CN107762107A - A kind of technique for preventing surface layer from settling in floor heating construction - Google Patents
A kind of technique for preventing surface layer from settling in floor heating construction Download PDFInfo
- Publication number
- CN107762107A CN107762107A CN201710794882.7A CN201710794882A CN107762107A CN 107762107 A CN107762107 A CN 107762107A CN 201710794882 A CN201710794882 A CN 201710794882A CN 107762107 A CN107762107 A CN 107762107A
- Authority
- CN
- China
- Prior art keywords
- perforate
- surface layer
- settling
- technique
- floor heating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/12—Tube and panel arrangements for ceiling, wall, or underfloor heating
- F24D3/14—Tube and panel arrangements for ceiling, wall, or underfloor heating incorporated in a ceiling, wall or floor
- F24D3/141—Tube mountings specially adapted therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/12—Tube and panel arrangements for ceiling, wall, or underfloor heating
- F24D3/14—Tube and panel arrangements for ceiling, wall, or underfloor heating incorporated in a ceiling, wall or floor
- F24D3/149—Tube-laying devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2290/00—Specially adapted covering, lining or flooring elements not otherwise provided for
- E04F2290/02—Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets
- E04F2290/023—Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets for heating
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
A kind of technique for preventing surface layer from settling in floor heating construction, comprises the following steps:A1, heat-insulation layer is covered on earth construction layer, multiple holes are opened according to default spacing on the heat-insulation layer;A2, cement mortar is filled up in the perforate on the heat-insulation layer;A3, after insulation layer surface is cleaned out, lay reflectance coating;A4, hot-water heating coil pipe is installed on the reflectance coating.
Description
Technical field
The invention belongs to technical field of building construction, more particularly to a kind of work for preventing surface layer from settling in floor heating construction
Skill.
Background technology
Floor heating at present construction generally applies in decoration construction, substantially increase people life comfortableness, but
Often occur due to having laid floor heating water pipe in actual use, surface stone material or floor can go out after having used a period of time
Now settle the phenomenon of faulting of slab ends, the position especially often walked about daily, the place that such as enters, the gateway in aisle and corner.
The main reason for producing the above situation is that the warming plate top discontinuity under floor heating water pipe sedimentation change occurs
Shape, discontinuity, mainly surface layer load be excessive and the place of entering and personnel often walk about, and position easily forms facing stone
Material or the fissure of displacement and cracking phenomena on floor occur, because the warming plate under floor heating water pipe is the extruded sheet of 2 centimeters of thickness, extruded sheet
By the extruding meeting deformation retract of gravity, because the crushing resistance difference and the coefficient of resilience of warming plate are low, cause above floor heating water pipe
Mortar cover and surface layer under screed there is situation about settling, screed occur sedimentation will cause surface layer sedimentation and
Faulting of slab ends.
The content of the invention
The present invention provides a kind of technique for preventing surface layer from settling in floor heating construction, is settled with solving surface layer in floor heating structure
Problem.
A kind of technique for preventing surface layer from settling in floor heating construction, it is characterised in that comprise the following steps:
A1, heat-insulation layer is covered on earth construction layer, multiple holes are opened according to default spacing on the heat-insulation layer;
A2, cement mortar is filled up in the perforate on the heat-insulation layer;
A3, after insulation layer surface is cleaned out, lay reflectance coating;
A4, hot-water heating coil pipe is installed on the reflectance coating.
In step A1, the hole opened is circular hole, and between perforate be it is equidistant, perforate spacing vertically and horizontally for 500mm~
600mm。
Perforate is 5 centimetres of Φ circular hole.
The perforate spacing at warming plate edge is 250mm~300mm, and the circular hole ordinate of the perforate spacing is with perforate spacing
500mm~600mm circular hole ordinate is separated by arrangement.
The warming plate is the extruded sheet of 2 cm thicks.
It can suitably increase heat-insulation layer perforate in the position that personnel often walk about and the position for being likely to be load, open
The position in hole should determine according to the typesetting figure situation of the area in room, the standard width of a room in an old-style house size in room and surface layer stone material, floor tile, it is ensured that stone
There is the circular hole strong point below material and floor tile piece.
Beneficial effects of the present invention include:
1. opening circular hole on warming plate and filling up cement mortar, the regular strong point one by one, increase insulation are formed
The crushing resistance of plate, the strong point, which is tried one's best, corresponds to the edge joint position of surface layer stone material and floor tile, so preferably can prevent surface layer from settling.
2. the circular hole strong point, which is also possible to prevent the personnel before no laying hot-water heating pipe, walks about etc. above and to cause warming plate to move
It is dynamic to walk.
3. each strong point, which can play, plays balanced support effect to the hot-water heating protective layer mortar above water pipe and surface layer,
Prevent load and the sedimentation for position surface layer of often walking about and craze and transfiguration.
4. be provided with warming plate the cement strong point can keep screed above hot-water heating pipe and surface layer will not integrally under
It is heavy, serve and protect hot-water heating pipe not acted on by the bearing strain of load, improve the service life of hot-water heating pipe.
Brief description of the drawings
Detailed description below, above-mentioned and other mesh of exemplary embodiment of the invention are read by reference to accompanying drawing
, feature and advantage will become prone to understand.In the accompanying drawings, if showing the present invention's by way of example, and not by way of limitation
Dry embodiment, wherein:
Fig. 1 is existing floor heating structure diagrammatic cross-section.
Fig. 2 is that warming plate opens Φ 5cm circular hole process schematic representations in the embodiment of the present invention
Fig. 3 is filling concrete mortar process schematic representation after warming plate perforate in the embodiment of the present invention.
1 --- hot-water heating coil pipe, 2 --- 1mm reflectance coatings, 3 --- 2cm warming plates, 4 --- original ground structure sheaf, 5 --- Φ
5cm circular holes.
Embodiment
Fig. 1 is existing floor heating structure diagrammatic cross-section.The process step of the invention includes:
First, 5 centimeters of Φ circular hole is opened according to certain spacing on the warming plate laid, the warming plate after perforate
Take away, it is vertically and horizontally 500mm~600mm to form equidistant cavity, perforate spacing one by one, and extruded sheet edge is opened far from wall side
Pitch of holes is 250mm~300mm, and spacing can determine according to house type and actual conditions.
Struck off as shown in Fig. 2 circular hole is filled up with cement mortar in the circular hole held successfully, being cleared up above warming plate
Totally, reflectance coating is then laid.
As shown in figure 3, the spacing of perforate must be unified, in the position that personnel often walk about and load is likely to be
Position can suitably increase perforate, and the position of perforate should be according to the area in room, the standard width of a room in an old-style house size in room and surface layer stone material, floor tile
Typesetting figure situation determine, it is ensured that below stone material and floor tile piece have the circular hole strong point.
What deserves to be explained is although foregoing teachings describe the essence of the invention by reference to some embodiments
God and principle, it should be appreciated that, the present invention is not limited to disclosed embodiment, the also unawareness of the division to each side
The feature that taste in these aspects can not combine, and this division is merely to the convenience of statement.It is contemplated that cover appended power
Included various modifications and equivalent arrangements in the spirit and scope that profit requires.
Claims (7)
1. a kind of technique for preventing surface layer from settling in floor heating construction, it is characterised in that comprise the following steps:
A1, heat-insulation layer is covered on earth construction layer, multiple holes are opened according to default spacing on the heat-insulation layer;
A2, cement mortar is filled up in the perforate on the heat-insulation layer;
A3, after insulation layer surface is cleaned out, lay reflectance coating;
A4, hot-water heating coil pipe is installed on the reflectance coating.
2. the technique for preventing surface layer from settling in floor heating construction as claimed in claim 1, it is characterised in that in step A1,
The hole opened is circular hole, and is equidistant between perforate, and perforate spacing is vertically and horizontally 500mm~600mm.
3. the technique for preventing surface layer from settling in floor heating construction as claimed in claim 2, it is characterised in that perforate is 5 lis of Φ
The circular hole of rice.
4. the technique for preventing surface layer from settling in floor heating construction as claimed in claim 3, it is characterised in that warming plate edge
Perforate spacing is 250mm~300mm, and the circular hole ordinate of the perforate spacing is indulged with perforate spacing for 500mm~600mm circular hole
Line is separated by arrangement.
5. the technique for preventing surface layer from settling in floor heating construction as claimed in claim 1, it is characterised in that the warming plate is
The extruded sheet of 2 cm thicks.
6. the technique for preventing surface layer from settling in floor heating construction as claimed in claim 4, it is characterised in that often walked in personnel
Dynamic position can suitably increase heat-insulation layer perforate with the position for being likely to be load, and the position of perforate should be according to room
Area, the standard width of a room in an old-style house size in room and surface layer stone material, the typesetting figure situation of floor tile are determined, it is ensured that are had below stone material and floor tile piece
The circular hole strong point.
7. the technique for preventing surface layer from settling in floor heating construction as claimed in claim 1, it is characterised in that the thickness of reflectance coating
It is 1mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710794882.7A CN107762107A (en) | 2017-09-06 | 2017-09-06 | A kind of technique for preventing surface layer from settling in floor heating construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710794882.7A CN107762107A (en) | 2017-09-06 | 2017-09-06 | A kind of technique for preventing surface layer from settling in floor heating construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107762107A true CN107762107A (en) | 2018-03-06 |
Family
ID=61265354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710794882.7A Pending CN107762107A (en) | 2017-09-06 | 2017-09-06 | A kind of technique for preventing surface layer from settling in floor heating construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107762107A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040070359A (en) * | 2003-02-03 | 2004-08-09 | 김태일 | A hypocaust panel for the interior of a room |
KR20090113235A (en) * | 2009-10-09 | 2009-10-29 | 신춘우 | Fabricated pannel for ondol |
CN203905377U (en) * | 2014-04-22 | 2014-10-29 | 杨众 | Soft soil foundation free setting terrace |
CN204571211U (en) * | 2015-03-06 | 2015-08-19 | 上海建工五建集团有限公司 | A kind of concrete floor |
CN205012596U (en) * | 2015-09-06 | 2016-02-03 | 方远建设集团股份有限公司 | Defense sector face is uniform settlement structure not |
-
2017
- 2017-09-06 CN CN201710794882.7A patent/CN107762107A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040070359A (en) * | 2003-02-03 | 2004-08-09 | 김태일 | A hypocaust panel for the interior of a room |
KR20090113235A (en) * | 2009-10-09 | 2009-10-29 | 신춘우 | Fabricated pannel for ondol |
CN203905377U (en) * | 2014-04-22 | 2014-10-29 | 杨众 | Soft soil foundation free setting terrace |
CN204571211U (en) * | 2015-03-06 | 2015-08-19 | 上海建工五建集团有限公司 | A kind of concrete floor |
CN205012596U (en) * | 2015-09-06 | 2016-02-03 | 方远建设集团股份有限公司 | Defense sector face is uniform settlement structure not |
Non-Patent Citations (1)
Title |
---|
徐立新: "《中国地暖实用手册》", 31 August 2014, 沈阳:辽宁科学出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2018267563B2 (en) | Modular integrated building and construction method thereof | |
US20060254169A1 (en) | Apparatus, system, and method for extending an exterior wall surface below a debridge of a weep screed | |
JP6175568B2 (en) | Junction between floor panel and panel rail | |
CN206503303U (en) | A kind of Honeycomb Beam and base-supporting floor combining structure suitable for floor heating house | |
US8887462B2 (en) | Prefabricated tile system with modular backing board | |
US20130318704A1 (en) | Tileable line drain systems and related methods | |
CN204252344U (en) | House ground spacing heat preservation and soundproof structure | |
CN201883549U (en) | Concrete structure capable of improving energy accumulation and heat insulation of building ground surface | |
CN107762107A (en) | A kind of technique for preventing surface layer from settling in floor heating construction | |
CN202730972U (en) | Waterproof node of wall body of bathroom | |
CN205224517U (en) | Ceramic tile type ground structure | |
CN204059710U (en) | A kind of concrete floor falls a grade furred ceiling crack resistence structure | |
CN201865303U (en) | Ground thermal-insulation system for improving temperature of first floor of civil building | |
CN201865302U (en) | Ground thermal insulation system for solving problem of low temperature in first floor of civilian construction | |
GB2463331A (en) | Wet area floor former system | |
CN206408726U (en) | A kind of drain structure | |
JP2016044405A (en) | Countermeasure construction method against ground liquefaction | |
CN107905497A (en) | A kind of threshold closes up with floor and its manufacture craft | |
CN113700344A (en) | Assembly type toilet capable of improving building space utilization rate | |
CN203499208U (en) | Building ground having expansion joint structure | |
CN206034855U (en) | Novel ground keel structure | |
CN205825211U (en) | Intelligent carbon fiber heating dry type paved system | |
CN210887905U (en) | Kitchen floor seepage prevention structure | |
CN215631343U (en) | Closing-up structure suitable for ground in old room | |
CN206174386U (en) | Bathroom floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180306 |