CN107755364A - Set cement equipment is cleaned in a kind of construction site with rebar surface - Google Patents
Set cement equipment is cleaned in a kind of construction site with rebar surface Download PDFInfo
- Publication number
- CN107755364A CN107755364A CN201611212133.0A CN201611212133A CN107755364A CN 107755364 A CN107755364 A CN 107755364A CN 201611212133 A CN201611212133 A CN 201611212133A CN 107755364 A CN107755364 A CN 107755364A
- Authority
- CN
- China
- Prior art keywords
- welding
- way
- motor
- slide rail
- front side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B7/00—Cleaning by methods not provided for in a single other subclass or a single group in this subclass
- B08B7/02—Cleaning by methods not provided for in a single other subclass or a single group in this subclass by distortion, beating, or vibration of the surface to be cleaned
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/22—Apparatus or processes for treating or working the shaped or preshaped articles for cleaning
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Wire Processing (AREA)
Abstract
The present invention relates to a kind of reinforcing bar cleaning equipment, more particularly to a kind of construction site to clean set cement equipment with rebar surface.More thoroughly, to a kind of less construction site of reinforcing bar injury set cement equipment is cleaned the technical problem to be solved in the present invention is to provide time saving and energy saving in reset procedure, removing with rebar surface.In order to solve the above-mentioned technical problem, set cement equipment is cleaned with rebar surface the invention provides such a construction site, includes bottom plate etc.;Right part is provided with mounting table by way of welding on the upside of bottom plate, left is provided with fixing device on the upside of bottom plate, mounting table left end is provided with connecting rod by way of welding, and connecting rod right-hand member is arranged on the right side of fixing device, and right side is provided with support bar by way of welding on bottom plate.Invention achieves it is time saving and energy saving in reset procedure, remove more thoroughly, less effect is injured to reinforcing bar, rotated by using the first motor driven reinforcing bar.
Description
Technical field
The present invention relates to a kind of reinforcing bar cleaning equipment, more particularly to a kind of construction site to clean set cement with rebar surface
Equipment.
Background technology
Cement:Powdery hydraulicity inorganic coagulation material.Add water stir after into slurry, can harden in atmosphere or in water
Preferably hardening, and can the materials such as sand, stone is cemented together securely.The mixture of early stage lime and volcanic ash and modern times
Lime pozzolanic cement is much like, and the concrete made of its cementing rubble, not only intensity is higher after hardening, and can also resist
The erosion of fresh water or brackish water.For a long time, it is as a kind of important binder materials, be widely used in civil construction, water conservancy,
The engineerings such as national defence.
Reinforcing bar (Rebar) refers to that armored concrete is used and prestressed reinforced concrete steel, its cross section are circle, has
When for the square of fillet.Including plain bar, Ribbed Bar, twisted bar.Concrete reinforcement steel refers to that reinforcing bar mixes
The vertical bar or wire rod shape steel of native arrangement of reinforcement are coagulated, its profile is divided into two kinds of plain bar and deformed bar, and the condition of delivery is vertical bar
Justify two kinds with disk.
At present when construction, how much can all run into the rebar surface needed to use can all speckle with cement, and this
A little cement after solidification will be stone, is manually difficult to clean off, and will be to follow-up building operation if not removing
In the presence of certain influence, and it is to use manually to use hammer to be purged most of in the cement to rebar surface at present, but
It is that the time that this method needs is longer, that is, wastes time and energy, will be removed not if the cement of rebar surface is more
Totally, and this method manually removed also has injured to reinforcing bar.
Therefore need time saving and energy saving, removing in a kind of reset procedure of research and development badly and more thoroughly, to reinforcing bar injure less building
Building site with rebar surface is cleaned set cement equipment and existed to overcome manually the cement of rebar surface to be carried out beaing removing at present
Waste time and energy, remove not thoroughly, the shortcomings that having been injured to reinforcing bar.
The content of the invention
(1) technical problems to be solved
The present invention wastes time and energy, removed not to overcome manually to the cement of rebar surface beat removing at present and exist
Thoroughly, the shortcomings that having been injured to reinforcing bar, the technical problem to be solved in the present invention is to provide time saving and energy saving in reset procedure, removing
More thoroughly, a kind of less construction site is injured to reinforcing bar and cleans set cement equipment with rebar surface.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a construction site to clean solidified water with rebar surface
Mud equipment, include bottom plate, mounting table, connecting rod, fixing device, support bar, guide rail and shaking device, right part leads on the upside of bottom plate
The mode for crossing welding is provided with mounting table, and left is provided with fixing device on the upside of bottom plate, and mounting table left end is by way of welding
Connecting rod is installed, connecting rod right-hand member is arranged on the right side of fixing device, and right side is provided with support by way of welding on bottom plate
Bar, support bar are located on the right side of mounting table, and post upper is provided with guide rail by way of welding, and vibrations dress is provided with guide rail
Put.
Preferably, fixing device includes supporting table, fixed station, first bearing seat, fixed cover, first gear, the first electricity
Machine, second gear, clamping seats, fixed plate, second bearing seat, bull stick, suitable screw mandrel screw, inverse screw mandrel screw, the first slide rail, first
Sliding block, along threaded block, minus thread block, the first contiguous block and clamping plate, supporting table is installed by way of welding on bottom plate, propped up
Support platform upper end is provided with fixed station by way of welding, and middle part is provided with first axle by bolted connection in fixed station
Bearing, first bearing seat is interior to be connected with fixed cover by interference, and right is provided with first by way of welding on the outside of fixed cover
Gear, fixed station left lower are provided with the first motor by bolted connection, and the first motor of the first motor left end is defeated
Shaft is connected with second gear by shaft coupling, and first gear engages with second gear, and fixed cover right-hand member is by way of welding
Clamping seats are installed, the fixed plate left end of clamping seats is arranged on fixed cover right side wall by way of welding, before fixed plate is interior
Side is provided with second bearing seat by bolted connection, and second bearing seat is interior to be connected with bull stick by interference, and bull stick stretches out
Above fixed plate, it is provided with by way of welding on the upside of bull stick and is installed along screw mandrel screw, bull stick downside by way of welding
There is inverse screw mandrel screw, be all located in fixed plate along screw mandrel screw and inverse screw mandrel screw, connected in fixed plate on rear wall by bolt
The mode connect is provided with the first slide rail, is separated in the middle part of the first slide rail, and both sides slidingtype is connected with two first to the first slide rail up and down
Sliding block, the first sliding block right side are provided with the first contiguous block by way of welding, pass through welding on front side of the contiguous block of upside first
Mode be provided with along threaded block, coordinate along threaded block and along screw mandrel screw, the front side of the contiguous block of downside first passes through welding
Mode is provided with minus thread block, and minus thread block and inverse screw mandrel screw coordinate, and the rear of the first contiguous block is installed by way of welding
There is clamping plate.
Preferably, shaking device includes guide pin bushing, the first nut, the first screw rod, the first pressing plate, the second slide rail, the second cunning
Block, the second contiguous block, push pedal, spring, movement weight mass, connecting plate, the second motor, the first runner, rotating shaft, cam, the second runner and
Belt pulley, slidingtype is connected with guide pin bushing on guide rail, and upside is provided with through hole in guide pin bushing, and guide pin bushing outer upper end is pacified by way of welding
Equipped with the first nut, the first nut and through hole are placed with the first screw rod with a vertical line in the first nut and through hole, the
One screw rod and the first nut coordinate, and the first screw rod lower end is provided with the first pressing plate by way of welding, and left leads on the downside of guide pin bushing
Cross bolted mode and the second slide rail is installed, slidingtype is connected with the second sliding block on the second slide rail, leads on front side of the second sliding block
The mode for crossing welding is provided with the second contiguous block, and the second contiguous block left end is provided with movement weight mass by way of welding, and second connects
Connect block right-hand member and push pedal is installed by way of welding, right is provided with connecting plate by way of welding on the downside of guide pin bushing, connects
Plate front side top is provided with the second motor by bolted connection, passes through on the second motor output shaft on front side of the second motor
Shaft coupling is connected with the first runner, and lower section is rotatably connected with rotating shaft on front side of connecting plate, is connected on front side of rotating shaft by way of welding
Be connected to cam, be connected with the second runner on front side of rotating shaft by way of welding, the second runner be located on front side of cam, the second runner with
First runner is connected with belt pulley in approximately the same plane between the first runner and the second runner.
Preferably, the 3rd slide rail, the 3rd sliding block, the 3rd motor, the 3rd gear, rack, the 4th slide rail and are also included
Four-slider, left is provided with the 3rd slide rail by bolted connection in bottom plate, and the 3rd slide rail inner sliding type is connected with the 3rd
Sliding block, the 3rd upper end of slide block are arranged on supporting table lower end, the side being bolted on front side of the 3rd sliding block by way of welding
Formula is provided with the 3rd motor, and the 3rd motor output shaft on front side of the 3rd motor is connected with the 3rd gear by shaft coupling, and the 3rd slides
Front side is provided with rack, rack and the engagement of the 3rd gear by bolted connection on rail, is bolted in mounting table
Mode the 4th slide rail is installed, slidingtype is connected with Four-slider, the side that Four-slider left end passes through welding on the 4th slide rail
Formula is provided with connecting rod.
Preferably, the material of bottom plate is stainless steel.
Preferably, the material of support bar is Q235 steel.
Preferably, the first motor, the second motor and the 3rd motor are servomotor.
Operation principle:When user needs to clear up the cement of rebar surface, reinforcing bar can be put into fixing device,
It is fixed fixing device, is opening shaking device, shaking device shakes to rebar surface, so as to realize to reinforcing bar
The cement block on surface is impacted, so that the cement of rebar surface is cleaned.
Because fixing device include supporting table, fixed station, first bearing seat, fixed cover, first gear, the first motor,
Second gear, clamping seats, fixed plate, second bearing seat, bull stick, suitable screw mandrel screw, inverse screw mandrel screw, the first slide rail, first are slided
Block, along threaded block, minus thread block, the first contiguous block and clamping plate, supporting table is installed by way of welding on bottom plate, supported
Platform upper end is provided with fixed station by way of welding, and middle part is provided with clutch shaft bearing by bolted connection in fixed station
Seat, first bearing seat is interior to be connected with fixed cover by interference, and right is provided with the first tooth by way of welding on the outside of fixed cover
Wheel, fixed station left lower are provided with the first motor, the first motor output of the first motor left end by bolted connection
Axle is connected with second gear by shaft coupling, and first gear engages with second gear, and fixed cover right-hand member is pacified by way of welding
Equipped with clamping seats, the fixed plate left end of clamping seats is arranged on fixed cover right side wall by way of welding, front side in fixed plate
Second bearing seat is installed by bolted connection, second bearing seat is interior to be connected with bull stick by interference, and bull stick stretches out solid
Above fixed board, it is provided with by way of welding on the upside of bull stick and is provided with along screw mandrel screw, bull stick downside by way of welding
Inverse screw mandrel screw, it is all located in fixed plate along screw mandrel screw and inverse screw mandrel screw, is bolted in fixed plate on rear wall
Mode the first slide rail is installed, separated in the middle part of the first slide rail, both sides slidingtype is connected with two first cunnings to the first slide rail up and down
Block, the first sliding block right side are provided with the first contiguous block by way of welding, and the front side of the contiguous block of upside first passes through welding
Mode is provided with along threaded block, is coordinated along threaded block and along screw mandrel screw, the side that the front side of the contiguous block of downside first passes through welding
Formula is provided with minus thread block, and minus thread block and inverse screw mandrel screw coordinate, and the rear of the first contiguous block is provided with by way of welding
Clamping plate, when user is put into reinforcing bar in fixing device, reinforcing bar can be put into fixed cover, then be stretched again from fixed cover right-hand member
Go out to be placed on mounting table, then rotate bull stick, bar rotation will drive to be rotated along screw mandrel screw and inverse screw mandrel screw, so as to be
Matched suitable threaded block and minus thread block is respectively by the counter motion on the first slide rail of the first sliding block, so that clamping plate
To central motion or away from central motion, so that the reinforcing bar being placed in fixed cover is located at the center of fixed cover, it is also real
Showing the fixation to reinforcing bar, after reinforcing bar fixes, opened the first motor, the first motor driven second gear rotates, and second
Gear rotation drives the first gear rotation being engaged with, so as to drive fixed cover in first bearing seat internal rotation, so as to drive
The reinforcing bar rotation being fixed in fixed cover, can so facilitate and each position of rebar surface can be impacted by shaking device.
Because shaking device include guide pin bushing, the first nut, the first screw rod, the first pressing plate, the second slide rail, the second sliding block,
Second contiguous block, push pedal, spring, movement weight mass, connecting plate, the second motor, the first runner, rotating shaft, cam, the second runner and belt
Take turns, slidingtype is connected with guide pin bushing on guide rail, and upside is provided with through hole in guide pin bushing, and guide pin bushing outer upper end is provided with by way of welding
First nut, the first nut and through hole are placed with the first screw rod, the first spiral shell with a vertical line in the first nut and through hole
Bar and the first nut coordinate, and the first screw rod lower end is provided with the first pressing plate by way of welding, and left passes through spiral shell on the downside of guide pin bushing
Tether the mode connect and the second slide rail is installed, slidingtype is connected with the second sliding block on the second slide rail, passes through weldering on front side of the second sliding block
The mode connect is provided with the second contiguous block, and the second contiguous block left end is provided with movement weight mass, the second contiguous block by way of welding
Right-hand member is provided with push pedal by way of welding, and right is provided with connecting plate by way of welding on the downside of guide pin bushing, before connecting plate
Second motor is installed above side by bolted connection, passes through shaft coupling on the second motor output shaft on front side of the second motor
Device is connected with the first runner, and lower section is rotatably connected with rotating shaft on front side of connecting plate, is connected with front side of rotating shaft by way of welding
Cam, rotating shaft front side are connected with the second runner by way of welding, and the second runner is located on front side of cam, the second runner and first
Runner is connected with belt pulley in approximately the same plane between the first runner and the second runner, and after reinforcing bar places, movement is led
Set, the 3rd slide rail is moved to the position that reinforcing bar proceeds by cleaning with movement weight mass, then open the second motor, the second motor
The first runner will be driven to turn clockwise, the rotation of the first runner will drive the second runner to turn clockwise, and the rotation of the second runner will
Rotating shaft rotation is driven, rotating shaft rotation will turn clockwise with moving cam, the push pedal that the protrusions contact for making cam is arrived in cam rotation,
So as to which push pedal is pushed up, push pedal, which moves up, will drive the second sliding block to move up, so as to drive movement weight mass to move up,
Extension spring is made spring be in extended state by the second sliding block simultaneously, when cam, which rotates to, is not exposed to push pedal, spring general
Set back, while pull the second sliding block to move down, the second sliding block pulls movement weight mass and push pedal to move down, and weight is soon to steel
Muscle surface is beaten, so as to lay the cement of rebar surface.
Because also include the 3rd slide rail, the 3rd sliding block, the 3rd motor, the 3rd gear, rack, the 4th slide rail and the 4th to slide
Block, left is provided with the 3rd slide rail by bolted connection in bottom plate, and the 3rd slide rail inner sliding type is connected with the 3rd sliding block,
3rd upper end of slide block is arranged on supporting table lower end by way of welding, is installed by bolted connection on front side of the 3rd sliding block
There is the 3rd motor, the 3rd motor output shaft on front side of the 3rd motor is connected with the 3rd gear by shaft coupling, and the 3rd slide rail is gone forward
Side is provided with rack by bolted connection, and rack and the 3rd gear engage, in mounting table by bolted connection
4th slide rail is installed, slidingtype is connected with Four-slider on the 4th slide rail, and Four-slider left end is installed by way of welding
There is connecting rod, when there is more cement on reinforcing bar, the 3rd motor can be opened, control the gear up time of the 3rd motor driven the 3rd
Pin rotates, and the 3rd gear, which turns clockwise, to be rotated on rack, so as to drive the 3rd sliding block to be moved right on the 3rd slide rail,
3rd sliding block drives supporting table to move right, so that reinforcing bar also moves right, while supporting table will promote the by connecting rod
Four-slider moves right on the 4th slide rail.
Because the material of bottom plate is stainless steel, stainless steel corrosion resistance and acid resistance are strong, can extension fixture service life.
Because the material of support bar is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device more
It is long.
Because the first motor, the second motor and the 3rd motor are servomotor, anti-overload ability is strong, and high speed performance is good, energy
It is precisely controlled its rotating speed.
(3) beneficial effect
Invention achieves it is time saving and energy saving in reset procedure, remove more thoroughly, less effect is injured to reinforcing bar, pass through
Rotated using the first motor driven reinforcing bar, the second motor control movement weight mass is back and forth moved up and down with the 3rd motor driven reinforcing bar or so
Mobile mode, it is not only able to more thoroughly remove the cement of rebar surface, moreover it is possible to quickly enter rebar surface
Row cleaning, saved the time, and is beaten without artificial, it is only necessary to which reinforcing bar is put into can in the equipment.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the main structure diagram of fixing device of the present invention.
Fig. 3 is the right side structural representation of clamping seats of the present invention.
Fig. 4 is the main structure diagram of shaking device of the present invention.
Mark in accompanying drawing for:1- bottom plates, 2- mounting tables, 3- connecting rods, 4- fixing devices, 41- supporting tables, 42- are fixed
Platform, 43- first bearing seats, 44- fixed covers, 45- first gears, the motors of 46- first, 47- second gears, 48- clamping seats, 481-
Fixed plate, 482- second bearing seats, 483- bull sticks, 484- is along screw mandrel screw, and 485- is against screw mandrel screw, the slide rails of 486- first,
The sliding blocks of 487- first, 488- is along threaded block, 489- minus thread blocks, the contiguous blocks of 4810- first, 4811- clamping plates, 5- support bars,
6- guide rails, 7- shaking devices, 71- guide pin bushings, 72- through holes, the nuts of 73- first, the screw rods of 74- first, the pressing plates of 75- first, 76-
Two slide rails, the sliding blocks of 77- second, the contiguous blocks of 78- second, 79- push pedals, 710- springs, 711- movement weight masses, 712- connecting plates,
The motors of 713- second, the runners of 714- first, 715- rotating shafts, 716- cams, the runners of 717- second, 718- belt pulleys, 8- the 3rd are slided
Rail, the sliding blocks of 9- the 3rd, the motors of 10- the 3rd, the gears of 11- the 3rd, 12- racks, the slide rails of 13- the 4th, 14- Four-sliders.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
Set cement equipment is cleaned in a kind of construction site with rebar surface, as Figure 1-4, includes bottom plate 1, mounting table
2nd, connecting rod 3, fixing device 4, support bar 5, guide rail 6 and shaking device 7, the upside right part of bottom plate 1 are installed by way of welding
There is mounting table 2, the upside left of bottom plate 1 is provided with fixing device 4, and the left end of mounting table 2 is provided with connecting rod by way of welding
3, the right-hand member of connecting rod 3 is arranged on the right side of fixing device 4, and right side is provided with support bar 5 by way of welding on bottom plate 1, supports
Bar 5 is located at the right side of mounting table 2, and the upper end of support bar 5 is provided with guide rail 6 by way of welding, shaking device is provided with guide rail 6
7。
Fixing device 4 includes supporting table 41, fixed station 42, first bearing seat 43, fixed cover 44, first gear 45,
One motor 46, second gear 47, clamping seats 48, fixed plate 481, second bearing seat 482, bull stick 483, along screw mandrel screw 484,
Inverse screw mandrel screw 485, the first slide rail 486, the first sliding block 487, suitable threaded block 488, minus thread block 489, the first contiguous block 4810
With clamping plate 4811, supporting table 41 is installed by way of welding on bottom plate 1, the upper end of supporting table 41 is pacified by way of welding
Equipped with fixed station 42, middle part is provided with first bearing seat 43, first bearing seat 43 by bolted connection in fixed station 42
Interior to be connected with fixed cover 44 by interference, the outside right of fixed cover 44 is provided with first gear 45 by way of welding, fixed
The left lower of platform 42 is provided with the first motor 46 by bolted connection, and the first motor 46 of the left end of the first motor 46 is defeated
Shaft is connected with second gear 47 by shaft coupling, and first gear 45 engages with second gear 47, and the right-hand member of fixed cover 44 passes through weldering
The mode connect is provided with clamping seats 48, and the left end of fixed plate 481 of clamping seats 48 is arranged on the right side of fixed cover 44 by way of welding
In side wall, front side is provided with second bearing seat 482 by bolted connection in fixed plate 481, leads in second bearing seat 482
Interference is connected with bull stick 483, and bull stick 483 stretches out the top of fixed plate 481, and the upside of bull stick 483 is provided with by way of welding
Along screw mandrel screw 484, the downside of bull stick 483 is provided with inverse screw mandrel screw 485 by way of welding, along screw mandrel screw 484 and inverse
Screw mandrel screw 485 is all located in fixed plate 481, and first is provided with by bolted connection on rear wall in fixed plate 481
Slide rail 486, the middle part of the first slide rail 486 separate, the first slide rail about 486 both sides slidingtype be connected with two the first sliding blocks 487, the
The right side of one sliding block 487 is provided with the first contiguous block 4810 by way of welding, and the front side of the first contiguous block of upside 4810 passes through
The mode of welding is provided with along threaded block 488, is coordinated along threaded block 488 and along screw mandrel screw 484, the contiguous block of downside first
4810 front side is provided with minus thread block 489 by way of welding, and minus thread block 489 and inverse screw mandrel screw 485 coordinate, and first
The rear of contiguous block 4810 is provided with clamping plate 4811 by way of welding.
Shaking device 7 includes guide pin bushing 71, the first nut 73, the first screw rod 74, the first pressing plate 75, the second slide rail 76,
Two sliding blocks 77, the second contiguous block 78, push pedal 79, spring 710, movement weight mass 711, connecting plate 712, the second motor 713, the first runner
714th, rotating shaft 715, cam 716, the second runner 717 and belt pulley 718, slidingtype is connected with guide pin bushing 71 on guide rail 6, in guide pin bushing 71
Upside is provided with through hole 72, and the outer upper end of guide pin bushing 71 is provided with the first nut 73, the first nut 73 and through hole by way of welding
72 with a vertical line, being placed with the first screw rod 74, the first screw rod 74 and the first nut in the first nut 73 and through hole 72
73 coordinate, and the lower end of the first screw rod 74 is provided with the first pressing plate 75 by way of welding, and the downside left of guide pin bushing 71 is connected by bolt
The mode connect is provided with the second slide rail 76, and slidingtype is connected with the second sliding block 77 on the second slide rail 76, and the front side of the second sliding block 77 is logical
The mode for crossing welding is provided with the second contiguous block 78, and the left end of the second contiguous block 78 is provided with movement weight mass 711 by way of welding,
The right-hand member of second contiguous block 78 is provided with push pedal 79 by way of welding, and the downside right of guide pin bushing 71 is provided with by way of welding
Connecting plate 712, the front side top of connecting plate 712 are provided with the second motor 713 by bolted connection, before the second motor 713
The first runner 714 is connected with by shaft coupling on the output shaft of the second motor 713 of side, the front side of connecting plate 712 lower section rotatably connects
Rotating shaft 715 is connected to, the front side of rotating shaft 715 is connected with cam 716 by way of welding, and the front side of rotating shaft 715 is by way of welding
The second runner 717 is connected with, the second runner 717 is located at the front side of cam 716, and the second runner 717 and the first runner 714 are same
In plane, belt pulley 718 is connected between the first runner 714 and the second runner 717.
Also include the 3rd slide rail 8, the 3rd sliding block 9, the 3rd motor 10, the 3rd gear 11, rack 12, the and of the 4th slide rail 13
Four-slider 14, left is provided with the 3rd slide rail 8 by bolted connection in bottom plate 1, and the inner sliding type of the 3rd slide rail 8 connects
The 3rd sliding block 9 is connected to, the upper end of the 3rd sliding block 9 is arranged on the lower end of supporting table 41 by way of welding, and the front side of the 3rd sliding block 9 passes through
Bolted mode is provided with the 3rd motor 10, and the output shaft of the 3rd motor 10 of the front side of the 3rd motor 10 is connected by shaft coupling
There is the 3rd gear 11, front side is provided with rack 12, the gear 11 of rack 12 and the 3rd by bolted connection on the 3rd slide rail 8
Engage, the 4th slide rail 13 is installed by bolted connection in mounting table 2, slidingtype is connected with the 4th on the 4th slide rail 13
Sliding block 14, the left end of Four-slider 14 are provided with connecting rod 3 by way of welding.
The material of bottom plate 1 is stainless steel.
The material of support bar 5 is Q235 steel.
First motor 46, the second motor 713 and the 3rd motor 10 are servomotor.
Operation principle:When user needs to clear up the cement of rebar surface, reinforcing bar can be put into fixing device 4
Interior, it is fixed fixing device 4, is opening shaking device 7, shaking device 7 shakes to rebar surface, so as to realize
The cement block of rebar surface is impacted, so that the cement of rebar surface is cleaned.
Because fixing device 4 includes supporting table 41, fixed station 42, first bearing seat 43, fixed cover 44, first gear
45th, the first motor 46, second gear 47, clamping seats 48, fixed plate 481, second bearing seat 482, bull stick 483, suitable screw mandrel screw
484th, inverse screw mandrel screw 485, the first slide rail 486, the first sliding block 487, suitable threaded block 488, minus thread block 489, the first contiguous block
4810 and clamping plate 4811, supporting table 41, the side that the upper end of supporting table 41 passes through welding are installed by way of welding on bottom plate 1
Formula is provided with fixed station 42, and middle part is provided with first bearing seat 43, clutch shaft bearing by bolted connection in fixed station 42
Fixed cover 44 is connected with by interference in seat 43, the outside right of fixed cover 44 is provided with first gear 45 by way of welding,
The left lower of fixed station 42 is provided with the first motor 46, the first motor of the left end of the first motor 46 by bolted connection
46 output shafts are connected with second gear 47 by shaft coupling, and first gear 45 engages with second gear 47, and the right-hand member of fixed cover 44 leads to
The mode for crossing welding is provided with clamping seats 48, and the left end of fixed plate 481 of clamping seats 48 is arranged on fixed cover by way of welding
On 44 right side walls, front side is provided with second bearing seat 482, second bearing seat 482 by bolted connection in fixed plate 481
Interior to be connected with bull stick 483 by interference, bull stick 483 stretches out the top of fixed plate 481, and the upside of bull stick 483 is pacified by way of welding
Equipped with along screw mandrel screw 484, the downside of bull stick 483 is provided with inverse screw mandrel screw 485 by way of welding, along screw mandrel screw 484
It is all located in fixed plate 481 with inverse screw mandrel screw 485, is provided with by bolted connection on rear wall in fixed plate 481
First slide rail 486, the middle part of the first slide rail 486 separate, the first slide rail about 486 both sides slidingtype be connected with two the first sliding blocks
487, the right side of the first sliding block 487 is provided with the first contiguous block 4810 by way of welding, before the first contiguous block of upside 4810
Side is provided with by way of welding along threaded block 488, is coordinated along threaded block 488 and along screw mandrel screw 484, downside first connects
The front side for connecing block 4810 is provided with minus thread block 489 by way of welding, and minus thread block 489 and inverse screw mandrel screw 485 coordinate,
The rear of first contiguous block 4810 is provided with clamping plate 4811 by way of welding, when user is put into reinforcing bar in fixing device 4
When, reinforcing bar can be put into fixed cover 44, then stretch out and be placed on mounting table 2 from the right-hand member of fixed cover 44 again, then rotated and turn
Bar 483, bull stick 483 is rotated to drive and rotated along screw mandrel screw 484 and inverse screw mandrel screw 485, so as to be matched suitable spiral shell
Line block 488 and minus thread block 489 are respectively by the counter motion on the first slide rail 486 of the first sliding block 487, so that clamping plate
4811 to central motion or away from central motion, so that the reinforcing bar being placed in fixed cover 44 is located at the centre bit of fixed cover 44
Put, also achieve the fixation to reinforcing bar, after reinforcing bar fixes, open the first motor 46, the first motor 46 drives the second tooth
The rotation of wheel 47, the rotation of second gear 47 drives the first gear 45 being engaged with to rotate, so as to drive fixed cover 44 first
The internal rotation of bearing block 43, so as to drive the reinforcing bar being fixed in fixed cover 44 to rotate, it can so facilitate to each of rebar surface
Individual position can be impacted by shaking device 7.
Because shaking device 7 includes guide pin bushing 71, the first nut 73, the first screw rod 74, the first pressing plate 75, the second slide rail
76th, the second sliding block 77, the second contiguous block 78, push pedal 79, spring 710, movement weight mass 711, connecting plate 712, the second motor 713,
One runner 714, rotating shaft 715, cam 716, the second runner 717 and belt pulley 718, slidingtype is connected with guide pin bushing 71 on guide rail 6,
Upside is provided with through hole 72 in guide pin bushing 71, and the outer upper end of guide pin bushing 71 is provided with the first nut 73, the first nut by way of welding
73 and through hole 72 with a vertical line, being placed with the first screw rod 74, the He of the first screw rod 74 in the first nut 73 and through hole 72
First nut 73 coordinates, and the lower end of the first screw rod 74 is provided with the first pressing plate 75 by way of welding, and the downside left of guide pin bushing 71 leads to
Cross bolted mode and the second slide rail 76 is installed, slidingtype is connected with the second sliding block 77, the second sliding block on the second slide rail 76
77 front sides are provided with the second contiguous block 78 by way of welding, and the left end of the second contiguous block 78 is provided with weight by way of welding
Hammer block 711 into shape, the right-hand member of the second contiguous block 78 is provided with push pedal 79, the side that the downside right of guide pin bushing 71 passes through welding by way of welding
Formula is provided with connecting plate 712, and the front side top of connecting plate 712 is provided with the second motor 713, the second electricity by bolted connection
First runner 714 is connected with by shaft coupling on the output shaft of the second motor 713 of the front side of machine 713, the front side of connecting plate 712 lower section is revolved
Rotatable to be connected with rotating shaft 715, the front side of rotating shaft 715 is connected with cam 716 by way of welding, and the front side of rotating shaft 715 passes through welding
Mode be connected with the second runner 717, the second runner 717 is located at the front side of cam 716, and the second runner 717 and the first runner 714 exist
In approximately the same plane, belt pulley 718 is connected between the first runner 714 and the second runner 717, after reinforcing bar places, is moved
Dynamic guide pin bushing 71, the 3rd slide rail 8 is moved to the position that reinforcing bar proceeds by cleaning with movement weight mass 711, then open the second electricity
Machine 713, the second motor 713 will drive the first runner 714 to turn clockwise, and the rotation of the first runner 714 will drive the second runner
717 turn clockwise, and the second runner 717, which rotates, will drive rotating shaft 715 to rotate, and the rotation of rotating shaft 715 will be with the up time of moving cam 716
Pin rotates, and cam 716 rotates the push pedal 79 for arriving the protrusions contact for making cam 716, so as to which push pedal 79 is pushed up, push pedal 79
Moving up will drive the second sliding block 77 to move up, and so as to drive movement weight mass 711 to move up, while the second sliding block 77 will be drawn
Spring 710 is stretched, spring 710 is in extended state, when cam 716, which rotates to, is not exposed to push pedal 79, spring 710 will be extensive
Position is restored, while pulls the second sliding block 77 to move down, the second sliding block 77 pulls movement weight mass 711 and push pedal 79 to move down, weight
Hammer beats to rebar surface soon, so as to lay the cement of rebar surface.
Because also include the 3rd slide rail 8, the 3rd sliding block 9, the 3rd motor 10, the 3rd gear 11, rack the 12, the 4th to slide
Rail 13 and Four-slider 14, left is provided with the 3rd slide rail 8 by bolted connection in bottom plate 1, is slided in the 3rd slide rail 8
Formula is connected with the 3rd sliding block 9, and the upper end of the 3rd sliding block 9 is arranged on the lower end of supporting table 41, the front side of the 3rd sliding block 9 by way of welding
3rd motor 10 is installed by bolted connection, the output shaft of the 3rd motor 10 of the front side of the 3rd motor 10 passes through shaft coupling
Device is connected with the 3rd gear 11, and front side is provided with rack 12, rack 12 and the 3rd by bolted connection on the 3rd slide rail 8
Gear 11 engages, and is provided with the 4th slide rail 13 in mounting table 2 by bolted connection, and slidingtype connects on the 4th slide rail 13
There is Four-slider 14, the left end of Four-slider 14 is provided with connecting rod 3 by way of welding, when there is more cement on reinforcing bar
When, the 3rd motor 10 can be opened, the 3rd motor 10 of control drives the 3rd gear 11 to turn clockwise, the up time of the 3rd gear 11
Pin rotation will rotate on rack 12, and so as to drive the 3rd sliding block 9 to be moved right on the 3rd slide rail 8, the 3rd sliding block 9 drives
Supporting table 41 moves right, so that reinforcing bar also moves right, while supporting table 41 will promote Four-slider 14 by connecting rod 3
Moved right on the 4th slide rail 13.
Because the material of bottom plate 1 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, can extension fixture use the longevity
Life.
Because the material of support bar 5 is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device more
It is long.
Because the first motor 46, the second motor 713 and the 3rd motor 10 are servomotor, anti-overload ability is strong, high speed
Can be good, its rotating speed can be precisely controlled.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (7)
1. set cement equipment is cleaned in a kind of construction site with rebar surface, it is characterised in that includes bottom plate(1), mounting table
(2), connecting rod(3), fixing device(4), support bar(5), guide rail(6)And shaking device(7), bottom plate(1)Upside right part passes through
The mode of welding is provided with mounting table(2), bottom plate(1)Upside left is provided with fixing device(4), mounting table(2)Left end passes through
The mode of welding is provided with connecting rod(3), connecting rod(3)Right-hand member is arranged on fixing device(4)Right side, bottom plate(1)Upper right side leads to
The mode for crossing welding is provided with support bar(5), support bar(5)Positioned at mounting table(2)Right side, support bar(5)Upper end passes through welding
Mode guide rail is installed(6), guide rail(6)On shaking device is installed(7).
2. set cement equipment is cleaned in a kind of construction site according to claim 1 with rebar surface, it is characterised in that Gu
Determine device(4)Include supporting table(41), fixed station(42), first bearing seat(43), fixed cover(44), first gear(45)、
First motor(46), second gear(47), clamping seats(48), fixed plate(481), second bearing seat(482), bull stick(483), it is suitable
Screw mandrel screw(484), inverse screw mandrel screw(485), the first slide rail(486), the first sliding block(487), along threaded block(488), inverse spiral shell
Line block(489), the first contiguous block(4810)And clamping plate(4811), bottom plate(1)On supporting table is installed by way of welding
(41), supporting table(41)Upper end is provided with fixed station by way of welding(42), fixed station(42)Interior middle part is connected by bolt
The mode connect is provided with first bearing seat(43), first bearing seat(43)It is interior that fixed cover is connected with by interference(44), fixed cover
(44)Outside right is provided with first gear by way of welding(45), fixed station(42)What left lower was bolted
Mode is provided with the first motor(46), the first motor(46)First motor of left end(46)Output shaft is connected with by shaft coupling
Two gears(47), first gear(45)With second gear(47)Engagement, fixed cover(44)Right-hand member is provided with by way of welding
Clamping seats(48), clamping seats(48)Fixed plate(481)Left end is arranged on fixed cover by way of welding(44)On right side wall,
Fixed plate(481)Interior front side is provided with second bearing seat by bolted connection(482), second bearing seat(482)It is interior logical
Interference is connected with bull stick(483), bull stick(483)Stretch out fixed plate(481)Top, bull stick(483)The side that upside passes through welding
Formula is provided with along screw mandrel screw(484), bull stick(483)Downside is provided with inverse screw mandrel screw by way of welding(485), along silk
Bar screw(484)With inverse screw mandrel screw(485)It is all located at fixed plate(481)It is interior, fixed plate(481)Pass through bolt on interior rear wall
The mode of connection is provided with the first slide rail(486), the first slide rail(486)Middle part separates, the first slide rail(486)Upper and lower two Slideslip
Formula is connected with two the first sliding blocks(487), the first sliding block(487)Right side is provided with the first contiguous block by way of welding
(4810), the contiguous block of upside first(4810)Front side be provided with by way of welding along threaded block(488), along threaded block
(488)With suitable screw mandrel screw(484)Coordinate, the contiguous block of downside first(4810)Front side inverse spiral shell is installed by way of welding
Line block(489), minus thread block(489)With inverse screw mandrel screw(485)Coordinate, the first contiguous block(4810)The rear side by welding
Formula is provided with clamping plate(4811).
3. set cement equipment is cleaned in a kind of construction site according to claim 1 with rebar surface, it is characterised in that shake
Dynamic device(7)Include guide pin bushing(71), the first nut(73), the first screw rod(74), the first pressing plate(75), the second slide rail(76)、
Second sliding block(77), the second contiguous block(78), push pedal(79), spring(710), movement weight mass(711), connecting plate(712), second electricity
Machine(713), the first runner(714), rotating shaft(715), cam(716), the second runner(717)And belt pulley(718), guide rail(6)
Upper slidingtype is connected with guide pin bushing(71), guide pin bushing(71)Interior upside is provided with through hole(72), guide pin bushing(71)Outer upper end passes through welding
Mode is provided with the first nut(73), the first nut(73)And through hole(72)With on a vertical line, the first nut(73)With
Through hole(72)Inside it is placed with the first screw rod(74), the first screw rod(74)With the first nut(73)Coordinate, the first screw rod(74)Lower end
First pressing plate is installed by way of welding(75), guide pin bushing(71)Downside left is provided with second by bolted connection
Slide rail(76), the second slide rail(76)Upper slidingtype is connected with the second sliding block(77), the second sliding block(77)The side that front side passes through welding
Formula is provided with the second contiguous block(78), the second contiguous block(78)Left end is provided with movement weight mass by way of welding(711), second
Contiguous block(78)Right-hand member is provided with push pedal by way of welding(79), guide pin bushing(71)Installed by way of welding downside right
There is connecting plate(712), connecting plate(712)Front side top is provided with the second motor by bolted connection(713), the second electricity
Machine(713)Second motor of front side(713)The first runner is connected with by shaft coupling on output shaft(714), connecting plate(712)Before
Side-lower is rotatably connected with rotating shaft(715), rotating shaft(715)Front side is connected with cam by way of welding(716), rotating shaft
(715)Front side is connected with the second runner by way of welding(717), the second runner(717)Positioned at cam(716)Front side, the
Two runners(717)With the first runner(714)In approximately the same plane, the first runner(714)With the second runner(717)Between connect
There is belt pulley(718).
4. set cement equipment is cleaned in a kind of construction site according to claim 1 with rebar surface, it is characterised in that also
Include the 3rd slide rail(8), the 3rd sliding block(9), the 3rd motor(10), the 3rd gear(11), rack(12), the 4th slide rail(13)
With Four-slider(14), bottom plate(1)Interior left is provided with the 3rd slide rail by bolted connection(8), the 3rd slide rail(8)It is interior
Slidingtype is connected with the 3rd sliding block(9), the 3rd sliding block(9)Upper end is arranged on supporting table by way of welding(41)Lower end, the
Three sliding blocks(9)Front side is provided with the 3rd motor by bolted connection(10), the 3rd motor(10)3rd motor of front side
(10)Output shaft is connected with the 3rd gear by shaft coupling(11), the 3rd slide rail(8)Pacify by bolted connection upper front side
Equipped with rack(12), rack(12)With the 3rd gear(11)Engagement, mounting table(2)Is inside provided with by bolted connection
Four slide rails(13), the 4th slide rail(13)Upper slidingtype is connected with Four-slider(14), Four-slider(14)Left end passes through welding
Mode is provided with connecting rod(3).
5. set cement equipment is cleaned in a kind of construction site according to claim 1 with rebar surface, it is characterised in that bottom
Plate(1)Material be stainless steel.
6. set cement equipment is cleaned in a kind of construction site according to claim 1 with rebar surface, it is characterised in that branch
Strut(5)Material be Q235 steel.
7. set cement equipment is cleaned in a kind of construction site according to claim 1 with rebar surface, it is characterised in that the
One motor(46), the second motor(713)With the 3rd motor(10)For servomotor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611212133.0A CN107755364A (en) | 2016-12-25 | 2016-12-25 | Set cement equipment is cleaned in a kind of construction site with rebar surface |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611212133.0A CN107755364A (en) | 2016-12-25 | 2016-12-25 | Set cement equipment is cleaned in a kind of construction site with rebar surface |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107755364A true CN107755364A (en) | 2018-03-06 |
Family
ID=61264351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611212133.0A Pending CN107755364A (en) | 2016-12-25 | 2016-12-25 | Set cement equipment is cleaned in a kind of construction site with rebar surface |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107755364A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108838170A (en) * | 2018-05-08 | 2018-11-20 | 刘珍虎 | It is a kind of for building for the rebar surface cleaning equipment containing concrete |
CN109092731A (en) * | 2018-07-06 | 2018-12-28 | 刘珍虎 | A kind of cleaning equipment being directed to the remaining concrete slag of rebar surface |
CN110487648A (en) * | 2019-08-12 | 2019-11-22 | 佛山市思特四通化工有限公司 | A kind of high-precision detection device and its application method for Ceramic Tiles quality |
CN111251257A (en) * | 2020-03-19 | 2020-06-09 | 孙忠君 | Automatic striking device for scraper production |
CN112404045A (en) * | 2020-11-04 | 2021-02-26 | 董小铃 | Steel sheet pile frozen soil cleaning equipment |
CN112691723A (en) * | 2021-01-13 | 2021-04-23 | 成都阔升蕊科技有限公司 | Residual cement cleaning device for shearing reinforcing steel bars |
CN113145616A (en) * | 2021-04-24 | 2021-07-23 | 孙佳梅 | Construction steel bar recovery processing device |
CN113245311A (en) * | 2021-05-13 | 2021-08-13 | 梁红梅 | Cement removing equipment for steel pipe recovery |
CN114232998A (en) * | 2021-12-16 | 2022-03-25 | 陕西航天通宇建筑工程有限公司 | Construction device for building main body |
CN116586170A (en) * | 2023-05-19 | 2023-08-15 | 江苏鹿晶新材料科技有限公司 | Preparation system and preparation process of recycled concrete |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000024534A (en) * | 1998-07-14 | 2000-01-25 | Kyowa Exeo Corp | Concrete column crushing machine |
CN203197179U (en) * | 2013-01-23 | 2013-09-18 | 姬宪龙 | Thin walled tube die-forging necking device and air hammer provided with same |
CN104174476A (en) * | 2014-07-16 | 2014-12-03 | 广西电力线路器材厂 | Waste electric pole crushing device |
CN204412345U (en) * | 2015-01-23 | 2015-06-24 | 黄享苟 | A kind of demolishing buildings waste steel bar retracting device |
CN105082016A (en) * | 2015-09-11 | 2015-11-25 | 国网福建省电力有限公司 | Screw rod electric clamp |
CN105313044A (en) * | 2015-11-05 | 2016-02-10 | 芜湖赛特施工设备有限公司 | Clamping device used for getting reinforcing steel bars from cement brick wall through hammering |
CN205650281U (en) * | 2016-03-17 | 2016-10-19 | 丁小伟 | Quick comminution device of bar -shaped traditional chinese medicine |
CN106111243A (en) * | 2016-08-29 | 2016-11-16 | 陈依林 | A kind of 3D prints with garbage cam-type processing equipment for pulverizing |
-
2016
- 2016-12-25 CN CN201611212133.0A patent/CN107755364A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000024534A (en) * | 1998-07-14 | 2000-01-25 | Kyowa Exeo Corp | Concrete column crushing machine |
CN203197179U (en) * | 2013-01-23 | 2013-09-18 | 姬宪龙 | Thin walled tube die-forging necking device and air hammer provided with same |
CN104174476A (en) * | 2014-07-16 | 2014-12-03 | 广西电力线路器材厂 | Waste electric pole crushing device |
CN204412345U (en) * | 2015-01-23 | 2015-06-24 | 黄享苟 | A kind of demolishing buildings waste steel bar retracting device |
CN105082016A (en) * | 2015-09-11 | 2015-11-25 | 国网福建省电力有限公司 | Screw rod electric clamp |
CN105313044A (en) * | 2015-11-05 | 2016-02-10 | 芜湖赛特施工设备有限公司 | Clamping device used for getting reinforcing steel bars from cement brick wall through hammering |
CN205650281U (en) * | 2016-03-17 | 2016-10-19 | 丁小伟 | Quick comminution device of bar -shaped traditional chinese medicine |
CN106111243A (en) * | 2016-08-29 | 2016-11-16 | 陈依林 | A kind of 3D prints with garbage cam-type processing equipment for pulverizing |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108838170A (en) * | 2018-05-08 | 2018-11-20 | 刘珍虎 | It is a kind of for building for the rebar surface cleaning equipment containing concrete |
CN109092731A (en) * | 2018-07-06 | 2018-12-28 | 刘珍虎 | A kind of cleaning equipment being directed to the remaining concrete slag of rebar surface |
CN110487648B (en) * | 2019-08-12 | 2022-03-01 | 佛山市德信致远陶瓷有限公司 | High-precision detection equipment for ceramic tile quality and use method thereof |
CN110487648A (en) * | 2019-08-12 | 2019-11-22 | 佛山市思特四通化工有限公司 | A kind of high-precision detection device and its application method for Ceramic Tiles quality |
CN111251257A (en) * | 2020-03-19 | 2020-06-09 | 孙忠君 | Automatic striking device for scraper production |
CN111251257B (en) * | 2020-03-19 | 2023-10-27 | 柳宁 | Automatic striking device for scraper production |
CN112404045B (en) * | 2020-11-04 | 2022-01-28 | 山东西海建设集团有限公司 | Steel sheet pile frozen soil cleaning equipment |
CN112404045A (en) * | 2020-11-04 | 2021-02-26 | 董小铃 | Steel sheet pile frozen soil cleaning equipment |
CN112691723A (en) * | 2021-01-13 | 2021-04-23 | 成都阔升蕊科技有限公司 | Residual cement cleaning device for shearing reinforcing steel bars |
CN113145616A (en) * | 2021-04-24 | 2021-07-23 | 孙佳梅 | Construction steel bar recovery processing device |
CN113145616B (en) * | 2021-04-24 | 2023-09-29 | 中交一公局集团有限公司 | Construction steel bar recycling device |
CN113245311A (en) * | 2021-05-13 | 2021-08-13 | 梁红梅 | Cement removing equipment for steel pipe recovery |
CN114232998A (en) * | 2021-12-16 | 2022-03-25 | 陕西航天通宇建筑工程有限公司 | Construction device for building main body |
CN116586170A (en) * | 2023-05-19 | 2023-08-15 | 江苏鹿晶新材料科技有限公司 | Preparation system and preparation process of recycled concrete |
CN116586170B (en) * | 2023-05-19 | 2024-04-16 | 江苏鹿晶新材料科技有限公司 | Preparation system and preparation process of recycled concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107755364A (en) | Set cement equipment is cleaned in a kind of construction site with rebar surface | |
CN106733985A (en) | A kind of construction site barrel of cement cleaning equipment | |
CN106677504B (en) | A kind of construction site ground cement installation apparatus | |
CN206216918U (en) | A kind of novel architecture concrete central mix plant | |
CN206216911U (en) | A kind of cement bonded sand cam-type quick agitator | |
CN205651501U (en) | Cement flash mixed device for building | |
CN109464793A (en) | A kind of random teeing apparatus of table tennis | |
CN108838170A (en) | It is a kind of for building for the rebar surface cleaning equipment containing concrete | |
CN109092731A (en) | A kind of cleaning equipment being directed to the remaining concrete slag of rebar surface | |
CN215754875U (en) | A conveyer for ready-mixed concrete | |
CN206319237U (en) | A kind of urban construction efficient repair apparatus of road | |
CN106499186B (en) | A kind of build concrete Liftable conveying device | |
CN108162173A (en) | A kind of cement uniform mixing equipment of road and bridge | |
CN108214898A (en) | A kind of mixing plant that dipping and heaving stirring can be carried out to cement | |
CN108193881A (en) | A kind of concreting planisher | |
CN112405839A (en) | Cement stirring self-cleaning device | |
CN107090864A (en) | A kind of construction site irrigation canals and ditches cement highly efficient pad device | |
CN205871254U (en) | Cement bag compressor arrangement for building | |
CN207955735U (en) | A kind of municipal administration bridge construction material conveyor | |
CN205854688U (en) | Device quickly poured out by a kind of cement for building | |
CN109821839A (en) | Wall processing unit is scraped with barrel of cement for a kind of construction site | |
CN206355914U (en) | A kind of gear type liquid stirring device | |
CN111345338B (en) | Swing type snail sand spitting device and method based on oscillation caused by inertia | |
CN209181463U (en) | A kind of reflux-type drying device of wet aggregates during dry-mixed mortar production | |
CN208542684U (en) | A kind of construction site rebar surface cement block remove device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181127 Address after: Room 501-10, Triumph Commercial Office Complex Building, 56 Hongguzhong Avenue, Honggutan New District, Nanchang City, Jiangxi Province Applicant after: Liao Leixin Address before: 330038 Red Valley Road 1568, Red Valley, Nanchang, Jiangxi, China. The Red Valley triumph commercial office complex and commercial six 301-10 room (third floors) Applicant before: NANCHANG NUOYIHONG TECHNOLOGY CO.,LTD. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180306 |