CN107732947A - A kind of demand response system and method for energy internet - Google Patents
A kind of demand response system and method for energy internet Download PDFInfo
- Publication number
- CN107732947A CN107732947A CN201711163288.4A CN201711163288A CN107732947A CN 107732947 A CN107732947 A CN 107732947A CN 201711163288 A CN201711163288 A CN 201711163288A CN 107732947 A CN107732947 A CN 107732947A
- Authority
- CN
- China
- Prior art keywords
- demand response
- electrical equipment
- demand
- energy
- regulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000004044 response Effects 0.000 title claims abstract description 111
- 238000000034 method Methods 0.000 title claims abstract description 14
- 230000001105 regulatory effect Effects 0.000 claims abstract description 33
- 230000005611 electricity Effects 0.000 claims abstract description 28
- 238000004891 communication Methods 0.000 claims description 20
- 238000001514 detection method Methods 0.000 claims description 12
- 238000004146 energy storage Methods 0.000 claims description 11
- 239000000178 monomer Substances 0.000 claims description 10
- 238000006243 chemical reaction Methods 0.000 claims description 5
- 230000005540 biological transmission Effects 0.000 description 8
- 238000005265 energy consumption Methods 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 238000012986 modification Methods 0.000 description 4
- 230000009467 reduction Effects 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- WHXSMMKQMYFTQS-UHFFFAOYSA-N Lithium Chemical compound [Li] WHXSMMKQMYFTQS-UHFFFAOYSA-N 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011217 control strategy Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000007418 data mining Methods 0.000 description 1
- 238000003745 diagnosis Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 229910052744 lithium Inorganic materials 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000001172 regenerating effect Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
-
- H02J13/0062—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/40—Bus networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/40—Bus networks
- H04L2012/40208—Bus networks characterized by the use of a particular bus standard
- H04L2012/40221—Profibus
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/14—Energy storage units
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a kind of demand response system and method for energy internet, demand response compensation device is set in mechanical floor power demand side, and demand response regulates and controls terminal and sends regulating command to demand response electrical equipment and demand response compensation device according to regulation and control demand;Demand response compensation device is used to carry out charge or discharge according to regulating command, to adjust the energy difference between electrical equipment practical adjustments to power network compensation power network target during electrical equipment performs electricity consumption regulation.Using technical scheme, compensated by setting demand response compensation device in mechanical floor power demand side and participating in power grid regulation, so as to allow possess be unsatisfactory on regulating power but regulating time require electrical equipment can participate in the automatic demand response system of energy internet, the equipment range of choice for making it possible to participate in automatic demand response is greatly widened, and also makes the ability of regulation and control of energy internet be strengthened.
Description
Technical field
The present invention relates to energy Internet technical field, more particularly to a kind of demand response system for energy internet
And method.
Background technology
Energy internet is a kind of internet and production of energy, transmission, storage, consumption and energy market depth integration
Energy industry develops neomorph, has device intelligence, multipotency collaboration, information symmetrical, supply and demand is scattered, system is flat, transaction opening
Etc. principal character.Energy internet is the grand strategy support for promoting China's energy revolution, to improving regenerative resource proportion, is promoted
Enter fossil clean energy efficiently to utilize, lift Integrated Energy efficiency, promote energy market opening and industrial upgrading, form new warp
Ji growth point, lifting energy international cooperation level are significant.
The automatic demand response of user side is the important component of energy internet.It is mainly carried out to industry and commerce user
Flexible load regulates and controls, and it is actively engaged in power network peak load shifting, and balances and fluctuated caused by renewable energy power generation.To industry and commerce
User and resident carry out flexible load regulation and control, realize automatic demand response, can give full play to Demand-side interactive resources and exist
Peak load shifting, the balance intermittent renewable energy bring the effect in the fluctuation of power network.Using market mechanism, build with load
The automatic demand response system of integrator's pattern, by disposing automatic demand response main website and terminal, carry out power consumer industry
Non-core production auxiliary device, such as motor, blower fan, the modification of pump electrical equipment and communication system construction, gather user
With energy data, the service such as energy monitor, analysis and diagnosis for providing personalization for power consumer;Data mining, policy of regulation and control point
Analysis, realize that electric load participates in power network peak load shifting, realize that interconnecting for a variety of distributed energy resources is allocated with flexibility
Transaction.But many industrial equipments possess regulating power, but load reduction can not be quickly completed in a short time.In order to ensure
Production, the regulation processes of these energy consumption equipments may be from several minutes to dozens of minutes;And the signal of power network regulation needs
Feedback is made in several seconds to tens seconds.According to prior art, such equipment is not meet automatic demand response energy internet
The condition of transformation.The allowance that this kind equipment of industry and commerce user can not enjoy demand response is used, the operator of virtual plant
Ability of regulation and control is also greatly affected.
Therefore for drawbacks described above present in currently available technology, it is necessary to be studied in fact, to provide a kind of scheme,
Solves defect present in prior art.
The content of the invention
In view of this, it is necessory to provide a kind of demand response system and method for energy internet, by setting
Standby layer power demand side sets demand response compensation device and participates in power grid regulation compensation, possesses regulating power but regulation so as to allow
The electrical equipment for being unsatisfactory for requiring on time can be participated in the automatic demand response system of energy internet.
The defects of in order to overcome prior art, technical scheme are as follows:
A kind of demand response system for energy internet, using four-layer structure, including demand response electrical equipment, use
In the demand response regulation and control terminal that controls multiple demand response electrical equipment power demands and more by Internet remote control
The virtual plant operation platform of individual demand response regulation and control terminal, sets at least one demand response to mend in mechanical floor power demand side
Device is repaid, demand response regulates and controls terminal and sends tune to demand response electrical equipment and demand response compensation device according to regulation and control demand
Section instruction;Demand response electrical equipment performs electricity consumption regulation according to regulating command, and the demand response compensation device is used for basis
Regulating command carries out charge or discharge, to adjust and use to power network compensation power network target during electrical equipment performs electricity consumption regulation
Energy difference between electric equipment practical adjustments;
The demand response compensation device include two way convertor (PCS), battery management unit (BMS), energy-storage battery group,
Control unit, detection metering units and communication unit, wherein, the two way convertor is used for energy conversion;The battery management
Unit is used for the electric current, voltage, temperature information for detecting every group of monomer of battery pack, and sends the data to control unit, while
Ensure that every group of monomer flows, pressed during charge/discharge;The detection metering units are used for real-time voltage, the electricity for detecting electrical equipment
The parameters such as stream, power simultaneously measure electricity;The communication unit be used for receive demand response regulation and control terminal regulating command or to its
Send data;Described control unit collects various data messages, and the mode of operation of decision systems is operating power.
Preferably, cooperate with and enter to power network by communication unit cascade network between multiple demand response compensation devices
Row ability compensation.
The invention also discloses a kind of demand response method for energy internet, comprise the following steps:
Step S1:In mechanical floor power demand side, at least one demand response compensation device is set;
Step S2:Demand response regulates and controls terminal and filled according to regulation and control demand to demand response electrical equipment and demand response compensation
Put transmission regulating command;
Step S3:Demand response compensation device carries out charge or discharge according to regulating command, to perform use in electrical equipment
To the energy difference between the regulation of power network compensation power network target and electrical equipment practical adjustments during electricity regulation.
Preferably, the demand response compensation device includes two way convertor (PCS), battery management unit (BMS), energy storage
Battery pack, control unit, detection metering units and communication unit, wherein, the two way convertor is used for energy conversion;The electricity
Pond administrative unit is used for the electric current, voltage, temperature information for detecting every group of monomer of battery pack, and sends the data to control unit,
Ensure that every group of monomer flows, pressed in charge/discharge simultaneously;The detection metering units are used for the real-time electricity for detecting electrical equipment
The parameters such as pressure, electric current, power simultaneously measure electricity;The communication unit be used for receive demand response regulation and control terminal regulating command or
It is sent to data;Described control unit collects various data messages, and the mode of operation of decision systems is operating power.
The present invention is compensated by setting demand response compensation device to participate in power grid regulation in mechanical floor power demand side, so as to
Allow and possess the automatic demand that the electrical equipment for being unsatisfactory for requiring on regulating power but regulating time can participate in energy internet
In Response System.This equipment range of choice for making it possible to participate in automatic demand response is greatly widened, and also makes energy internet
Ability of regulation and control is strengthened.
Brief description of the drawings
Fig. 1 is the demand response system general frame schematic diagram that the present invention is used for energy internet.
Fig. 2 is the structural representation of demand response compensation device in the present invention.
Fig. 3 is the FB(flow block) for the demand response method for being used for energy internet in the present invention.
Specific examples below will combine above-mentioned accompanying drawing and further illustrate the present invention.
Embodiment
Technical scheme provided by the invention is described further below with reference to accompanying drawing.
In the prior art, the user of energy internet is participated in, if electrical equipment receives the demand that operating service business is assigned
Response signal is controlled, and realizes the demand of spatial load forecasting or peak clipping at the appointed time, then operating service business, which needs to pay, to be used
The corresponding expense in family.Meanwhile the energy expenditure of reduction is also a part for income.This is that automatic demand response can use contract
The premise of energy management.
But it is different from air-conditioning, heat pump, illumination or household electrical appliance, many industrial equipments can not quickly complete in a short time
Load reduction, unexpected regulation may be produced to production procedure and had a strong impact on.In order to ensure to produce, the regulation of these energy consumption equipments
Process may be from several minutes to dozens of minutes;And the signal of power network regulation needs to make feedback within the several seconds to tens seconds.
According to routine, such equipment is not meet the condition of automatic demand response transformation.This kind equipment of industry and commerce user can not be enjoyed
Used by the allowance of demand response, the ability of regulation and control of the operator of virtual plant is also greatly affected.
The present invention allows aiming at this kind of application scenario and possesses regulating power, but desired consumption is unsatisfactory on regulating time
Energy equipment is participated in the automatic demand response system of energy internet.Adjusted with compensation device to fill up power network regulation and equipment
Between time difference caused by energy difference.Before demand response electrical equipment completes regulation, provided and lacked by compensation device
Mouth energy.In the meantime, compensation device is in short time high power discharge state, and its power is equal to the regulated value of operator requirement
With the difference of equipment real time energy consumption value.When equipment completes regulation or receives the termination signal of operator transmission, compensation equipment stops
Discharged to power network, into reverse small-power charged state;High-power quick charge can also be carried out in the paddy electricity period, to reduce
Overall energy expense.
Referring to Fig. 1, the demand response system general frame schematic diagram that the present invention is used for energy internet is shown, demand is rung
Compensation device is answered to use four coating systems frameworks, respectively mechanical floor, measurement with the integrated of virtual plant comprehensive operation service platform
Layer, Internet and main website layer, major function are as follows:
(1) mechanical floor
It is made up of user side adjustable apparatus and demand response compensation device.The former include electric motor system, blower fan system,
Pumping system etc..
(2) layer is measured
It is made up of automatic demand response regulation and control terminal, non-intruding measuring equipment and various intelligent meters, is responsible for compensation device
The transmission of collection, remote control command with user side equipment information and the communication with main website.
(3) Internet
Internet is made up of equipment such as 4G communication equipments, data encryption equipment and interchangers, is mounted in user side oneself
The hinge that dynamic demand response terminal and non-intruding measuring equipment communicate with main station system.
(4) main website layer
Main website layer is made up of front-collection equipment, database server and application server, is responsible for compensation device and use
Family equipment carries out Data Collection, processing, analysis and storage, while issues control command to demand response regulation and control terminal.
As shown in Figure 1, the present invention sets at least one demand response compensation device in mechanical floor power demand side, and demand is rung
Terminal should be regulated and controled regulating command is sent to demand response electrical equipment and demand response compensation device according to regulation and control demand;Demand is rung
Electricity consumption regulation is performed according to regulating command using electric equipment, the demand response compensation device is used to be filled according to regulating command
Electricity or electric discharge, to be performed in electrical equipment during electricity consumption is adjusted to the regulation of power network compensation power network target and electrical equipment practical adjustments
Between energy difference.
Compensation device of the present invention can several parallel connections, the ac bus of access demand response energy consumption equipment side;
To meet the requirement of different capacity.Automatic network-building between each compensation device, receive the instruction of demand response regulation and control terminal, according to every
The surplus of energy-storage units in platform compensation device, determine respective discharge capacity or charge volume.In Regional Energy overall well-to-do period,
As wind energy or luminous energy are more abundant, the not high spring and autumn of total load, compensation device can also be by the pattern of peak-trough electricity energy-accumulating power station
Work, to make full use of equipment, allow maximum revenue.
Referring to Fig. 2, the structural representation of demand response compensation device in the present invention, demand response compensation device bag are shown
Include two way convertor (PCS), battery management unit (BMS), energy-storage battery group, control unit, detection metering units and communication unit
Member, wherein, PCS is responsible for energy conversion, both can with battery to grid transmission, can also power network charged to battery.BMS is responsible for detection
The key messages such as the electric current of every group of monomer of battery pack, voltage, temperature, and control unit is sent the data to, while in charge/discharge
When ensure that every group of monomer flows, pressed.Energy-storage battery group must be low capacity, the motive-power battery of high-discharge-rate, with lithium from
Based on sub- battery.General stored energy capacitance selection is discharged 20~30 minutes in full power.Detection metering units effect is detection power consumption
The parameters such as the real-time voltage of equipment, electric current, power, while measure electricity.Communication unit is responsible for receiving, sends data to demand sound
Should regulate and control terminal, and with other compensation device group-net communications.Control unit collects various data messages, the Working mould of decision systems
The parameters such as formula, watt level.
The demand response compensation device designed using the present invention, can be operated in different mode of operations, various to be applicable
Different application scenarios.
1st, compensation model
When demand response regulation and control terminal receives the startup order that main station system is sent, energy consumption equipment and compensation device are same
Shi Qidong.The energy consumption equipment power at metering units record current time, the reduction that control unit instructs according to main website are detected first
Value and the time for completing response, current time PCS compensation power is calculated, and start to discharge to ac bus.Set in power consumption
During standby progressively regulation, PCS compensation power is also accordingly made adjustment.When equipment completion regulation, or the deadline is reached,
Or when receiving the termination signal of main website transmission, compensation equipment stops electric discharge.
2nd, rectification mode
After compensation model terminates, just into rectification mode.Now PCS charges from ac bus power taking to energy-storage battery.Root
According to the plan of main website, there can be two kinds of rectification modes.As main website determines capacity may be arranged to regulate and control in following 8 hours, then mend
System is repaid to charge using 1/4C~1/6C;As main website did not arranged capacity to regulate and control in following 8 hours, then compensation system according to when
Between, at peak, electricity choosing period of time is charged using 1/15~1/20C, is charged in the paddy electricity period using 1C~1/4C.
3rd, backup mode
If power distribution network catastrophic failure, compensation device can quickly identify and be switched to backup mode.Now first confirm that automatic
Shearing device has disconnected ac bus, and PCS carries out DC/AC inversions afterwards, is discharged to the demand response electrical equipment of the access point,
Drop power regulating signals are sent to it simultaneously.After power system restoration is normal, backup mode, and incoming transport bus again are exited.
As energy-storage battery group has consumed more than 90%, when power network does not recover yet, then sent to the demand response electrical equipment of the access point
Soft-off signal, power-off suddenly is avoided to cause bigger loss.
4th, energy storage pattern
In Regional Energy overall well-to-do period, main station system, which sends instruction, can make compensation device be operated in energy-accumulating power station mould
Formula.Now, compensation device can use as a small-sized energy-accumulating power station., can according to the short-term scene of main website and load prediction
The generation schedule of whole plant area's whole day each micro battery of 24 hours, load electricity consumption plan are arranged with reasonable plan ahead, energy storage is filled
Electric discharge plan, generation schedule and power demand is set to reach balance generally.It is small that compensation device can be arranged in load power consumption,
Charged when electricity price is low;It is big in load power consumption, discharged when electricity price is high.Realize that paddy electricity peak is used, reduce electric cost.Compensation system has
The charging interval of body, charge power, discharge time, discharge power are planned as a whole to determine by main website.
5th, communication modes
To realize the purpose of main website carries out automatic demand response control, operational monitoring to user power utilization equipment, main website needs
By automatic demand response terminal, real-time information communication, transmission regulation are carried out with compensation device and the main electrical equipment of user
Instruction, real-time collecting device running status, environment parameter and with can situation.Communication modes mainly include following several classes:
Sent in live real time data:Support by DLT645, MODBUS, OPC and BACnet agreement collecting device energy and
Running status, and uniformly switch to IEC60870-5-104 teletransmission stipulations, sent in remote signalling amount displacement in real time, on remote measurement quantitative change bit timing
Send, meet to monitor and call together in real time to survey adjustable requirement.
Demand response instruction issuing:Demand response control instruction, using compatible GDW376.1 communications protocol, can and electricity consumption
Information acquisition system slitless connection.
Control instruction forwards:Demand response instruction translation is the control to equipment according to preset control strategy by terminal
Instruction, and can be communicated by MODBUS agreements with device controller.It can also be led to by OPC or BACnet with BAS system
News, then pass through BAS system control device state.
Referring to Fig. 3, a kind of FB(flow block) of demand response method for energy internet in the present invention is shown, including
Following steps:
Step S1:In mechanical floor power demand side, at least one demand response compensation device is set;
Step S2:Demand response regulates and controls terminal and filled according to regulation and control demand to demand response electrical equipment and demand response compensation
Put transmission regulating command;
Step S3:Demand response compensation device carries out charge or discharge according to regulating command, to perform use in electrical equipment
To the energy difference between the regulation of power network compensation power network target and electrical equipment practical adjustments during electricity regulation.
Using above-mentioned technical proposal, the present invention in mechanical floor power demand side by setting demand response compensation device to participate in
Power grid regulation compensate, so as to allow possess be unsatisfactory on regulating power but regulating time require electrical equipment can participate in the energy
In the automatic demand response system of internet.This equipment range of choice for making it possible to participate in automatic demand response is greatly widened,
Also the ability of regulation and control of energy internet is made be strengthened.
The explanation of above example is only intended to help the method and its core concept for understanding the present invention.It should be pointed out that pair
For those skilled in the art, under the premise without departing from the principles of the invention, the present invention can also be carried out
Some improvement and modification, these are improved and modification is also fallen into the protection domain of the claims in the present invention.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention.
A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention
The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one
The most wide scope caused.
Claims (4)
1. a kind of demand response system for energy internet, using four-layer structure, including demand response electrical equipment, it is used for
The demand response of multiple demand response electrical equipment power demands is controlled to regulate and control terminal and multiple by Internet remote control
Demand response regulates and controls the virtual plant operation platform of terminal, it is characterised in that is set in mechanical floor power demand side at least one
Demand response compensation device, demand response regulate and control terminal and compensated according to regulation and control demand to demand response electrical equipment and demand response
Device sends regulating command;Demand response electrical equipment performs electricity consumption regulation, the demand response compensation dress according to regulating command
Put for carrying out charge or discharge according to regulating command, to be performed in electrical equipment during electricity consumption is adjusted to power network compensation power network mesh
Energy difference between mark regulation and electrical equipment practical adjustments;
The demand response compensation device includes two way convertor (PCS), battery management unit (BMS), energy-storage battery group, control
Unit, detection metering units and communication unit, wherein, the two way convertor is used for energy conversion;The battery management unit
For detecting the electric current, voltage, temperature information of every group of monomer of battery pack, and control unit is sent the data to, while in discharge charge
Ensure that every group of monomer flows, pressed when electric;The detection metering units are used for the real-time voltage, electric current, work(for detecting electrical equipment
The parameters such as rate simultaneously measure electricity;The communication unit is used to receive the regulating command of demand response regulation and control terminal or is sent to count
According to;Described control unit collects various data messages, and the mode of operation of decision systems is operating power.
2. the demand response system according to claim 1 for energy internet, it is characterised in that multiple demands
By communication unit cascade network between response compensation device, cooperate with to power network and carry out ability compensation.
A kind of 3. demand response method for energy internet, it is characterised in that comprise the following steps:
Step S1:In mechanical floor power demand side, at least one demand response compensation device is set;
Step S2:Demand response regulates and controls terminal and sent out according to regulation and control demand to demand response electrical equipment and demand response compensation device
Send regulating command;
Step S3:Demand response compensation device carries out charge or discharge according to regulating command, is adjusted with performing electricity consumption in electrical equipment
To the energy difference between the regulation of power network compensation power network target and electrical equipment practical adjustments during section.
4. the demand response method according to claim 4 for energy internet, it is characterised in that the demand response
Compensation device includes two way convertor (PCS), battery management unit (BMS), energy-storage battery group, control unit, detection metering list
Member and communication unit, wherein, the two way convertor is used for energy conversion;The battery management unit is every for detecting battery pack
Electric current, voltage, the temperature information of group monomer, and control unit is sent the data to, while ensure every group of monomer in charge/discharge
Flow, press;The detection metering units are used to detect the parameters such as the real-time voltage, electric current, power of electrical equipment and measure electricity
Amount;The communication unit is used to receive the regulating command of demand response regulation and control terminal or is sent to data;Described control unit
Collect various data messages, the mode of operation of decision systems is operating power.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711163288.4A CN107732947A (en) | 2017-11-21 | 2017-11-21 | A kind of demand response system and method for energy internet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711163288.4A CN107732947A (en) | 2017-11-21 | 2017-11-21 | A kind of demand response system and method for energy internet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107732947A true CN107732947A (en) | 2018-02-23 |
Family
ID=61216485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711163288.4A Pending CN107732947A (en) | 2017-11-21 | 2017-11-21 | A kind of demand response system and method for energy internet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107732947A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110048513A (en) * | 2019-02-28 | 2019-07-23 | 深圳市科陆电子科技股份有限公司 | Echelon utilizes Vehicular dynamic battery energy-storage system |
CN110298594A (en) * | 2019-07-04 | 2019-10-01 | 北京华建网源电力设计研究院有限公司 | A kind of the load automatic regulating system and method for virtual plant |
EP4089871A1 (en) * | 2021-05-14 | 2022-11-16 | Huawei Digital Power Technologies Co., Ltd. | Energy storage system and related method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120123604A1 (en) * | 2010-11-12 | 2012-05-17 | Nathan Bowman Littrell | Systems, methods, and apparatus for demand response of battery-powered devices |
CN106099962A (en) * | 2016-08-22 | 2016-11-09 | 国网江苏省电力公司盐城供电公司 | A kind of electric automobile charging station is actively engaged in the system and method for electrical network regulation |
CN106655243A (en) * | 2016-08-12 | 2017-05-10 | 浙江工业大学 | Electric vehicle's automatic demand responding method aiming to maintain the supply-and-demand balance of a micro power grid |
CN106786542A (en) * | 2017-01-04 | 2017-05-31 | 国家电网公司 | A kind of demand response system |
CN106950840A (en) * | 2017-05-11 | 2017-07-14 | 山东理工大学 | Towards the integrated energy system layered distribution type control method for coordinating of power network peak clipping |
CN107230984A (en) * | 2017-07-26 | 2017-10-03 | 杭州电子科技大学 | A kind of electricity needs response participates in the method and control system of distribution network voltage regulation |
CN107332266A (en) * | 2017-08-25 | 2017-11-07 | 浙江南都电源动力股份有限公司 | User side energy-accumulating power station and its application model |
CN207459740U (en) * | 2017-11-21 | 2018-06-05 | 浙江省能源与核技术应用研究院 | A kind of demand response system for energy internet |
-
2017
- 2017-11-21 CN CN201711163288.4A patent/CN107732947A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120123604A1 (en) * | 2010-11-12 | 2012-05-17 | Nathan Bowman Littrell | Systems, methods, and apparatus for demand response of battery-powered devices |
CN106655243A (en) * | 2016-08-12 | 2017-05-10 | 浙江工业大学 | Electric vehicle's automatic demand responding method aiming to maintain the supply-and-demand balance of a micro power grid |
CN106099962A (en) * | 2016-08-22 | 2016-11-09 | 国网江苏省电力公司盐城供电公司 | A kind of electric automobile charging station is actively engaged in the system and method for electrical network regulation |
CN106786542A (en) * | 2017-01-04 | 2017-05-31 | 国家电网公司 | A kind of demand response system |
CN106950840A (en) * | 2017-05-11 | 2017-07-14 | 山东理工大学 | Towards the integrated energy system layered distribution type control method for coordinating of power network peak clipping |
CN107230984A (en) * | 2017-07-26 | 2017-10-03 | 杭州电子科技大学 | A kind of electricity needs response participates in the method and control system of distribution network voltage regulation |
CN107332266A (en) * | 2017-08-25 | 2017-11-07 | 浙江南都电源动力股份有限公司 | User side energy-accumulating power station and its application model |
CN207459740U (en) * | 2017-11-21 | 2018-06-05 | 浙江省能源与核技术应用研究院 | A kind of demand response system for energy internet |
Non-Patent Citations (2)
Title |
---|
刘东旗;王连成;庞金海;吴玉光;: "智能电网自动需求响应技术系统的研究", 自动化仪表, vol. 34, no. 11, pages 76 - 79 * |
石怀德;李德智;高峰;袁静伟;郭炳庆;王永雷;: "能源互联网中用电与需求侧管理商业模式研究", 电源技术, vol. 40, no. 11, pages 2288 - 2291 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110048513A (en) * | 2019-02-28 | 2019-07-23 | 深圳市科陆电子科技股份有限公司 | Echelon utilizes Vehicular dynamic battery energy-storage system |
CN110048513B (en) * | 2019-02-28 | 2023-08-18 | 深圳市科陆电子科技股份有限公司 | Power battery energy storage system for gradient utilization vehicle |
CN110298594A (en) * | 2019-07-04 | 2019-10-01 | 北京华建网源电力设计研究院有限公司 | A kind of the load automatic regulating system and method for virtual plant |
EP4089871A1 (en) * | 2021-05-14 | 2022-11-16 | Huawei Digital Power Technologies Co., Ltd. | Energy storage system and related method |
US11757285B2 (en) | 2021-05-14 | 2023-09-12 | Huawei Digital Power Technologies Co., Ltd. | Energy storage system and related method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109713712B (en) | Optical storage intelligent management integrated machine and optical storage intelligent management method | |
CN103001225B (en) | MAS-based (multi-agent system) multi-microgrid energy management system simulation method | |
CN110190597B (en) | Distributed power management system | |
CN103400205B (en) | A kind of power distribution network energy efficiency management system and method for coordinating control based on idle work optimization | |
CN104716693B (en) | The energy management method and controller, system of a kind of distributed energy storage battery | |
CN109409702A (en) | A kind of operation of power networks index analysing system | |
CN103208809A (en) | Regulating device and control method for balance of demand side battery pack | |
CN105743111A (en) | Energy storage system of power battery for echelon utilization vehicle | |
CN107732947A (en) | A kind of demand response system and method for energy internet | |
CN114285159B (en) | Energy control system for transformer area | |
CN105515110A (en) | Electric automobile ordered charging real-time control system | |
CN109193723B (en) | Combined base station backup energy storage power supply and control method | |
CN113263938A (en) | Intelligent ordered charging system and method based on edge calculation | |
CN104158187A (en) | Control method and system for secondary allocation of local power grid energy and power | |
CN110061565A (en) | A kind of energy storage charge/discharge capacity control system and method based on wind-driven generator | |
CN103580052B (en) | A kind of composite energy storage power station for active distribution network and distribution method thereof | |
CN111610361A (en) | Electric power Internet of things random measurement system and method | |
CN207249427U (en) | A kind of electric meter system applied to family's photovoltaic generation | |
CN113098042A (en) | Base station distributed energy storage power-saving control method based on user power utilization prediction | |
CN110867934A (en) | Commercial power solar charging module sharing system | |
CN204190487U (en) | For the load data collect and transmit analytical equipment in rural power dispensing table district | |
CN207459740U (en) | A kind of demand response system for energy internet | |
CN109004641A (en) | A kind of microgrid source net lotus control method for coordinating based on energy source optimization scheduling | |
CN117057547A (en) | Method, device and storage medium for constructing multi-form load resource scheduling model of intelligent energy service platform | |
CN216530731U (en) | Synthesize green energy efficiency intelligence management and control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |