CN107784488A - A kind of business process management system of loose couplings - Google Patents
A kind of business process management system of loose couplings Download PDFInfo
- Publication number
- CN107784488A CN107784488A CN201711156334.8A CN201711156334A CN107784488A CN 107784488 A CN107784488 A CN 107784488A CN 201711156334 A CN201711156334 A CN 201711156334A CN 107784488 A CN107784488 A CN 107784488A
- Authority
- CN
- China
- Prior art keywords
- module
- plug
- operation flow
- result
- interface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Mining
Abstract
The invention discloses a kind of business process management system of loose couplings, including:Client, for generating operation flow, that submits the operation flow and the operation flow performs request, and shows the execution state and result of operation;BPM device, request is performed for receive the operation flow and the operation flow, the operation is generated according to the relevant information of the operation flow, and monitors the execution state and result of the operation, the execution state of the operation and result are fed back into the client;Explorer, for performing the operation.Pass through each component Coordination Treatment operation flow in the system, it is possible to achieve geological data is accurately and comprehensively handled.
Description
Technical field
The present invention relates to High Performance Computing field, more particularly to a kind of business process management system of loose couplings.
Background technology
China's oil consumption figure is only second to the U.S. at present, turns into the second-biggest-in-the-world oil consumption country, and seismic prospecting is modern
The most widely used one kind in oil exploration method.Accurately, comprehensively realize that seismic data process is extremely urgent.However,
China, the BPM towards seismic data process are still within starting and stage of fumbling.
Therefore, how accurately, comprehensively the processing for realizing geological data is those skilled in the art's technology urgently to be resolved hurrily
Problem.
The content of the invention
It is an object of the invention to provide a kind of business process management system of loose couplings, accurately, comprehensively can realize ground
Shake the processing of data.
In order to solve the above technical problems, the invention provides a kind of business process management system of loose couplings, the system
System includes:
Client, for generating operation flow, the request that performs of the operation flow and the operation flow is submitted, and
Show the execution state and result of operation;
BPM device, request is performed for receive the operation flow and the operation flow, according to institute
The relevant information for stating operation flow generates the operation, and monitors the execution state and result of the operation, by the operation
Execution state feeds back to the client with result;
Explorer, for performing the operation.
Preferably, the BPM device includes:
Web server, request is performed for receive the operation flow and the operation flow;
Business integration platform, for parsing the operation flow, according to analysis result, directive script is formed, described in submission
Directive script, the operation is generated, obtain the execution state and result of the operation, and by the execution state of the operation with tying
Fruit feeds back to the client;
BPM database, for storing the relevant information of the operation flow;
Shared memory, for storing the result of the operation.
Preferably, the business integration platform includes:
Parameter management module, the relevant parameter for management function module;
Script management module, for generating the operation according to the relevant parameter of the functional module;
State monitoring and management module, for obtaining the execution state and result of the operation by way of poll, and will
The state of the operation feeds back to the client with result.
Preferably, the business integration platform also includes:
Document management module, for establishing index for the storage path of file resource;
User management module, for being managed to the account of user, password and authority.
Preferably, the explorer includes:
Disk resident storage drive, for storing the disk space of each tool software;
Scheduling of resource module, for dispatching the disk space, perform the operation.
Preferably, the system also includes:
Plug-in unit processing module, the configuration file for configuration plug-in;Wherein, the configuration file of the plug-in unit provides including plug-in unit
Source ID, plugin name, plug-in unit path, plug-in parameter;
Plug-in unit loads engine, for reading the configuration file of the plug-in unit, and loads corresponding plug-in unit;
Plug-in unit display module, for showing the plug-in unit by the form of menu or tool bar.
Preferably, the system also includes:
Visual remote interactive module, for passing through internet remote monitoring and the management operation.
Preferably, the system also includes:
Interface setup module, for setting between the system and system component and the system and external module connect
Mouthful.
Preferably, the interface setup module includes:
Operation flow interacts submodule, for realizing the data interaction of multiple business platforms with being connected.
Preferably, the interface setup module also includes:
System sets submodule with functional module interface, for realizing management of the system to each functional module;
System sets submodule with resource manager interface, for increasing explorer newly;
System sets submodule with database interface, for realizing management of the system to database;
Remote visualization interface sets submodule, for realizing that the remote visualization of the system operates;
System and GeoEast interfaces set submodule, for realizing being connected for the system and GeoEast.
The business process management system of loose couplings provided by the present invention, including:Client, for generating Business Stream
Journey, that submits the operation flow and the operation flow performs request, and shows the execution state and result of operation;Business
Workflow manager, request is performed for receive the operation flow and the operation flow, according to the operation flow
Relevant information generates the operation, and monitors the execution state and result of the operation, by the execution state of the operation and knot
Fruit feeds back to the client;Explorer, for performing the operation.
The business process management system of loose couplings provided by the present invention, the characteristics of for seismo logical data, support ground
The high-performance treatments of data are learned in shake.By each component Coordination Treatment operation flow in system, accurately and comprehensively processing ground is realized
The purpose of data is learned in shake.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, the present invention will be implemented below
The required accompanying drawing used is briefly described in example or description of the prior art, it should be apparent that, drawings in the following description are only
Only it is embodiments of the invention, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also
To obtain other accompanying drawings according to the accompanying drawing of offer.
Fig. 1 is a kind of schematic diagram of the business process management system of loose couplings provided in an embodiment of the present invention;
Fig. 2 is condition monitoring interface schematic diagram provided in an embodiment of the present invention;
Fig. 3 is that plug-in unit provided in an embodiment of the present invention loads schematic diagram;
Fig. 4 is the schematic flow sheet that user provided in an embodiment of the present invention submits remote desktop service request;
Fig. 5 is that system provided in an embodiment of the present invention response user asks and returns to the schematic flow sheet of remote desktop;
Fig. 6 is that the base class of explorer provided in an embodiment of the present invention includes schematic diagram.
Embodiment
The core of the present invention is to provide a kind of business process management system of loose couplings, and the system can be realized to earthquake
Data are learned accurately and comprehensively to be handled.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is
Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art
The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 1 is refer to, Fig. 1 is a kind of signal of the business process management system of loose couplings provided in an embodiment of the present invention
Figure, understand that the business process management system can include with reference to the schematic diagram:
Client 100, for generating operation flow, that submits operation flow and operation flow performs request, and shows
The execution state and result of operation;
Specifically, under edit pattern, each functional module can be added in operation flow from the list of editing interface.
Wherein, the operation flow that is defined by GUI (Graphical User Interface, graphic user interface), tool software with
And relevant parameter can be stored in Work Process Management database.User can be created between each functional module by drag and drop
Dependence, to realize, each functional module serial or parallel is run in operation flow.I.e. user can be by functional module
Drag and drop and edit generation operation flow, and the parameter of each functional module in operation flow can be configured.Generation
Operation flow is carried in the form of XML (Extensible Markup Language, extensible markup language) project file
Hand over, and submit operation flow to perform request.Wherein, functional module is to form the elementary cell of operation flow, functional module
Calling by Business Process Control.Functional module both can be executable application programs or custom script.
Further, can be by operation after the execution state of operation of BPM device feedback is received with result
Execution state and result be shown on condition monitoring interface;As shown in Fig. 2 Fig. 2 supervises for state provided in an embodiment of the present invention
Control interface schematic diagram;The state of operation can be known by condition monitoring interface, for example, the execution state of operation 1 can be known
For operation;The execution state of operation 2 is to exit;The execution state of operation 3 is to shelve;The execution state of operation 4 is that operation is being arranged
It is suspended during team.
BPM device 200, request is performed for receive operation flow and operation flow, according to operation flow
Operation is generated, and monitors the execution state and result of operation, the execution state of operation and result are fed back into client 100;
Preferably, BPM device 200 includes:
Web server, request is performed for receive operation flow and operation flow;
Business integration platform, for parsing operation flow, according to analysis result, directive script is formed, submits directive script,
Operation is generated, obtains the execution state and result of operation, and the execution state of operation and result are fed back into client;
BPM database, the relevant information for storage service flow;
Shared memory, for storing the result of operation.
Specifically, operation flow performs request is sent to business integration platform, in the operating mode, industry through Web server
Being engaged in integrated platform can be using the operation flow of the business process engine parsing submission of client 100, according to each work(in operation flow
The program and parameter of energy module, form job script, and the job script after submission turns into operation, are received simultaneously by explorer
Carry out scheduling of resource and Job execution.In the monitoring mode, the job script i.e. running status of operation having been filed on is supervised
Control, and the execution state of operation and result are returned into client.
The relevant information of BPM database purchase operation flow, it can additionally store operation and user
Details;Meanwhile BPM database can be with the configuration data of SRM device.Wherein, operation flow
Operation flow list, functional module and parameter form, directive script list, state list, file can be included by managing database
List, user's list.Wherein, centered on operation flow list, other each lists and operation flow list are interrelated, are industry
Business integrated platform provides support.
Shared memory stores the result of operation, includes the intermediate result and final result of operation.Pass through shared memory
Can realize node different on networking, different operating system can sharing data each other, application program can be allowed to pass through net
Network accesses the data in server disk, realizes the shared of application program and user data.
Preferably, business integration platform includes:
Parameter management module, the relevant parameter for management function module;
Script management module, for generating operation according to the relevant parameter of functional module;
State monitoring and management module, for obtaining the execution state and result of the operation by way of poll, and will
The state of the operation feeds back to the client with result.
Specifically, the relevant parameter of parameter management module management functional module, for the input, output, function of functional module
Parameter/configuration interface is provided between module.Wherein, each functional module needs to provide details, including needs from terminal operating work(
The order of energy module or script, the resource and function mould ordered the parameter used, functional module is distributed to by explorer
Block is by the anticipated output of generation.The parameter of all functional modules is input in system by Web browser interface, and is stored in number
According to storehouse.
Script management module generates operation according to the relevant parameter of functional module.Wherein, the resource request that operation is related to
Include required internal memory, interior check figure and the duration that distribute to operation.To generate operation, the parameter of the functional module called with
And the input that is related to, output file information etc. need to completely can use.
State monitoring and management module is monitored to the job run state having been filed on, and by the execution state of operation with tying
Fruit feeds back to client.State monitoring and management module to the real-time monitoring of operation by being interacted with explorer 300 to complete,
Use the more new state of the command tools Inspection of explorer 300.By lasting poll to update Job Details.
The data of the operation of return are resolved and are stored in BPM database, to retain the state recording of operation.
Preferably, business integration platform also includes:
Document management module, for establishing index for the storage path of file resource;
User management module, for being managed to the account of user, password and authority.
Specifically, document management module establishes index for the storage path of file resource;It is responsible for providing used file
Source, the input of operation and the working directory of output and operation are managed.File resource is stored in the mesh by system administration
Record in hierarchical structure.After Job execution success, user can be with the result of access operation.
User management module is managed to the account of user, password and authority;Provided the user according to user right
Job management function.Monitoring job state, operation is deleted, cancels the operation being currently running, pause or retains operation, more corrects students' papers
Different processing responses is provided for the user of different rights Deng these operations.
Explorer 300, for performing operation.
Specifically, explorer 300 calls corresponding functional module, operation is performed according to scheduling strategy, and in user
Pass through the intermediate result and final result of the specified location output operation of parameter setting.In addition, explorer 300 is also responsible for bearing
The collection of information carrying breath, resource management, load balancing.
Preferably, explorer 300 includes:
Disk resident storage drive, for storing the disk space of each tool software;
Scheduling of resource module, for dispatching the disk space, perform operation.
In summary, the business process management system of loose couplings provided by the present invention, including client 100, are used for
Generation operation flow, submission operation flow and operation flow perform request, and show the execution state and result of operation;Industry
It is engaged in workflow manager 200, request is performed for receive operation flow and operation flow, according to the relevant information of operation flow
Operation is generated, and monitors the execution state and result of operation, the execution state of operation and result are fed back into client 100;Money
Source manager 300, for performing operation.
The business process management system of loose couplings provided by the present invention, the characteristics of for seismo logical data, support ground
The high-performance treatments of data are learned in shake.By each component Coordination Treatment operation flow in system, realize and seismo logical data is carried out
Accurately and comprehensively handle.
On the basis of above-described embodiment:
As a kind of preferred embodiment, the system also includes:
Plug-in unit processing module, the configuration file for configuration plug-in;Wherein, the configuration file of plug-in unit includes plug-in resource
ID, plugin name, plug-in unit path, plug-in parameter;
Plug-in unit loads engine, for reading the configuration file of plug-in unit, and loads corresponding plug-in unit;
Plug-in unit display module, for showing plug-in unit by the form of menu or tool bar.
Specifically, to realize Function Extension, load engine coordinated using plug-in card configuration file and plug-in unit and complete.It is logical
Cross plug-in card configuration file and illustrate the information such as the resource ID of plug-in unit, title, position.Plug-in unit loading engine is then responsible for loading plug-in unit.
When business integration platform starts, plug-in unit loading engine reads plug-in card configuration file, and loads corresponding plug-in unit.Wherein, loading
Plug-in unit can be shown in the form of menu or tool bar.
Fig. 3 is may be referred to, Fig. 3 is that plug-in unit provided in an embodiment of the present invention loads schematic diagram;Understand, insert with reference to the schematic diagram
Part loading may comprise steps of:
It is the startup integrated platform in Fig. 3 to start business integration platform;
The configuration file for reading plug-in unit is the reading plug-in card configuration file in Fig. 3;
Load plug-in unit;
Show plug-in menu.
Wherein, the configuration file of plug-in unit describes the letters such as resource ID, title, plug-in unit path and the corresponding event of each plug-in unit
Breath.Business integration platform determines whether enabling for plug-in unit by setting corresponding switch in configuration file.Business integration platform
During operation, check configuration file and load plug-in unit.The configuration file of plug-in unit is stored and parsed in xml form, expansible, also can office
Change in portion.
The preferred embodiment, the Function Extension mechanism based on plug-in unit is established, third-party functional module can be loaded
Into business integration platform, and then the function for integrated platform of activating business.
On the basis of above-described embodiment:
As a kind of preferred embodiment, the system also includes:
Visual remote interactive module, for passing through internet remote monitoring and management operation.
Specifically, under remote interaction pattern, visual remote interactive module, it is responsible for receiving user's input.User can be with
Operation is monitored and managed by Web browser interface remote.In order that loose coupling is kept between system and each business integration platform,
Remote visualization can be realized using remote desktop technology.Fig. 4 and Fig. 5 are referred to, wherein, Fig. 4 provides for the embodiment of the present invention
User submit remote desktop service request schematic flow sheet, Fig. 5 be system provided in an embodiment of the present invention respond user please
Ask and return to the schematic flow sheet of remote desktop.Pass through the detailed status information of graphical interaction interface display operation flow, user
It can monitor the state of operation flow in real time in internet, including job run state, be currently running or wait operation
Operation number, on-line/off-line nodes, the ratio of the processor used in whole cluster, still available disk space etc..With
Family can check the state of each node in cluster and the current queue where the operation being submitted by graphical interaction interface.
Further, visual remote interactive module uses B/S (Browser/Server, browser/server) pattern, uses
Family is interacted in Terminal Server Client by Web browser and business integration platform.
The preferred embodiment, by visual remote interactive module, realize Terminal Server Client to operation flow on server
The monitoring and operation of execution state, realize the displaying of business flow processing result.Meanwhile B/S structures utilize Web browser, knot
Close script and component technology, realize client functionality, can reach the seamless upgrade of system, reduce system maintenance expense,
Realize the purpose of cross-platform operation.
On the basis of above-described embodiment:
As a kind of preferred embodiment, the system also includes:
Interface setup module, for setting between system and system component and the interface of system and external module.
Preferably, interface setup module includes:
Operation flow interacts submodule, for realizing the data interaction of multiple business platforms with being connected.
Specifically, to realize the interaction of multiple business platforms with being connected, can with reasonable definition project file, take into account with
GeoEast compatibility, the collaborative process of finishing service flow.XML data, which exchanges, can use customized label.At two
XML project file business transferring procedure informations can be passed through between business platform.By the side that file index is established for data file
Linking is established in formula, the data interaction between different business platform.The result of previous business platform passes through file path rope
Draw and pass to the latter business platform.The intermediate result and final result data of operation can be saved on the shared memory,
It is shared by multiple business platforms.
Preferably, interface setup module also includes:
System sets submodule with functional module interface, for realizing management of the system to each functional module;
System sets submodule with resource manager interface, for increasing explorer newly;
System sets submodule with database interface, for realizing management of the system to database;
Remote visualization interface sets submodule, for realizing that the remote visualization of system operates;
System and GeoEast interfaces set submodule, for realizing being connected for system and GeoEast.
Specifically, new functional module needs to provide corresponding parameter information for system in addition.These information are by industry
Business workflow management database is preserved, updated and safeguarded., will be from BPM database when system carries out module calling
Corresponding list obtain corresponding information.Meanwhile the BPM database safeguards input configuration text for each newly-increased module
Part, input configuration file are that module or operation flow provide one group of acquiescence input.By module list, parameter form, workflow table
Single and the common maintenance tool software of other related lists, parameter and workflow relevant information.Each newly-increased tool software
Need to system provide detail parameters illustrate, the parameter value of input-output file and acquiescence.To tool software and workflow
Modification only influence related form data.
Further, the purpose for establishing the interface of explorer 300 is to increase explorer 300 newly for support, rather than will
Fixed resource manager 300 and system binding.In order to support propagation energy of the BPM device 200 to explorer 300
Power, the interface of explorer 300 use script wrapper.Base class is established for explorer 300 first, with reference to figure 6, Fig. 6 is
The base class of explorer provided in an embodiment of the present invention includes schematic diagram.Secondly, newly-increased explorer 300 can basis
Base class writes derived class.Derived class can follow following rule:
Derived class is inherited from the base class of explorer 300.Some needed for base class offer BPM device 200 are important
Function is, it is necessary to which derived class covers some unconsummated functions;
The output of data cover basic function of the derived class from explorer 300, and return them to business
Workflow manager 200.So, BPM device 200 receives and knows how the list of process object or object.Resource pipe
The contents of object for managing device 300 may be different, so object can include the metadata description which kind of categorical data they hold, with
Just BPM device 200 adjusts its interface to adapt to data.
Derived class is saved in the particular file folder that BPM device 200 can be found., can be in business using derived class
Derived class title is specified in the configuration file of workflow manager 200.
Further, using Object Relation Mapping mechanism, one, work reflects between relevant database and Business Entity object
Penetrate.So, by the attribute and method of operation object come operation service object, SQL (the Structured Query of complexity are avoided
Language, SQL) sentence.Use Object Relation Mapping mechanism so that database migration cost reduces.Not by
The limitation that concrete database is realized, system code need not be changed when changing database.
Further, system realizes remote visualization using remote desktop technology.Using remote server is deployed in, by remote
Journey desktop server manages the Linux environment desktop of multi-user.The remote desktop client based on Web, Yong Hutong are established simultaneously
Client acquisition request remote desktop is crossed, starts the single application of remote desktop, realizes the display of remote application with interacting.Pass through
Using remote desktop technology, the independence of original program can be maximally maintained.
Further, in order to farthest keep GeoEast independence, can be accomplished by the following way with
GeoEast interaction:
New GeoEast modules are established for GeoEast in business integration platform, and specify relevant parameter, specifying should
GeoEast modules .job document locations required when running;
Under remote interaction pattern, jsfconsole platforms, editing affairs flow, by operation flow in specified location are run
Place saves as .job files;
Operation flow is submitted, the GeoEast modules under business integration platform generate corresponding script command line sjob
Xxxx.job, control program is performed by GeoEast and receives script;
Call a kind of work of JSF (Java Server Faces, standard card cage for being used to build Java web applications)
Industry querying command, obtain the execution state of GeoEast operation.
In addition, in order to realize being connected for system and GeoEast, relevant interface can be set to realize the number to GeoEast
Accessed according to storehouse, access GeoEast output result, reading process destination file;The order of the status poll of JSF operations is called,
Obtain the execution state of JSF operation inside GeoEast;Start
Jsfconsole, remote interaction editing affairs flow;Logged in GeoEast user, use business integration platform
Family turns into GeoEast validated user.
Each embodiment is described by the way of progressive in specification, and what each embodiment stressed is and other realities
Apply the difference of example, between each embodiment identical similar portion mutually referring to.
Professional further appreciates that, with reference to the unit of each example of the embodiments described herein description
And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software, the composition and step of each example are generally described according to function in the above description.These
Function is performed with hardware or software mode actually, application-specific and design constraint depending on technical scheme.Specialty
Technical staff can realize described function using distinct methods to each specific application, but this realization should not
Think beyond the scope of this invention.
Directly it can be held with reference to the step of method or algorithm that the embodiments described herein describes with hardware, processor
Capable software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), internal memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
The business process management system of loose couplings provided by the present invention is described in detail above, herein
Apply specific case to be set forth the principle and embodiment of the present invention, the explanation of above example is only intended to help
Understand the method and its core concept of the present invention.It should be pointed out that for those skilled in the art, do not taking off
On the premise of from the principle of the invention, some improvement and modification can be carried out with the present invention, these are improved and modification also falls into this hair
In bright scope of the claims.
Claims (10)
1. a kind of business process management system of loose couplings, it is characterised in that the system includes:
Client, for generating operation flow, that submits the operation flow and the operation flow performs request, and shows
The execution state and result of operation;
BPM device, request is performed for receive the operation flow and the operation flow, according to the industry
The relevant information for flow of being engaged in generates the operation, and monitors the execution state and result of the operation, by the execution of the operation
State feeds back to the client with result;
Explorer, for performing the operation.
2. system according to claim 1, it is characterised in that the BPM device includes:
Web server, request is performed for receive the operation flow and the operation flow;
Business integration platform, for parsing the operation flow, according to analysis result, directive script is formed, submits the script
Instruction, generates the operation, obtains the execution state and result of the operation, and the execution state of the operation and result is anti-
Feed the client;
BPM database, for storing the relevant information of the operation flow;
Shared memory, for storing the result of the operation.
3. system according to claim 2, it is characterised in that the business integration platform includes:
Parameter management module, the relevant parameter for management function module;
Script management module, for generating operation according to the relevant parameter of the functional module;
State monitoring and management module, for obtaining the execution state and result of the operation by way of poll, and by described in
The state of operation feeds back to the client with result.
4. system according to claim 3, it is characterised in that the business integration platform also includes:
Document management module, for establishing index for the storage path of file resource;
User management module, for being managed to the account of user, password and authority.
5. system according to claim 1, it is characterised in that the explorer includes:
Disk resident storage drive, for storing the disk space of each tool software;
Scheduling of resource module, for dispatching the disk space, perform the operation.
6. system according to claim 1, it is characterised in that the system also includes:
Plug-in unit processing module, the configuration file for configuration plug-in;Wherein, the configuration file of the plug-in unit includes plug-in resource
ID, plugin name, plug-in unit path, plug-in parameter;
Plug-in unit loads engine, for reading the plug-in card configuration file, and loads corresponding plug-in unit;
Plug-in unit display module, for showing the plug-in unit by the form of menu or tool bar.
7. system according to claim 1, it is characterised in that the system also includes:
Visual remote interactive module, for passing through internet remote monitoring and the management operation.
8. system according to claim 1, it is characterised in that the system also includes:
Interface setup module, for setting between the system and system component and the interface of the system and external module.
9. system according to claim 8, it is characterised in that the interface setup module includes:
Operation flow interacts submodule, for realizing the data interaction of multiple business platforms with being connected.
10. system according to claim 9, it is characterised in that the interface setup module also includes:
System sets submodule with functional module interface, for realizing management of the system to each functional module;
System sets submodule with resource manager interface, for increasing explorer newly;
System sets submodule with database interface, for realizing management of the system to database;
Remote visualization interface sets submodule, for realizing that the remote visualization of the system operates;
System and GeoEast interfaces set submodule, for realizing being connected for the system and GeoEast.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711156334.8A CN107784488B (en) | 2017-11-20 | 2017-11-20 | Loosely coupled business process management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711156334.8A CN107784488B (en) | 2017-11-20 | 2017-11-20 | Loosely coupled business process management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107784488A true CN107784488A (en) | 2018-03-09 |
CN107784488B CN107784488B (en) | 2022-06-14 |
Family
ID=61429635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711156334.8A Active CN107784488B (en) | 2017-11-20 | 2017-11-20 | Loosely coupled business process management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107784488B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110347441A (en) * | 2019-06-25 | 2019-10-18 | 银江股份有限公司 | A kind of thermal expansion data integration automotive engine system and method |
CN110795489A (en) * | 2019-11-13 | 2020-02-14 | 四川长虹电器股份有限公司 | System and method for managing and controlling process of operation unit |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101968859A (en) * | 2010-09-29 | 2011-02-09 | 用友软件股份有限公司 | Business process management method and system based on cloud computing environment |
CN105447643A (en) * | 2015-11-30 | 2016-03-30 | 北京航空航天大学 | Cloud computing platform-oriented scientific workflow system and method |
CN106775632A (en) * | 2016-11-21 | 2017-05-31 | 中国科学院遥感与数字地球研究所 | A kind of operation flow can flexible expansion high-performance geographic information processing method and system |
CN107038066A (en) * | 2017-05-09 | 2017-08-11 | 吉林大学 | A kind of Activity Calculation system based on Web |
CN107341643A (en) * | 2016-04-29 | 2017-11-10 | 泰康保险集团股份有限公司 | Visual flow methods of exhibiting and system |
-
2017
- 2017-11-20 CN CN201711156334.8A patent/CN107784488B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101968859A (en) * | 2010-09-29 | 2011-02-09 | 用友软件股份有限公司 | Business process management method and system based on cloud computing environment |
CN105447643A (en) * | 2015-11-30 | 2016-03-30 | 北京航空航天大学 | Cloud computing platform-oriented scientific workflow system and method |
CN107341643A (en) * | 2016-04-29 | 2017-11-10 | 泰康保险集团股份有限公司 | Visual flow methods of exhibiting and system |
CN106775632A (en) * | 2016-11-21 | 2017-05-31 | 中国科学院遥感与数字地球研究所 | A kind of operation flow can flexible expansion high-performance geographic information processing method and system |
CN107038066A (en) * | 2017-05-09 | 2017-08-11 | 吉林大学 | A kind of Activity Calculation system based on Web |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110347441A (en) * | 2019-06-25 | 2019-10-18 | 银江股份有限公司 | A kind of thermal expansion data integration automotive engine system and method |
CN110795489A (en) * | 2019-11-13 | 2020-02-14 | 四川长虹电器股份有限公司 | System and method for managing and controlling process of operation unit |
Also Published As
Publication number | Publication date |
---|---|
CN107784488B (en) | 2022-06-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10496384B2 (en) | Generation of dynamic software models using input mapping with feature definitions | |
US20210287152A1 (en) | Workflow project design systems, apparatuses, and methods | |
US20210357582A1 (en) | Editable table in a spreadsheet integrated with a web service | |
US10628132B2 (en) | Inversion of control framework for multiple behaviors of a process | |
US11093242B2 (en) | Automatically mapping data while designing process flows | |
US8417798B2 (en) | Deploying artifacts for packaged software application in cloud computing environment | |
CN106022007B (en) | The cloud platform system and method learning big data and calculating is organized towards biology | |
US9348609B2 (en) | Framework for ad-hoc process flexibility | |
US9043750B2 (en) | Automated generation of two-tier mobile applications | |
US20130339943A1 (en) | Computerized migration tool and method | |
CN103377168A (en) | Providing of open data protocol service at top part of general interaction layer | |
US10216513B2 (en) | Plugin for multi-module web applications | |
WO2023103247A1 (en) | Component and strategy linkage method and apparatus, and device, system and storage medium | |
US20170249170A1 (en) | Home system establishing method | |
CN107784488A (en) | A kind of business process management system of loose couplings | |
CN110231936A (en) | A kind of application method of mobile terminal flow engine frame and mobile terminal flow engine | |
US11169823B2 (en) | Process initiation | |
KR101902191B1 (en) | Apparatus and method for dynamic customization and execution of query based software logic for multitenant | |
CN112181409A (en) | Application construction method, application rendering method and device | |
CN113568758B (en) | GPU resource pooling method, system, device and computer readable storage medium | |
US11663199B1 (en) | Application development based on stored data | |
US10506025B2 (en) | Modifying document metadata with integrated cloud services | |
US10417051B2 (en) | Synchronizing shared resources in an order processing environment using a synchronization component | |
US20200210153A1 (en) | Inversion of control framework for multiple behaviors on top of a process | |
Kukla et al. | A general and scalable solution for heterogeneous workflow invocation and nesting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |