CN107817742A - Electricity power engineering management intelligence managing and control system based on BIM technology - Google Patents
Electricity power engineering management intelligence managing and control system based on BIM technology Download PDFInfo
- Publication number
- CN107817742A CN107817742A CN201710822133.0A CN201710822133A CN107817742A CN 107817742 A CN107817742 A CN 107817742A CN 201710822133 A CN201710822133 A CN 201710822133A CN 107817742 A CN107817742 A CN 107817742A
- Authority
- CN
- China
- Prior art keywords
- temperature
- humidity
- buildings models
- models
- control system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/048—Monitoring; Safety
Abstract
The present invention is intended to provide the electricity power engineering management intelligence managing and control system based on BIM technology, to solve the technical problem that can not be alarmed according to scene temperature in prior art.Including BIM models, the BIM models include BUILDINGS MODELS;It is architectural corresponding to BUILDINGS MODELS to be provided with ambient temperature detection device and monitoring camera;The ambient temperature detection device environment temperature that will be detected that is connected with BUILDINGS MODELS is sent to BUILDINGS MODELS;BUILDINGS MODELS is connected with monitoring camera for controlling monitoring camera to shoot and obtaining the photo of monitoring camera shooting.Following advantageous effects can be obtained by implementing the present invention:The present invention can be alarmed according to the environment temperature monitored, and control camera to be shot;The picture photographed is used to be shown in BUILDINGS MODELS so that administrative staff check, administrative staff can know whether scene stops constructing on request according to the picture photographed, and then effectively prevent construction at high temperature phenomenon, and then meet relevant regulations.
Description
Technical field
The present invention relates to a kind of managing and control system, and in particular to a kind of electricity power engineering management intelligence management and control based on BIM technology
System.
Background technology
Electricity power engineering management intelligence managing and control system based on BIM technology, is a kind of managing and control system using BIM technology, BIM
That is BIM, electricity power engineering management intelligence managing and control system is by establishing every relevant information number with electricity power engineering project
Based on, it is established that three-dimensional BUILDINGS MODELS, the information transfer of electricity power engineering is supplied into pipe to building mould by staff
Control personnel check so that electricity power engineering management and control is more convenient.But managing and control system of the prior art can not enter according to scene temperature
Row alarm, related management regulation is violated to prevent construction.
The content of the invention
The present invention is intended to provide the electricity power engineering management intelligence managing and control system based on BIM technology, to solve prior art side
The technical problem that can not be alarmed according to scene temperature in case.
In order to realize the purpose, the electricity power engineering management intelligence managing and control system of the invention based on BIM technology, including BIM
Model, the BIM models include BUILDINGS MODELS;Entity corresponding to BUILDINGS MODELS it is architectural be provided with ambient temperature detection device and
Monitoring camera;The ambient temperature detection device environment temperature that will be detected that is connected with BUILDINGS MODELS is sent to building mould
Type;BUILDINGS MODELS is connected with monitoring camera for controlling monitoring camera to shoot and obtaining the photo of monitoring camera shooting;
Wherein BUILDINGS MODELS performs following steps:The environment temperature of ambient temperature detection device monitoring is obtained in real time, according to the ring of acquisition
Border temperature is alarmed, wherein carrying out alarm according to the environment temperature of acquisition includes:If environment temperature more than 37 DEG C and
At less than 40 DEG C, BUILDINGS MODELS carries out one-level temperature alarming and judges whether current time is the working time according to system time,
Camera is controlled to be shot if current time is not the working time;If environment temperature is higher than 40 DEG C, two level temperature is carried out
Degree is alarmed and controls camera to be shot;If environment temperature is less than 37 degree, stop one-level temperature alarming and two level temperature
Alarm.
Preferably, when BUILDINGS MODELS carries out one-level temperature alarming or two level temperature alarming, BUILDINGS MODELS is when setting
Between obtain camera shooting photo, and calculate adjacent time shooting two photos similarity, if adjacent time shoot
The similarities of two photos be less than setting value, then carry out construction at high temperature alarm.
Preferably, the similarity of two photos for calculating adjacent time shooting includes:Two photos are carried out
Gray proces, and row threshold division is entered according to the average gray of the photo after respective gray proces;To two after Threshold segmentation
The gray value of pixel of the photo in same position is compared one by one, draws the pixel total amount M and not of same grayscale value
With the pixel total amount N of gray value;The similarity Y of two photos is calculated by equation below:
Y=M/ (M+N).
Preferably, entity corresponding to BUILDINGS MODELS is architectural is provided with ambient humidity detection means and dehumidifier, the environment
The humidity detector ambient humidity that will be detected that is connected with BUILDINGS MODELS is sent to BUILDINGS MODELS, the BUILDINGS MODELS and dehumidifying
Device is connected for controlling dehumidifier to be dehumidified;Wherein BUILDINGS MODELS also executes the following steps:Ambient humidity detection is obtained in real time
The ambient humidity of device monitoring, alarmed according to the ambient humidity of acquisition, wherein being alarmed according to the ambient humidity of acquisition
Including:If the ambient humidity obtained is higher than 80%, carries out humidity alarm and control dehumidifier to be dehumidified;If obtain
Ambient humidity is not higher than 80%, then stops humidity alarm and control dehumidifier to stop dehumidifying after postponing setting time.
Preferably, the BIM models include device model, and the entity device corresponding to the device model is provided with equipment
Temperature-detecting device and equipment humidity detector, the device temperature detection means are connected with device model for that will detect
Device temperature be transferred to on corresponding device model, the equipment humidity detector is connected with device model for will inspection
The equipment humidity measured is transferred to corresponding device model.
Preferably, after the device model receives device temperature, device temperature and default temperature threshold are compared
Compared with if device temperature is more than default temperature threshold, being alarmed.
Preferably, after the device model receives equipment humidity, equipment humidity and default humidity threshold are compared
Compared with if equipment humidity is more than default humidity threshold, being alarmed.
Following advantageous effects can be obtained by implementing the present invention:The present invention can be according to the environment temperature monitored
Alarmed, and control camera to be shot;The picture photographed is used to be shown in BUILDINGS MODELS so that administrative staff look into
See, administrative staff can know whether scene stops constructing on request according to the picture photographed, and then effectively prevent high temperature
Construction phenomenon, and then meet relevant regulations.
Embodiment
For the ease of the understanding of those skilled in the art, the present invention is made further with reference to specific embodiment
It is bright:
The invention provides a kind of electricity power engineering management intelligence managing and control system based on BIM technology, including BIM models, institute
Stating BIM models includes BUILDINGS MODELS;Entity corresponding to BUILDINGS MODELS is architectural to be taken the photograph provided with ambient temperature detection device and monitoring
As head;The ambient temperature detection device is connected with BUILDINGS MODELS for the environment temperature detected to be sent into BUILDINGS MODELS;
BUILDINGS MODELS is connected with monitoring camera for controlling monitoring camera to shoot and obtaining the photo of monitoring camera shooting;Wherein
BUILDINGS MODELS performs following steps:The environment temperature of ambient temperature detection device monitoring is obtained in real time, according to the environment temperature of acquisition
Degree is alarmed, wherein carrying out alarm according to the environment temperature of acquisition includes:If environment temperature is more than 37 DEG C and 40 DEG C
When following, BUILDINGS MODELS carries out one-level temperature alarming and judges whether current time is the working time according to system time, if
Current time is not the working time then to control camera to be shot;If environment temperature is higher than 40 DEG C, two level temperature report is carried out
Warn and control camera to be shot;If environment temperature is less than 37 degree, stop one-level temperature alarming and two level temperature alarming.
The present invention is alarmed according to the environment temperature monitored, and controls camera to be shot.The picture photographed
For being shown in BUILDINGS MODELS so that administrative staff check, administrative staff can be to know scene according to the picture photographed
It is no to stop construction on request, and then construction at high temperature phenomenon effectively is prevented, and then meet relevant regulations.
As a kind of optional embodiment of the electricity power engineering management intelligence managing and control system based on BIM technology, when building mould
When type carries out one-level temperature alarming or two level temperature alarming, BUILDINGS MODELS obtains the photo of camera shooting every setting time,
And the similarity of two photos of adjacent time shooting is calculated, set if the similarity of two photos of adjacent time shooting is less than
Definite value, then carry out construction at high temperature alarm.During one-level temperature alarming or two level temperature alarming, shot by front and rear adjacent time
The similarity interpretation scenes of two photos whether there are personnel constructing, if personnel are constructing, then alarmed, Jin Erda
To the purpose of intelligent management and control.
As a kind of optional embodiment of the electricity power engineering management intelligence managing and control system based on BIM technology, the calculating
The similarity of two photos of adjacent time shooting includes:Gray proces are carried out to two photos, and according to respective gray scale
The average gray of photo after processing enters row threshold division;To pixel of two photos in same position after Threshold segmentation
Gray value compared one by one, draw the pixel total amount M of same grayscale value and the pixel total amount N of different gray values;It is logical
Cross the similarity Y that equation below calculates two photos:
Y=M/ (M+N).
Gray proces are first passed through, row threshold division is then entered according to average gray value, further according to two after Threshold segmentation
The gray value of pixel of the photo in same position calculates the similarity of two kinds of photos, realizes the quick calculating of similarity.
As a kind of optional embodiment of the electricity power engineering management intelligence managing and control system based on BIM technology, BUILDINGS MODELS
Corresponding entity is architectural to be provided with ambient humidity detection means and dehumidifier, the ambient humidity detection means and BUILDINGS MODELS phase
The ambient humidity detected is even sent to BUILDINGS MODELS, the BUILDINGS MODELS is connected with dehumidifier for controlling dehumidifier to carry out
Dehumidifying;Wherein BUILDINGS MODELS also executes the following steps:The ambient humidity of ambient humidity detection arrangement monitors is obtained in real time, according to obtaining
The ambient humidity taken is alarmed, wherein carrying out alarm according to the ambient humidity of acquisition includes:If the ambient humidity obtained is high
In 80%, then carry out humidity alarm and control dehumidifier to be dehumidified;If the ambient humidity obtained is not higher than 80%, stop
Humidity alarm simultaneously postpones control dehumidifier stopping dehumidifying after setting time.Automatic alarm is carried out according to site environment humidity, and certainly
Dynamic dehumidifying.
As a kind of optional embodiment of the electricity power engineering management intelligence managing and control system based on BIM technology, the BIM moulds
Type includes device model, and the entity device corresponding to the device model is provided with device temperature detection means and equipment humidity is examined
Device is surveyed, the device temperature detection means is connected with device model for the device temperature detected to be transferred to corresponding
On device model, the equipment humidity detector is connected corresponding for the equipment detected humidity to be transferred to device model
Device model.
As a kind of optional embodiment of the electricity power engineering management intelligence managing and control system based on BIM technology, the equipment
After model receives device temperature, by device temperature compared with default temperature threshold, preset if device temperature is more than
Temperature threshold, then alarmed.After the device model receives equipment humidity, by equipment humidity and default humidity threshold
It is compared, if equipment humidity is more than default humidity threshold, is alarmed.
The specific embodiment of the present invention is the foregoing is only, but the technical characteristic of the present invention is not limited thereto, Ren Heben
The technical staff in field in the field of the invention, all cover among the scope of the claims of the present invention by the change or modification made.
Claims (7)
1. the electricity power engineering management intelligence managing and control system based on BIM technology, it is characterised in that:Including BIM models, the BIM moulds
Type includes BUILDINGS MODELS;Entity corresponding to BUILDINGS MODELS is architectural to be provided with ambient temperature detection device and monitoring camera;Institute
State the ambient temperature detection device environment temperature that will be detected that is connected with BUILDINGS MODELS and be sent to BUILDINGS MODELS;BUILDINGS MODELS and prison
Control camera is connected for controlling monitoring camera to shoot and obtaining the photo of monitoring camera shooting;Wherein BUILDINGS MODELS performs
Following steps:The environment temperature of ambient temperature detection device monitoring is obtained in real time, is alarmed according to the environment temperature of acquisition, its
The middle environment temperature according to acquisition, which carries out alarm, to be included:If environment temperature more than 37 DEG C and at less than 40 DEG C, builds mould
Type carries out one-level temperature alarming and judges whether current time is the working time according to system time, if current time is not work
Making the time then controls camera to be shot;If environment temperature is higher than 40 DEG C, carries out two level temperature alarming and control camera
Shot;If environment temperature is less than 37 degree, stop one-level temperature alarming and two level temperature alarming.
2. the electricity power engineering management intelligence managing and control system based on BIM technology as claimed in claim 1, it is characterised in that:When building
When building model progress one-level temperature alarming or two level temperature alarming, BUILDINGS MODELS obtains the photograph of camera shooting every setting time
Piece, and the similarity of two photos of adjacent time shooting is calculated, if the similarity of two photos of adjacent time shooting is low
In setting value, then construction at high temperature alarm is carried out.
3. the electricity power engineering management intelligence managing and control system based on BIM technology as claimed in claim 2, it is characterised in that:It is described
Calculating the similarity of two photos of adjacent time shooting includes:Gray proces are carried out to two photos, and according to respective
The average gray of photo after gray proces enters row threshold division;To picture of two photos in same position after Threshold segmentation
The gray value of vegetarian refreshments is compared one by one, draws the pixel total amount M of same grayscale value and the pixel total amount of different gray values
N;The similarity Y of two photos is calculated by equation below:
Y=M/ (M+N).
4. the electricity power engineering management intelligence managing and control system based on BIM technology as claimed in claim 1, reality corresponding to BUILDINGS MODELS
Body is architectural to be provided with ambient humidity detection means and dehumidifier, and the ambient humidity detection means is connected with BUILDINGS MODELS will detection
To ambient humidity be sent to BUILDINGS MODELS, the BUILDINGS MODELS is connected with dehumidifier for controlling dehumidifier to be dehumidified;Its
Middle BUILDINGS MODELS also executes the following steps:The ambient humidity of ambient humidity detection arrangement monitors is obtained in real time, according to the ring of acquisition
Border humidity is alarmed, wherein carrying out alarm according to the ambient humidity of acquisition includes:If the ambient humidity obtained is higher than 80%,
Then carry out humidity alarm and control dehumidifier to be dehumidified;If the ambient humidity obtained is not higher than 80%, stop humidity report
Warn and control dehumidifier to stop dehumidifying after postponing setting time.
5. the electricity power engineering management intelligence managing and control system based on BIM technology as claimed in claim 1, it is characterised in that:It is described
BIM models include device model, and the entity device corresponding to the device model is provided with device temperature detection means and equipment
Humidity detector, the device temperature detection means be connected with device model for by the device temperature detected be transferred to
On corresponding device model, the equipment humidity detector is connected with device model for the equipment humidity transmission that will be detected
To corresponding device model.
6. the electricity power engineering management intelligence managing and control system based on BIM technology as claimed in claim 5, the device model receives
To after device temperature, by device temperature compared with default temperature threshold, if device temperature is more than default temperature threshold
Value, then alarmed.
7. the electricity power engineering management intelligence managing and control system based on BIM technology as claimed in claim 5, the device model receives
To after equipment humidity, by equipment humidity compared with default humidity threshold, if equipment humidity is more than default humidity threshold
Value, then alarmed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710822133.0A CN107817742A (en) | 2017-09-13 | 2017-09-13 | Electricity power engineering management intelligence managing and control system based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710822133.0A CN107817742A (en) | 2017-09-13 | 2017-09-13 | Electricity power engineering management intelligence managing and control system based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107817742A true CN107817742A (en) | 2018-03-20 |
Family
ID=61607102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710822133.0A Pending CN107817742A (en) | 2017-09-13 | 2017-09-13 | Electricity power engineering management intelligence managing and control system based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107817742A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101310653B1 (en) * | 2012-04-05 | 2013-09-24 | 연세대학교 산학협력단 | Context awareness system based bim using thermal image camera |
CN103955174A (en) * | 2014-03-31 | 2014-07-30 | 湖南大学 | Building health monitoring system based on building information model technology |
CN104680322A (en) * | 2015-02-13 | 2015-06-03 | 上海同筑信息科技有限公司 | Project acceptance system and method based on BIM |
CN106650855A (en) * | 2017-01-03 | 2017-05-10 | 宁波高新区禾丰科技有限公司 | Fire-fighting equipment comprehensive management system |
CN106919129A (en) * | 2017-04-05 | 2017-07-04 | 东北大学 | A kind of hanger rail type movable monitoring early-warning system based on Urban Underground pipe gallery |
CN106996804A (en) * | 2017-04-01 | 2017-08-01 | 深圳市新科聚合网络技术有限公司 | Indoor air chemical pollution visualization system based on BIM |
CN206373493U (en) * | 2016-12-03 | 2017-08-04 | 西安知点信息科技有限公司 | A kind of intelligent pipeline maintenance system based on BIM models |
-
2017
- 2017-09-13 CN CN201710822133.0A patent/CN107817742A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101310653B1 (en) * | 2012-04-05 | 2013-09-24 | 연세대학교 산학협력단 | Context awareness system based bim using thermal image camera |
CN103955174A (en) * | 2014-03-31 | 2014-07-30 | 湖南大学 | Building health monitoring system based on building information model technology |
CN104680322A (en) * | 2015-02-13 | 2015-06-03 | 上海同筑信息科技有限公司 | Project acceptance system and method based on BIM |
CN206373493U (en) * | 2016-12-03 | 2017-08-04 | 西安知点信息科技有限公司 | A kind of intelligent pipeline maintenance system based on BIM models |
CN106650855A (en) * | 2017-01-03 | 2017-05-10 | 宁波高新区禾丰科技有限公司 | Fire-fighting equipment comprehensive management system |
CN106996804A (en) * | 2017-04-01 | 2017-08-01 | 深圳市新科聚合网络技术有限公司 | Indoor air chemical pollution visualization system based on BIM |
CN106919129A (en) * | 2017-04-05 | 2017-07-04 | 东北大学 | A kind of hanger rail type movable monitoring early-warning system based on Urban Underground pipe gallery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109632033A (en) | A kind of apparatus and method for of cubing | |
CN103189687A (en) | Energy management system | |
CN112434669B (en) | Human body behavior detection method and system based on multi-information fusion | |
CN105828065B (en) | A kind of video pictures overexposure detection method and device | |
CN101924923B (en) | Embedded intelligent automatic zooming snapping system and method thereof | |
CN103226694B (en) | A kind of portrait in real time obtains comparison and early warning cloth Ore-controlling Role and using method thereof | |
CN104463869B (en) | A kind of video flame image composite identification method | |
CN103425959B (en) | Flame video detection method for identifying fire hazard | |
CN103632158A (en) | Forest fire prevention monitor method and forest fire prevention monitor system | |
CN102673979A (en) | Method and device for judging deviation of conveying belt | |
KR101204259B1 (en) | A method for detecting fire or smoke | |
CN106767718B (en) | Steel building collapsing risk monitoring method in fire | |
CN105469427B (en) | One kind is for method for tracking target in video | |
CN104820995A (en) | Large public place-oriented people stream density monitoring and early warning method | |
CN113299035A (en) | Fire identification method and system based on artificial intelligence and binocular vision | |
CN109848073A (en) | A kind of apparatus and method for sorting coal and gangue | |
CN108364292A (en) | A kind of illumination estimation method based on several multi-view images | |
CN116189103B (en) | Equipment monitoring automatic control method and control system based on visual image analysis | |
CN109631766A (en) | A kind of wood plank dimension measurement method based on image | |
CN103175512A (en) | Shooting measurement method of attitude of tail end of boom of concrete pump truck | |
CN111931652A (en) | Dressing detection method and device and monitoring terminal | |
CN107817742A (en) | Electricity power engineering management intelligence managing and control system based on BIM technology | |
CN117132947B (en) | Dangerous area personnel identification method based on monitoring video | |
CN110443316A (en) | Board turning recognition methods, device and the distribution network failure of fault detector monitor system | |
CN107590936A (en) | A kind of warehouse warning system based on video monitoring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180320 |
|
RJ01 | Rejection of invention patent application after publication |