CN107780515A - A kind of used in construction drainage plastic inspection well - Google Patents
A kind of used in construction drainage plastic inspection well Download PDFInfo
- Publication number
- CN107780515A CN107780515A CN201610782472.6A CN201610782472A CN107780515A CN 107780515 A CN107780515 A CN 107780515A CN 201610782472 A CN201610782472 A CN 201610782472A CN 107780515 A CN107780515 A CN 107780515A
- Authority
- CN
- China
- Prior art keywords
- well body
- well
- plate
- ultra
- plastic inspection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/02—Manhole shafts or other inspection chambers; Snow-filling openings; accessories
- E03F5/024—Manhole shafts or other inspection chambers; Snow-filling openings; accessories made of plastic material
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/02—Manhole shafts or other inspection chambers; Snow-filling openings; accessories
- E03F5/025—Manhole shafts or other inspection chambers; Snow-filling openings; accessories provided with a liner
Abstract
The invention discloses a kind of used in construction drainage plastic inspection well of building plumbing system technical field,Including well body,Well lid is provided with the top of the well body,The well body bottom is provided with concrete foundation layer,The concrete foundation layer bottom is provided with broken stone foundation layer,The well body left bottom is provided with water inlet pipe,The well body bottom right side is provided with outlet pipe,The water inlet pipe is provided with diaphragm with water outlet inside pipe wall,The well body inner chamber is provided with and uses plate,It is described to be equipped with card article with the plate left and right sides,The well body is equipped with the neck being engaged with card article with plate junction,Include ultra-thin waterproof foam rubber belt with plate,Ultra-thin waterproof foam rubber belt is using a kind of ultra-thin PE foams as base material,Two sides is coated with the low sour glue of excellent performance,Ultra-thin waterproof foam rubber belt has good water proofing property and damping effect,The present invention is simple in construction,It is easy to use,It is suitable for being widely popularized.
Description
Technical field
The present invention relates to building plumbing system technical field, specially a kind of used in construction drainage plastic inspection well.
Background technology
At present, water drainage plastics inspection shaft obtains popularization and application step by step in China, and water drainage plastics inspection shaft, which has, saves material
Material, the advantages of soil and energy-saving and emission-reduction is saved, it combines to form drainage system with overall drainpipe, can prevent sewage from penetrating into
It pollution of the underground to environment, can prevent rainwater from entering drainage system and increasing the burden of sewage treatment plant, still, be moulded in draining
During material inspection shaft is applied in architectural complex, because the more conventional brick drainage inspection well of the size of its inspection shaft is much smaller, build
After the pressure drainage built enters plastic inspection well, aqueous vapor separates obstructed, hydraulic pressure and washing away for inspection shaft is had a great influence, it is necessary to right
The pressure drainage of building carries out being necessarily the 201520900801 one kind buildings proposed with processing, such as Chinese Patent Application No.
Cell draining plastic inspection well, including pit shaft, well seat and rotation section, described rotation section include the first rotation section and second turn
Dynamic portion, the first described rotation section are arranged on well seat upper end, and the second described rotation section is arranged on pit shaft lower end, the one residential
Draining plastic inspection well can conveniently adjust the relative direction between pit shaft and well seat, increase construction by the rotation section of setting
Efficiency, although above patent can effectively fix well seat by the fixing groove of setting, safe handling, can not effectively it support
Kinetic energy impact caused by imperial construction drainage, make the reduction of one residential draining plastic inspection well service life, be not suitable for wide
General popularization, therefore, a kind of it is proposed that used in construction drainage plastic inspection well.
The content of the invention
It is an object of the invention to provide a kind of used in construction drainage plastic inspection well, to solve to propose in above-mentioned background technology
In water drainage plastics inspection shaft is applied in architectural complex, because the more conventional brick drainage inspection well of the size of its inspection shaft will
It is much smaller, after the pressure drainage of building enters plastic inspection well, aqueous vapor separate obstructed, hydraulic pressure on inspection shaft wash away influence compared with
It is big, it is necessary to the pressure drainage to building carry out it is certain with processing the problem of.
To achieve the above object, the present invention provides following technical scheme:A kind of used in construction drainage plastic inspection well, including well
Body, the well body top are provided with well lid, and the well body bottom is provided with concrete foundation layer, and the concrete foundation layer bottom is provided with
Broken stone foundation layer, the well body left bottom are provided with water inlet pipe, and the well body bottom right side is provided with outlet pipe, the water inlet pipe with
The inwall of outlet pipe is equipped with diaphragm, and the well body inner chamber, which is provided with, uses plate, described to be equipped with card article with the plate left and right sides, described
Well body is equipped with the neck being engaged with card article with plate junction, described to be provided with drainage pipe with plate.
Preferably, it is described to be provided with delivery port with plate inner chamber.
Preferably, the well body inwall is provided with high-density polyethylene resin film.
Preferably, the neck intracavity bottom is provided with limited block.
Preferably, the plate includes ultra-thin waterproof foam rubber belt, is provided with the right side of the ultra-thin waterproof foam rubber belt
Bonding rubber layer, the bonding rubber layer right side are provided with cast stone material layer, supporting layer are provided with the right side of the cast stone material layer.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention passes through concrete foundation layer and broken stone foundation layer
The fixation to well body can be realized, well body left bottom is provided with water inlet pipe, and well body bottom right side is provided with outlet pipe, and water inlet pipe is with going out
Water pipe inner cavity top and bottom are equipped with diaphragm, protect water inlet pipe and outlet pipe not to be corroded oxidation, so as to extend pipeline
Service life, well body inner chamber is provided with and uses plate, includes ultra-thin waterproof foam rubber belt with plate, ultra-thin waterproof foam rubber belt be with
A kind of ultra-thin PE foams are base material, and two sides is coated with the low sour glue of excellent performance, and ultra-thin waterproof foam rubber belt has good
Cohesive, water proofing property and damping effect, be provided with that natural environmental-protective is pollution-free and cementability on the right side of ultra-thin waterproof foam rubber belt
The good bonding rubber layer of energy, bonding rubber layer right side are provided with hardness height, the cast stone material layer that wearability is good and resistance to corrosion is strong,
Supporting layer is provided with the right side of cast stone material layer, it is real by the neck on card article and well body with plate to entirely being played a supporting role with plate
Now dismount, neck intracavity bottom is provided with limited block, it is possible to achieve to the positioning with plate, the draining of architecture indoor drainage pipe is entered
Enter and be directly impinging after plastic inspection well with plate, the kinetic energy of draining being directly transmitted to use plate, so that well body is effective
The impact of current is avoided, extends the service life of well body, the present invention is simple in construction, easy to use, is suitable for being widely popularized.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 uses plate structure schematic diagram for the present invention's.
In figure:1 well body, 2 well lids, 3 concrete foundation layers, 4 broken stone foundation layers, 5 water inlet pipes, 6 outlet pipes, 7 diaphragms, 8
Plate, 91 ultra-thin waterproof foam rubber belts, 92 bonding rubber layers, 93 cast stone material layers, 94 supporting layers, 10 card articles, 11 are used in neck, 9
Drainage pipe.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
Fig. 1-2 is referred to, the present invention provides a kind of technical scheme:A kind of used in construction drainage plastic inspection well, including well body
1, the top of well body 1 is provided with well lid 2, and the bottom of well body 1 is provided with concrete foundation layer 3, the bottom of concrete foundation layer 3
Provided with broken stone foundation layer 4, the left bottom of well body 1 is provided with water inlet pipe 5, and the bottom right side of well body 1 is provided with outlet pipe 6, institute
The inwall for stating water inlet pipe 5 and outlet pipe 6 is equipped with diaphragm 7, and the inner chamber of well body 1, which is provided with, uses plate 9, described to use plate 9 or so two
Side is equipped with card article 10, and the well body 1 is equipped with the neck 8 being engaged with card article 10 with the junction of plate 9, described with plate 9
Provided with drainage pipe 11.
Wherein, it is described to be provided with delivery port with plate 9 inner chamber, be easy to discharge part current, with reduce water flow impact pressure to
Infringement, the inwall of well body 1 are provided with high-density polyethylene resin film caused by plate 9, and high-density polyethylene resin film has good
Good heat resistance and cold resistance, chemical stability is good, and wearability is good and the corrosion of acid and alkali-resistance and various salts, be widely used in
Water and blowdown, the intracavity bottom of neck 8 are provided with limited block, it is possible to achieve to the positioning with plate 9, the plate 9 includes ultra-thin
Waterproof foam rubber belt 91, the ultra-thin right side of waterproof foam rubber belt 91 are provided with bonding rubber layer 92, the bonding rubber layer
92 right sides are provided with cast stone material layer 93, and the right side of cast stone material layer 93 is provided with supporting layer 94, ultra-thin waterproof foam rubber belt 91
It is using a kind of ultra-thin PE foams as base material, two sides is coated with the low sour glue of excellent performance, and ultra-thin waterproof foam rubber belt 91 has
There are good cohesive, water proofing property and damping effect, it is pollution-free that the ultra-thin right side of waterproof foam rubber belt 91 is provided with natural environmental-protective
And the bonding rubber layer 92 that adhesive property is good, the right side of bonding rubber layer 92 is provided with hardness height, wearability is good and resistance to corrosion is strong
Cast stone material layer 93, the right side of cast stone material layer 93 is provided with supporting layer 94, to entirely being played a supporting role with plate 9.
Operation principle:The present invention can realize the fixation to well body 1, well by concrete foundation layer 3 and broken stone foundation layer 4
The left bottom of body 1 is provided with water inlet pipe 5, and the bottom right side of well body 1 is provided with outlet pipe 6, water inlet pipe 5 and the inner cavity top of outlet pipe 6 and bottom
Portion is equipped with diaphragm 7, protects water inlet pipe 5 and outlet pipe 6 not to be corroded oxidation, so as to extend the service life of pipeline, well
The inner chamber of body 1 is provided with and uses plate 9, includes ultra-thin waterproof foam rubber belt 91 with plate 9, ultra-thin waterproof foam rubber belt 91 is super with one kind
Thin PE foams are base material, and two sides is coated with the low sour glue of excellent performance, and ultra-thin waterproof foam rubber belt 91 has good glue
Conjunction property, water proofing property and damping effect, the ultra-thin right side of waterproof foam rubber belt 91 is pollution-free provided with natural environmental-protective and adhesive property
Good bonding rubber layer 92, the right side of bonding rubber layer 92 are provided with hardness height, the cast stone material that wearability is good and resistance to corrosion is strong
Layer 93, the right side of cast stone material layer 93 are provided with supporting layer 94, to entirely being played a supporting role with plate 9, pass through card article 10 and well with plate 9
Neck 8 on body 1 realizes dismounting, and the intracavity bottom of neck 8 is provided with limited block, it is possible to achieve to the positioning with plate 9, architecture indoor row
Water go out family pipe 11 be drained into plastic inspection well after be directly impinging with plate 9, the kinetic energy of draining can be directly transmitted to use
Plate 9, so that well body 1 effectively avoids the impact of current, extend the service life of well body 1.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (5)
1. a kind of used in construction drainage plastic inspection well, including well body (1), it is characterised in that:Well lid is provided with the top of the well body (1)
(2), well body (1) bottom is provided with concrete foundation layer (3), and concrete foundation layer (3) bottom is provided with broken stone foundation layer
(4), well body (1) left bottom is provided with water inlet pipe (5), and well body (1) bottom right side is provided with outlet pipe (6), it is described enter
The inwall of water pipe (5) and outlet pipe (6) is equipped with diaphragm (7), and well body (1) inner chamber is provided with and uses plate (9), described to use plate
(9) left and right sides is equipped with card article (10), and the well body (1) is equipped with what is be engaged with card article (10) with plate (9) junction
Neck (8), it is described to be provided with drainage pipe (11) with plate (9).
A kind of 2. used in construction drainage plastic inspection well according to claim 1, it is characterised in that:It is described to use plate (9) inner chamber
Provided with delivery port.
A kind of 3. used in construction drainage plastic inspection well according to claim 1, it is characterised in that:Well body (1) inwall
It is provided with high-density polyethylene resin film.
A kind of 4. used in construction drainage plastic inspection well according to claim 1, it is characterised in that:Neck (8) inner chamber
Bottom is provided with limited block.
A kind of 5. used in construction drainage plastic inspection well according to claim 1, it is characterised in that:The plate (9) includes
Ultra-thin waterproof foam rubber belt (91), ultra-thin waterproof foam rubber belt (91) right side is provided with bonding rubber layer (92), described
Cast stone material layer (93) is provided with the right side of bonding rubber layer (92), supporting layer (94) is provided with the right side of the cast stone material layer (93).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610782472.6A CN107780515A (en) | 2016-08-30 | 2016-08-30 | A kind of used in construction drainage plastic inspection well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610782472.6A CN107780515A (en) | 2016-08-30 | 2016-08-30 | A kind of used in construction drainage plastic inspection well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107780515A true CN107780515A (en) | 2018-03-09 |
Family
ID=61451051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610782472.6A Pending CN107780515A (en) | 2016-08-30 | 2016-08-30 | A kind of used in construction drainage plastic inspection well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107780515A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109334018A (en) * | 2018-10-12 | 2019-02-15 | 安徽郎川金鹏塑业有限公司 | A kind of preparation method for the injection molding inspection shaft facilitating entrance |
-
2016
- 2016-08-30 CN CN201610782472.6A patent/CN107780515A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109334018A (en) * | 2018-10-12 | 2019-02-15 | 安徽郎川金鹏塑业有限公司 | A kind of preparation method for the injection molding inspection shaft facilitating entrance |
CN109334018B (en) * | 2018-10-12 | 2021-06-18 | 安徽郎川金鹏塑业有限公司 | Preparation method of injection molding inspection well convenient to enter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100424281C (en) | Linear contacting water-collecting device | |
CN106437042A (en) | Spongy urban siphoning and water-draining roof | |
CN107780515A (en) | A kind of used in construction drainage plastic inspection well | |
CN106186354A (en) | A kind of biological nest biology multiplication river water body fast purification device | |
CN208792438U (en) | A kind of double standpipes band water seal is from ventilation draining sub-assembly | |
CN207919707U (en) | A kind of anti-freezing anti-blocking plug drainpipe | |
CN206846174U (en) | A kind of firm type municipal administration water supply and sewerage pipeline stainless steel inner lining tube pressure testing head | |
CN206581236U (en) | A kind of drainage arrangement of storage station | |
CN206174324U (en) | Vacuum device on sponge city siphon drainage roof | |
CN204983124U (en) | Automatically cleaning of integration pump station is cheated end and is had pump station that end was cheated to this automatically cleaning | |
CN203963288U (en) | A kind of novel beallon PVC-U pipe | |
CN109610269B (en) | Water absorption trestle for gardens | |
CN203905142U (en) | Draining system | |
CN207512707U (en) | A kind of stiling basin for laying novel evacuation system | |
CN206174320U (en) | Sponge city siphon drainage's roof | |
CN201914969U (en) | Siphon water decanter | |
CN206708574U (en) | A kind of sewerage special PVC drainpipe | |
CN206593267U (en) | Can central drainage and can purified water air conditioner humidifier | |
CN204647580U (en) | A kind of ultra-high performance concrete pipeline of novel form of reinforcement | |
CN214466906U (en) | Corrosion-resistant double-wall corrugated blow-off pipe | |
CN201095778Y (en) | Water-saving device | |
CN214245858U (en) | Anti-floating drainage structure for underground structure | |
CN204370546U (en) | A kind of novel drainage inspection well of the draining that crosses | |
CN210764406U (en) | High-efficient pulse water distribution device | |
CN206916847U (en) | A kind of pre-buried bent-tube boiler deodorization accumulated water treating system of outdoor alternate configuration plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180309 |