CN107740403A - A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin - Google Patents

A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin Download PDF

Info

Publication number
CN107740403A
CN107740403A CN201711046009.6A CN201711046009A CN107740403A CN 107740403 A CN107740403 A CN 107740403A CN 201711046009 A CN201711046009 A CN 201711046009A CN 107740403 A CN107740403 A CN 107740403A
Authority
CN
China
Prior art keywords
chimney filter
vertical drainage
drainage chimney
heating
electrical bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711046009.6A
Other languages
Chinese (zh)
Inventor
陈富
张健
李立新
侯晋芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd, Tianjin Harbor Engineering Quality Inspection Center Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201711046009.6A priority Critical patent/CN107740403A/en
Publication of CN107740403A publication Critical patent/CN107740403A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/11Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin, vertical drainage chimney filter is first connected in sleeve pipe, vertical drainage chimney filter bottom heat sealing machine, which plates, prevents weak soil from entering chimney filter, sleeve pipe by board-plugging device or is manually driven into designated depth, then sleeve pipe is extracted, vertical drainage chimney filter is stayed in the soil body, then cut off vertical drainage chimney filter, make its top leakage sand bedding course;Electrical bar is inserted in vertical drainage chimney filter, electrical bar is connected by the lead of insulative water-proof quick plug, and insulative water-proof quick plug is connected with the snap joint of T-shaped cable, and T-shaped cable is connected with electric power system;Ground is heated using electrical bar, prepressing water discharge consolidation is carried out to ground with reference to the methods of piling prepressing or vacuum preloading or combined vacuum and surcharge preloading.

Description

A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin
Technical field
The invention belongs to civil engineering groundwork process field, relates particularly to a kind of vertical drainage chimney filter in-built electrical hot pin Heating consolidation construction method.
Background technology
Discharging consolidation method has a wide range of applications in Soft Clay Foundation processing.In order to shorten drainage path, reduce solid The time is tied, it is necessary to squeeze into vertical plastic draining board in ground.Plastic draining board is that banding is composite structured, and centre is to be extruded into The quilted plastic panel of type, the two sides of core plate is that non-woven geotextile parcel makees filtering layer.Plastic draining board typically first connects sleeve pipe It is interior, sleeve pipe is driven into by designated depth by plate machinery, then extracts sleeve pipe, plastic draining board is left in the soil body, plane On generally according to square or equilateral triangle arrange, spacing is 0.7-2.0 rice.Level is to drainage system by horizontal sand bedding course And the chimney filter composition of embedment sand bedding course.Vertical drainage plate is connected with horizontal drainage system, forms complete drainage system.
Because sleeve pipe causes larger disturbance during the soil body is squeezed into surrounding soil, make under the infiltration coefficient of the soil body Drop, formed " smear zone (smear zone) ", its diameter is about 2.0-3.0 times of casing diameter.The presence of smear zone is significantly The rate of discharge of pore water is hindered, causes consolidation time to increase.The scholar's research such as Abuel-Naga find that heating can improve The infiltration coefficient of smear zone, the inhibition that smear zone is discharged for pore water can be greatly reduced, and be consolidated by indoor large Consolidation time can be shortened by tying the heating of instrument verification experimental verification, while can increase final settlement.Typically now noted using U-tube Water heats or drain bar winding electric-heating-wire-heating method, complex operation and observable index is higher, therefore is not suitable for extensive scene Construction, it is therefore desirable to develop one kind and be suitable for the construction of live plate, and the higher hot type vertical drainage of heating efficiency leads to Road.
A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin is developed, electrical bar is placed on insertion ground In the vertical drainage chimney filter of base, during consolidation draining, the smear zone soil body around electrical bar heating rise vertical drainage chimney filter Temperature, increase the infiltration coefficient of the soil body, shorten consolidation time, while the final settlement during basement process can be increased Amount.
The content of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of adding for vertical drainage chimney filter in-built electrical hot pin Hot consolidation construction method, the temperature of the smear zone soil body around vertical drainage chimney filter is raised, increase the infiltration coefficient of the soil body, shorten admittedly The time is tied, while the final settlement during basement process can be increased.
The present invention is achieved by the following technical solutions:
A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin, including vertical drainage chimney filter and be built in Electrical bar in vertical drainage chimney filter;The vertical drainage chimney filter is by permeable bellows and wraps up the terylene spun-bonded of permeable bellows Non-woven fabrics forms,
Vertical drainage chimney filter is first connected in sleeve pipe, vertical drainage chimney filter bottom heat sealing machine, which plates, prevents weak soil from entering Chimney filter, designated depth is driven into by board-plugging device or manually by sleeve pipe, then extracts sleeve pipe, vertical drainage chimney filter is stayed in soil In vivo, vertical drainage chimney filter is then cut off, makes its top leakage sand bedding course;
After having set vertical drainage chimney filter, electrical bar is inserted in vertical drainage chimney filter, electrical bar is fast by insulative water-proof The lead of fast plug is connected, and insulative water-proof quick plug is connected with the snap joint of T-shaped cable, and T-shaped cable is with supplying Electric system is connected;
After electric rod circuit connection terminates, vertical drainage chimney filter leakage part heap sand is covered, is suitably higher by sand pad around Layer;
Open electric power system, ground heated using electrical bar, with reference to piling prepressing or vacuum preloading or The methods of combined vacuum and surcharge preloading, carries out prepressing water discharge consolidation to ground.
In the above-mentioned technical solutions, the permeable bellows is that the external form formed by high density poly propylene (PPR) is in ripple The new water drainage plastics tubing of shape, uniformly permeable through hole, permeable bellows surrounding outsourcing terylene are spun the groove of permeable bellows Bonded non-woven fabrics.
In the above-mentioned technical solutions, the electrical bar uses quartz heating rod or ceramic heating bar.
In the above-mentioned technical solutions, electrical bar length should be identical with vertical drainage chimney filter length.
In the above-mentioned technical solutions, temperature sensor, and and temperature controller are buried in the position on the outside of ground inner close fitting chimney filter It is connected;Temperature controller is also connected with electric power system;In heating process, using temperature controller, when temperature sensor temperature is more than 90 Degree Celsius when, automatically power off;When temperature sensor temperature is less than 80 degrees Celsius, auto-power on heating.
In the above-mentioned technical solutions, in pre-compaction process, monitoring settlement of foundation, pore water pressure dissipation and soil temperature Change etc., when calculating that the degree of consolidation reaches more than 90%, unloaded, electrical bar is recycled.
A kind of foundation drainage structure that above-mentioned heating consolidation construction method is formed, including vertical drainage chimney filter and electric heating Rod, the vertical drainage chimney filter are made up of the terylene spun-bonded non-woven fabrics of permeable bellows and the permeable bellows of parcel, vertical drainage Chimney filter is vertically arranged in ground, and in the electrical bar insertion vertical drainage chimney filter, electrical bar passes through insulative water-proof quick plug Lead be connected, and insulative water-proof quick plug is connected with the snap joint of T-shaped cable, T-shaped cable and electric power system It is connected.
The advantages of the present invention are:
The present invention places electrical bar in vertical drainage chimney filter, so as to not influence the basis of chimney filter itself drain function On, make chimney filter while be provided with electric heating function, its heating arrangement sealing is strong, classification of waterproof is high, and electrical bar construction letter It is single, it is easy to connect.
Using the temperature of the smear zone soil body around vertical drainage chimney filter in-built electrical hot pin rise chimney filter, consolidation draining is accelerated Speed, shorten consolidation time.
Vertical drainage chimney filter uses tubular structure, convenient to be squeezed into ground using plate machinery, itself can compress suitable Answer the sedimentation during basement process.And vertical drainage chimney filter and electrical bar are split-type structural, vertical drainage chimney filter inserts ground Vertical inner space is formd after base, then facilitates and electrical bar is placed in vertical drainage chimney filter, avoid plate process pair In the destruction of electrical bar.Compared with heating wire winding formula heats drain bar, its is simple in construction, is easy to site operation and protection.
Brief description of the drawings
Fig. 1 is the structural representation of vertical drainage chimney filter of the present invention.
Fig. 2 is that electrical bar is connected detail drawing with electric power system.
Fig. 3 is vertical drainage chimney filter in-built electrical hot pin heating consolidation construction sectional drawing.
Embodiment
Technical scheme is further illustrated with reference to specific embodiment.
A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin, including vertical drainage chimney filter 1 and be used for The electrical bar 2 being built in vertical drainage chimney filter;
The vertical drainage chimney filter is by permeable bellows 1-1 and the terylene spun-bonded non-woven fabrics 1-2 groups for wrapping up permeable bellows Into the permeable bellows is the corrugated new water drainage plastics tubing of the external form formed by high density poly propylene (PPR), thoroughly The uniform permeable through hole 1-3 of the groove of water ripples pipe, the permeable terylene spun-bonded non-woven fabrics of bellows surrounding outsourcing;Vertical drainage chimney filter Diameter be preferably 30mm, other technologies index is as follows:
To the 50% of external diameter, 1. off-load immediately, sample does not rupture press perpendicular, not stratified;
2. the weight that temperature is 1Kg with weight under conditions of 0 DEG C, height 1M, impacting 10 times, more than Ying Jiuci nothings are opened Split;
3. inwall is uniform and smooth, permeable hole is equably beaten less than the 1/2 of trough height, is beaten in trough height more than 1/2 Hole count no more than sum 10%;
4. water permeable area >=2500mm2/m;
5. longitudinal welds≤3.0%;
6. flexibility %≤2;
7. ring stiffness >=13kN/m2
8th, a diameter of 1mm-3mm of permeable through hole, spacing 10mm, and 360 degree of scopes on the groove of permeable bellows Inside it is uniformly distributed.
The electrical bar 2 can use quartz heating rod or ceramic heating bar, classification of waterproof IPX7, and electrical bar length should be with Chimney filter length is identical.
Using vertical drainage chimney filter and electrical bar carry out heat consolidation construction procedure be:
Referring to accompanying drawing 2 and 3, place first flattens, and lays medium coarse sand bed course, it is desirable to which its infiltration coefficient is more than 10-3M/s, will Vertical drainage chimney filter is first connected in sleeve pipe, and vertical drainage chimney filter bottom heat sealing machine, which plates, prevents weak soil from entering chimney filter, passes through Sleeve pipe is manually driven into designated depth by board-plugging device, then extracts sleeve pipe, vertical drainage chimney filter is stayed in the soil body, then Vertical drainage chimney filter is cut off, it is about 0.1 meter to make its top leakage sand bedding course length, and vertical drainage chimney filter is according to square or waits Side triangular arrangement, spacing are 0.7-2.0 rice;
After having set vertical drainage chimney filter, electrical bar 2 is placed in vertical drainage chimney filter 1, electrical bar is anti-by insulating The lead of water quick plug 3 is connected, and insulative water-proof quick plug 3 is connected with the snap joint of T-shaped cable 4, T-shaped electricity Cable is connected with electric power system;
Temperature sensor 5 is buried in position on the outside of ground inner close fitting chimney filter, and is connected with temperature controller;Temperature controller also with Electric power system is connected, and controls the power supply to electrical bar;
After electric rod circuit connection terminates, vertical drainage chimney filter leakage part heap sand is covered, is suitably higher by sand pad around Layer;
Open electric power system, ground heated using electrical bar, can combine piling prepressing or vacuum preloading, Or the methods of combined vacuum and surcharge preloading, carries out prepressing water discharge consolidation to ground.
By in thermal process, when temperature sensor temperature is more than 90 degrees Celsius, automatically power off;When temperature sensor temperature is low When 80 degrees Celsius, auto-power on heating;
In pre-compaction process, monitoring settlement of foundation, pore water pressure dissipation and soil temperature change etc., the degree of consolidation is calculated When reaching more than 90%, unloaded, electrical bar is recycled.
Exemplary description has been done to the present invention above, it should explanation, in the situation for the core for not departing from the present invention Under, any simple deformation, modification or other skilled in the art can not spend the equivalent substitution of creative work equal Fall into protection scope of the present invention.

Claims (7)

  1. A kind of 1. heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin, it is characterised in that:Filtered including vertical drainage Pipe and electrical bar;The vertical drainage chimney filter is made up of the terylene spun-bonded non-woven fabrics of permeable bellows and the permeable bellows of parcel,
    Vertical drainage chimney filter is first connected in sleeve pipe, vertical drainage chimney filter bottom heat sealing machine, which plates, prevents weak soil from entering filter Pipe, is driven into designated depth by board-plugging device or manually by sleeve pipe, then extracts sleeve pipe, vertical drainage chimney filter is stayed in the soil body It is interior, vertical drainage chimney filter is then cut off, makes its top leakage sand bedding course;
    After having set vertical drainage chimney filter, electrical bar is inserted in vertical drainage chimney filter, electrical bar is quickly inserted by insulative water-proof The lead of head is connected, and insulative water-proof quick plug is connected with the snap joint of T-shaped cable, and T-shaped cable is with power supply System is connected;
    After electric rod circuit connection terminates, vertical drainage chimney filter leakage part heap sand is covered, is suitably higher by sand bedding course around;
    Electric power system is opened, ground is heated using electrical bar, with reference to piling prepressing or vacuum preloading or vacuum The methods of combined heap load precompacting, carries out prepressing water discharge consolidation to ground.
  2. 2. a kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin according to claim 1, its feature It is:The permeable bellows is the corrugated plastic pipe of external form, the uniform permeable through hole of the groove of permeable bellows, thoroughly The terylene spun-bonded non-woven fabrics of water ripples pipe surrounding outsourcing.
  3. 3. a kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin according to claim 1, its feature It is:The electrical bar uses quartz heating rod or ceramic heating bar.
  4. 4. a kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin according to claim 1, its feature It is:Electrical bar length should be identical with vertical drainage chimney filter length.
  5. 5. a kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin according to claim 1, its feature It is:Temperature sensor is buried in position on the outside of ground inner close fitting chimney filter, and is connected with temperature controller;Temperature controller also with power supply System is connected;In heating process, using temperature controller, when temperature sensor temperature is more than 90 degrees Celsius, automatically power off;Work as temperature When spending sensor temperature less than 80 degrees Celsius, auto-power on heating.
  6. 6. a kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin according to claim 1, its feature It is:In pre-compaction process, monitoring settlement of foundation, pore water pressure dissipation and soil temperature change etc., calculate that the degree of consolidation reaches When more than 90%, unloaded, electrical bar is recycled.
  7. What 7. a kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin according to claim 1 was formed A kind of foundation drainage structure, it is characterised in that:Including vertical drainage chimney filter and electrical bar, the vertical drainage chimney filter is by permeable ripple Line pipe and the terylene spun-bonded non-woven fabrics composition for wrapping up permeable bellows, vertical drainage chimney filter are vertically arranged in ground, the electricity In hot pin insertion vertical drainage chimney filter, electrical bar is connected by the lead of insulative water-proof quick plug, and insulative water-proof is fast Fast plug is connected with the snap joint of T-shaped cable, and T-shaped cable is connected with electric power system.
CN201711046009.6A 2017-10-31 2017-10-31 A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin Pending CN107740403A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711046009.6A CN107740403A (en) 2017-10-31 2017-10-31 A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711046009.6A CN107740403A (en) 2017-10-31 2017-10-31 A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin

Publications (1)

Publication Number Publication Date
CN107740403A true CN107740403A (en) 2018-02-27

Family

ID=61233726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711046009.6A Pending CN107740403A (en) 2017-10-31 2017-10-31 A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin

Country Status (1)

Country Link
CN (1) CN107740403A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853517A (en) * 2019-02-18 2019-06-07 中交天津港湾工程研究院有限公司 A kind of U-shaped circulating hot water consolidation draining system and its construction method
CN110004912A (en) * 2019-03-29 2019-07-12 中交天津港湾工程研究院有限公司 A kind of outer plastic draining board and its consolidation draining construction method around heater wire
CN112176983A (en) * 2020-08-28 2021-01-05 温州大学 Combined type heating, electroosmosis and drainage pumping frame system
WO2021164426A1 (en) * 2020-09-27 2021-08-26 江苏鑫泰岩土科技有限公司 Pressurized thermosensitive vaporization phase change consolidation method and thermal desensitization intermittent-type evaporator therefor
CN113389214A (en) * 2021-04-13 2021-09-14 海南大学 South sea island reef composite foundation construction device
CN113865988A (en) * 2021-09-26 2021-12-31 浙江大学 Soft soil thermal consolidation model test device and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831903A (en) * 2010-05-18 2010-09-15 上海港湾软地基处理工程(集团)有限公司 Method for treating soft foundation
CN103255761A (en) * 2012-02-16 2013-08-21 同济大学 Method for reinforcing soft soil foundation by using calescence type vacuum preloading way
CN203530996U (en) * 2013-09-25 2014-04-09 杭州萧山路桥工程处 Multi-well-point combined type precipitation facility
CN104727296A (en) * 2013-12-20 2015-06-24 邓立新 Self-suction drain pipe
CN107190729A (en) * 2017-06-20 2017-09-22 天津大学 A kind of ground heater and application device progress ground heat the construction method of combined vacuum precompressed soft soil foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831903A (en) * 2010-05-18 2010-09-15 上海港湾软地基处理工程(集团)有限公司 Method for treating soft foundation
CN103255761A (en) * 2012-02-16 2013-08-21 同济大学 Method for reinforcing soft soil foundation by using calescence type vacuum preloading way
CN203530996U (en) * 2013-09-25 2014-04-09 杭州萧山路桥工程处 Multi-well-point combined type precipitation facility
CN104727296A (en) * 2013-12-20 2015-06-24 邓立新 Self-suction drain pipe
CN107190729A (en) * 2017-06-20 2017-09-22 天津大学 A kind of ground heater and application device progress ground heat the construction method of combined vacuum precompressed soft soil foundation

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853517A (en) * 2019-02-18 2019-06-07 中交天津港湾工程研究院有限公司 A kind of U-shaped circulating hot water consolidation draining system and its construction method
CN109853517B (en) * 2019-02-18 2024-02-09 中交天津港湾工程研究院有限公司 U-shaped circulating hot water consolidation drainage system and construction method thereof
CN110004912A (en) * 2019-03-29 2019-07-12 中交天津港湾工程研究院有限公司 A kind of outer plastic draining board and its consolidation draining construction method around heater wire
CN112176983A (en) * 2020-08-28 2021-01-05 温州大学 Combined type heating, electroosmosis and drainage pumping frame system
WO2021164426A1 (en) * 2020-09-27 2021-08-26 江苏鑫泰岩土科技有限公司 Pressurized thermosensitive vaporization phase change consolidation method and thermal desensitization intermittent-type evaporator therefor
CN113389214A (en) * 2021-04-13 2021-09-14 海南大学 South sea island reef composite foundation construction device
CN113389214B (en) * 2021-04-13 2022-05-03 海南大学 South sea island reef composite foundation construction device
CN113865988A (en) * 2021-09-26 2021-12-31 浙江大学 Soft soil thermal consolidation model test device and method

Similar Documents

Publication Publication Date Title
CN107740403A (en) A kind of heating consolidation construction method of vertical drainage chimney filter in-built electrical hot pin
CN103255761B (en) A kind of temperature-increasing type Vacuum Preloading Method for Consolidation of Soft Soil Foundation method
CN105887604B (en) A kind of operation roadbed disease disposal plant and processing method
CN107794909A (en) A kind of hot laid plastic drain bar and its construction method
CN102926378A (en) Conductive composite vacuum soft soil reinforcing prepressing method
CN109914385A (en) A kind of method of hydraulic structure treatment of soft foundation
CN205475195U (en) Bloated joint vacuum preloading ground processing apparatus of bandlet side
CN107190729A (en) A kind of ground heater and application device progress ground heat the construction method of combined vacuum precompressed soft soil foundation
CN207891864U (en) A kind of ground heating discharge structure of vertical drainage chimney filter in-built electrical hot pin
CN107476285A (en) The apparatus and method of vacuum electroosmosis joint reinforcement Soft Clay Foundation
CN109853517B (en) U-shaped circulating hot water consolidation drainage system and construction method thereof
CN110004912A (en) A kind of outer plastic draining board and its consolidation draining construction method around heater wire
CN208668397U (en) A kind of vertical drainage consolidation pile and system accelerating bury consolidation using hot water
CN207672556U (en) A kind of hot laid plastic drain bar
CN206685168U (en) The photovoltaic cable of protection against rodents sting
CN110939121A (en) Drainage consolidation construction method combining hot water pipe and plastic drainage plate
CN102828499A (en) Improved quick high vacuum densification soft foundation treatment method
CN205777284U (en) A kind of floor heating structure
CN205917685U (en) Integral type well dotted arranges vacuum system
CN101349056A (en) Composite electroosmosis and AC electric shock water drain method and uses thereof
CN210086226U (en) Plastic drainage plate externally wound with heating wire
CN105926577B (en) Vacuum preloading seepage consolidation method
CN101338558A (en) Composite AC electric shock discharging method, device thereof and uses
CN108086636A (en) It is a kind of to be integrally formed fever ceramic tile and its production installation method
CN110195429B (en) Heating and solidifying system of vacuum pre-pressing combined closed-sun type solar water heater and construction method

Legal Events