The content of the invention
The embodiments of the invention provide the secondary cell anti-activating method in a kind of across base station carrier paradigmatic system and device, uses
Deactivated with the secondary cell realized in across base station carrier paradigmatic system.
Secondary cell anti-activating method in across base station carrier paradigmatic system provided in an embodiment of the present invention, applied to including master
Across the base station carrier paradigmatic system of serving BS and auxiliary serving BS, this method include:
Main plot in across base station carrier polymerization determines to need the secondary cell deactivated;Main service where the main plot
Base station sends secondary cell to the auxiliary serving BS where the secondary cell and deactivates instruction, and the secondary cell deactivates instruction and is used for
Indicate that the secondary cell is deactivated.
Alternatively, the main plot in across base station carrier polymerization determines to need the secondary cell deactivated, including:It is described across base station
Connecing between main serving BS of the main plot according to where the main plot in carrier aggregation and the auxiliary serving BS where secondary cell
Carrier aggregation gain between mouth time delay or main plot and secondary cell, it is determined that needing the secondary cell deactivated.
Further, main serving BS of the main plot in across the base station carrier polymerization according to where the main plot with it is auxiliary
The interface time delay between auxiliary serving BS where cell, it is determined that the secondary cell deactivated is needed, including:It is described to gather across base station carrier
The main serving BS where the main plot cycle detection main plot in conjunction and the interface between the auxiliary serving BS where secondary cell
Time delay, and when detect interface time delay be more than setting thresholding when, by the secondary cell detected be defined as need deactivate it is auxiliary small
Area.
Alternatively, the main plot in across the base station carrier polymerization is according to the carrier aggregation gain between secondary cell, it is determined that
The secondary cell deactivated is needed, including:The carrier wave between main plot cycle detection and secondary cell in across the base station carrier polymerization
Aggregation gain, and when detecting the carrier aggregation gain between secondary cell less than setting thresholding, the secondary cell detected is true
It is set to the secondary cell that needs deactivate.
Alternatively, the secondary cell, which deactivates instruction, includes the cell ID of user's mark and the secondary cell.Enter
One step, the secondary cell deactivates also to be included deactivating reason in instruction.
A kind of base station provided in an embodiment of the present invention, applied to across the base station load for including main serving BS and auxiliary serving BS
Ripple paradigmatic system, the base station are main serving BS, and the base station includes:
Determining module, for determining to need the secondary cell deactivated;
Indicating module, instruction is deactivated for sending secondary cell to the auxiliary serving BS where the secondary cell, it is described auxiliary
Cell deactivates instruction and is used to indicate that the secondary cell is deactivated.
Alternatively, the determining module is specifically used for:Where main serving BS and secondary cell according to where main plot
The carrier aggregation gain between interface time delay or main plot and secondary cell between auxiliary serving BS, it is determined that need deactivate it is auxiliary small
Area.
Further, the determining module is specifically used for:Main serving BS and secondary cell where cycle detection main plot
Interface time delay between the auxiliary serving BS at place, and when detecting that interface time delay is more than setting thresholding, it is auxiliary small by what is detected
Area is defined as needing the secondary cell deactivated.
Alternatively, the determining module is specifically used for:Carrier aggregation gain between cycle detection and secondary cell, and when detection
To the carrier aggregation gain between secondary cell less than setting thresholding when, by the secondary cell detected be defined as need deactivate it is auxiliary
Cell.
A kind of device for being used to communicate provided in an embodiment of the present invention, including:Transceiver, processor and memory;
The memory, for storing computer program instructions;
The processor, it is coupled to the memory, for reading the computer program instructions of the memory storage, and
Perform method described above.
In the above embodiment of the present invention, the main plot in across base station carrier polymerization determines to need the secondary cell deactivated,
Main serving BS where the main plot sends secondary cell to the auxiliary serving BS where the secondary cell and deactivates instruction, with instruction
The secondary cell is deactivated, it is achieved thereby that the secondary cell triggered by the main plot in polymerizeing across base station carrier is deactivated and lived through
Journey.
Further embodiment of the present invention additionally provides the secondary cell anti-activating method in a kind of across base station carrier paradigmatic system
And device, to realize that the secondary cell in across base station carrier paradigmatic system deactivates.
Secondary cell anti-activating method in across the base station carrier paradigmatic system that further embodiment of the present invention provides, is applied to
Across base station carrier paradigmatic system including main serving BS and auxiliary serving BS, this method include:
Secondary cell in across base station carrier polymerization determines to deactivate;
Base station hair where main plot of the auxiliary serving BS into across the base station carrier polymerization where the secondary cell
Secondary cell is sent to deactivate instruction, the secondary cell deactivates instruction and is used to indicate to set the carrier aggregation state of the secondary cell
For deactivation status;
The secondary cell is deactivated.
Alternatively, the secondary cell in across base station carrier polymerization is according to whether meeting implicit deactivation condition or being born according to cell
Carry, it is determined whether need to deactivate.
Further, after the auxiliary serving BS where the secondary cell sends secondary cell deactivation instruction, in addition to:Connect
The secondary cell that main serving BS where receiving the main plot is sent, which deactivates, to be confirmed;
The secondary cell is deactivated, including:After the secondary cell receives the secondary cell deactivation confirmation, carry out
Deactivate.
Alternatively, the secondary cell, which deactivates, confirms it is the main serving BS confirmation secondary cell where the main plot
Deactivation reason do not meet to send in the case of implicit deactivation condition.
Alternatively, the secondary cell, which deactivates instruction, includes the cell ID of user's mark and the secondary cell.
Alternatively, the secondary cell deactivates also includes deactivating reason in instruction.
A kind of base station that further embodiment of the present invention provides, applied to including main serving BS and auxiliary serving BS across
Base station carrier paradigmatic system, serving BS supplemented by the base station, the base station includes:
Determining module, for determining to deactivate;
Indicating module, send secondary cell for the base station where the main plot into across the base station carrier polymerization and deactivate
Instruction, the secondary cell deactivate instruction and are used to indicate to deactivate the secondary cell;
Flexible module is deactivated, for being deactivated.
Alternatively, the determining module is specifically used for:According to whether meet it is implicit deactivate condition or according to cell load,
Determine the need for deactivating.
Alternatively, the flexible module that deactivates is specifically used for:Main serving BS where receiving the main plot swashs according to area
After the secondary cell that instruction living is sent deactivates confirmation, deactivated.
Alternatively, the secondary cell, which deactivates, confirms it is the main serving BS confirmation secondary cell where the main plot
Deactivation reason do not meet to send in the case of implicit deactivation condition.
A kind of device for being used to communicate that further embodiment of the present invention provides, including:Transceiver, processor and storage
Device;
The memory, for storing computer program instructions;
The processor, it is coupled to the memory, for reading the computer program instructions of the memory storage, and
Perform method described above.
In the above embodiment of the present invention, the secondary cell in across base station carrier polymerization is determined after deactivating, on the one hand, this is auxiliary
Base station where main plot of the auxiliary serving BS in polymerizeing across base station carrier where cell sends secondary cell and deactivates instruction,
The secondary cell is arranged to deactivate with instruction, on the other hand, the secondary cell is deactivated, it is achieved thereby that by carrying across base station
The secondary cell deactivation process of secondary cell triggering in ripple polymerization.
Embodiment
The embodiments of the invention provide the secondary cell anti-activating method in across base station carrier paradigmatic system, secondary cell deactivates
Process can be triggered by main plot, can also be triggered by secondary cell.
In the embodiment of the present invention, include a main plot (PCell) across base station (eNB) carrier aggregation for terminal configuration
And one or more secondary cells (SCell), the eNB where PCell are expressed as PCell eNB (main serving BS), SCell institutes
ENB be expressed as SCell eNB (auxiliary serving BS).
The embodiment of the present invention is described in detail below in conjunction with the accompanying drawings.
Referring to Fig. 1, deactivated for the PCell provided in an embodiment of the present invention by polymerizeing across the base station carrier SCell triggered
Movable-frame hive figure.The flow describes the process that PCell eNB deactivate to SCell eNB instructions SCell, it may include following steps:
Step 101:PCell determines to need the SCell deactivated.
Wherein, the PCell in the step and SCell is main plot and the secondary cell in across base station carrier polymerization.
PCell can be according to the X2 interface time delay between the SCell eNB where the PCell eNB and SCell where the PCell
Or carrier aggregation gain between the station between SCell, it is determined that needing the secondary cell deactivated.Wherein, X2 interface refers between two eNB
The interface of information exchange.
Further, after PCell determines the SCell that needs deactivate, the SCell that the needs deactivate is arranged to
State of activation.
Step 102:SCell eNB where the SCell that PCell eNB where the PCell deactivate to needs are sent
Secondary cell deactivates instruction, and the secondary cell deactivates instruction and is used to indicate that the SCell that the needs deactivate is deactivated.
The secondary cell deactivates instruction and can sent by X2 interface.
Wherein, the secondary cell that PCell is sent, which deactivates, may include that the SCell's that UE marks, needs deactivate is small in instruction
Area identifies, and further, may also include the information such as the reason for SCell is deactivated.The reason for SCell is deactivated may include but unlimited
In:X2 interface time delay is more than setting thresholding, or carrier aggregation gain is less than setting thresholding between station.
Step 103:After SCell receives secondary cell deactivation instruction, radio bearers of the corresponding UE on the SCell is removed
The relevant information of (Radio Bearer, abbreviation RB).
The flow shown in Fig. 1 is described in detail with reference to Fig. 2 and Fig. 3 separately below.Wherein, Fig. 2 is exemplarily illustrated
PCell triggers the signaling interaction diagram of SCell deactivation processes according to X2 interface time delay, and Fig. 2 schematically illustrates PCell roots
According to the signaling interaction diagram of carrier aggregation gain triggering SCell deactivation processes between station.
As shown in Fig. 2 the process that PCell triggers SCell deactivations according to X2 interface time delay may include following steps:
Step 201:PCell is the SCell (SCell between standing) in across the base station carrier polymerization of UE configurations, and activates and be somebody's turn to do
SCell.Wherein, the PCell in the flow and SCell is the main plot and auxiliary small in across the base station carrier polymerization for UE configurations
Area, the SCell eNB where PCell eNB and SCell where PCell are different base stations.
Step 202:PCell periodically detects the X2 interface time delay between PCell eNB and SCell eNB.Work as PCell
When X2 interface time delay between eNB and SCell eNB is more than setting thresholding, PCell judges to need to deactivate the SCell.
Step 203:The SCell is arranged to deactivation status by PCell eNB, sends the control list of media access control layer
First (MAC CE) notifies the UE to deactivate the SCell.
Step 204:The SCell that PCell eNB send PCell triggerings by X2 interface to SCell eNB deactivates instruction,
To indicate to deactivate the SCell.It is X2 that UE marks, the mark of the SCell and SCell are carried in the instruction and deactivates reason
Interface time delay is big.
Step 205:After SCell eNB receive SCell deactivation instructions, remove all RBs of the UE on the SCell
Relevant information.
As shown in figure 3, PCell may include to walk as follows according to the process that carrier aggregation gain triggering SCell is deactivated between station
Suddenly:
Step 301:PCell is the SCell in across the base station carrier polymerization of UE configurations, and activates the SCell.Wherein, the stream
PCell and SCell in journey are main plot and secondary cell in across the base station carrier polymerization for UE configurations, where PCell
SCell eNB where PCell eNB and SCell are different base stations.
Step 302:PCell periodically detects the carrier aggregation gain between PCell eNB and the SCell eNB.When
When carrier aggregation gain between PCell eNB and the SCell eNB is less than setting thresholding, PCell judges to need to deactivate to be somebody's turn to do
SCell。
Step 303:The SCell is arranged to deactivation status by PCell eNB, is sent MAC CE and is notified the UE is deactivated should
SCell。
Step 304:The SCell that PCell eNB send PCell triggerings by X2 interface to SCell eNB deactivates instruction,
UE marks, SCell marks and SCell deactivations reason is carried to indicate to deactivate the SCell, in the instruction for carrier wave to gather
It is low to close gain.
Step 305:After SCell eNB receive SCell deactivation instructions, remove all RBs of the UE on the SCell
Relevant information, to save SCell eNB spaces.
By above description as can be seen that PCell eNB can or carrier aggregation increasing big due to X2 interface interaction time delay
The low factor of benefit judges to be no longer appropriate for transmitting data by the SCell, so as to deactivate the SCell, realizes by across base station carrier
The secondary cell deactivation process of main plot triggering in polymerization.Using above-described embodiment, business not at the end of, across base station carrier
Also SCell can be interacted in paradigmatic system between PCell eNB and SCell eNB and deactivates information.
It is being triggered by the SCell in polymerizeing across base station carrier for further embodiment of the present invention offer referring to Fig. 4
SCell deactivates block diagram.The flow describes the process that SCell eNB deactivate to PCell eNB requests SCell.The flow
In PCell and SCell be main plot and secondary cell in across base station carrier polymerization.The distance may include following steps:
Step 401:SCell determines to deactivate.
In the step, SCell can be according to whether meet implicit deactivation condition or according to cell load, it is determined that needing to deactivate
Serve sb. right SCell.
Step 403:SCell eNB where the SCell send secondary cell to PCell eNB and deactivate instruction, with instruction
The carrier aggregation state of the SCell is arranged to deactivation status by PCell.
The secondary cell deactivates instruction and can sent by X2 interface.Wherein, X2 interface refers to two eNB information interactions
Interface.
Wherein, the secondary cell that SCell is sent, which deactivates, may include that the SCell's that UE marks, needs deactivate is small in instruction
Area identifies, and further, may also include the information such as the reason for SCell is deactivated.The reason for SCell is deactivated may include but unlimited
In:Meet implicit condition or the cell load of deactivating more than setting thresholding.
Step 405:The SCell is deactivated.
In the step, SCell removes RBs of the corresponding UE on SCell relevant information.
Further,, can when SCell judges oneself load higher (such as higher than setting thresholding) in above-mentioned steps 401
Activate first using the SCell as secondary cell in the station of main plot, so as to carry out load balancing.If, should after above-mentioned processing
Scell load is still larger, then in step 403, the SCell eNB where the SCell send secondary cell to PCell eNB
Deactivate instruction.
Further, after step 403, can also include the steps of:
Step 404:PCell eNB are after the secondary cell for receiving SCell eNB transmissions deactivates instruction, to SCell
ENB, which sends secondary cell and deactivated, to be confirmed.
Wherein, secondary cell activation may include UE marks and the cell ID of the SCell in confirming.
Correspondingly, in step 404, after SCell eNB receive above-mentioned secondary cell deactivation confirmation, carry out at deactivation
Reason.
Alternatively, in above-mentioned steps 403, the secondary cell that PCell eNB receive SCell eNB transmissions deactivates instruction
Afterwards, the deactivation reason carried in instruction is deactivated according to the secondary cell, confirms that it is not to meet implicit deactivate to deactivate reason
In the case of condition, send secondary cell and deactivate confirmation, otherwise can not send secondary cell and deactivate confirmation.
The flow shown in Fig. 4 is described in detail with reference to Fig. 5 and Fig. 6 separately below.Wherein, Fig. 5 is exemplarily illustrated
SCell schematically illustrates according to the signaling interaction diagram for deactivating implicit judgement bar triggering SCell deactivation processes, Fig. 6
SCell triggers the signaling interaction diagram of SCell deactivation processes according to cell load.
As shown in figure 5, SCell may include following steps according to implicit judgement bar triggering SCell deactivation processes are deactivated:
Step 501:PCell is the SCell in across the base station carrier polymerization of UE configurations, and activates the SCell.Wherein, the stream
PCell and SCell in journey are main plot and secondary cell in across the base station carrier polymerization for UE configurations, where PCell
SCell eNB where PCell eNB and SCell are different base stations.
Step 502:SCell carries out the implicit deactivation judgement of the SCell.
SCell home base stations can be to safeguard the packet data inactivity timer (deactivation using the station as SCell each UE
Timer is referred to as sCellDeactivationTimer), when SCell is activated, start or restart corresponding to the SCell
SCellDeactivationTimer, and the scheduling authorization physical down control distributed for SCell ownership UE on the SCell
During channel (Physical Downlink Control Channel, abbreviation PDCCH), restart corresponding
sCellDeactivationTimer。
When SCell is the sCellDeactivationTimer time-out that a UE is configured, then judgement needs to be directed to the UE
SCell is performed to deactivate.
Step 503:SCell eNB where the SCell send SCell triggerings by X2 interface to PCell eNB
SCell deactivates instruction, (asks PCell to set the carrier aggregation state of the SCell to ask to deactivate the SCell
For deactivation status), it is that SCell is implicitly deactivated that UE marks, SCell marks and SCell are carried in the instruction and deactivates reason
It is living.
Step 504:After PCell receives SCell deactivation instructions, the SCell is arranged to deactivation status.Because should
SCell deactivates reason and deactivated to be implicit, and PCell can need not send MAC CE and notify the UE to deactivate the SCell.
Step 505:PCell eNB are deactivated by X2 interface transmission secondary cell to be confirmed, UE marks are carried in the message, are somebody's turn to do
SCell marks etc..
Step 506:After SCell eNB receive secondary cell deactivation confirmation, remove all RBs of the UE on the SCell
Relevant information.
By above description as can be seen that when the UE is not scheduled for a long time, UE side bases are in SCell packet data inactivity timers
SCell deactivation is carried out, UE no longer monitors the SCell after SCell is deactivated.Now, SCell judges whether the UE goes
It has activated the SCell.If it is determined that the UE has deactivated the SCell, then SCell synchronously deactivates the SCell, it is impossible to after
Continue the data that the UE is sent on the SCell., it is necessary to lead in time after SCell eNB judge that the UE has deactivated the SCell
Know PCell eNB, PCell eNB are no longer in the SCell transmitting datas afterwards.
As shown in fig. 6, the process that SCell triggers SCell deactivations according to cell load may include following steps:
Step 601:PCell is the SCell in across the base station carrier polymerization of UE configurations, and activates the SCell.Wherein, the stream
PCell and SCell in journey are main plot and secondary cell in across the base station carrier polymerization for UE configurations, where PCell
SCell eNB where PCell eNB and SCell are different base stations.
Step 602:SCell periodically carries out load balancing judgement.After the cell load is higher than setting thresholding, then really
The fixed cell needs to trigger load balancing.
Step 603:Scell determines load balancing targeted customer, is performed for these load balancing targeted customer in station
SCell activation, SCell shares the cell load and realizes load balancing in the station by activating these UE.Wherein, should
SCell can select load balancing targeted customer according to following condition:Using the SCell as the PCell of carrier aggregation, and it is configured
But SCell UE not yet in activation station.
For example, the base station where cell 1 is eNB1, cell 2 and cell 3 belong to same base station eNB 2.In cell 1
UEa is configured with across base station carrier polymerization, wherein, cell 1 is the PCell in across the base station carrier polymerization, and cell 2 is should be across base station
SCell in carrier aggregation.UEb in cell 2 is configured with station intercarrier polymerization, wherein, cell 2 is in the station intercarrier polymerization
PCell, cell 3 is the SCell in the polymerization of station intercarrier and is not yet activated.Cell 2 is as in across base station carrier polymerization
SCell carry out cell load detection, when detecting that cell load is more than the load balancing thresholding of setting, perform following load
The selection course of equalization target user:
In using cell 2 as the PCell of station intercarrier polymerization UE, if SCell in configured station be present but not yet swash
It serves somebody right station in SCell UE, if in the presence of, by the UE selection be load balancing targeted customer.For example the UEb in this example is chosen
It is selected as load balancing targeted customer.
Further, if in selecting the targeted customer of load balancing using aforesaid way and these users being stood
After SCell activation, the load of the cell is less than or equal to setting thresholding, then terminates this load balancing flow;If using upper
The mode of stating selects the targeted customer of load balancing and after the interior SCell activation that to these users stand, the load of the cell is still
More than setting thresholding, then step 604 is performed.
Further, if using the load balancing targeted customer number that aforesaid way is selected as 0, step 604 is performed.
Step 604:SCell selections using this cell as across base station carrier polymerization in SCell UE be used as load balancing
Targeted customer.
Step 605:SCell sends SCell by X2 interface to the PCell attributive eNBs of these load balancing targeted customer
Instruction is deactivated, request is no longer using this cell as SCell between station.In the instruction message carry UE mark, the SCell mark and
It is load balancing that SCell, which deactivates reason,.
Step 606:After PCell receives secondary cell deactivation instruction, by being somebody's turn to do in corresponding UE across base station carrier polymerization
SCell is arranged to deactivation status, and sends MAC CE and notify corresponding UE to deactivate the SCell.
Step 607:PCell eNB are sent secondary cell and deactivated by X2 interface to be confirmed, UE marks are carried in the confirmation message
Knowledge, SCell marks etc..
Step 608:After SCell eNB receive secondary cell deactivation confirmation, remove all RBs of the UE on the SCell
Relevant information.
By above description as can be seen that in order to realize across base station carrier polymerization, X2 interface chain of command and X2 interface user
Face needs to interact many information/datas, larger across the cost that eNB carrier aggregation needs are paid, if SCell load is
Very high, in order to reduce load, SCell eNB can ask the deactivation of the SCell to PCell eNB.
In the above embodiment of the present invention, the secondary cell in across base station carrier polymerization is determined after deactivating, on the one hand, this is auxiliary
Base station where main plot of the auxiliary serving BS in polymerizeing across base station carrier where cell sends secondary cell and deactivates instruction,
The secondary cell is arranged to deactivate with instruction, on the other hand, the secondary cell is deactivated, it is achieved thereby that by carrying across base station
The secondary cell deactivation process of secondary cell triggering in ripple polymerization.
Based on identical technical concept, the embodiment of the present invention additionally provides a kind of base station, and the base station can be realized shown in Fig. 1
Flow.
As shown in fig. 7, the base station applies are in across the base station carrier paradigmatic system for including main serving BS and auxiliary serving BS,
The base station may include as main serving BS:Determining module 701, indicating module 702, wherein:
Determining module 701, for determining to need the secondary cell deactivated;
Indicating module 702, instruction is deactivated for sending secondary cell to the auxiliary serving BS where the secondary cell, it is described
Secondary cell deactivates instruction and is used to indicate that the secondary cell is deactivated.
Optionally it is determined that module 701 can be specifically used for:Where main serving BS and secondary cell according to where main plot
The carrier aggregation gain between interface time delay or main plot and secondary cell between auxiliary serving BS, it is determined that need deactivate it is auxiliary small
Area.
Further, it is determined that module 701 can be specifically used for:Main serving BS and secondary cell where cycle detection main plot
Interface time delay between the auxiliary serving BS at place, and when detecting that interface time delay is more than setting thresholding, it is auxiliary small by what is detected
Area is defined as needing the secondary cell deactivated.
Optionally it is determined that module 701 can be specifically used for:Cycle detection carry out across base station carrier polymerization main plot with it is auxiliary small
The carrier aggregation gain in section, and when detecting carrier aggregation gain less than setting thresholding, the secondary cell detected is determined
To need the secondary cell deactivated.
Based on identical technical concept, the embodiment of the present invention additionally provides a kind of base station, and the base station can be realized shown in Fig. 4
Flow.
As shown in figure 8, the base station applies are in across the base station carrier paradigmatic system for including main serving BS and auxiliary serving BS,
The base station may include as auxiliary serving BS:Determining module 801, indicating module 802 and flexible module 803 is deactivated, wherein:
Determining module 801, for determining to deactivate;
Indicating module 802, send secondary cell for the base station where the main plot into across the base station carrier polymerization and go
Activation instruction, the secondary cell deactivate instruction and are used to indicate to deactivate the secondary cell;
Flexible module 803 is deactivated, for being deactivated.
Optionally it is determined that module 801 can be specifically used for:According to whether meet implicit deactivation condition or born according to cell
Carry, it is determined whether need to deactivate.
Alternatively, deactivating flexible module 803 can be specifically used for:Main serving BS where receiving the main plot swashs according to area
After the secondary cell that instruction living is sent deactivates confirmation, deactivated.
Alternatively, the secondary cell, which deactivates, confirms it is the main serving BS confirmation secondary cell where the main plot
Deactivation reason do not meet to send in the case of implicit deactivation condition.
Based on identical technical concept, the embodiment of the present invention additionally provides a kind of device for being used to communicate, and the device can be real
Flow described in existing Fig. 1.
As shown in figure 9, the device can be applied to across the base station carrier polymerization system for including main serving BS and auxiliary serving BS
System, realize the function of main serving BS.The device may include:Processor 901, memory 902, transceiver 903 and bus connect
Mouthful.Processor 901 is responsible for bus architecture and common processing, and memory 902 can store processor 901 and perform operation
When used data.Transceiver 903 is used to data are received and sent under the control of processor 901.
Bus architecture can include the bus and bridge of any number of interconnection, specifically represented by processor 901 one or
The various circuits for the memory that multiple processors and memory 902 represent link together.Bus architecture can also will be such as outer
Various other circuits of peripheral equipment, voltage-stablizer and management circuit or the like link together, and these are all that this area institute is public
Know, therefore, no longer it is described further herein.EBI provides interface.Processor 901 is responsible for total coil holder
Structure and common processing, memory 902 can store the used data when performing operation of processor 901.
The flow that the embodiment of the present invention discloses, can apply in processor 901, or realized by processor 901.In reality
During existing, each step of signal processing flow can pass through the integrated logic circuit or software of the hardware in processor 901
The instruction of form is completed.Processor 901 can be that general processor, digital signal processor, application specific integrated circuit, scene can compile
Journey gate array either other PLDs, discrete gate or transistor logic, discrete hardware components, it is possible to achieve
Or disclosed each method, step and logic diagram in the execution embodiment of the present invention.General processor can be microprocessor
Or any conventional processor etc..The step of method with reference to disclosed in the embodiment of the present invention, can be embodied directly at hardware
Reason device performs completion, or performs completion with the hardware in processor and software module combination.Software module can be located at random
Memory, flash memory, read-only storage, the ability such as programmable read only memory or electrically erasable programmable memory, register
In the ripe storage medium in domain.The storage medium is located at memory 902, and processor 901 reads the information in memory 902, knot
Close the step of its hardware completes signal processing flow.
Specifically, processor 901, for reading the program in memory 902, following process is performed:It is determined that need to deactivate
Secondary cell living, send secondary cell to the auxiliary serving BS where the secondary cell and deactivate instruction, the secondary cell deactivates
Indicate to be used to indicate that the secondary cell is deactivated.
The specific implementation process that secondary cell in above-mentioned across base station carrier paradigmatic system deactivates flow can be found in foregoing reality
Example is applied, will not be described in detail herein.
Based on identical technical concept, the embodiment of the present invention additionally provides a kind of device for being used to communicate, and the device can be real
Flow described in existing Fig. 4.
As shown in Figure 10, the device can be applied to across the base station carrier polymerization system for including main serving BS and auxiliary serving BS
System, realize the function of auxiliary serving BS.The device may include:
Processor 1001, memory 1002, transceiver 1003 and EBI.Processor 1001 is responsible for total coil holder
Structure and common processing, memory 1002 can store the used data when performing operation of processor 1001.Transceiver
1003 are used to data are received and sent under the control of processor 1001.
Bus architecture can include the bus and bridge of any number of interconnection, specifically represented by processor 1001 one or
The various circuits for the memory that multiple processors and memory 1002 represent link together.Bus architecture can also will be such as outer
Various other circuits of peripheral equipment, voltage-stablizer and management circuit or the like link together, and these are all that this area institute is public
Know, therefore, no longer it is described further herein.EBI provides interface.Processor 1001 is responsible for bus
Framework and common processing, memory 1002 can store the used data when performing operation of processor 1001.
The flow that the embodiment of the present invention discloses, can apply in processor 1001, or realized by processor 1001.
In implementation process, each step of signal processing flow can pass through the integrated logic circuit or soft of the hardware in processor 1001
The instruction of part form is completed.Processor 1001 can be general processor, digital signal processor, application specific integrated circuit, scene
Programmable gate array either other PLDs, discrete gate or transistor logic, discrete hardware components, can be with
Realize or perform disclosed each method, step and the logic diagram in the embodiment of the present invention.General processor can be micro- place
Manage device or any conventional processor etc..The step of method with reference to disclosed in the embodiment of the present invention, can be embodied directly in hard
Part computing device is completed, or performs completion with the hardware in processor and software module combination.Software module can be located at
Random access memory, flash memory, read-only storage, programmable read only memory or electrically erasable programmable memory, register etc.
In the ripe storage medium in this area.The storage medium is located at memory 1002, and processor 1001 is read in memory 1002
Information, with reference to the step of its hardware completion signal processing flow.
Specifically, processor 1001, for reading the program in memory 1002, following process is performed:
It is determined that deactivating, deactivated, and the base station where the main plot into across the base station carrier polymerization is sent
Secondary cell deactivates instruction, and the secondary cell deactivates instruction and is used to indicate the carrier aggregation state of the secondary cell being arranged to
Deactivation status.
The specific implementation process that secondary cell in above-mentioned across base station carrier paradigmatic system deactivates flow can be found in foregoing reality
Example is applied, will not be described in detail herein.
The present invention is the flow with reference to method according to embodiments of the present invention, equipment (system) and computer program product
Figure and/or block diagram describe.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram
Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided
The processors of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce
A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real
The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which produces, to be included referring to
Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or
The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that counted
Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, so as in computer or
The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one
The step of function of being specified in individual square frame or multiple square frames.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know basic creation
Property concept, then can make other change and modification to these embodiments.So appended claims be intended to be construed to include it is excellent
Select embodiment and fall into having altered and changing for the scope of the invention.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention
God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising including these changes and modification.