is transmitted on string item 6, rotates flute profile wheel, then installation before item 6 of going here and there is inserted under motive force and the collective effect of exciting force Hole 11 and rear mounting hole 21, mounting hole 11 or rear mounting hole 21 be most before being inserted into the last one of the last one first piece 100 Until the latter end face;
5) step 1) is repeated several times to 4), is all installed until all string items 6;
6) excision string item 6 is exposed at the extra part of 100 outside of first piece.
According to the method that above-described nail belt assembles, a kind of equipment of nail belt assembly is also provided, including mounting platform 4, Corrugated plating 5 and propulsion assembly 7;
Propulsion assembly 7 includes two propulsion electric machines 71, shock electric machine 72, the propulsion of 73, two pairs of fixed frame, 74, two pairs of flute profile wheel Gear mesh 75, exciting gear mesh 76, eccentric wheel are to 77, two pairs of propulsion transmission shafts to 78 and exciting transmission shaft to 79;
Gear mesh 75, a pair of of flute profile wheel 74 is promoted to be fixedly connected respectively with propulsion transmission shaft to 78, propulsion electric machine 71 is consolidated Determine flange to be fixedly connected with fixed frame 73, the output shaft of propulsion electric machine 71 and promotes transmission shaft to a propulsion transmission shaft in 78 It is fixedly connected, promotes transmission shaft to be connected respectively with fixed frame 73 by bearing to 78, be arc-shaped wheel at the wheel rim of flute profile wheel 74 The arc-shaped race 741 of slot 741, a pair of of flute profile wheel 74 is aligned, if string item 6 is placed on adjacent, string item 6 can be clamped, A pair of of flute profile wheel 74 can drive string item 6 to move when rotating simultaneously by frictional force;Gear mesh 75 is promoted to be intermeshed;It is electric when promoting When energization its output shaft rotation of machine 71, by promoting transmission shaft to 78 and gear mesh 75 being promoted to drive a pair of of rotation of flute profile wheel 74, The string item 6 being clipped in the middle is driven to move simultaneously;The present embodiment arranges two sets of flute profile wheels 74 and corresponding driving mechanism, increases to string The propulsive force of item 6;
Exciting gear mesh 76, a pair of of eccentric wheel 77 are fixedly connected with exciting transmission shaft to 79 respectively, and shock electric machine 72 is consolidated Determine flange to be fixedly connected with fixed frame 73, the output shaft and exciting transmission shaft of shock electric machine 72 are to an exciting transmission shaft in 79 It is fixedly connected, exciting transmission shaft is connected with fixed frame 73 by bearing respectively to 79, and exciting gear mesh 76 is intermeshed, a pair of inclined Heart wheel 77 always be in mirror symmetry, symmetrical plane 8 be the meshing point of exciting gear mesh 76 and with exciting gear mesh 76 Two pitch circles tangent plane simultaneously;When shock electric machine 72 is powered the rotation of its output shaft, by exciting transmission shaft to 79 Hes Exciting gear mesh 76 drives a pair of of 77 synchronous backward of eccentric wheel to rotate, centrifugal force caused by this pair of of eccentric wheel 77, vertical It offsets each other in the component on the direction of axis line of string item 6, the component on the direction of axis line for being parallel to string item 6 mutually changes Add, to generate the vibration in one direction, vibration is by exciting transmission shaft to 79, fixed frame 73, propulsion transmission shaft to 78 and one String item 6 is passed to flute profile wheel 74;
Mounting hole 11 before string item 6 is easy for being pushed under the propulsive force of a pair of of flute profile wheel 74 and the collective effect of vibration With rear mounting hole 21, as soon as thus complete string item 6 an installation, be repeated several times above step quickly more string items 6 can be installed On;For the ease of installation, width dimensions of the original length of string item 6 often than nail belt 100 are big, in this way, in string item through most When the last one end face of the preceding mounting hole 11 of the last one of the latter first piece 100 or rear mounting hole 21, there are also enough length Two pairs of flute profile wheels 74 are allowed to clamp, extra string item 6 finally prescinds again;
Multiple corrugated platings 5 are fixedly connected with mounting platform 4, and corrugated plating 5 has a wave crest 51 and trough 52 above, on first piece 100 The transition part 30 for the concave shape being arranged between preceding connecting pin 10 and rear connector 20 is mutually chimeric with wave crest 51, in the horizontal plane, hangs down Directly in playing positioning action on preceding 11 direction of mounting hole;The end face of preceding mounting hole 11 and rear mounting hole 21 is respectively and at trough 52 Two sides are mutually fitted into, and in the horizontal plane, are parallel on 11 direction of axis line of preceding mounting hole and are played positioning action;First piece at this time 100 stabilizations are placed on corrugated plating 5;
Above-described pitch circle refers to the pitch circle being previously mentioned in GB/T1356-1987, GB/T1357-1987.
There is positioning table 41 on mounting platform 4, string item 6 is clamped between two pairs of flute profile wheels 74 on propulsion assembly 7, string item 6 One end alignment after the preceding mounting hole 11 of armour-piercing piece 100 or after mounting hole 21, the fixed frame 73 on propulsion assembly 7 is close to positioning table 41, such propulsion assembly 7 exerts a force by means of power, could generate propulsive force to string item 6, effectively be inserted into preceding mounting hole 11 or rear mounting hole 21。
Above-described 741 frictionally of arc-shaped race pushes string item 6, in order to increase 741 pairs of string items 6 of arc-shaped race Frictional force, arc-shaped 741 surface of race is provided with decorative pattern 742, can thus generate bigger frictional force, prevent from skidding.
The course of work of the present embodiment is such that
1) first piece 100 on mounting platform 4, mutually chimeric, Kong Yukong alignment is arranged neatly, the concave surface on first piece 100 The transition part 30 of shape is mutually chimeric with wave crest 51, the end face of preceding mounting hole 11 and rear mounting hole 21 respectively with the two sides phase of trough 52 It is chimeric;
2) it is clamped in string item 6 among the arc-shaped race 741 of two pairs of flute profile wheels 74, makes one end insertion first piece of string item 6 100 preceding mounting hole 11 or rear about 2 millimeters of mounting hole 21, make fixed frame 73 be close to positioning table 41;If this one end thing of string item 6 Chamfering is first made, then can be easier when being inserted into preceding mounting hole 11 or rear mounting hole 21;
3) start shock electric machine 72, rotate a pair of of eccentric wheel 77 with 2000 revs/min of revolving speed synchronous backward, generate flat Row is in the exciting force of string 6 direction of axis line of item;
4) start two propulsion electric machines 71 simultaneously, then two pairs of 74 synchronous rotaries of flute profile wheel push string item 6, and string item 6 is pushing Preceding mounting hole 11 and rear mounting hole 21 are inserted under power and the collective effect of exciting force, until being inserted into the last one first piece 100 most Before the latter until the last one end face of mounting hole 11 or rear mounting hole 21;
5) step 1) is repeated several times to 4), is all installed until all string items 6;
6) excision string item 6 is exposed at the extra part of 100 outside of first piece.
The present embodiment the utility model has the advantages that easy to use, reduce labor intensity, improve working efficiency, there is the case where vibration Under do not need too big tensile force and can make to go here and there item to penetrate in hole, effectively avoid breaking string item 6 or make and go here and there item 6 and press from both sides crackle, avoid Item of going here and there wastes.

Claims (1)

1. a kind of nail belt assembly equipment of mechanization installation, which is characterized in that including mounting platform, corrugated plating and propulsion assembly;
Propulsion assembly includes propulsion electric machine, shock electric machine, fixed frame, flute profile wheel, promotes gear mesh, exciting gear mesh, eccentric wheel To, promote transmission shaft to and exciting transmission shaft pair;
Promote gear mesh, a pair of of flute profile wheel respectively with promote transmission shaft to being fixedly connected, the mounting flange of propulsion electric machine and fixation Frame is fixedly connected, and the output shaft of propulsion electric machine is fixedly connected with a propulsion transmission shaft of propulsion transmission shaft assignment, promotes transmission Axis is race at the wheel rim of flute profile wheel to being connected respectively with fixed frame by revolute, and the race alignment of a pair of of flute profile wheel clamps String item, a pair of of flute profile wheel drive string item movement;Promote gear mesh intermeshing;
Exciting gear mesh, a pair of of eccentric wheel are respectively with exciting transmission shaft to being fixedly connected, the mounting flange of shock electric machine and fixation Frame is fixedly connected, and the output shaft of shock electric machine is fixedly connected with an exciting transmission shaft of exciting transmission shaft assignment, exciting transmission For axis to being connected respectively with fixed frame by revolute, exciting gear mesh intermeshing, a pair of of eccentric wheel is in mirror symmetry always State, symmetrical plane were the meshing point of exciting gear mesh and the plane tangent simultaneously with two pitch circles of exciting gear mesh;It is more A corrugated plating is fixedly connected with mounting platform, there is wave crest and trough above corrugated plating, first piece go forward connecting pin and rear connector it Between the transition part of concave shape that is arranged it is mutually chimeric with wave crest;The end face of preceding mounting hole and rear mounting hole respectively with the two sides at trough Face is mutually fitted into;
There is positioning table on mounting platform, the fixed frame on propulsion assembly is close to positioning table;
The working method of the nail belt assembly equipment is as follows:
1) mutually chimeric, Kong Yukong alignment arrangement is neat first piece on mounting platform, the transition part of the concave shape of first on piece with Wave crest is mutually fitted into, and preceding mounting hole is mutually fitted into the two sides of trough respectively with the end face of rear mounting hole;
2) it is clamped in string item among the race of two pairs of flute profile wheels, the preceding mounting hole for making one end insertion first piece of string item or installation afterwards 1 to 5 millimeter of hole, makes fixed frame be close to positioning table;
3) start shock electric machine, rotate a pair of of eccentric wheel with 600 to 3000 revs/min of revolving speed synchronous backward, generate parallel In the exciting force of string direction of axis line;
4) start two propulsion electric machines simultaneously, then two pairs of flute profile wheel synchronous rotaries push string item, go here and there item in motive force and exciting force Collective effect under be inserted into preceding mounting hole and rear mounting hole, before being inserted into the last one of the last one first piece mounting hole or after Until the last one end face of mounting hole;
5) step 1) is repeated several times to 4), is all installed until all string items;
6) excision string item is exposed at the extra part outside first piece.
CN201711049324.4A 2016-07-31 2016-07-31 The nail belt assembly equipment of mechanization installation Active CN107825133B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711049324.4A CN107825133B (en) 2016-07-31 2016-07-31 The nail belt assembly equipment of mechanization installation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201711049324.4A CN107825133B (en) 2016-07-31 2016-07-31 The nail belt assembly equipment of mechanization installation
CN201610611929.7A CN106064307B (en) 2016-07-31 2016-07-31 First band assembly method and equipment

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610611929.7A Division CN106064307B (en) 2016-07-31 2016-07-31 First band assembly method and equipment

Publications (2)

Publication Number Publication Date
CN107825133A CN107825133A (en) 2018-03-23
CN107825133B true CN107825133B (en) 2019-05-14

Family

ID=57207163

Family Applications (5)

Application Number Title Priority Date Filing Date
CN201711049325.9A Active CN107756028B (en) 2016-07-31 2016-07-31 A kind of nail belt assembly equipment of mechanization installation
CN201711053558.6A Withdrawn CN107825134A (en) 2016-07-31 2016-07-31 First band assembly equipment
CN201711049323.XA Active CN107717446B (en) 2016-07-31 2016-07-31 A kind of nail belt assembly equipment
CN201711049324.4A Active CN107825133B (en) 2016-07-31 2016-07-31 The nail belt assembly equipment of mechanization installation
CN201610611929.7A Active CN106064307B (en) 2016-07-31 2016-07-31 First band assembly method and equipment

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201711049325.9A Active CN107756028B (en) 2016-07-31 2016-07-31 A kind of nail belt assembly equipment of mechanization installation
CN201711053558.6A Withdrawn CN107825134A (en) 2016-07-31 2016-07-31 First band assembly equipment
CN201711049323.XA Active CN107717446B (en) 2016-07-31 2016-07-31 A kind of nail belt assembly equipment

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610611929.7A Active CN106064307B (en) 2016-07-31 2016-07-31 First band assembly method and equipment

Country Status (1)

Country Link
CN (5) CN107756028B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108581283B (en) * 2018-05-07 2019-11-19 新昌县辰逸服饰有限公司 Semi-automatic tooling is welded in nail belt feeder connecting section intelligence

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3802184A (en) * 1972-03-20 1974-04-09 Fmc Corp Assembly machine
US4230222A (en) * 1979-01-22 1980-10-28 Clark Philip G Grain conveyor assembly
US4570436A (en) * 1982-09-30 1986-02-18 Wilkie Donald S Apparatus for assembling conveyor chain
DE3636476A1 (en) * 1986-08-22 1988-02-25 Guenter Linke Method and apparatus for the production of inverted tooth chains for driving and conveying purposes
JPH0228507B2 (en) * 1987-02-09 1990-06-25 Maruma Tractor & Equip TORATSUKURINKUKUMITATESOCHI
JPH08187676A (en) * 1994-12-30 1996-07-23 Hitachi Constr Mach Co Ltd Disassembly device, connecting device and disassembly connecting device for roller chain
US6029342A (en) * 1997-09-08 2000-02-29 Amsted Industries Incorporated Apparatus kit and method for roller chain assembly
CN2362817Y (en) * 1999-01-04 2000-02-09 中煤精工科技开发有限责任公司 Material conveyer
US6471045B1 (en) * 1999-10-12 2002-10-29 Seagate Technology Llc Roller and belt conveyor system
US6951096B2 (en) * 2002-05-21 2005-10-04 Caterpillar Inc. Method and apparatus for installing links on an endless track chain
JP3964836B2 (en) * 2003-08-04 2007-08-22 本田技研工業株式会社 Subassembly assembly method and assembly jig for continuously variable transmission belt
JP2005246549A (en) * 2004-03-04 2005-09-15 Toyota Motor Corp Assembling device
CN2813530Y (en) * 2005-03-31 2006-09-06 孟凡英 Two-dimensional flexible nail belt
CN2785785Y (en) * 2005-04-21 2006-06-07 张鸣涛 Compaction mechanism of high-speed chains assembling machine
CN201395393Y (en) * 2008-12-12 2010-02-03 孟凡英 Fastening type nail belt
US9180604B2 (en) * 2011-02-25 2015-11-10 Edward G. Joseph Apparatus and methods for truss assembly
CN202765696U (en) * 2012-04-26 2013-03-06 安徽理工大学 Combined deck belt
CN203738375U (en) * 2014-03-28 2014-07-30 陈善弟 Automatic correction tape core puncher
CN204053436U (en) * 2014-08-26 2014-12-31 鹤壁煤电股份有限公司第八煤矿 A kind of special equipment for the dismounting of first band string bar
CN204473798U (en) * 2014-12-26 2015-07-15 徐州五洋科技股份有限公司 First Tape Feeder
CN204568614U (en) * 2015-04-16 2015-08-19 徐州五洋科技股份有限公司 The first band of feeder
CN105479160B (en) * 2015-12-16 2018-02-16 韩燕� A kind of assembly of light-duty clean-up scraper forming assembling machine

Also Published As

Publication number Publication date
CN107756028A (en) 2018-03-06
CN107717446B (en) 2019-05-14
CN106064307B (en) 2017-12-15
CN107825133A (en) 2018-03-23
CN107825134A (en) 2018-03-23
CN107717446A (en) 2018-02-23
CN106064307A (en) 2016-11-02
CN107756028B (en) 2019-05-14

Similar Documents

Publication Publication Date Title
CN104786374B (en) Wire saw rotary machine and method for preventing eccentric wear of diamond wire saw by adopting same
CN107825133B (en) The nail belt assembly equipment of mechanization installation
CN201236055Y (en) Roller stick type synchrodrive apparatus
CN105201500A (en) Cutting part of thin-coal-layer double-connection cutting-loading coal mining machine
CN201092073Y (en) Double-shaft hob cutter woodworking lathe
CN202344407U (en) Shot blasting mechanism for producing steel plate spring
CN211727566U (en) Drill bit on multi-station drilling machine
CN201887609U (en) Piece sorting machine
CN211990686U (en) Paying-off walking device of rib winding machine
CN210115330U (en) Guide and guard device capable of realizing rapid centering
CN106735483A (en) Inner hole key slot milling attachment and method for milling
CN2613154Y (en) Huon pine paper shear cut type cut mechanism
CN213770181U (en) Crawler-type rotating device for large-scale shaft forging
CN201268771Y (en) Double-headpiece overedger
CN201679906U (en) Chain wheel and chain plate reducing mechanism based on chain transmission
CN212711491U (en) Bearing conveying and guiding device
CN204221084U (en) A kind of laborsaving planer
CN205253796U (en) Curved circular knitting machine of aluminium door and window
CN213864174U (en) Full autoloading structure of solid axle of bicycle chain
CN217731577U (en) Conveyer for machining
CN212150486U (en) Workpiece conveying mechanism for electroplating industry
CN216548945U (en) Conveyor is used in cable processing
CN220027230U (en) Thermistor raw material ball mill
CN217377131U (en) Incomplete tooth row rope winch
CN202296624U (en) Transmission device for producing take-up machine in large-pull process of a welding wire

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190418

Address after: 325600 No. 29 Daxing West Road, Liushi Town, Yueqing City, Zhejiang Province

Applicant after: YUEQING FENGJIE ELECTRONIC TECHNOLOGY CO., LTD.

Address before: Room 704, 5 Building, Ganglongcheng City Square, Suzhou High-tech Zone, Jiangsu Province

Applicant before: Suzhou Yu get water, electricity and gas Science and Technology Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211201

Address after: 274000 301, East 3rd floor, Heze Industrial Technology Research Institute, Nanjing Road, Heze Development Zone, Shandong Province

Patentee after: Shandong Dongjian Intelligent Technology Co.,Ltd.

Address before: 325600 No. 29 Daxing West Road, Liushi Town, Yueqing City, Zhejiang Province

Patentee before: YUEQING FENGJIE ELECTRONIC TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220421

Address after: 226600 169 Li Fa FA Road, Chengdong Town, Haian City, Nantong, Jiangsu.

Patentee after: Jiangsu Jingjiang Industrial Equipment Co.,Ltd.

Address before: 274000 301, East 3rd floor, Heze Industrial Technology Research Institute, Nanjing Road, Heze Development Zone, Shandong Province

Patentee before: Shandong Dongjian Intelligent Technology Co.,Ltd.

TR01 Transfer of patent right