CN107732910A - A kind of method of fast recovery of power supply - Google Patents

A kind of method of fast recovery of power supply Download PDF

Info

Publication number
CN107732910A
CN107732910A CN201711173016.2A CN201711173016A CN107732910A CN 107732910 A CN107732910 A CN 107732910A CN 201711173016 A CN201711173016 A CN 201711173016A CN 107732910 A CN107732910 A CN 107732910A
Authority
CN
China
Prior art keywords
turn
power
supply
path
electric grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711173016.2A
Other languages
Chinese (zh)
Other versions
CN107732910B (en
Inventor
延海平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Greater Electric Automation Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711173016.2A priority Critical patent/CN107732910B/en
Publication of CN107732910A publication Critical patent/CN107732910A/en
Application granted granted Critical
Publication of CN107732910B publication Critical patent/CN107732910B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/005
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of method of fast recovery of power supply, by the power recovery method for setting consideration condition, using simple and reliable simplification tide model, so that partial electric grid on structure is met, it is relatively easy in operation in the case of, the screening of restoration path is realized using less data and the equation simplified, improves and turns for the swiftness of process.Method includes:Judge power-off before partial electric grid running status whether simultaneously satisfaction two conditions;Establish and turn to simplify tide model for Path selection set and power system;Obtain turning in real time for Path selection set and corresponding simplified trend and export turning of meeting to require and supply path;When have turn supply and demand and ask when, turn to carry out electric power for path and turn to supply according to output.

Description

A kind of method of fast recovery of power supply
Technical field
It is especially a kind of when faulty component operation of power networks structure is relatively simple the present invention relates to intelligent power grid technology field In the case of the obvious method for shortening the time that restores electricity.
Background technology
Electric power system fault is due to the rugged environment factor such as heavy rain, heavy snow, strong wind and increasingly old electric power The congestion etc. of equipment, communication port is inevitable.For uncontrollable electric power system fault, best counter-measure is exactly Faulty component and bulk power grid can be departed from rapidly when a failure occurs it and use other parts to be powered for the load of faulty component, Restored electricity by the way of excision-transfer.
The existing method to restore electricity needs the carry out such as the real-time topology result according to power system, loading condition real-time Stability analysis, such as implement the Load flow calculation of complexity, fractograph analysis etc..Although these calculating accuracys rate are higher, mistake Make it that real-time performance is weaker in cumbersome calculation and data extraction procedure.And weaker real-time reduces power supply reliably Property simultaneously improves the possibility of the further failure of system.
The content of the invention
Therefore, in view of the above-mentioned problems, the invention provides a kind of method of fast recovery of power supply, the feelings of condition are being met Under condition, the judgment mode that will not also reduce of relatively simple and accuracy rate is set so that can rapidly judge when breaking down Go out to need the restoration approach taken, and then improve promptness and reliability that electric power turns to supply.
In order to achieve the above object, the present invention proposes a kind of method of fast recovery of power supply, comprises the following steps:
A. whether partial electric grid running status meets condition before judging power-off;
B. founding mathematical models;
C. mathematical modeling is solved;
D. when have turn supply and demand and ask when, turn to carry out electric power for path and turn to supply according to output.
The method of above-mentioned fast recovery of power supply, also meets condition:Step a includes:
Condition includes:
1. meet for all nodes in partial electric grid:
;N is partial electric grid interior joint sum,For part Power network interior joint i voltage phase angle,For partial electric grid interior joint j voltage phase angle, j is the node adjacent with i;
2. voltage compensating device is provided with partial electric grid to cause the voltage magnitude of each node to fluctuate very little, so that can The voltage magnitude perunit value for thinking each node is 1;
When the partial electric grid meets above-mentioned 2 conditions simultaneously, step b is performed;When the partial electric grid can not meet above-mentioned 2 bars During part, terminate this method.
The method of above-mentioned fast recovery of power supply, also meets condition:Step b includes:
Set and turn to supply Path selection set S:
S={s1,s2... ..., sp, p is selective to turn to supply total number of paths, siRepresent and a kind of selective turn to supply path;
Establish power system and simplify tide model:
Wherein, PiFor the active power of node i,For the partial electric grid interior joint i of estimation voltage phase angle,For estimation Partial electric grid interior joint j voltage phase angle, BijThe imaginary part of admittance between node i, j.
The method of above-mentioned fast recovery of power supply, also meets condition:Step c includes:
Obtain turning to supply Path selection set S in real time0, turn contributed for Path selection set by electric power monitoring system according to power supply, Bearing power, circuit contact situation, capacity of trunk parameter, on off state determine, when power supply output, bearing power, circuit contact One of situation, capacity of trunk parameter, on off state, which exist to recalculate when changing, turns original to replace for Path selection set Turn for Path selection set so that turn being capable of real-time tracking power system concrete condition for Path selection set;
For turning to supply Path selection set S in real time0In it is each it is selective turn to supply path, using electric system simulation program Solve and turn the simplification trend after supplying for path implementation according to this turn, i.e., turn the local electricity after supplying for path implementation according to according to this turn The active power of all nodes in net, the voltage phase angle for setting voltage phase angle datum node are 0, are solved by simplifying tide model The estimated voltage phase angle of other n-1 node in partial electric grid, judge the estimated voltage phase angle of this n-1 node whether pre- If safe range in, if it is, exporting this turn supplies path.
The method of above-mentioned fast recovery of power supply, also meets condition:Step d includes:
When have turn supply and demand and ask when, turn to carry out electric power for path and turn to supply according to output;Turn supply and demand to ask including a certain bar of power system There is permanent fault, a certain generator dead electricity in circuit;Permanent fault refers to still can not self-healing after reclosing twice Failure.
The method of above-mentioned fast recovery of power supply, also meet that condition permanent fault includes wired foil ground short circuit;Weight Combined floodgate includes single-pole reclosing and three_phase reclosing.
Power recovery method of the invention by setting consideration condition, using simple and reliable simplification tide model so that Partial electric grid on structure is met, it is relatively easy in operation in the case of, using less data and the equation simplified come real The screening of existing restoration path, improves and turns for the swiftness of process.
Brief description of the drawings
Fig. 1 is fast recovery of power supply method flow diagram.
Embodiment
Fig. 1 is referred to, a kind of method of fast recovery of power supply, is comprised the following steps:
A. whether partial electric grid running status meets condition before judging power-off;
Condition includes:
1. meet for all nodes in partial electric grid:
;N is partial electric grid interior joint sum, For partial electric grid interior joint i voltage phase angle,For partial electric grid interior joint j voltage phase angle, j is the node adjacent with i;
2. voltage compensating device is provided with partial electric grid to cause the voltage magnitude of each node to fluctuate very little, so that can The voltage magnitude perunit value for thinking each node is 1;
When the partial electric grid meets above-mentioned 2 conditions simultaneously, step b is performed;When the partial electric grid can not meet above-mentioned 2 bars During part, terminate this method;
B. founding mathematical models:
Set and turn to supply Path selection set S:
S={s1,s2... ..., sp, p is selective to turn to supply total number of paths, siRepresent and a kind of selective turn to supply path;
Establish power system and simplify tide model:
Wherein, PiFor the active power of node i,For the partial electric grid interior joint i of estimation voltage phase angle,For estimation Partial electric grid interior joint j voltage phase angle, BijThe imaginary part of admittance between node i, j;
C. mathematical modeling is solved:
Obtain turning to supply Path selection set S in real time0, turn contributed for Path selection set by electric power monitoring system according to power supply, Bearing power, circuit contact situation, capacity of trunk parameter, on off state determine, when power supply output, bearing power, circuit contact One of situation, capacity of trunk parameter, on off state, which exist to recalculate when changing, turns original to replace for Path selection set Turn for Path selection set so that turn being capable of real-time tracking power system concrete condition for Path selection set;
For turning to supply Path selection set S in real time0In it is each it is selective turn to supply path, using electric system simulation program Solve and turn the simplification trend after supplying for path implementation according to this turn, i.e., turn the local electricity after supplying for path implementation according to according to this turn The active power of all nodes in net, the voltage phase angle for setting voltage phase angle datum node are 0, are solved by simplifying tide model The estimated voltage phase angle of other n-1 node in partial electric grid, judge the estimated voltage phase angle of this n-1 node whether pre- If safe range in, if it is, exporting this turn supplies path;
D. when have turn supply and demand and ask when, turn to carry out electric power for path and turn to supply according to output;Turn supply and demand and ask a certain including power system There is permanent fault, a certain generator dead electricity in bar circuit;Permanent fault refers to still can not be certainly after reclosing twice More failure.
Permanent fault includes wired foil ground short circuit;Reclosing includes single-pole reclosing and three_phase reclosing.
It should be noted that above content is that to combine specific embodiment made for the present invention further specifically It is bright, it is impossible to assert that the embodiment of the present invention is only limitted to this, under the above-mentioned guidance of the present invention, those skilled in the art can To carry out various improvement and deformation on the basis of above-described embodiment, and these are improved or deformation falls in protection model of the invention In enclosing.

Claims (7)

1. a kind of method of fast recovery of power supply, comprises the following steps:
A. whether partial electric grid running status meets condition before judging power-off;
B. founding mathematical models;
C. mathematical modeling is solved;
D. when have turn supply and demand and ask when, turn to carry out electric power for path and turn to supply according to output.
2. the device of a kind of fast recovery of power supply according to claim 1, it is characterised in that step a includes:
Condition includes:
Meet for all nodes in partial electric grid:
;N is partial electric grid interior joint sum,For office Portion power network interior joint i voltage phase angle,For partial electric grid interior joint j voltage phase angle, j is the node adjacent with i;
Voltage compensating device is provided with partial electric grid to cause the voltage magnitude of each node to fluctuate very little, so that can recognize It is 1 for the voltage magnitude perunit value of each node;
When the partial electric grid meets above-mentioned 2 conditions simultaneously, step b is performed;When the partial electric grid can not meet above-mentioned 2 bars During part, terminate this method.
3. the method for a kind of fast recovery of power supply according to claim 2, it is characterised in that step b includes:
Set and turn to supply Path selection set S:
S={s1,s2... ..., sp, p is selective to turn to supply total number of paths, siRepresent and a kind of selective turn to supply path;
Establish power system and simplify tide model:
Wherein, PiFor the active power of node i,For the partial electric grid interior joint i of estimation voltage phase angle,For estimation Partial electric grid interior joint j voltage phase angle, BijThe imaginary part of admittance between node i, j.
4. the method for a kind of fast recovery of power supply according to claim 3, it is characterised in that step c includes:
Obtain turning to supply Path selection set S in real time0, turn to be contributed, born according to power supply by electric power monitoring system for Path selection set Carry power, circuit contact situation, capacity of trunk parameter, on off state to determine, when power supply output, bearing power, circuit contact feelings One of condition, capacity of trunk parameter, on off state, which exist to recalculate when changing, turns original to replace for Path selection set Turn for Path selection set so that turn being capable of real-time tracking power system concrete condition for Path selection set;
For turning to supply Path selection set S in real time0In it is each it is selective turn to supply path, using electric system simulation program Solve and turn the simplification trend after supplying for path implementation according to this turn, i.e., turn the local electricity after supplying for path implementation according to according to this turn The active power of all nodes in net, the voltage phase angle for setting voltage phase angle datum node are 0, are solved by simplifying tide model The estimated voltage phase angle of other n-1 node in partial electric grid, judge the estimated voltage phase angle of this n-1 node whether pre- If safe range in, if it is, exporting this turn supplies path.
5. the method for a kind of fast recovery of power supply according to claim 4, it is characterised in that step d includes:
When have turn supply and demand and ask when, turn to carry out electric power for path and turn to supply according to output;Turn supply and demand to ask including a certain bar of power system There is permanent fault, a certain generator dead electricity in circuit;Permanent fault refers to still can not self-healing after reclosing twice Failure.
6. the method for a kind of fast recovery of power supply according to claim 5, it is characterised in that permanent fault includes circuit Metallic earthing short circuit.
7. the method for a kind of fast recovery of power supply according to claim 6, it is characterised in that reclosing includes single-phase coincidence Lock and three_phase reclosing.
CN201711173016.2A 2017-11-22 2017-11-22 Method for rapidly recovering power supply Active CN107732910B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711173016.2A CN107732910B (en) 2017-11-22 2017-11-22 Method for rapidly recovering power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711173016.2A CN107732910B (en) 2017-11-22 2017-11-22 Method for rapidly recovering power supply

Publications (2)

Publication Number Publication Date
CN107732910A true CN107732910A (en) 2018-02-23
CN107732910B CN107732910B (en) 2020-12-04

Family

ID=61217990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711173016.2A Active CN107732910B (en) 2017-11-22 2017-11-22 Method for rapidly recovering power supply

Country Status (1)

Country Link
CN (1) CN107732910B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111934316A (en) * 2020-08-10 2020-11-13 国网安徽省电力有限公司黄山供电公司 Method for selecting substation recovery path after power grid tripping

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103426033A (en) * 2013-07-31 2013-12-04 国电南瑞科技股份有限公司 Power distribution network fault recovery optimization rebuilding algorithm based on critical path method
US20150212534A1 (en) * 2014-01-24 2015-07-30 International Business Machines Corporation Generating electric substation load transfer control parameters
CN106026085A (en) * 2016-06-27 2016-10-12 中国南方电网有限责任公司 Power distribution network closed-loop power supply transferring path optimum decision method
CN106374453A (en) * 2016-09-05 2017-02-01 中国电力科学研究院 Electric power system reconstruction method
CN107196307A (en) * 2017-07-18 2017-09-22 西安交通大学 A kind of method that electric network active trend is quickly estimated after transformer fault

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103426033A (en) * 2013-07-31 2013-12-04 国电南瑞科技股份有限公司 Power distribution network fault recovery optimization rebuilding algorithm based on critical path method
US20150212534A1 (en) * 2014-01-24 2015-07-30 International Business Machines Corporation Generating electric substation load transfer control parameters
CN106026085A (en) * 2016-06-27 2016-10-12 中国南方电网有限责任公司 Power distribution network closed-loop power supply transferring path optimum decision method
CN106374453A (en) * 2016-09-05 2017-02-01 中国电力科学研究院 Electric power system reconstruction method
CN107196307A (en) * 2017-07-18 2017-09-22 西安交通大学 A kind of method that electric network active trend is quickly estimated after transformer fault

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111934316A (en) * 2020-08-10 2020-11-13 国网安徽省电力有限公司黄山供电公司 Method for selecting substation recovery path after power grid tripping
CN111934316B (en) * 2020-08-10 2024-03-12 国网安徽省电力有限公司黄山供电公司 Method for selecting recovery path of transformer substation after tripping of power grid

Also Published As

Publication number Publication date
CN107732910B (en) 2020-12-04

Similar Documents

Publication Publication Date Title
CN107872058B (en) Distribution network integrated protection method fusing self-healing of line
CN103825267B (en) A kind of computational methods of MMC-MTDC dc-side short-circuit electric current
CN104377696B (en) Mine high voltage power network quick-break setting simulation inspection method based on incidence matrixes
CN109378815B (en) Power distribution network closed loop switching power supply control method, device and equipment
CN105576622A (en) Self-adaptive setting calculation method for single-bus mine high-voltage power grid running in multi-segment way
CN111898877A (en) Pre-disaster rush repair personnel pre-deployment method for improving power grid recovery speed
CN106527394A (en) ECPS (Electric Cyber-Physical System) cascading fault risk assessment method of considering multiple information factors
CN103366315A (en) Distribution network operating safety assessment method based on distribution network fault lost load recovery values
Zhai et al. Modeling and identification of worst-case cascading failures in power systems
CN105140973A (en) High-voltage direct-current power transmission system reliability assessment method considering alternating-current side fault
CN109698500A (en) A kind of distribution network reliability method for improving based on intelligent Sofe Switch
CN105160148B (en) A kind of alternating current-direct current power network cascading failure critical circuits discrimination method
CN107732910A (en) A kind of method of fast recovery of power supply
CN105391030A (en) Planned island division method through load gradual loading and aggregation based on network topology structure
CN102611085B (en) Intertripping simulation analysis method
Duong et al. A method for real time voltage stability monitoring in sub-transmission networks
Sheng et al. Collaborative fault recovery and network reconstruction method for cyber-physical-systems based on double layer optimization
CN110021933A (en) Consider the power information system control function reliability estimation method of component faults
CN110112745A (en) Electric network information physical system means of defence, device, equipment and storage medium
CN114386222A (en) Power distribution network cooperative fault recovery method and system based on information physical system
CN108146261A (en) The fault protecting method and device of electric vehicle rapid charging station
CN104865843B (en) A kind of method that electric system hybrid simulation failure is uniformly processed
CN107134764A (en) A kind of T-type structure mining high-voltage electric-network automatic short-circuit computational methods
CN113809738A (en) Distribution network fault self-healing method and device based on main station and terminal protection cooperation
CN108390374B (en) Big data analysis-based transfer path selection method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201112

Address after: Room w901a, Taiwan Science and technology enterprise development center, Xiamen Torch High tech Zone (Xiang'an) Industrial Zone, Xiamen, Fujian Province

Applicant after: XIAMEN GREATER ELECTRIC AUTOMATION Co.,Ltd.

Address before: 251800 Yangxin County, Binzhou, Shandong Province, a happy road

Applicant before: Yanhaiping

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A method of quickly restoring power supply

Effective date of registration: 20220713

Granted publication date: 20201204

Pledgee: Bank of China Limited by Share Ltd. Xiamen branch

Pledgor: XIAMEN GREATER ELECTRIC AUTOMATION Co.,Ltd.

Registration number: Y2022110000155