CN107737810A - Steel pipe rolling technique - Google Patents

Steel pipe rolling technique Download PDF

Info

Publication number
CN107737810A
CN107737810A CN201710994284.4A CN201710994284A CN107737810A CN 107737810 A CN107737810 A CN 107737810A CN 201710994284 A CN201710994284 A CN 201710994284A CN 107737810 A CN107737810 A CN 107737810A
Authority
CN
China
Prior art keywords
rolling
pipe
heating
steel pipe
sizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710994284.4A
Other languages
Chinese (zh)
Inventor
孙超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710994284.4A priority Critical patent/CN107737810A/en
Publication of CN107737810A publication Critical patent/CN107737810A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B23/00Tube-rolling not restricted to methods provided for in only one of groups B21B17/00, B21B19/00, B21B21/00, e.g. combined processes planetary tube rolling, auxiliary arrangements, e.g. lubricating, special tube blanks, continuous casting combined with tube rolling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The present invention relates to a kind of steel pipe rolling technique, including step are as follows:Heating, pipe is heated in heating furnace more than 1150 DEG C;Perforation, perforated machine enter eleven punch 11 to the pipe after heating, hollow billet are made;Secondary soaking, manufactured hollow billet after perforation is sent into Sloping Hearth Heating Furnace and carries out Short Time Heating;Rolling, the hollow billet after secondary soaking is through on retained mandrel, is then carried out undergauge by three-roll cross rolling mill, is subtracted wall, extension rolling, forms hollow forging;De- pipe, the hollow forging after rolling are deviate from from retained mandrel;Sizing truing, sizing, shaping are carried out, forms hot production tube;Cooling, hot production tube are cooled down by step cooling bed;Finished product is collected, production thin-wall seamless steel pipe is which solved in the operation of rolling to cool the production problem for being not easy to roll again soon, the unreasonable product structure that thin-wall seamless steel pipe production replaces hot rolling with cold-drawn is changed, energy consumption, the efficiency for reducing equipment investment cost, improving production seamless steel pipe can be reduced.

Description

Steel pipe rolling technique
Technical field:
The invention belongs to steel pipe rolling technology field, and in particular to a kind of steel pipe rolling technique.
Background technology:
Ranked the first for successive years by development for many years, the capacity and output of seamless steel pipe in China.The country possesses Various types of seamless steel pipe hot-rollings and cold-drawn unit, the reason for because of historical development, technology layout is uneven, and what is fallen behind is cold Drawing machine group and technology occupy very big ratio.Particularly in thin-wall seamless steel pipe production technical field, due to the hair after perforation Pipe temperature is too low can not hot rolling.So also using the techniques such as traditional perforation cold-drawn, its high energy consumption, lumber recovery are low, pollution ring Border has seriously had a strong impact on the raising of seamless steel tube production manufacturing capacity.
The content of the invention:
A kind of steel pipe rolling technique is provided it is an object of the invention to solve problems of the prior art.Which solve life Production thin-wall seamless steel pipe cools the production problem for being not easy to roll again soon in the operation of rolling, change thin-wall seamless steel pipe production with Cold-drawn replaces the unreasonable product structure of hot rolling, can reduce energy consumption, reduce equipment investment cost, improves production seamless steel The efficiency of pipe.
The technical proposal of the invention is realized in this way:
Steel pipe rolling technique, it is characterised in that comprise the following steps:
1), heating, pipe is heated to more than 1150 DEG C in heating furnace;
2), perforation, perforated machine enters eleven punch 11 to the pipe after heating, hollow billet is made;
3), secondary soaking, manufactured hollow billet will be sent into Sloping Hearth Heating Furnace after perforation and carry out Short Time Heating;
4), rolling, the hollow billet after secondary soaking is through on retained mandrel, then by three-roll cross rolling mill carry out undergauge, Subtract wall, extension rolling, form hollow forging;
5), de- pipe, the hollow forging after rolling deviates from from retained mandrel;
6), sizing truing, by hollow forging by sizing unit, carry out sizing, shaping, form hot production tube;
7), cooling, hot production tube cooled down by step cooling bed;
8), finished product collect, the hot production tube after cooling is straightened, crop, inspection, packing, mark storage, formed commercial pipes.
Described step 2)In punch be two-roller skew-rolling formula punch.
Described step 3)In secondary soaking to 850-1050 degrees Celsius, soaking time is 3-5 minutes.
Described step 6)In sizing unit continuously arrange composition for 5-15 framves sizing mill.
The positive effect of the present invention:
1st, the pickling that traditional cold-drawn processing technology needs, phosphatization, saponification environmental pollution is larger, and new technology does not produce dirt to environment Dye, it is that environment influences to be advantageous to environmental impact assessment.
2nd, 2~3 times are improved compared to traditional handicraft, production efficiency.
3rd, new technology stock utilization is high, and steel pipe's production benefit per ton improves 20% or so.
4th, fixed equipment less investment, it is with short production cycle.
Brief description of the drawings:
Fig. 1 is steel pipe rolling process chart.
In figure:1st, heating of pipe blank stove, 2, perforation unit, 3, feeding mechanism, 4, discharging material stirring-up mechanism, 5, Sloping Hearth heating Stove, 6, gas furnace, 7, rotary feeding mechanism, retained mandrel mechanism, 8, roller trio skew rolling unit, 9, sizing unit, 10, stepping it is cold Bed.
Embodiment:
Embodiment:With reference to as shown in figure 1, being further described to steel pipe rolling craft embodiment of the present invention:Steel pipe rolling technique, It is characterized in that comprise the following steps:
1), heating, the pipe of a diameter of 50-100 millimeters is heated to more than 1150 DEG C in heating furnace;
2), perforation, perforated machine enters eleven punch 11 to the pipe after heating, and the hollow billet that external diameter is 53-103 millimeters is made;
3), secondary soaking, manufactured hollow billet will be sent into Sloping Hearth Heating Furnace after perforation and carry out Short Time Heating;
4), rolling, the hollow billet after secondary soaking is through on retained mandrel, then by three-roll cross rolling mill carry out undergauge, Subtract wall, extension rolling, formed hollow forging, for pipe, undergauge 10-15 millimeters, subtract wall 0.5-1 millimeters, extension roll Elongation percentage processed is 1.2);
5), de- pipe, the hollow forging after rolling deviates from from retained mandrel, and passing through the rotation of three-high mill, holding tube and material transfer lifting will Hollow forging after rolling is taken out of;
6), sizing truing, by hollow forging by sizing unit, carry out sizing, shaping, form hot production tube, it meets GB/T8162- 1999 standards;
7), cooling, hot production tube cooled down by step cooling bed;
8), finished product collect, the hot production tube after cooling is straightened, crop, inspection, packing, mark storage, formed commercial pipes.
Described step 2)In punch be two-roller skew-rolling formula punch.
Described step 3)In secondary soaking to 850-1050 degrees Celsius, soaking time is 3-5 minutes.
Described step 6)In sizing unit continuously arrange composition for 5-15 framves sizing mill.
When pipe is heated to more than 1150 DEG C in heating of pipe blank stove, perforated unit is rolled into hollow billet, by feeding mechanism When feeding Sloping Hearth Heating Furnace is heated to more than 900 DEG C, rotary feeding mechanism and retained mandrel are passed to by discharging and material stirring-up mechanism Hollow billet is through on retained mandrel by mechanism, sport car motion in advance, starts rotary feeding, and hollow billet is rotated into feeding roller trio skew rolling unit enters Row rolling, by the operation of hydraulic restraint plug mechanism in the operation of rolling, carry out undergauge, subtract wall, extension rolling, formed waste Pipe;Hollow forging after rolling is deviate from from retained mandrel, and last hollow forging carries out sizing truing by sizing unit, forms hot finished product Pipe;Hot production tube after sizing is cooled down by step cooling bed;Hot production tube after final cooling is straightened, crop, inspection Test, pack, marking storage, forming commercial pipes.Heating of pipe blank stove is supplied with Sloping Hearth Heating Furnace by gas furnace.

Claims (4)

1. steel pipe rolling technique, it is characterised in that comprise the following steps:
1), heating, pipe is heated to more than 1150 DEG C in heating furnace;
2), perforation, perforated machine enters eleven punch 11 to the pipe after heating, hollow billet is made;
3), secondary soaking, manufactured hollow billet will be sent into Sloping Hearth Heating Furnace after perforation and carry out Short Time Heating;
4), rolling, the hollow billet after secondary soaking is through on retained mandrel, then by three-roll cross rolling mill carry out undergauge, Subtract wall, extension rolling, form hollow forging;
5), de- pipe, the hollow forging after rolling deviates from from retained mandrel;
6), sizing truing, by hollow forging by sizing unit, carry out sizing, shaping, form hot production tube;
7), cooling, hot production tube cooled down by step cooling bed;
8), finished product collect, the hot production tube after cooling is straightened, crop, inspection, packing, mark storage, formed commercial pipes.
2. technique according to claim 1, it is characterised in that:Described step 2)In punch wear for two-roller skew-rolling formula Hole machine.
3. technique according to claim 1, it is characterised in that:Described step 3)In secondary soaking take the photograph to 850-1050 Family name's degree, soaking time are 3-5 minutes.
4. technique according to claim 1, it is characterised in that:Described step 6)In sizing unit be 5-15 frame sizings Machine continuously arranges composition.
CN201710994284.4A 2017-10-23 2017-10-23 Steel pipe rolling technique Pending CN107737810A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710994284.4A CN107737810A (en) 2017-10-23 2017-10-23 Steel pipe rolling technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710994284.4A CN107737810A (en) 2017-10-23 2017-10-23 Steel pipe rolling technique

Publications (1)

Publication Number Publication Date
CN107737810A true CN107737810A (en) 2018-02-27

Family

ID=61238119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710994284.4A Pending CN107737810A (en) 2017-10-23 2017-10-23 Steel pipe rolling technique

Country Status (1)

Country Link
CN (1) CN107737810A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111282997A (en) * 2020-02-17 2020-06-16 包头钢铁(集团)有限责任公司 Heat-resistant seamless steel tube 12Cr1MoVG hot continuous rolling production method
CN111633386A (en) * 2020-06-08 2020-09-08 安徽孺子牛轴承有限公司 Machining process for prolonging service life of bearing
CN113976629A (en) * 2021-11-09 2022-01-28 北京科技大学 Seamless pipe and preparation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111282997A (en) * 2020-02-17 2020-06-16 包头钢铁(集团)有限责任公司 Heat-resistant seamless steel tube 12Cr1MoVG hot continuous rolling production method
CN111633386A (en) * 2020-06-08 2020-09-08 安徽孺子牛轴承有限公司 Machining process for prolonging service life of bearing
CN113976629A (en) * 2021-11-09 2022-01-28 北京科技大学 Seamless pipe and preparation method thereof

Similar Documents

Publication Publication Date Title
JP3855300B2 (en) Manufacturing method and equipment for seamless steel pipe
CN101020190A (en) Hot rolling process of seamless steel pipe
CN102294379B (en) Method for manufacturing seamless steel pipe for high-pressure gas cylinder with large caliber
CN101327492A (en) Process and system for manufacturing hot-rolled seamless tube
CN107931331B (en) A kind of production method of two roller cold rolling seamless steel of high-precision
JP4894855B2 (en) Seamless pipe manufacturing method
CN103272845B (en) Hot rolling process of small-bore ultra-thin-wall seamless steel tube
CN103128102B (en) Production method of titanium alloy oil well pipe
JP2003311317A (en) Method for manufacturing seamless tube
CN107737810A (en) Steel pipe rolling technique
CN202438543U (en) Punching and rolling equipment of high-alloy difficultly deformable seamless steel pipe
CN102284486A (en) Process for manufacturing seamless steel tubes by hot rolling
CN103736734A (en) Process of preparing high-chromium alloy supper 13-Cr seamless steel tubes through CPE (cross-roll piercing and elongation) hot rolling mill
CN101337236A (en) Rolling mill technique of three-roller full-floating core rod tandem rolling tube
CN102581014A (en) Process for producing thin-wall seamless steel tubes
CN103316916A (en) Square tube former and production method of square tubes
CN101439365B (en) Method for rolling seamless steel pipe from die-casting hollow steel ingot
CN101020191A (en) Hot rolling process of seamless steel pipe
CN101020192A (en) Hot rolling process of seamless steel pipe
CN101972776A (en) Hot rolling production process of automatic tube rolling mill
CN201253641Y (en) Hot rolled seamless steel tube manufacturing system
CN106825106A (en) The technique of thin-walled hot rolled seamless steel tube in a kind of double-core axle two-roller skew-rolling production
CN101954377A (en) Full-floating mandrel tandem-rolling seamless steel pipe production process
CN102228905A (en) Production process of hot continuous rolling seamless steel tube with small caliber
CN105290281B (en) The production method of the nickeliferous ring forging of large thick-wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180227

WD01 Invention patent application deemed withdrawn after publication